Remaining gas amount management system
Patent Information
- Application Number
- JP2025526063
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Priority Date
- 2023-06-06
- Filing Date
- 2024-05-28
- Publication Date
- 2024-12-12
AI Technical Summary
Conventional gas remaining amount management systems require high server specifications and processing time for frequent gas-out predictions, leading to increased costs and inefficiencies, especially when using machine learning for prediction models.
A gas remaining amount management system that adjusts the frequency of predicting the remaining gas amount based on predetermined trigger information, such as replacement cycle, elapsed time, or gas consumption patterns, reducing server load and processing time by calculating predictions less frequently before certain thresholds are met.
This approach reduces the need for high server specifications and processing time, lowering costs while maintaining accurate gas remaining amount predictions, especially by calculating predictions more frequently after certain periods or when gas containers are near replacement.
Abstract
Description
Gas Remaining Management System
[0001] The present invention relates to a gas remaining amount management system that manages the remaining amount of gas for each consumer's home.
[0002] Conventionally, a gas shortage estimation system has been known that determines the estimated date of gas shortage by determining the remaining gas amount through frequent measurements from a gas meter that detects the flow rate of gas used flowing from a gas container installed in a consumer's home to a gas appliance (Patent Document 1).
[0003] JP 2019-124285 A
[0004] However, while predicting remaining gas levels based on frequently measured data improves the accuracy of predictions, there are issues with the need to upgrade server specifications to enable frequent predictions, resulting in increased costs. Also, performing frequent predictions requires enormous amounts of processing time. Furthermore, especially when using machine learning for predictions, the costs and processing time required to create input processing information for learning and to create a prediction model are enormous.
[0005] Therefore, an object of the present invention is to provide a gas remaining amount management system that can reduce the cost and processing time required to predict the amount of gas remaining in a gas container at a consumer's home.
[0006] The gas remaining quantity management system of the present invention comprises a flow rate measurement unit that measures the flow rate of gas flowing from a gas container installed in one or more consumer homes to a gas appliance; a remaining quantity calculation unit that calculates a predicted value of the remaining gas quantity in the gas container after a second predetermined period has elapsed using past data that is past gas consumption during a first predetermined period; and an alarm unit that notifies the user of the need to replace the gas container based on the predicted value or the replacement period of the gas container, and the remaining quantity calculation unit changes the frequency at which the predicted value is calculated based on predetermined prediction frequency change trigger information.
[0007] According to the present invention, the remaining amount calculation unit changes the frequency at which it calculates the predicted value of the remaining gas amount based on predetermined prediction frequency change trigger information. In this case, the remaining amount calculation unit calculates the predicted value at a predetermined frequency for a certain period of time, and then calculates the predicted value more frequently than the predetermined frequency after the certain period has elapsed. For example, the remaining amount calculation unit may calculate the predicted value once every three days for a certain period of time, and then calculate the predicted value once per day after the certain period has elapsed. In this way, while the present invention calculates the predicted value more frequently after the certain period has elapsed, it does not calculate the predicted value more frequently before the certain period has elapsed. This reduces the load on the server compared to conventional systems, thereby reducing the need to upgrade the server's specifications while suppressing increases in processing time. This makes it possible to reduce the cost and processing time required to predict the remaining gas amount in a gas container at a consumer's home.
[0008] In the above invention, the remaining amount calculation unit may change the frequency based on a past performance value of the replacement period as the predicted frequency change trigger information.
[0009] According to the above configuration, when the replacement time is used as the trigger information for changing the prediction frequency, the predicted value can be calculated, for example, once every three days from when the replacement period is notified until half of the replacement period has elapsed, and once a day after half of the replacement period has elapsed. This reduces the load on the server, thereby reducing the cost and processing time required to predict the remaining gas amount.
[0010] In the above aspect, the remaining amount calculation unit may change the frequency based on the elapsed time since the gas container was replaced, which serves as the prediction frequency change trigger information.
[0011] According to the above configuration, when the elapsed time since the gas container was replaced is used as the trigger information for changing the prediction frequency, the predicted value can be calculated, for example, once every three days for a certain period of time immediately after the replacement, and once every two days after the certain period has elapsed. This reduces the load on the server, thereby reducing the cost and processing time required for predicting the remaining gas amount.
[0012] In the above invention, the remaining amount calculation unit may calculate the predicted value when the replacement period as the prediction frequency change trigger information is equal to or greater than a first threshold value, and may not calculate the predicted value when the replacement period is less than the first threshold value.
[0013] According to the above configuration, it is possible to prevent the calculation of a predicted value of the remaining gas amount for a customer's home whose replacement cycle is less than the first threshold. In this case, if the replacement cycle is short and constant, there is little need to calculate a predicted value. Therefore, it is possible to reduce the processing required to calculate a predicted value.
[0014] In the above invention, the remaining amount calculation unit may change the frequency based on a remaining gas amount obtained from the gas consumption amount, which serves as the predicted frequency change trigger information.
