Electric automobile charging pile
By using parallel-connected charging stack main cabinets and control terminals in the charging stack, and combining star and ring topology networks for power distribution, the delay and unevenness problems during the expansion of modular charging stacks are solved, achieving efficient power distribution and improved system availability.
Patent Information
- Application Number
- CN202521769352.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-20
- Publication Date
- 2026-06-23
- Estimated Expiration
- 2035-08-20
AI Technical Summary
Existing modular charging piles suffer from high communication latency between modules and uneven power distribution during capacity expansion, resulting in low overall operating efficiency of the charging pile after expansion.
The system employs two parallel-connectable charging stack main cabinets and control terminals, utilizing PDU output modules connected via parallel cabinet contactors and communication interfaces. Power distribution is achieved through star and ring topology networks, enabling plug-and-play capacity expansion and optimizing power distribution through intelligent scheduling algorithms.
It improves the power distribution efficiency after the charging pile is expanded, avoids the islanding effect, enhances the continuous availability and space utilization of the system, and reduces maintenance costs.