Method and system for assembling monitoring device on basis of electric energy meter and acquisition terminal asset number

By establishing a target asset number mapping table in the production execution subsystem and having the communication unit and monitoring unit automatically transmitted by the conveying equipment, the problem of mismatched asset numbers during the assembly of monitoring equipment was solved, thus achieving accurate assembly and efficient production of monitoring equipment.

WO2026040424A1PCT designated stage Publication Date: 2026-02-26HANGZHOU XILI INTELLIGENT TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2025/087273
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2024-08-21
Filing Date
2025-04-03
Publication Date
2026-02-26

AI Technical Summary

Technical Problem

In existing technologies, when manually assembling the communication unit and monitoring unit of monitoring equipment, the asset number may not match, leading to incorrect data transmission relationships and making it impossible to accurately obtain data from the monitoring equipment.

Method used

The production execution subsystem establishes a target asset number mapping table, and the communication unit and monitoring unit transmission equipment automatically transmit the data to the assembly equipment according to the mapping table and a preset order, ensuring accurate asset number correspondence.

Benefits of technology

It enables accurate assembly of monitoring equipment, ensures the correspondence between the asset numbers of communication units and monitoring units, improves assembly efficiency and accuracy, and avoids human error.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2025087273_26022026_PF_FP_ABST
    Figure CN2025087273_26022026_PF_FP_ABST
Patent Text Reader

Abstract

Disclosed in the embodiments of the present disclosure are a method and system for assembling a monitoring device on the basis of an electric energy meter and an acquisition terminal asset number. The method comprises: by means of a production execution subsystem and on the basis of a received target production task, establishing a target asset number mapping table, and sending the target asset number mapping table to a communication unit conveying device and a monitoring unit conveying device; by means of the communication unit conveying device and on the basis of a target communication unit asset number in the received target asset number mapping table and a preset conveying sequence, conveying the current communication unit to an assembly device; by means of the monitoring unit conveying device and on the basis of a target monitoring unit asset number in the received target asset number mapping table and a preset conveying sequence, conveying the current monitoring unit to the assembly device; and, by means of the assembly device, encapsulating the received current communication unit and current monitoring unit, so as to accurately and conveniently obtain a target monitoring device, and ensure that the target communication unit asset number and the target monitoring unit asset number in the target monitoring device accurately corresponds to each other.
Need to check novelty before this filing date? Find Prior Art

Description

Method and system for assembling monitoring device based on electric energy meter and asset number of collection terminal

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] The present disclosure claims priority to the Chinese patent application No. 202411153403X, filed on August 21, 2024, and entitled “Method and system for assembling monitoring device based on electric energy meter and asset number of collection terminal”, the content of which is incorporated herein by reference in its entirety. TECHNICAL FIELD

[0003] Embodiments of the present disclosure relate to the technical field of computer, and in particular, to a method and system for assembling monitoring device based on electric energy meter and asset number of collection terminal. BACKGROUND

[0004] With the development of technology, it has been generally realized that monitoring devices transmit data remotely through communication units. Especially in the power industry, remote transmission of monitoring voltage or current can be realized.

[0005] Currently, the communication unit is usually assembled into the monitoring unit based on manual assembly to obtain a monitoring device capable of remotely transmitting data, and the communication unit asset number of the communication unit and the monitoring unit asset number of the monitoring unit included in the assembled monitoring device are recorded based on manual recording, so as to provide the monitoring device and its corresponding asset number information to the customer.

[0006] However, this manual assembly and recording method is time-consuming and laborious. After recording the asset number, if the communication unit is taken out, it cannot be tracked, and when it is assembled again, it may be assembled incorrectly, resulting in that the recorded asset number does not correspond to the monitoring device, and when the customer uses the non-corresponding asset number to establish the data transmission relationship of the monitoring device, the accurate data of the monitoring device cannot be obtained.

[0007] SUMMARY

[0008] Embodiments of the present disclosure provide a method and system for assembling monitoring device based on electric energy meter and asset number of collection terminal, to accurately and conveniently realize the assembly of monitoring device corresponding to production task, and ensure the accurate correspondence between the communication unit asset number and the monitoring unit asset number in the monitoring device.

[0009] Embodiments of the present disclosure provide a method for assembling monitoring device based on electric energy meter and asset number of collection terminal, comprising:

[0010] receiving a target production task to be assembled by a production execution subsystem, and establishing a target asset number mapping table corresponding to the target production task based on the target production task, and sending the target asset number mapping table to a communication unit transfer device and a monitoring unit transfer device;

[0011] The communication unit transmission device determines a current communication unit to be transmitted based on the target communication unit asset number in the received target asset number mapping table and a preset transmission sequence, and transmits the current communication unit to the assembly device;

[0012] The monitoring unit transmission device determines a current monitoring unit to be transmitted based on the target monitoring unit asset number in the received target asset number mapping table and a preset transmission sequence, and transmits the current monitoring unit to the assembly device;

[0013] The assembly device encapsulates the received current communication unit and current monitoring unit to obtain a target monitoring device corresponding to the target production task.