[0015] According to the above configuration, when the remaining gas amount is used as the trigger information for changing the prediction frequency, for example, if the remaining gas amount is 50% or more of the capacity of the gas container, the predicted value can be calculated once every seven days, and if the remaining gas amount is less than 50% of the capacity of the gas container, the predicted value can be calculated once every two days. This reduces the load on the server, thereby reducing the cost and processing time required for predicting the remaining gas amount.
[0016] In the above aspect, the remaining amount calculation unit may calculate the predicted value when the remaining amount of gas is less than a second threshold value.
[0017] According to the above configuration, when the remaining amount of gas is equal to or greater than the second threshold, the predicted value of the remaining amount of gas can be prevented from being calculated, thereby reducing the calculation process of the predicted value.
[0018] In the above invention, when the remaining amount of gas is equal to or greater than a third threshold, the remaining amount calculation unit may reduce the frequency compared to when the remaining amount of gas is less than the third threshold.
[0019] According to the above configuration, when the remaining amount of gas is equal to or greater than the third threshold, the frequency of calculating the predicted value can be relatively reduced, thereby reducing the calculation process of the predicted value.
[0020] In the above aspect, the remaining amount calculation unit may change the frequency based on a notification by the notification unit as the prediction frequency change trigger information.
[0021] According to the above configuration, when a notification by the notification unit is used as the prediction frequency change trigger information, the predicted value can be calculated, for example, once every two days before the notification is issued, and once a day after the notification is issued. This reduces the load on the server, thereby reducing the cost and processing time required to predict the remaining gas amount.
[0022] In the above invention, after calculating the predicted value, the remaining amount calculation unit may compare the predicted value as the prediction frequency change trigger information with a fourth threshold value, and if the predicted value is equal to or greater than the fourth threshold value, may lower the frequency more than when the predicted value is less than the fourth threshold value.
[0023] According to the above configuration, for example, a predicted value of the remaining gas amount is calculated when a predetermined number of days have passed since the gas container was replaced. If the predicted value is equal to or greater than a fourth threshold, the frequency of calculating the predicted value is reduced thereafter. This reduces the calculation process of the predicted value.
[0024] In the above invention, after calculating the predicted value, the remaining amount calculation unit calculates the number of usable days until the gas container needs to be replaced based on the predicted value, compares the number of usable days as the predicted frequency change trigger information with a fifth threshold value, and if the number of usable days is equal to or greater than the fifth threshold value, lowers the frequency compared to when the number of usable days is less than the fifth threshold value.
[0025] According to the above configuration, for example, a predicted value of the remaining gas amount is calculated when a predetermined number of days have passed since the gas container was replaced. Then, if the number of usable days is equal to or greater than a fifth threshold, the frequency of calculating the predicted value thereafter is reduced. This reduces the processing time required to calculate the predicted value.
[0026] In the above invention, after calculating the predicted value, the remaining amount calculation unit calculates the consumable amount, which is the amount that can be used per day until the second specified period has elapsed, based on the current remaining gas amount and the predicted value, and compares the gas consumption on the day after the day on which the consumable amount was calculated as the prediction frequency change trigger information with the consumable amount, and calculates the predicted value if the gas consumption amount exceeds the consumable amount, but does not need to calculate the predicted value if the gas consumption amount is equal to or less than the consumable amount.
[0027] According to the above configuration, for example, a predicted value of the remaining gas amount is calculated when a predetermined number of days have passed since the gas container was replaced. If the gas consumption amount is equal to or less than the consumable amount, the predicted value can be no longer calculated. This reduces the calculation process of the predicted value.
[0028] According to the present invention, a gas remaining amount management system can be provided that can reduce the cost and processing time required to predict the amount of gas remaining in a gas container at a consumer's home.
[0029] FIG. 1 is a block diagram showing a gas remaining quantity management system according to one embodiment. FIG. 2 is a block diagram showing the configuration of a customer's home and a center server in the gas remaining quantity management system of FIG. 1. FIG. 3 is a diagram for explaining the replacement cycle of a gas container. It is a diagram showing an example of a replacement cycle by season. It is a flowchart showing an example of the processing flow by the gas remaining quantity management system. It is a diagram showing a time series relating to the management of the gas remaining quantity at a customer's home. It is a diagram showing a time series relating to the management of the gas remaining quantity according to the modified example of FIG. 6. It is a flowchart showing another example of the processing flow by the gas remaining quantity management system.
[0030] A gas remaining amount management system according to an embodiment of the present invention will be described below with reference to the drawings. The gas remaining amount management system described below is merely one embodiment of the present invention. Therefore, the present invention is not limited to the following embodiment, and additions, deletions, and modifications can be made without departing from the spirit of the present invention.
[0031] First Embodiment Fig. 1 is a block diagram showing a gas remaining amount management system 100 according to this embodiment. Fig. 2 is a block diagram showing the detailed configuration of a customer's home 20 and a center server 10 in the gas remaining amount management system 100 of Fig. 1.
