A device for construction of a water trench inner partition sliding form
CN224692813UActive Publication Date: 2026-08-28THE THIRD ENG OF CHINA RAILWAY 12TH BUREAU GROUP +1
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202521317108.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-26
- Publication Date
- 2026-08-28
- Estimated Expiration
- 2035-06-26
AI Technical Summary
Technical Problem
[0005]本实用新型为了解决水沟内隔墙采用模板支模存在浇筑混凝土耗时较长、精度不宜控制的问题
Benefits of technology
本实用新型提供的一种水沟内隔墙滑模施工装置,通过创新的滑模结构、滑移机构、动态滑动顶撑对中机构以及配套的升降、驱动、振捣系统,彻底改变了传统模板施工模式;它实现了水沟内隔墙的连续、高效、高精度、低强度机械化施工,有效解决了背景技术中存在的劳动强度大、效率低、耗时长、调整困难、精度难控等核心问题,显著提升了施工速度、工程质量、作业安全性和经济效益,尤其适用于长距离直线水沟隔墙的施工。
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN224692813U_ABST
Abstract
The utility model belongs to cast-in-situ concrete formwork technology field, concretely relates to a water ditch inner partition wall slip form construction device, including hopper, slip form and sliding mechanism, slip form is carried on the sliding mechanism, the sliding mechanism straddles the water ditch, is supported on the roadbed of water ditch two sides, and the sliding mechanism can move along the water ditch, the slip form has the linear mould cavity that bottom is open, one end of front and back direction is open, the other end is closed, the linear mould cavity is divided into with the formed partition wall section and the section to be poured, the hopper is located the top of slip form's section to be poured, and the bottom discharge gate of hopper is connected with the top pouring gate of slip form, and the left and right sides of slip form are provided with sliding jacking mechanism, adopts continuous slip form pouring process, replaces the cumbersome process of traditional segmented formwork, the sliding mechanism can drive the slip form along the water ditch and continuously moves, realizes the one-time continuous forming of partition wall, saves the template handling, on -the -spot assembly, repeated measurement adjustment, dismounting and other large time -consuming links in traditional method.