Intercepting device for water conservancy construction

By introducing adjustable connecting plates and fixing plates into the hydraulic construction device, the installation difficulties caused by the inability to move the installation components were solved. Furthermore, the protective plate protects the bottom rod, enabling flexible fixing of the installation components and protection of the bottom rod, thereby improving the installation efficiency and durability of the device.

CN224133668UActive Publication Date: 2026-04-17JINING WATER CONSERVANCY PROJECT CONSTR SUPERVISION CENT CO LTD
0 Cites 0 Cited by

Patent Information

Application Number
CN202521006018.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-05-21
Publication Date
2026-04-17
Estimated Expiration
2035-05-21

AI Technical Summary

Technical Problem

In existing water conservancy construction equipment, the installation components are directly fixed to the mounting frame and cannot be moved, which makes them easily obstructed by other structures during installation, causing installation difficulties.

Method used

By separating the mounting component and mounting bracket into adjustable connecting plates and fixing plates, the position of the mounting component can be adjusted using a combination of sliding grooves and slots, and it can be fixed by connecting screws and nuts; at the same time, a protective plate is installed on the base rod, which can be disassembled and assembled using hexagonal bolts and nuts to protect the base rod from damage.

Benefits of technology

It improves the installation range and flexibility of the mounting components, avoids obstruction problems during installation, protects the base rod from impact, and extends the service life of the device.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The utility model relates to the technical field of water conservancy construction, in particular to a cut-off device for water conservancy construction, which comprises a main body, the main body comprises a mounting frame, the surface of the mounting frame is fixedly connected with a bottom rod and a hydraulic cylinder, the inner surface of the mounting frame is slidably connected with a cut-off plate, and the surface of the mounting frame is provided with a mounting piece; the adjusting mechanism comprises a fixing plate. According to the utility model, the mounting piece and the mounting frame are detached and connected under the connection of the connecting plate and the fixing plate, so that the position of the mounting piece can be adjusted according to the clamping grooves at different positions on the fixing plate, and the condition that the mounting piece is blocked by a convex structure of a mounting plane or other equipment during mounting is avoided; and meanwhile, under the connection of a screw rod and a first nut, the installation piece with the position being moved and adjusted can be installed and fixed, and a protection plate is installed on the surface of the bottom rod, so that the protection plate can achieve the protection effect on the bottom rod.
Need to check novelty before this filing date? Find Prior Art