[0032] As shown in Fig. 1, the gas remaining quantity management system 100 includes a center server 10 and a plurality of consumer homes 20. Although Fig. 1 illustrates four consumer homes 20, the gas remaining quantity management system 100 may include three or fewer consumer homes 20, or may include five or more consumer homes 20.
[0033] 2 , each consumer home 20 is provided with two gas containers 11, a switch 12, a gas meter 13, and two gas appliances 14. The gas meter 13 corresponds to a flow rate measurement unit. Examples of consumer homes 20 include, but are not limited to, hospitals, schools, municipal facilities, nursing homes, ordinary homes, and commercial facilities, and may be any building in which gas can be used.
[0034] The gas container 11 is also called a gas cylinder, and is filled with a gas such as liquefied petroleum gas (LP gas). Hereinafter, LP gas will be simply referred to as gas. The switch 12 switches the gas supply path so that the gas in one of the two gas containers 11 is supplied to the consumer's home 20. This allows the gas in the other gas container 11 to be supplied to the gas appliance 14 even if one of the two gas containers 11 runs out of gas.
[0035] In this embodiment, running out of gas is defined as follows. When the switch 12 switches the gas container 11 to be used, it means that the gas container 11 used before the switch is out of gas. In this case, the switch 12 detects a change in pressure inside the gas container 11 and switches the gas container 11. Specifically, the gas container 11 is filled with gas under pressure, and when the gas runs out, the pressure drops. The switch 12 detects the change in pressure and switches the gas container 11 when the pressure drops to a predetermined value. Therefore, a drop in the pressure detected by the switch 12 to a predetermined value can be considered to be an out-of-gas state. Running out of gas also includes manually switching the gas container 11 when the pressure drops and the gas appliance 14 becomes unusable. Furthermore, running out of gas does not only refer to pressure, but also includes, for example, when the remaining amount, calculated by subtracting the gas flow rate from the expected gas volume, becomes zero or close to zero. These definitions apply to running out of gas in each of the two gas containers 11.
[0036] The gas meter 13 measures the flow rate of gas flowing from the gas container 11 installed in the consumer's home 20 to the gas appliance 14, and converts the measured value into an indicator value that serves as information on the amount of gas used (consumption). When the gas meter 13 detects any abnormality, it may take measures such as shutting off the gas supply path with a shutoff unit.
[0037] The gas meter 13 has a communication unit 13a. The communication unit 13a has a function of wirelessly communicating with the communication unit 3 in the center server 10. A communication network such as the Internet, LAN, LPWA (Low Power Wide Area), or WI-SUN can be used as a wireless communication method between the communication unit 13a and the communication unit 3 of the center server 10. The communication unit 13a periodically (e.g., once a day) transmits information related to guideline values that serve as information on the amount of gas used (consumption) at the consumer's residence 20 to the communication unit 3 of the center server 10, along with date information related to use or non-use (i.e., zero use), an ID that identifies the consumer's residence 20, and location information for the consumer's residence 20. Note that the communication unit 13a does not have to be provided within the gas meter 13 and may be a separate unit.
[0038] The gas appliance 14 is, for example, a gas stove, a gas water heater, a gas fan heater, etc. However, the gas container 14 is not limited to the above and may be any appliance that consumes gas.
[0039] The center server 10 has a remaining amount calculation unit 1, a notification unit 2, a communication unit 3, and a memory unit 4. Of the above components of the center server 10, the remaining amount calculation unit 1 and the notification unit 2 are functionally realized by a microcontroller including a CPU (Central Processing Unit) and memory (ROM (Read Only Memory) and RAM (Random Access Memory)) that stores programs, or an ASIC (Application Specific Integrated Circuit), etc. Examples of the memory unit 4 include various types of memory or a hard disk, etc. The center server 10 may also be configured as a cloud system.
[0040] The remaining amount calculation unit 1 periodically (e.g., once a day) receives gas usage measurement results sent from the communication unit 13a of the gas meter 13 of each consumer's home 20 via the communication unit 3. The remaining amount calculation unit 1 calculates the current remaining amount of gas in the gas container 11 from the measurement results based on gas container installation information assigned to each consumer's home 20. In this case, the remaining amount calculation unit 1 can obtain the remaining amount of gas by subtracting the usage amount from the initial amount of gas in the gas container 11 pre-stored in the memory unit 4. The gas container installation information is information necessary for calculating the remaining amount of gas based on the gas usage measurement results by the gas meter 13, and is information indicating the number of consumer's homes 20 associated with one gas container 11. In FIG. 2, the number of consumer's homes 20 associated with one gas container 11 is one, so the gas container installation information is 1. On the other hand, in an apartment building or the like where multiple consumer's homes 20 are located, a gas meter 13 is provided for each consumer's home 20, and the gas containers 11 are concentrated in one location. In other words, there is one gas container 11 associated with multiple customer homes 20. Therefore, if there are, for example, four customer homes 20, the above gas container installation information will be 4. The gas container installation information may also include the number of gas containers 11 installed upstream of the switch 12 in the customer home 20.
