Chain-type construction system with easily detachable modules

DE202022002158U1Inactive Publication Date: 2024-10-17NIESSEN GUNTHER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE202022002158
Authority / Receiving Office
DE · DE
Patent Type
Utility models
Current Assignee / Owner
Priority Date
2022-06-30
Filing Date
2022-10-01
Publication Date
2024-10-17
Estimated Expiration
Not applicable · inactive patent
Patent Text Reader

Abstract

Claim 1: Construction system of the chain type with quickly detachable modules, wherein the modules are highly load-bearing house modules, including highly load-bearing column elements, and ultra-stable DBM modules attached (or, in the case of steel, welded DBM modules, or, in the case of concrete, cast DBM modules), the DBM modules being cut in the middle and then ultra-stablely splined, as precisely described in claim 5, part 5g, and wherein the modules, if they are not flat but tall and can fall over, are given built-in safety by being a. not top-heavy but exactly the opposite, bottom-heavy, and b. also having a wide base so that they can stand securely on their own, which increases safety against falling over because gravity helps, and this applies not only during the installation process but also during operation in the building throughout its entire life cycle, so that the building gains additional strength against, for example, lateral forces such as wind pressure in a storm.
Need to check novelty before this filing date? Find Prior Art

Description

Today, buildings of conventional construction are often constructed from semi-finished or fully delivered prefab floor sections, wall sections, corner columns, and ceiling sections, from large, heavy modules made of a wide variety of building materials, from reinforced concrete modules, steel-glass modules, wood modules, etc. This creates larger, more complex modules, spaces / rooms, which in turn are connected as 1-D, 2-D or 3-D chains. Since no other techniques exist for joining heavy prefab modules together in an ultra-stable manner, so that the joints can withstand all normal forces, the modules are cast in concrete. Or, in the case of steel structures for high-rise buildings and skyscrapers, the steel profiles are welded after heavy bolting. In timber structures, delivered modules are glued together. Or they are screwed together, which is labor-intensive and cumbersome. In all of these cases, the opportunity to separate them quickly and undamaged is missed. The connections are not quick-release, click-in connections. In all of these cases, neither the quick and easy construction of the buildings is possible, nor the collaboration of robots, nor the rapid recovery of undamaged modules for a second or third life in other buildings, for the recirculating use of scarce building materials obtained from nature, is impossible. This is for the much-discussed circular economy in construction, with the desired avoidance of billions of tons of construction waste. The technical challenge, therefore, is to add a new technology to the techniques described above that makes precisely this possible: circular construction. Connecting heavy modules using highly resilient, quick-and-easy-to-remove connections, using 'click' connections between modules. There are numerous chain-and-socket construction systems with detachable modules, including various types of scaffolding, shelves made of metal profiles and wood or other building materials, wall cabinets, and various types of children's toys, including construction sets, including the well-known Lego with click-lock connectors. Lego stands out for its simplicity of connection. But even moderate stress causes a structure made of Lego bricks to collapse. A similarly quick and easy connection to Lego, but at the same time an ultra-stable, highly resilient connection between the bricks: that's the goal—that's the technical challenge. What general shape do detachable modules need to hold together with high resilience? That's the question. The new development / invention solves the problem in several sub-steps, with the result that different types of differently shaped, more cleverly formed prefab modules are created, all of which have certain typical properties in common, which can now be described so precisely that experts can actually build ultra-stable structures with the new modules, A catchy generic term for the new prefab modules must be defined: Definition: LL-HLH modules are easily removable, highly resilient house modules. Definition: LL-HL house modules are easily removable, highly resilient house modules. Highly resilient connection between LL-HL house modules! With these new modules, we can eliminate the technical difficulties on the path to a circular construction industry. After transport to the construction site and prior to installation, such modules can potentially be connected to form complex modules next to the building under construction. They can then be lifted into the growing building using powerful lifting gear. They can then be easily and quickly connected to form an ultra-stable structure. They can then be retrieved just as quickly and undamaged, either immediately or after 5, 10, or 20 years, for reuse at another location, or if the building requires conversion to a different form: for example, a pyramid house instead of a cuboid house. This allows for gradual conversion to more beautiful houses, more attractive streets, more livable neighborhoods, and more beautiful entire cities. Anyone who has designed a building, determined its size and shape, and wants to construct it from LL-HLH modules must divide it into parts in a second planning phase. More skillfully than before. That is the technical task. This involves previously overlooked fundamental insights. This involves new ideas. This involves previously overlooked technologies. The technologies sought have always been possible, they just haven't been discovered yet. Inventing is discovering previously unknown possibilities. Those who proceed systematically, starting from the very bottom, with the simplest things, as serial inventors like Nikola Tesla always did, are likely to find more and new things with greater impact than lateral thinkers. A fruitful basic insight is: if the strength St1 of a detachable connection between two parts can be increased by a measure M1 in the direction R1, and by a measure M2 in the direction R2—but an increase in the direction R2 inevitably results in a decrease in the direction R1, and vice versa—then one must optimize between M1 and M2 so that St1 is equally strong in every direction. Similar relationships can apply between measures M1, M2, M3, .... Mn. One must always optimize. This can then lead to the discovery of concrete techniques. For example: If, at first glance, a strange idea, you cut flat parts of buildings such as walls, ceilings and floors lengthwise into x layers, and - optimizing x - cut them into 2 to 5 layers, and then again optimized into 3 layers, and then