The invention relates to a weak-base three-component combination flooding comprehensive adjustment method after
polymer flooding of a first-class oil layer. The problem that a proper comprehensive adjustment method is seriously lacked due to low-efficiency and ineffective circulation of dominant seepage channel development after
polymer flooding of a first-class oil layer is solved. The method comprises the steps that S1, in the non-effective period of a producing well, an
injection well adopts a double-height injection
system, and a dominant seepage channel, injection-production balance and
pressure balance are regulated and controlled; s2, in the
water content decline period, large-scale separate injection is carried out,
injection well measure adjustment is optimized, profile production is improved, and
oil production well effectiveness is promoted; s3, in the
water content low value period, the injection and production well fracturing mode is optimized; the injection-production capacity is kept; large-scale separate injection is increased, and the interval strength is optimized; and S4, in the
water content rising period, high-concentration low-speed injection of the
injection well is kept, and water content rising is controlled. According to the method, optimization measures of different injection stages of weak-base three-component combination flooding after
polymer flooding of the first-class oil layer are adjusted, dominant seepage channels are blocked, remaining oil of medium and low permeable
layers is excavated, and the block development effect is improved.