[0041] The remaining amount calculation unit 1 calculates a predicted value of the remaining gas amount in the gas container 11 after a second predetermined period has elapsed from the present using past data, which is the amount of gas consumed in the consumer's home 20 over a first predetermined period. Specifically, the remaining amount calculation unit 1 calculates the slope of the gas consumption amount using the past data over the first predetermined period, for example, to perform linear prediction. In this case, the remaining amount calculation unit 1 may calculate the slope of the gas consumption amount using the past data, for example, by the least squares method. The calculated slope can be used to calculate the amount of gas consumed after a second predetermined period has elapsed from the present. The remaining amount calculation unit 1 then converts the calculated gas consumption amount into a predicted value of the remaining gas amount. Specifically, the remaining amount calculation unit 1 obtains the predicted value of the remaining gas amount by subtracting the calculated gas consumption amount from the initial amount of gas. This predicted value is stored in the memory unit 4. Here, the remaining amount calculation unit 1 changes the frequency at which the predicted value of the remaining gas amount is calculated based on predetermined prediction frequency change trigger information. For example, the predetermined frequency may be once every seven days, once every three days, or once a day, etc. The prediction frequency change trigger information will be described in detail later.
[0042] The remaining amount calculation unit 1 may use a gas yield rate when calculating the remaining amount of gas. In this case, the remaining amount calculation unit 1 calculates the remaining amount of gas using a gas yield rate corresponding to the area where the consumer's home 20 corresponding to the gas meter 13 that transmits the measurement result is located or a gas yield rate corresponding to the date on which the measurement result by the gas meter 13 was obtained.
[0043] The notification unit 2 controls a display unit or an audio device to issue a warning, and notifies the user of the need to replace the gas container 11 based on the predicted remaining gas amount calculated by the remaining amount calculation unit 1. Specifically, the notification unit 2 compares the predicted remaining gas amount calculated by the remaining amount calculation unit 1 with a threshold value, and if the predicted remaining gas amount is less than the threshold value (hereinafter referred to as the replacement threshold), issues a warning to the business operator who will be replacing the gas container 11 to urge them to replace the gas container 11. This warning may be sent by email to the business operator, etc. After receiving the warning, the business operator replaces the gas container 11 at the consumer's home 20, and upon completion of the replacement, notifies the center server 10 that the replacement has been completed. The notification from the business operator is stored in the memory unit 4 together with the date.
[0044] The replacement threshold may be, for example, 10% of the volume of the gas container 11. However, the replacement threshold is not limited to this and may be, for example, a value between 10% and 50%. In this case, the notification unit 2 notifies the user that the replacement is due when the remaining gas amount falls below the replacement threshold, and does not notify the user that the replacement is due if the remaining gas amount is equal to or greater than the replacement threshold. The 10% may be 10% of the total volume of the gas containers 11 installed in each consumer's home 20 (i.e., the sum of the volumes of the gas containers 11), or 10% of the volume of any one of the multiple gas containers 11. The notification may be made by creating a list of consumer's homes 20 whose remaining gas amount falls below the replacement threshold and transmitting the list to the service provider, for example, once a day.
[0045] The memory unit 4 stores information on the amount of gas used in the consumer's home 20, received from the communication unit 13a via the communication unit 3, together with date information relating to whether or not use was made (i.e., the amount of use was zero), an ID identifying the consumer's home 20, and location information for the consumer's home 20. The memory unit 4 also stores a replacement threshold and each threshold described below, as well as the value of the remaining gas amount calculated by the remaining amount calculation unit 1, etc.
[0046] Hereinafter, the prediction frequency change trigger information will be described with several specific examples.
[0047] (First Example) The remaining amount calculation unit 1 can use the replacement period of the gas container 11 as the prediction frequency change trigger information. FIG. 3 is a diagram for explaining the replacement period of the gas container 11. As shown in FIG. 3, the replacement period is, for example, the number of days between one gas container replacement date and the other gas container replacement date for the two most recent gas container replacements, with the current date as the base date. For example, if one gas container replacement date is April 1st and the other gas container replacement date is April 20th, the replacement period is set to 19 days. The remaining amount calculation unit 1 reads the above-mentioned notification from the business operator from the memory unit 4 and calculates the replacement period of the gas container 11.
[0048] For example, the remaining amount calculation unit 1 may calculate the predicted value once every three days until half the number of days since the gas container 11 was replaced has passed, and may calculate the predicted value once a day after the number of days since the replacement has passed half the number of days since the replacement. In this way, the remaining amount calculation unit 1 may change the frequency with which it calculates the predicted value of the remaining gas amount based on past actual values of the replacement period.
[0049] FIG. 4 is a diagram showing an example of a replacement cycle by season. In consumer homes 20, gas consumption often varies significantly from season to season. Therefore, the replacement cycle of the gas container 11 may change from season to season. For example, as shown in FIG. 4, the replacement cycle from April to September (a relatively hot season) at consumer homes A and B is often longer than the replacement cycle from October to March (a relatively cold season). For this reason, it is desirable for the remaining amount calculation unit 1 to calculate the replacement cycle by season rather than using the same replacement cycle throughout the year.