cut these layers vertically (in the case of vertical walls) in such a way that transportable modules are created, then you can use them as the first prefab intermediate products to quickly and easily (sometimes super-fast with robots) build more complex intermediate products, which can then be lifted into the growing building as transportable large modules after transport to the construction site by a powerful (robot) crane and integrated super-stable in no time. Is this approach, which is contained in the application faxed on June 30, 2022, a new idea? This is something that the novelty search has to examine. In the present application 20 2022 002 158.5, based on 10 2022 002 367.9 dated June 30, 2022, in step 1 walls are cut vertically into 3 (up to 5) layers. In step 2 a strip of BM (floor module) is cut off at the bottom and a strip of DM (ceiling module) is cut off at the top, cutting in such a way that on the large middle part of the wall, only in the middle layer, bars pointing downwards and upwards are created and in BM and DM matching lock openings. In step 3 the vertical cuts are "glued" (= firmly assembled). This creates three modules: BM, Wall (smaller wall), and DM. These modules are plugged together and firmly connected with crossbars to form the old wall. Step 4: Repeat the same process with the floor walls below and above. Step 5: Glue the DM below and BM above, and glue the DM in the middle and BM above. This creates two ceiling-floor modules (DBM) that border the middle wall below / above. And one additional DBM each at the very bottom / top.Step 6: Now the middle wall on the right and left is "glued" (= firmly assembled) with 2 corresponding corner columns. The same is done for the wall below and above, so that on each side 3 corner columns stand directly on top of each other, loosely connected e.g. by a central pin. In step 7 the same operation 6, gluing walls to columns, carried out with walls that are arranged in turn at an angle of oBdAConnect at 90°, another wall at a corner piece of the house, 2 at a T-piece, 3 at a cross piece. In step 8, install a supporting triangle at a 90° angle, fixed at the bottom, detachable at the top. In step 9, repeat the same operations for adjoining walls. In step 10, cut all DBM modules with a wide side connection for floor slabs into 2 equal pieces in the longitudinal direction for later transport, and into 3 approximately equal pieces in the transverse direction for later transport, so as not to exceed the limited transport width with the complex modules. Then, splint at this inevitable weak point created in this way, build new strength at the cut through multiple splints: with 4 features 10a, 10b, 10c, 10d: 10a. In the center of each cut surface is a recess: a lock, for holding a loose double bolt (a pin) during later assembly, 10b.At the top and bottom and left and right are wide double locks with fixed crossbars according to claim 6 for reconnecting the cut DBM modules during installation, with loose double bars.10c. Thirdly, strong splinting of the interface through extra-strong frames of the smaller walls at the top and bottom after assembly, which are then coupled with their bars via the locks in the DBM modules at the bottom and top, respectively, via optimized lock-bar-crossbar connections.10d. Fourthly, strong splinting of the interface through wide floor sections that are inserted into the elongated (cut-off) half-open optimized lock-bar-crossbar connections attached to the left and right. With such foot-heavy corner modules, T-modules and cross modules, assembled into honeycombs and with detachable floor and ceiling sections of transportable dimensions and with transportable walls with strong frames (bevelled at the corners, or with massive, highly resilient supporting triangles in each corner), which click into bases on the columns (and on the supporting triangular modules, part of the column modules), one can build stable, control large forces and be 100% detachable into undamaged modules. There are no common terms yet for the complex forms of the LL-HLH modules. Therefore, these forms are described step by step, based on how they are formed. It's about objects and their shape. It is about objects, LL-HLH modules and their form, and their form-dependent functioning in an endlessly continuous chain construction. It is about the constructive properties of this chain construction with quick-release modules, as described in detail in the following patent claims, Given the overwhelming economic importance of the disclosed technical teaching and the difficulty of discovering and systematically developing it step by step, in competition with many others who have also attempted to do so, and not just since yesterday, this technical teaching, if it is new, should lead to protection rights. We'll see. Nothing is certain. Because: We've described the processes at the European Patent Office (EPO) elsewhere. Here, we're only hinting at them. We're only pointing them out. Science has discovered that there are clearly sick people “playing” because of a hereditarily defective dPPP gene, and says: SsG! Stop sick Game(r)s! Hard technology and powerful technology collide in this world! Powerful technology even intervenes in patent offices. These eight lines are enough of that! In addition to the main part of the technical teaching described above, the first version addresses further points, for example, how a building can be constructed using the new technology with components readily available at today's hardware store. Large sections of the first version of the 'Technical Description of the Invention' are adopted verbatim in the new version: Building houses with large modules, entire room walls, floors, and ceilings, works with the innovative, optimized bolt-lock-crossbar connection technology. In some cases, it can be even better. Continuous development, with new ideas, has yielded further results. Even faster, even safer, even simpler, with even fewer complications. And with robots. One option is to produce modules using mobile mini-prefab factories on construction sites, each with a series of reusable, robust steel molds. This minimizes transportation difficulties and costs, allowing even very large modules to be produced and deployed. Building click-module houses without a prefab factory, using simple components from the hardware store, that's also possible: Using profiles made of wood and / or steel to build large modules so that they have complex edge structures and are stable, is described in the fax patent application, the priority, and is incorporated here into the quick patent (utility model). Eliminating the disadvantages of version 1, building a cube that is smooth on all sides by means of a 3-dimensional construction of the “flat” modules (construction of 5 layers), this is, among other things, the subject of the following patent claims. Finally, the strength / stability of crossbars can be dramatically increased with permanently attached crossbars. Crossbars were previously assumed to be loose elements. The great discovery is that fixed crossbars can serve a useful purpose in loose double bars and loose quadruple bars, covering and reinforcing each other. The duality of fixed bars and loose crossbars, as well as fixed crossbars and loose double bars, is revealed. Modules that are foot-heavy rather than top-heavy and can stand on their own wide bases make the construction process safer. Built-in safety prevents construction accidents. At the same time, it gives the finished building greater stability. Building modules with fixed corners and cast-on or attached floor sections have these properties. Because they can be handled safely, they can now be built even larger and more complex, using molds, which saves labor and the work of assembling. Construction projects with larger and more complex, self-supporting corner modules, fixed corners in angle pieces, T-pieces, and cross pieces, into which ceiling / floor sections and wall sections can be integrated, are advantageous house building techniques. Version 2 follows version 1. The vertical connection between these modules is of the same type as in version 1. Horizontal connections with fixed cross members and loose double bars are added. “Buildings made of quickly detachable, securely connected modules, in particular large, heavy, complex modules” ... is what the patent claims state. This means that everything described also applies to small, lightweight systems: cabinets, boxes, crates and shelves, play areas for children... Although the requirements here are less stringent and therefore less perfect joining techniques can be used and deliver usable results, with the more perfect joining technique you can still build a bit better, more stable, more flexible and faster. The new technology can be used not only in the modular construction of houses, but also in the furnishing of rooms in the building with systems that serve to store 1,000 things in the household. Definition: Vertical locks are locks into which the bolts slide vertically. Vertical bolts are bolts that slide vertically into their locks. Horizontal locks are locks into which the bolts slide horizontally. Horizontal bolts are bolts that slide horizontally into their locks. Vertical double locks are locks, one lock at the bottom S(u) in module 1 and one lock at the top S(o) in module 2. A double bolt, such as a strong steel pipe, slides halfway vertically into S(u). Then module 2 with S(o) slides down over the upper half of the vertical double bolt. The double bolt is then fixed at the top and bottom with cross bolts in M1 and M2, preventing M1 and M2 from sliding apart. Definition: MOD-Bau-Technik is the name for the new construction technology with core <optimierte Zerschneidungs-Technik, Hand in Hand mit optimierter Verbindungs-Technik und optimierter Schienungs-Technik, Verstärkungs-Technik> , MOD, derived from module.MOD is all about strong modules with highly resilient connecting elements that can be quickly coupled and quickly and undamaged uncoupled for new uses, for a "second life" in another building with the goal of a smaller footprint, protection of nature, and a circular construction industry.MOD is all about building all buildings, small and large, solely from reusable modules, building ultra-stable buildings that have significantly better properties than the reinforced concrete blocks that are built today.

Claims

Patent claim 1Building system of the chain construction type with quickly detachable modules, dgd the modules are highly resilient house modules, with highly resilient column elements, and ultra-stable attached DBM modules (or welded DBM modules in the case of steel or cast DBM modules in the case of concrete), the DBM modules are cut in the middle and then splinted in an ultra-stable manner, as precisely described in claim 5, part 5g, and dgd, modules, if they are not flat but tall and can fall over, are given built-in safety by a. not being top-heavy, but exactly the opposite, foot-heavy and b. In addition, they are given a wide base so that they can stand safely on their own, which increases safety against falling over because gravity helps, not only during the installation process, but also during the function in the construction throughout its entire life cycle, so that the construction gets additional strength against e.g. lateral forces such as wind pressure in a storm,Point 2.1, Variant 2.1 Construction system according to claim 1, dgd the modules and their connecting elements are designed so that (step 1) the installation (with a crane) can proceed uninterrupted from top to bottom, through lateral connection in the subsequent step 2 via loose double bolts and fixed double locks and permanently attached cross bolts, as described in detail below, without the need for disruptive lateral movements of large modules as necessary for inserting horizontal fixed bolts into horizontal lock openings, instead, horizontal connection between modules after vertical lowering into the emerging building via a new connection technology that does not disrupt the known process of vertical oSRQ connection of modules, Point 2.2, Variant 2.2 according to point 2.1, Variant 2.1, dgd the modules and their connecting elements are designed so that the installation (with a crane) can proceed uninterrupted from top to bottom in step 1,The desired horizontal connection of two elements El1 and El2, which are located next to each other in the building, is achieved through an ancient connection technique, namely, in El1, part 1 of a double lock is located, and in El2, part 2 of this double lock, directly opposite and flush with each other. In part 1, a movable double bolt DRi is located, fully inserted, not protruding, and in a cavity behind it are springs that could push DRi out, but which are blocked during lowering. After successful lowering, they are precisely unblocked by a radio command, so that the horizontal locking by DRi is achieved. A process that occurs in a similar way, usually without radio command, usually manually controlled, millions of times in our doors: double lock-double bolt technology in many variations, a technology that makes use of movable bolts, which are then eo ipso double bolts.little and only in exceptional cases suitable for securing large building blocks / modules, where enormous forces occur, which fixed single bolts can cope with much better and which the new double locks with fixed cross bolts and with movable double bolts (point 2.1) can handle better, Point 3 a, Construction system according to claim 1 and 2dgd a first complex-shaped module 1, M1, a floor-wall connection module, module DB1, which is the edge part of floor slabs of rooms of a house / rooms of a building, constructed from 5 vertical layers, from layer S1 in the middle, S2 inside, S3 outside, S4 inside, S5 outside, each layer as wide as the wall to be connected to the floor, e.g. 6 m each layer as wide as the edge of the floor slab of