[0050] (Second Example) The remaining amount calculation unit 1 can use the elapsed time since the gas container 11 was replaced as the prediction frequency change trigger information. In this case, the remaining amount calculation unit 1 reads the most recent replacement completion notification from the provider from the storage unit 4 and calculates the elapsed time from the date of the notification to the present. For example, the remaining amount calculation unit 1 can calculate a predicted value once every three days for a certain period of time immediately after replacement, and once every two days after the certain period has elapsed. In this way, the remaining amount calculation unit 1 may change the frequency at which it calculates a predicted value of the remaining gas amount based on the elapsed time since the gas container 11 was replaced.
[0051] (Third Example) As in the first example, the remaining amount calculation unit 1 can use the replacement cycle of the gas container 11 as the prediction frequency change trigger information. The remaining amount calculation unit 1 compares the replacement cycle of the gas container 11 with a first threshold. An example of the first threshold is seven days. The remaining amount calculation unit 1 calculates a predicted value of the remaining gas amount only for consumer homes 20 whose replacement cycle is equal to or longer than the first threshold. In contrast, for consumer homes 20 whose replacement cycle is shorter than the first threshold, the remaining amount calculation unit 1 does not calculate a predicted value. In other words, the remaining amount calculation unit 1 sets the number of calculations of the predicted value to zero. This is based on the idea that for consumer homes 20 whose replacement cycle is, for example, shorter than seven days, it is sufficient to simply repeat the replacement cycle of the gas container 11 without predicting the remaining gas amount. In this way, the remaining amount calculation unit 1 may change the frequency at which it calculates a predicted value of the remaining gas amount based on past actual values of the replacement cycle.
[0052] (Fourth Example) The remaining amount calculation unit 1 can use the remaining gas amount obtained from the gas consumption amount as the trigger information for changing the prediction frequency. Specifically, the remaining amount calculation unit 1 compares the remaining gas amount with a third threshold, and when the remaining gas amount is equal to or greater than the third threshold, calculates the predicted value of the remaining gas amount less frequently than when the remaining gas amount is less than the third threshold. The third threshold can be, for example, a value equal to 50% of the capacity of the gas container 11. In this case, the remaining amount calculation unit 1 calculates the predicted value once every seven days when the remaining gas amount is 50% or greater of the capacity of the gas container 11. In contrast, when the remaining gas amount is less than 50% of the capacity of the gas container 11, the remaining amount calculation unit 1 can calculate the predicted value once every two days. In this way, the remaining amount calculation unit 1 can change the frequency with which it calculates the predicted value of the future remaining gas amount based on the current remaining gas amount.
[0053] (Fifth Example) The fifth example is a modification of the fourth example. Here, the remaining amount calculation unit 1 calculates a predicted value of the remaining gas amount only when the remaining gas amount is less than the second threshold. In contrast, when the remaining gas amount is equal to or greater than the second threshold, the remaining amount calculation unit 1 does not calculate a predicted value of the remaining gas amount. In other words, the remaining amount calculation unit 1 sets the number of calculations of the predicted value to zero. In this way, the remaining amount calculation unit 1 may change the frequency with which it calculates a predicted value of the future remaining gas amount based on the current remaining gas amount.
[0054] (Sixth Example) The remaining amount calculation unit 1 can use the notification by the notification unit 2 of the time to replace the gas container 11 as the trigger information for changing the prediction frequency. In this case, the remaining amount calculation unit 1 can calculate the predicted value once every two days before the notification is made, and once a day after the notification is made. In this way, the remaining amount calculation unit 1 can change the frequency at which it calculates the predicted value of the remaining gas amount based on the notification by the notification unit 2.
[0055] The process that summarizes the first embodiment will now be described with reference to a flowchart. Fig. 5 is a flowchart showing an example of the flow of the process performed by the remaining gas amount management system 100 of the first embodiment.
[0056] In the gas remaining amount management system 100, as shown in Figure 5, the gas meter 13 first measures the flow rate of gas flowing from the gas container 11 installed in the consumer's home 20 to the gas equipment 14 and converts it into an indicator value that provides information on the amount of gas used (consumption) (step S1).
[0057] Next, the remaining amount calculation unit 1 receives information on the amount of gas used sent from the communication unit 13a of the gas meter 13 in the consumer's home 20 via the communication unit 3, and calculates the remaining amount of gas based on the information on the amount of gas used (step S2). When calculating a predicted value of the future remaining amount of gas, the remaining amount calculation unit 1 changes the frequency of the calculation based on the above-mentioned prediction frequency change trigger information (step S3). Note that the processing of step S3 includes cases where the remaining amount calculation unit 1 increases the frequency of calculation of the predicted value and cases where the number of calculations is set to zero, as described above.
[0058] Next, the notification unit 2 compares the predicted value of the remaining gas amount calculated by the remaining amount calculation unit 1 with the replacement threshold value (step S4). If the predicted value of the remaining gas amount is less than the replacement threshold value (Yes in step S4), the notification unit 2 sends a replacement instruction to the business operator to warn them (step S5). On the other hand, if the predicted value of the remaining gas amount is equal to or greater than the replacement threshold value (No in step S4), the remaining amount calculation unit 1 returns to the processing of the above-mentioned step S1 and repeats the subsequent processing. Note that if the number of calculations is set to zero in the processing of step S3, in the processing of step S4, it is possible to determine whether or not the gas container 11 needs to be replaced based on a comparison between the current remaining gas amount calculated by the remaining amount calculation unit 1 and the replacement threshold value.
[0059] As described above, according to the gas remaining amount management system 100 of this embodiment, the remaining amount calculation unit 1 changes the frequency with which it calculates the predicted value of the remaining gas amount based on predetermined prediction frequency change trigger information. In this case, the remaining amount calculation unit 1 calculates the predicted value at a predetermined frequency for a certain period of time, and then calculates the predicted value at a frequency higher than the predetermined frequency after the certain period has elapsed. In this way, the predicted value is calculated more frequently after the certain period has elapsed, but the predicted value is not calculated more frequently before the certain period has elapsed. This reduces the load on the server compared to conventional systems, thereby reducing the need to upgrade the server specifications while suppressing increases in processing time. Furthermore, particularly when performing predictions using machine learning, the cost and processing time required to create input processing information for learning and to create a prediction model can be enormous. However, the gas remaining amount management system 100 of this embodiment can reduce these costs and processing time. As a result, it is possible to reduce the cost and processing time required to predict the remaining gas amount at a consumer's home 20.
[0060] Second Embodiment The second embodiment will be described with several specific examples of prediction frequency change trigger information. Unlike the first embodiment, the second embodiment calculates a predicted value of the remaining gas amount once before changing the frequency of calculating the predicted value of the remaining gas amount. Figure 6 is a diagram showing a time series related to management of the remaining gas amount in a customer's home 20 in the second embodiment.
[0061] (Seventh Example) As shown in FIG. 6 , the remaining amount calculation unit 1 calculates a predicted value of the remaining gas amount after a second predetermined period (e.g., seven days) has elapsed, based on the present. The remaining amount calculation unit 1 then compares the calculated predicted value with a fourth threshold value, using the calculated predicted value as prediction frequency change trigger information. During a period in which the comparison result indicates that the predicted value is equal to or greater than the fourth threshold value, the remaining amount calculation unit 1 calculates the predicted value, for example, once every three days. On the other hand, during a period in which the predicted value is less than the fourth threshold value, the remaining amount calculation unit 1 calculates the predicted value more frequently, for example, once a day. Additionally, the notification unit 2 compares the calculated predicted value with a replacement threshold value. When the comparison result indicates that the predicted value is less than the replacement threshold value, the notification unit 2 alerts the service provider. In this manner, the remaining amount calculation unit 1 may change the frequency with which it calculates the predicted value of the remaining gas amount.
[0062] (Eighth Example) Fig. 7 is a diagram showing a time series relating to management of the remaining gas amount according to a modification of Fig. 6. In this example, instead of using the predicted value of the remaining gas amount as the trigger information for changing the prediction frequency as in the seventh example, the trigger information for changing the prediction frequency is the number of days that the gas container 11 can be used until it needs to be replaced, which can be calculated based on the predicted value of the remaining gas amount.
[0063] 7, the remaining amount calculation unit 1 calculates a predicted value of the remaining amount of gas after a second predetermined period (for example, after 7 days) has elapsed from the present as in the case of FIG. 6. Then, the remaining amount calculation unit 1 calculates the number of usable days until the time for replacement of the gas container 11 based on the calculated predicted value and the replacement threshold value. For example, if the calculated predicted value of the remaining amount of gas (predicted value after 7 days) is 1.5 m 3 and the replacement threshold is 1 m 3 In this case, the remaining capacity calculation unit 1 performs linear prediction to obtain the number of usable days, for example, 10 days.
[0064] The remaining amount calculation unit 1 compares the calculated number of usable days with a fifth threshold (e.g., 14 days). During a period in which the comparison result indicates that the number of usable days is equal to or greater than the fifth threshold, the remaining amount calculation unit 1 calculates a predicted value, for example, once every two days. In contrast, during a period in which the number of usable days is less than the fifth threshold, the remaining amount calculation unit 1 calculates a predicted value, for example, once a day, to increase the frequency of predictions. Additionally, the notification unit 2 compares the number of usable days with a replacement threshold (a value obtained by converting, for example, 10% of the volume of the gas container 11 into a number of days, e.g., 7 days). When the comparison result indicates that the number of usable days is less than the replacement threshold, the notification unit 2 alerts the provider. In this manner, the remaining amount calculation unit 1 may change the frequency with which it calculates a predicted value of the remaining gas amount.