the room to be built, e.g. 6 m wide, and S1 to S5 the same height, about 20 cm, about 50 cm, about 1 m high, and S1 in the middle usually the thickest layer, about 10 cm thick, and S5 outside and S4 inside usually the thinnest layers, with only a covering function, about 5 mm thick, e.g. metal plate, about 2 cm thick, made of concrete, and S2 and S3 with S1 reinforcing function, S2 about 4 cm thick, S3 about 5 cm thick, where S1 to S5, if made of the same material, such as fiber-reinforced concrete,can be fused together to form the layer package S, manufactured in one casting in a mold, and S1 further contains optimized lock openings, recesses, depressions into which optimized bars of the wall are to engage from above, and S2 and S3 further contain optimized lock openings, but do not have to, usually alternatively to S1, recesses, depressions into which optimized bars of the corresponding wall layers W2 and W3 of the wall W are to engage from above, and module 1 further has long, half-open lock openings attached to S4 inside, supports, with permanently attached optimized cross bars (QR) upwards, to support inner parts of floor slabs BP of transportable dimensions, e.g. 2.40 mx 6 m, partial slabs of the entire floor slab BP or (3b) inner parts of the entire ceiling slab DP, e.g. 4.80 mx 6 m or 7.20 mx 6 m, whereby the inner layers of BP and DP are also made up of 5 layers, but horizontal layers,Shl(BP) to Sh5(BP) or Sh1(DP) to Sh5(DP), whereby the inner parts of the floor and ceiling panels are provided with corresponding QR holes at the edges, which engage the crossbars QR, for a secure fit, after which, in the final step, the loose part of the lock opening is clicked on top, whereby the entire floor panel BP is seen as all inner parts plus all 4 edge elements DB1 all around, whereby the module DB1 can alternatively also be seen as the lowest section of the wall, pure interpretation, which does not change the shape and properties of DB1. Claim 3, point 3 b, system according to point 3 a and d2n claims A1, A2dgd a second complex-shaped module 2, M2, a wall-ceiling connection module, module DB2, the edge part is made up of ceiling panels of rooms of a house / rooms of a building, analogous to DB1, constructed from 5 vertical layers, consisting of layer S1 in the middle, S2 inside, S3 outside, S4 completely inside, S5 completely outside, like the floor-wall connection module,with the difference that the recesses in S1 are located at the bottom and the upper bars of a wall engage from below. In module 2, like module 1, long, half-open lock openings are attached / cast inside, towards the ceiling panel, for placing, snapping, and clicking on portable inner parts of the ceiling panel DP. The entire ceiling panel DP is seen as all inner parts plus all 4 edge elements BD2 all around. Alternatively, the module DB2 can also be seen as the uppermost section of the wall. This is a pure interpretation that does not change the shape and properties of DB2. Point 3c of claim 3, construction step 3c. System according to points 3 a and 3 b. A third complex-shaped module 3, M3, module DB, a wall-bottom-ceiling-floor-wall-top connection module, is created by fusing / gluing the modules M2 and M1, M2 bottom, M1 top, i.e. the upper bars of a wall. W(u) below and the lower bars of a wall W(o) above,and can connect the walls of 2 floors in such a way that, depending on the case, in a square of 4 modules DB, the inner parts of DP and BP can merge into one panel or be installed at a distance a, with or without filling (e.g. insulating materials) in between, or, if a is large, can build a mezzanine with a variety of equipment therein, e.g. heat storage for heating, point 3d, of claim 3, construction step 3d, system according to point 3c, dgd 4 modules of the form 3c / DP / M3 are combined to form a rectangle RE and firmly connected, e.g., cast in one piece in a large mold, and, if not transportable, cuts are made to form transportable pieces, and at each interface an oSRQ connection (optimized lock-bolt-crossbar connection) is provided so that they can be disassembled, transported and reconnected on site to form the desired rectangle, or, in the case of 5 linear modules of the form DB,connected in a casting mold to form a pentagon, which can also be newly created on site from transportable parts, claim 3, point 3 e, construction step 3e, system according to claim 3d, dgd 4 rectangles Rel to Re4 of form 3d are put together to form a large rectangle grRE and inside there are 8 contact surfaces in the shape of a cross, then the contact surfaces are fused, then from grRE3e1) transportable angle pieces are cut out, with SRQ,3e2) transportable T-pieces, with SRQ, with double beams in the T-column,3e3) transportable cross+pieces, with SRQ, with 4 double beams in the cross,3f1. 2 modules of form 3c are connected to form a transportable angle piece, with a lock or bolt at both ends, with SRQ at both ends,3f2. 3 modules of form 3c are connected to form a portable T-piece, with SRQ, with lock or bolt at all ends. 3f3. 4 modules of form d are connected to form a portable cross-piece, with SRQ connections at the ends, cross-piece without double beam.3f4 2 modules of the form 3f1 are connected to a portable T-piece, with fusion at the two contact surfaces, with SRQ,3f5 4 modules of the form f1 are connected to a portable cross+piece, with fusion at the 4 contact surfaces, with SRQ,3f6 Simplification of 3f4 to 3f2, replacement of 3f4 by 3f2, simplification from a T-piece with to a T-piece without double beams,3f7 Simplification of 3f5 to 3f3, cross+piece without 4 double beams, Construction system according to A1 to A3, point 4a, variant 4a with solid layers W1 to W5, dgd a fourth complex-shaped module 4, M4, a wall module, module W, is constructed from 5 vertical layers, from layer W1 in the middle, W2 inside, W3 outside, W4 completely inside, W5 completely outside, each layer as wide as in module 1, from claim 1, and W1 to W5 the same height, about 2.80 m high, and W1 in the middle, usually the thickest layer, about 10 cm thick, and W5 completely outside 4 and W4 completely inside usually the thinnest layers, with only a covering function, e.g. metal plate 5 mm, e.g. concrete about 2 cm thick, and W2 and W3 with W1 reinforcing function, where W1 to W5, if made of the same material, e.g. concrete, can be fused together, produced in one casting in a mold, and W1 further dgd from W1 optimized (strong iron) bolts protrude, top and bottom, pins that are intended to engage in optimized locks of module BD, and W2 and W3 further dgd they can also contain optimized bolts, but do not have to,Usually, as an alternative to W1, tenons that are intended to engage the corresponding lock openings of module DB, variant 4b, point 4b, with layers W2 and W3 containing chambers, usually rectangular chambers, so that a grid of beams is created that still sufficiently supports W1 in terms of statics / load-bearing capacity, and that chambers can perform functions on the