[0065] (Ninth Example) In this example, first, the remaining amount calculation unit 1 calculates the current remaining amount of gas. Then, similar to the seventh example, the remaining amount calculation unit 1 calculates a predicted value of the remaining amount of gas after a second predetermined period has elapsed (for example, after seven days have elapsed) based on the current remaining amount of gas. Furthermore, the remaining amount calculation unit 1 calculates a consumable amount, which is the amount that can be used per day until the second predetermined period has elapsed, based on the current remaining amount of gas and the predicted value of the remaining amount of gas. For example, if the current remaining amount of gas is 3 m 3 The predicted remaining gas volume after 7 days is 1.5 m 3 If so, the available consumable amount per day is 0.21429 m 3 This becomes:
[0066] The remaining amount calculation unit 1 uses the gas consumption amount at the consumer's home 20 on the day following the day on which the consumable amount was calculated as prediction frequency change trigger information and compares the calculated gas consumption amount with the consumable amount. If the comparison result shows that the gas consumption amount at the consumer's home 20 exceeds the consumable amount, the remaining amount calculation unit 1 calculates a predicted value of the remaining gas amount. On the other hand, if the gas consumption amount at the consumer's home 20 is equal to or less than the consumable amount, the remaining amount calculation unit 1 does not calculate a predicted value of the remaining gas amount. In other words, the remaining amount calculation unit 1 sets the number of calculations of the predicted value to zero. In this way, the remaining amount calculation unit 1 may change the frequency with which it calculates a predicted value of the remaining gas amount.
[0067] The process that summarizes the second embodiment will now be described with reference to a flowchart. Fig. 8 is a flowchart showing an example of the flow of the process performed by the remaining gas amount management system 100 of the second embodiment.
[0068] In the gas remaining amount management system 100, as shown in Figure 8, the gas meter 13 first measures the flow rate of gas flowing from the gas container 11 installed in the consumer's home 20 to the gas equipment 14 and converts it into an indicator value that provides information on the amount of gas used (consumption) (step S11).
[0069] Next, the remaining amount calculation unit 1 receives information on the amount of gas used from the communication unit 13a of the gas meter 13 in the consumer's home 20 via the communication unit 3, and calculates the remaining amount of gas based on the information on the amount of gas used (step S12).The remaining amount calculation unit 1 then calculates a predicted value of the remaining amount of gas after the second predetermined period has elapsed, based on the present (step S13).
[0070] Next, the remaining amount calculation unit 1 changes the frequency of calculating the predicted value of the remaining gas amount based on the above-mentioned prediction frequency change trigger information (step S14). Note that the processing of step S14 includes the case where the remaining amount calculation unit 1 increases the calculation frequency of the predicted value as described above, and the case where the calculation count is set to zero.
[0071] Next, the notification unit 2 compares the predicted value of the remaining gas amount calculated by the remaining amount calculation unit 1 with the replacement threshold (step S15). If the predicted value of the remaining gas amount is less than the replacement threshold (Yes in step S15), the notification unit 2 sends a replacement instruction to the business operator to warn them (step S16). On the other hand, if the predicted value of the remaining gas amount is equal to or greater than the replacement threshold (No in step S15), the remaining amount calculation unit 1 returns to the process of step S11 and repeats the subsequent processes. Note that if the number of calculations is set to zero in the process of step S14, in the process of step S15, it is possible to determine whether or not the gas container 11 needs to be replaced based on a comparison between the current remaining gas amount calculated by the remaining amount calculation unit 1 and the replacement threshold.
[0072] As described above, in the second embodiment, the remaining gas amount calculation unit 1 also changes the frequency at which it calculates the predicted value of the remaining gas amount based on the prediction frequency change trigger information. Therefore, as in the first embodiment described above, the load on the server can be reduced compared to the conventional method, thereby reducing the need to upgrade the specifications of the server while suppressing increases in processing time. Furthermore, particularly when performing predictions using machine learning, the cost and processing time required to create input processing information for learning and to create a prediction model can be enormous. However, the second embodiment can also reduce these costs and processing time. As a result, it is possible to reduce the cost and processing time required to predict the remaining gas amount at the consumer's home 20.
[0073] (Modifications) The present invention is not limited to the above-described embodiment, and various modifications are possible without departing from the spirit of the present invention. For example, the following modifications are possible.
[0074] In the above embodiment, the notification unit 2 notifies the user when it is time to replace the gas container 11, but this is not limited to this. The notification unit 2 may also notify the user of a predicted amount of remaining gas, or the replacement period for the gas container 11, etc.
[0075] In the above embodiment, an ultrasonic meter, for example, can be used as the gas meter 13. However, the present invention is not limited to this, and a membrane meter using a measuring membrane or the like can also be used as the gas meter 13.
[0076] In addition, in the above embodiment, the predicted value of the remaining gas amount was calculated by linear prediction using the remaining amount calculation unit 1, but this is not limited to this, and the predicted value of the remaining gas amount may also be calculated by machine learning using artificial intelligence.