outside, such as accommodating and protecting insulating materials, or - at the top and outside in the house wall - accommodating and protecting solar power cells, W5 parts there made of glass, or solar heat cells, W5 there metal plates, painted green or black, which heat up and heat air or water on the inside, or accommodating and protecting small, silent heat pumps, with closing metal plates as heat exchangers, or - at the top of the house corners, from wall A across to wall B, accommodating small, silently rotating windmills, of a new design, highly effective, not described in this application, small windmills,which diligently collect energy for the house's residents when the sun isn't shining, with devices at the corners of the house that further increase the well-known wind buildup on windward house walls and thus the air flow through the rotors, or chambers made of strong concrete, with a rear wall W1, and strong concrete grid beams and strong closing steel plates, parts of W4, with a seal between the grid and steel plate, with a seal that is automatically pressed down by the air pressure and closes tightly, chambers that are pumped out of air and, despite their narrow shape, perfectly insulate, and that interior chambers with a W1 rear wall and W5 doors, take on functions, household functions: storing clothing, tools, cutlery, small items and ornaments, so that fewer additional cabinets need to be installed, System according to claims 1 to 4, construction 5a, system EK, dgd a fifth complex-shaped module 5, M5, a corner module, module EK, is formed from a cross piece 3f3 and 4 walls W / M4, and that they are fused to form a building element, a strong, high corner element EK of a cross shape, approximately cast in a mold, and that the 4 ceiling-floor parts, which can be clicked into any oBdA 90° angle at the bottom, are also firmly attached here, approximately cast in a mold, the 4 ceiling-floor parts at the top, however, are not, but are loosely clicked in later, and the structure with a wide base according to claim 1 is trimmed with a grid of oSRQ connections at the open ends, so that EK is still easy to transport, further dgd, the module DBM, at the bottom of the construction, is high, e.g. 1 m high, the Room wall W but low, e.g. 2 m high or even lower,This allows the high EK module to be driven under bridges with a maximum shower height of 4 m without complications, even if high rooms are required, and a large clearance between floor and ceiling, allowing low-level trucks of 0.80 m + 1 m + 2 m = 3.80 m to pass through. During construction, the inner floor slab in the DBM module below is installed at the lowest level, and the inner ceiling slab in the DBM module above, which is placed on top of it, is mounted at the (almost) highest level. This allows the room height in each room to be individually selected due to the DBM being 1 m high at the bottom and top. This creates a structural element: a crosspiece with four wall sections and ceiling-floor sections at the bottom, which meets requirement 1, is heavily foot-heavy, and is equipped with a foot. A structural element that stands securely immediately and also meets requirement 2, if horizontal bars that reconnect cut wall and floor sections are replaced by loose double bars.which are inserted from the side and pushed over fixed crossbars, which is described in claim 6. Extra-large fixed crossbars at the intersections of the floor sections can also protrude from the floor upwards into the room, designed as stable table legs, approximately two on each side of the intersection, and a double bar designed as a tabletop is pushed over them, thus serving a dual function, or, with shorter legs, a double bar for a bed is pushed over them. Construction 5b in claim 5, system ET according to A 1 to 4, dgd a T-piece 3f2 is connected to three wall sections and two ceiling-floor sections at the bottom to form a portable, foot-heavy, high T-piece ET, otherwise like EK, an element ET that can be used on exterior walls in buildings, while EK is intended for use in central parts of buildings. Construction 5c, system E-Wi according to claims 1 to 4, dgd an angle piece 3f1,Column with 2 wall sections and 1 ceiling-floor section connected at the bottom to a portable, foot-heavy, high oBdA 90° angle piece E-Wi, otherwise like EK, an element E-Wi, intended for use in corners of buildings, after which, after cross pieces EK. T-pieces ET and angle pieces E-Wi, to complete our construction kit for (large) buildings, now in 5d wall pieces are to be described, which fill gaps in walls, if a wall is to be e.g. 6 m wide, but the legs of the building elements E-Wi or ET or EK are only 1.70 m wide, so that a gap, 6m-2x1.70=2.60m wide, is to be filled, and accordingly 5e ceiling-floor parts are to be described, which fill gaps in the inner ceiling-floor slab iDBP below, if the entire double slab iDBP is to measure e.g. 6 mx 6 m, but the 4 floor parts of iDBP set with the high elements only measure 1.70 mx 1.70 m each, construction 5 d, gap filler wall part system E-LiW (LiW = gap filler in wall) according to claims 1 to 4,Point 4a or 4b, dgd a part of a wall made of 5 layers W1 to W5 with a corresponding part of an element DB / 3c and with a corresponding part of an inner ceiling-floor slab (iDBP) on one side, if the edge element, and if the inner element, is also connected or fused to the other side, and between the parts of ceiling iD (below) and floor iB (above) with a distance a, webs are attached of height a and outside at the edge below iD extra feet are attached, for secure standing, Construction 5e, Gap filler-floor part system LiDBP (LiDBP = gap filler in the ceiling-floor slab iDBP) according to claims 2 to 4, and 5a to 5d, dgd the additional middle part of iDBP also consists of 2 plates, LiD and LiB, with a distance a, which are firmly connected by webs of height a, where LiD is connected to the upper edge all around, oBdA half a plate thickness deep and oBdA 10 cm wide, overlapping on the lower edge of the complementary outer parts of iDP,Where LiB rests with its upper edge all around, half a panel thickness deep and oBdA 10 cm wide, on the lower edge of the complementary outer parts of iBP (located outside the wall element, where LiBP (top) is 10 cm wider all around than LiDP and the complementary outer parts of iBP are correspondingly 10 cm less wide, so that the lower, narrower part of the double panel LiDBP with LiDP can slide through the wider opening of iBP at the top when LiDP is lowered vertically to the support, whereby the overlapping support - optimized with regard to load-bearing capacity - is interrupted in layer B3 by recesses through which the webs of double bars pass and force-fit the outer and inner parts of the entire panel iBP. The double bars are inserted from above into prepared double locks in iBP.and the double locks here are cutouts in layer B3 (cutouts in the middle layer B1 are also possible) and are covered by a congruent part of B5, whereby the strength of the overall construction is optimized by creating double lock-free and non-free zones along the cutting line, whereby the optimized double lock connection can also be created in iDP, but does not have to be, whereby the double bars are then inserted into the double locks from below, from the room under the double plate iDP + iBP = iDBP, and are covered from below with a congruent cutout of B5, Construction 5 f, system according to claims 1 to 4, adapted to transport options (20 m long transports are permitted, as 2.50 m wide standard and 3.50 m wide special transports), dgd large complex modules (e.g. using concrete casting technology) are prefabricated, 3 6 m wide walls each, laid out in a line, together 18 m wide,as wide as the transport vehicle is long,1. with 4 partial walls on one side, 3.40 m wide, if they are to serve on the outside of a building, with cast-on base pieces DB,2. with 4 partial walls on the other side, 3.40 m wide, if they are to serve on the outside of a building, with cast-on base pieces DB,3. with 8 partial walls, 4 on each side, each 1.70 m wide, if they are to serve inside a building, foot-heavy large complex modules, of which 2 modules, type 5fl plus 5f2, when connected on site, already provide 3 rooms (without ceiling), each 6 m wide and 6.80 m deep, and 4 modules, 2 of the same type mounted on top, provide 3 complete rooms with ceiling and 3 rooms above without ceiling, with ceiling elements thereby a 6-room house, of which 3 modules, type 5f1 plus 5f3 plus 5f2, when connected on site, already provide 6 rooms (without ceiling), each 6 m wide and 5.10 m deep, and 6 modules, 3 of the same type mounted on top,Deliver 6 complete rooms with ceilings and 6 rooms above without ceilings, with ceiling elements, a 12-room house that can be built in a few hours, Part 5 g, Construction 5 g, according to claims 1 to 4 and 5, Part 5a to 5f, dgd in foot-heavy, transportable modules with columns in the corners, the permanently cast upper wall sections branching off from the columns are only short, oBdA approximately 50 cm, 75 cm or 1 m long, particularly strong and stable (column-like), and at the top end a piece of approximately 30 cm x 30 cm is cut out, so that the lower DBM sections are half the wall length, that the two short wall sections between 2 columns are supplemented by a long wall element WmO to form the entire wall, with bars (upwards and) downwards that engage in the DBM sections below and thus form the interface between the DBM sections below, and also rails above, when cut DBM parts of the next floor are lowered, the wall WmO above with 30cm x 30cm ears,which engage the 30cm x 30cm cutouts, whereby the edge of the WmO is so strong all around, e.g., with a strut above / below the cuts below / above, that it alone bears all the forces. A variation of the construction steps leads to the same result: in step 1 (= step 5.1), cut the walls vertically into 3 (up to 5) layers. In step 2, cut off a strip of BM (floor module) at the bottom and a strip of DM (ceiling module) at the top (seeing them as parts of the wall, not the floor). Cut them in such a way that, on the large central section of the wall, only in the middle layer, bars are created pointing downwards and upwards, and in BM and DM, lock openings are created. In step 3, the vertical cuts are "glued" (= firmly assembled) to create 3 modules: BM, wall (smaller wall), and DM, which are plugged together and firmly connected with crossbars to form the old wall.In step 4, perform the same operations with the wall of the floor below and the wall above. In step 5: "glue" the DM below and BM above, "glue" the DM in the middle and BM above, so that two ceiling-floor modules DBM are created, which border the middle wall below / above, as well as DBM below and above. In step 6, now "glue" the middle wall on the right and left with two corresponding corner columns (= firmly assemble). The same also applies to the walls below and above, so that on each side, three corner columns stand directly on top of each other, loosely connected, for example, by a central pin. In step 7, perform the same operation 6, gluing walls to each column, carried out with walls that connect in turn at an angle of 90°. One more wall at a corner piece of the house, two at a T-piece, three at a cross-piece. In step 8, a large vertical supporting triangle is placed in the angle between the column and DBM. install, fixed at the bottom, removable at the top,or alternatively, later, a large vertical supporting triangle in the angle between the frame beams vertically / horizontally of the side wall. In step 9, cut all DBM modules with a wide lateral connection for floor panels into 2 equal parts in the longitudinal direction for later transport, and into 3 approximately equal pieces in the transverse direction for later transport, so as not to exceed the limited transport width with the complex modules. Then, subsequent splinting at each unavoidable weak point thus created, building new strength at the cut through multiple splinting: with 4 features 9a, 9b, 9c, 9d: 9a. In the center of each cut surface is a recess: a lock, for receiving a loose double bolt (a pin) during later assembly. 9b. At the top and bottom and left and right are wide double locks with fixed crossbars according to claim 6 for reconnecting the cut DBM modules during installation, with loose double bolts.9c. Third, strong splinting of the interface through extra-strong frames of the smaller walls above and below after assembly, which are then coupled with their transoms via the locks in the DBM modules below and above, respectively, via optimized lock-transom-crossbeam connections. 9d. Fourth, strong splinting of the interface through wide floor sections that are inserted into the elongated (and cut) half-open optimized lock-transom-crossbeam connections attached to the left and right, strong multiple splinting from all sides in step 9d, so that buildings with such foot-heavy modules, EM. TM, KM built, have the characteristic of 'being able to control great forces', 'being able to build with them ultra-stable', with 100% dissolvability into undamaged modules. Construction 5g.1, a variant of Construction 5g with the difference that the columns are thick, strong metal tubes, hollow inside (advantage: less weight) or filled with concrete for even greater load-bearing capacity).Round columns, then, the laterally attached U-profiles / wall bases, into which the wall module, which is extra stiffened in the corners, slides from above, are not permanently attached to the column, but are connected to the column tube via sections of a larger, precisely fitting tube. The larger rings are cut into two half-rings, sitting on strong hinges on the U-profile so that the half-rings can grip the column. The profiles can be fixed to the column via screws at the back, so that the angles between the U-profiles attached to a column and the parts attached there can be infinitely adjusted, and these angles can also be changed later. The U-profiles can also be folded onto one another around a column for transport, so that, regardless of whether the column is lying down or standing, much less transport width is required and significantly larger rooms can be built. So that, where you are working with entire walls, with one column on the left and one on the right,With appropriate design of the hinges to create "folding space", a folding package can be formed from several columns and walls, which can be transported horizontally to the construction site as a transport unit, and a "folding house" can be built there, with trapezoidal-shaped rooms, for example. 