[0077] In addition, in the above embodiment, it has been explained that it is desirable to calculate the replacement period by season rather than using the same replacement period throughout the year, but this is not limited to this, and the replacement period may be calculated, for example, by month to make the replacement period even stricter.
[0078] In the above embodiment, the remaining gas quantity management system 100 has been described as a technical concept including the gas meter 13 and the center server 10, but the present invention is not limited to this. The remaining gas quantity management system 100 may also be a system provided in the gas meter 13 alone.
[0079] In the above embodiment, the remaining amount calculation unit 1 and the notification unit 2 are provided in the center server 10, but this is not limiting. The remaining amount calculation unit 1 and the notification unit 2 may be provided in the gas meter 13, and the center server 10 may have a function to output the notification content.
[0080] In addition, in the above embodiment, two gas containers 11 and two gas appliances 14 are exemplified for each consumer's home 20, but this is not limited to this, and the number of gas containers 11 may be one or three or more, and the number of gas appliances 14 may also be one or three or more.
[0081] Furthermore, in the above embodiment, the gas container 11 is filled with LP gas (liquefied petroleum gas) as an example of a gas, but this is not limited to this, and the gas container 11 may also be filled with other gases such as oxygen.
[0082] REFERENCE SIGNS LIST 1 Remaining amount calculation unit 2 Notification unit 3 Communication unit 4 Storage unit 10 Center server 11 Gas cylinder 13 Gas meter 13a Communication unit 14 Gas appliance 20 Customer's home 100 Gas remaining amount management system
Claims
1. A gas remaining quantity management system comprising: a flow rate measuring unit that measures the flow rate of gas flowing from a gas container installed in one or more consumer homes to a gas appliance; a remaining quantity calculation unit that calculates a predicted value of the remaining gas quantity in the gas container after a second specified period has elapsed using past data that is the past gas consumption during a first specified period; and an alarm unit that notifies the user of the time to replace the gas container based on the predicted value or the replacement period of the gas container, wherein the remaining quantity calculation unit changes the frequency at which the predicted value is calculated based on specified prediction frequency change trigger information.
2. The gas remaining amount management system according to claim 1, wherein the remaining amount calculation unit changes the frequency based on a past performance value of the replacement period as the predicted frequency change trigger information.
3. The gas remaining amount management system according to claim 1, wherein the remaining amount calculation unit changes the frequency based on the elapsed time since the gas container was replaced, which serves as the prediction frequency change trigger information.
4. The gas remaining amount management system of claim 1, wherein the remaining amount calculation unit calculates the predicted value when the replacement period as the prediction frequency change trigger information is equal to or greater than a first threshold value, and does not calculate the predicted value when the replacement period is less than the first threshold value.
5. A gas remaining amount management system as described in claim 1, wherein the remaining amount calculation unit changes the frequency based on the remaining gas amount obtained from the gas consumption amount as the predicted frequency change trigger information.
6. A gas remaining amount management system as described in claim 5, wherein the remaining amount calculation unit calculates the predicted value when the remaining gas amount is less than a second threshold value.
7. A gas remaining amount management system as described in claim 5, wherein the remaining amount calculation unit reduces the frequency when the remaining amount of gas is equal to or greater than a third threshold value compared to when the remaining amount of gas is less than the third threshold value.
8. The gas remaining amount management system according to claim 1, wherein the remaining amount calculation unit changes the frequency based on a notification by the notification unit as the prediction frequency change trigger information.
9. The gas remaining quantity management system of claim 1, wherein the remaining quantity calculation unit, after calculating the predicted value, compares the predicted value as the prediction frequency change trigger information with a fourth threshold value, and when the predicted value is equal to or greater than the fourth threshold value, lowers the frequency compared to when the predicted value is less than the fourth threshold value.
10. The gas remaining quantity management system of claim 1, wherein the remaining quantity calculation unit calculates the number of usable days until the gas container needs to be replaced based on the predicted value after calculating the predicted value, compares the number of usable days as the trigger information for changing the predicted frequency with a fifth threshold value, and when the number of usable days is equal to or greater than the fifth threshold value, lowers the frequency compared to when the number of usable days is less than the fifth threshold value.
11. The gas remaining amount management system of claim 1, wherein the remaining amount calculation unit, after calculating the predicted value, calculates a consumable amount, which is the amount that can be used per day until the second specified period has elapsed, based on the current remaining gas amount and the predicted value, compares the gas consumption on the day following the day on which the consumable amount was calculated as the prediction frequency change trigger information with the consumable amount, and calculates the predicted value if the gas consumption exceeds the consumable amount, and does not calculate the predicted value if the gas consumption is equal to or less than the consumable amount.
Citation Information
Patent Citations
Consumption estimation device of LP gas and consumption estimation method
JP2019020830A
Order system, order program and order method of LP gas
JP2019124284A
Gas delivery processing method, system, program, sever device, and recording medium
JP2021086533A
Gas provision management system, gas provision management method, and program
JP2021157516A