1000 possibilities for the floor plan design of rooms in a house, whereby the wall lengths can now measure up to the maximum transport space length of trucks. DBM modules can no longer be fused, but consist of 3 components that are assembled after transport: a U-profile, open at the top, horizontally attached to the vertical U-profile, which pivots around the upper column, in level 2; a U-profile, open at the bottom, horizontally attached to the vertical U-profile, which pivots around the lower column, in level 1 below; and a middle support section, with an integrated pair of bases for the columns, one base each supporting the column base at the top and bottom. desired width, maximum truck width,Cut to the desired length, maximum transport space length, with the cuts (weak points!) being splinted by the U-profiles and the strong wall frames within them. The three DBM elements are connected and splinted by oSRQ-V. After assembly phase 1, any selected angle between two walls can be filled with another tightly fitting triangular column section in assembly phase 2, thus providing additional stability. Assembly is carried out level by level. Important for creating super-strong module structures, overlapping techniques are used, even threefold: a. by using U-profiles that overlap and thus strengthen the frames of the wall modules, b. by splinting the interfaces at the end of half DBM modules with extra-strong wall frame sections, c. by pedestals of round columns in round bases in the central part of the center Z-SM of column modules SM, one base facing upwards and one base facing downwards,So that now both columns have been cut off at the top and bottom, respectively, and then re-bases have been added, using base technology (= overlapping / = splinting technology) and oSRQ technology, now without any transport problems for bridges on the way. System according to claims 1 to 5, dgd in addition to fixed bolts (pins) and fixed lock openings (recesses, pits into which bolts slide) and loose crossbars that prevent a bolt from sliding back out of its lock, loose double bolts are used that are inserted from the side, and with fixed, half-open, sideways lock openings, half located in module 1 and half in module 2, which are to be connected, and with fixed crossbars that protrude from the two lock halves as pins to the side, over which the loose double bolt with matching holes in it is pushed from the side, i.e. fixed crossbars (loose crossbars are also possible), firmly attached to the closed side of the double lock, half located in module 1 and half in module 2, so that the two modules to be connected can no longer slide apart after the double bolt has been inserted,In the next step, the open side of the double lock is closed with a congruent plate, clicked in or screwed tight. It should be noted that these double bolts / double locks are to be operated from the side, so there must be space, as with walls and floors, or space must be made for lateral access. This is a clear difference from fixed bolts and laterally enclosed locks that are to be operated from the front. Design point 6.1, system according to claim 6, consisting of two wall sections Wt1-M and Wt2-M, which are to be connected as modules in line (180°) to form a complete wall. Optimized double bolts / double locks are attached to the abutting edges on both the front and rear sides. Part 1 of each double lock on Wt1-M, part 2 on Wt2-M, both at the front and rear.where the double locks are located at the front in layer W3 and at the back in layer W2 and the fixed crossbars fQR protrude transversely to layer W1 from W1 to the front into the recess / lock in wall layer W3 and to the back into W2 and after inserting the double locks over fQR both at the front and back are then well connected by force, and after covering via parts of the wall layers W4 and W5 respectively, they are also visually well connected, and when the wall is loaded from the front, the double lock at the back best compensates for the pressure and when the wall is loaded from the back, the double lock at the front best absorbs the pressure, whereby this good connection has been achieved without the need for lateral movement of the modules Wt1-M or Wt2-M, so that the modules can be lowered vertically by the crane into the building being constructed, standing precisely in the desired place with millimeter precision and then, request 2, force-locked connected by loose double locks and fixed locks and fixed crossbars,Construction technology that allows for faster construction like no other, with two further variants being 6.1.a omitting the covers, instead using longer fixed crossbars and wider double bars, thus stronger and more visible, and 6.1.b equipping the interior and exterior walls W4 and W5 with protruding double bars, over which loosely positioned protruding double bars are pushed, e.g., butterfly-shaped, with a decorative function in addition to the connecting function, a new playing field for (interior) architects. Variant 6.2, system according to claim 6.1, dgd for a narrow wall section that is to be placed between two wall sections, two double locks on each of the two abutting edges are replaced by a quadruple lock, into which a quadruple bar is inserted. Construction variant 6.3, thick frames, thin walls, system according to claims 1 to 6, dgd in corner modules the edges of the vertical elements, i.e. the corner pillars themselves, the vertical joints with other half walls,and the horizontal edges at the top and bottom (DBM) are extra thick, e.g., S2 and S3 and W2 and W3 are extra thick, creating thick frames with high load-bearing capacity, and the inner surfaces of the wall sections are extra thin, e.g., S1 and W1 are extra thin, saving overall material and weight, with greater load-bearing capacity and a striking appearance of such MOD buildings, construction 6.3.1, system according to point 6.3, the thin wall W1 consists of two even thinner, but strong (metal) panels with air in the space between them, and energy is brought into the living space via the inner panel via the control system and air circulation when the outer panel, if located on the outside of the house, has become hot due to solar radiation, as long as the desired room temperature T has not yet been reached, whereas if the outer panel is colder than T, or too hot, the control system then sucks air away,until the gap is sufficiently insulated. Construction 6.3.2 System according to claim 6.3, dgd the thickened frames are cut into easily transportable parts: a. the thickened corner columns, b. the thickened vertical butt joints with other half walls, c. the thickened horizontal crossbeams at the top, which rest on a. and b., are produced separately for easier transport, and connected on site via oSRQ, which works particularly well due to the oversizing, for example via vertical double bars and double locks, System according to claim 1 to 6, dgd large, complex-shaped modules, now without a prefab factory and without complex-shaped concrete casting molds, are constructed from simply shaped, currently commercially available construction elements, from profiles and plates, from steel profiles and steel plates, and / or from wooden profiles: beams, boards, slats, and from rectangular plates, by these simple elements being three-dimensionally joined and connected in several layers, e.g. 5 layers as in claim 3 and 4, which ensures good stability and load-bearing capacity, Construction 7.1, System according to claim 7 and Construction 7.1, dgd as far as room walls are concerned, walls are constructed from 5 layers, (a. Material e.g. wood, b. Material e.g. steel profiles, c. Material e.g. reinforced concrete profiles, material e.g.Reinforced concrete boards), a middle layer W1 made of upright, stable beams and boards is connected 2-dimensionally to form a surface, which is framed by the surfaces / layers W2 and W3 made of horizontally laid and connected beams and boards, and the layers W1, W2, W3 are framed by the layers W4 and W5 made of panels that close the wall to the inside, W4, and to the outside, W5, and in layer 1, where bars are to protrude upwards and downwards, longer beams are inserted that protrude at the top and bottom, whereby layer W1, quite simply reinforced by layers W2 and W3, now meets high static requirements. Construction 7.2, System according to claim 7, dgd as far as easily transportable room floors and ceilings are concerned, and in the case of oversized parts thereof, and as far as "fused" ceiling-floor elements DBM and parts thereof are concerned, these are built up from several layers of simple elements, long narrow rectangular elements (beams, boards), layers which run partly horizontally, in the middle part, in the space between the edge elements, and partly vertically: in the edge elements (vertical, upright, also in the edge layers of "fused" ceiling-floor double elements DBM, which abut against the walls at the top and bottom, ie take up the bars of the walls), in particular dgd the abutting edges of the floor or.The ceiling and walls are constructed from 3 thick, upright beams next to each other, with the middle beam 1 containing recesses where the bars from layer W1 are to engage from below on the wall 'room below' and from above on the wall 'room above', firmly and stably enclosed between beams 2 (inside) and 3 (outside), so that when the floor or ceiling meet at a 90 degree angle and the wall is connected via a lock bar, here due to the packing of beam S1 between beams S2 (inside) and S3 (outside) and thus also due to the packing of the locks between beams S2 and S3 and - claim 2 - due to the packing of the bars in the wall, there is no longer an overhanging corner like in the first version, but a smooth finish when the width of beam S3 on the outside (a beam is wide, high, long) in the vertical layer package at the floor edge corresponds to the sum of the thicknesses of the outer wall layers S3 and S5.- analogous to the (cast) modules of type M3 / DBM described in claim 3 c, construction 7.3, assembly method according to claim 7 and points 7.1 and 7.2, dgd in layer W1, W2 and W3 elements are omitted as long as the statics are still good, so that a grid with cavities is created, closed off on the inside and outside by plates of the layers W4 (inside) and W5 (outside), cavities that can take on the following functions: a) insulation, if filled with insulating materials, b) heating, if filled with a small, quiet heat pump (komt), c) solar heating, if closed off on the outside with a strong iron plate, painted black or green, which gets hot when exposed to the sun's rays and allows warm air to circulate in the house via ducts and a thermostat. Pitched roof, system according to claims 1 to 7, dgd a building gets a pitched roof instead of a flat roof, in that oBdA 3.40m wide and very long roof frames are laid from 2 sides over a flat roof defined by DBM modules, which have tenons / bars on one side that fit exactly into the DB locks, which meet on the other side at an angle of oBdA 30 °, 45 °, 60 °, 90 ° or 120 ° and engage with each other via a lock-bar connection, whereby, depending on the length of the frames, in particular when they span several rooms, from the inside intermediate DBm modules in cross shape and on the sides in T-shape further cross or.T-pillars go upwards, cut diagonally at the top, and, connected via SRQ, support the frames from below, whereby, if diagonally cut partition walls are also used, attics are created, or, with two closing walls only on the left and right, but in the middle only pillars, a large covered roof garden is created, which, with large light-giving windows, can serve as a communal room, as a meeting point for all the residents of the (high-rise) building, whereby the roof a. either ends smoothly with the upper edge of the house, giving wind forces no point of contact, or b. is an overhanging roof, with an overhanging part extending beyond the beam zone, whereby under the overhang there can be a partially open pipe through which, when wind pressure is exerted on the side of the house, the air flows away in a channeled manner and turns rotors in the tube, well-known rotors or rotors of an innovative shape that produce electricity and produce more electricity than well-known ones, innovation no.2 of<Innovation Paradise> , which are to be described in a further application. Construction system according to claims 1 to 8, wherein the building is erected from the foundation solely by robots, by a large computer-controlled crane robot KRo and four helper robots HRo1 to HRo4 with large propellers on their backs, in that the numbered modules Mo.1 to Mo.x are set up around the construction site and KRo lifts them up one after the other and, in a program-controlled manner, places the first ones on the foundation and the following later into the growing building, with feasible precision, while HRo1 to HRo4, hanging all around the module, pushing and pulling, ensure greater precision, using their camera eyes to recognize from colored markings on the modules when they have to send the command "lower further!" to KRo, while guide structures on the modules ensure 100% precision and a secure fit, after which, unlocked by radio command, the horizontal double bars move into part 2 of their double lock and secure the modules in place.