[0014] Optionally, the method further comprises that the monitoring unit comprises at least one of a voltmeter, an ammeter, a watt-hour meter, a fire meter, an electric energy meter and a kilowatt-hour meter; and the communication unit comprises a collection terminal.

[0015] Optionally, the method further comprises determining target accessory information corresponding to each target product in the target production task; and establishing a target asset number mapping table corresponding to the target production task based on a target communication unit asset number corresponding to a target communication unit and a target monitoring unit asset number corresponding to a target monitoring unit in each target accessory information.

[0016] Optionally, the method further comprises establishing a target asset number mapping relationship corresponding to each target product based on a target communication unit asset number corresponding to a target communication unit and a target monitoring unit asset number corresponding to a target monitoring unit in each target accessory information; and sorting each target asset number mapping relationship based on a preset asset number sorting manner to obtain the target asset number mapping table corresponding to the target production task.

[0017] Optionally, the method further comprises that the communication unit transmission device determines a current communication unit asset number to be transmitted based on the target communication unit asset number in the received target asset number mapping table and a preset transmission sequence; and the communication unit transmission device performs asset number identification on the current communication unit to be transmitted to obtain a reference communication unit asset number, and continues to transmit the current communication unit to the assembly device when the reference communication unit asset number is the current communication unit asset number.

[0018] Optionally, the method further comprises: determining, by the monitoring unit conveying device, a current monitoring unit asset number of a current conveying based on the received target asset number mapping table and a preset conveying sequence; performing, by the monitoring unit conveying device, asset number identification on the current monitoring unit of the current conveying, obtaining a reference monitoring unit asset number, and when the reference monitoring unit asset number is the current monitoring unit asset number, conveying the current monitoring unit to a nameplate installation device and sending the current monitoring unit asset number to the nameplate installation device; and based on the received current monitoring unit asset number, performing, by the nameplate installation device, nameplate engraving to obtain a current device nameplate of the current monitoring unit, and installing the current device nameplate to the received current monitoring unit, and conveying the nameplate installation completed current monitoring unit to an assembly device.

[0019] Optionally, the method further comprises: sending, by the production execution subsystem, the target asset number mapping table to a checking device.

[0020] Optionally, the method further comprises: packaging, by the assembly device, the received current communication unit and the current monitoring unit to obtain a candidate monitoring device corresponding to a current product, and conveying the candidate monitoring device to a checking device; performing, by the checking device, asset number identification on the received candidate monitoring device to obtain a candidate communication unit asset number and a candidate monitoring unit asset number corresponding to the candidate monitoring device; and if a mapping relationship exists between the candidate communication unit asset number and the candidate monitoring unit asset number based on the received target asset number mapping table, determining, by the checking device, the candidate monitoring device as a current monitoring device corresponding to the current product, and obtaining, based on each current monitoring device, a target monitoring device corresponding to the target production task.

[0021] Optionally, the method further comprises: performing, by the checking device, nameplate scanning on the received candidate monitoring device to obtain a candidate monitoring unit asset number corresponding to the candidate monitoring device; and performing, by the checking device, communication identification on the received candidate monitoring device to obtain a candidate communication unit asset number corresponding to the candidate monitoring device.

[0022] The embodiments of the present disclosure further provide a system for assembling a monitoring device based on an electric energy meter and a collection terminal asset number, which comprises:

[0023] a production execution subsystem configured to receive a target production task to be assembled, and based on the target production task, establish a target asset number mapping table corresponding to the target production task, and send the target asset number mapping table to a communication unit conveying device and a monitoring unit conveying device;

[0024] The communication unit conveying device is configured to determine a current communication unit for current conveying based on a target communication unit asset number in the received target asset number mapping table and a preset conveying sequence, and convey the current communication unit to the assembling device;

[0025] The monitoring unit conveying device is configured to determine a current monitoring unit for current conveying based on a target monitoring unit asset number in the received target asset number mapping table and a preset conveying sequence, and convey the current monitoring unit to the assembling device;

[0026] The assembling device is configured to package the received current communication unit and the current monitoring unit to obtain a target monitoring device corresponding to the target production task.

[0027] The technical scheme of the embodiment of the present disclosure receives a target production task to be assembled by a production execution subsystem, establishes a target asset number mapping table corresponding to the target production task based on the target production task, and sends the target asset number mapping table to a communication unit conveying device and a monitoring unit conveying device; the communication unit conveying device determines a current communication unit for current conveying based on a target communication unit asset number in the received target asset number mapping table and a preset conveying sequence, and conveys the current communication unit to the assembling device; the monitoring unit conveying device determines a current monitoring unit for current conveying based on a target monitoring unit asset number in the received target asset number mapping table and a preset conveying sequence, and conveys the current monitoring unit to the assembling device; and the assembling device packages the received current communication unit and the current monitoring unit to accurately and conveniently obtain a target monitoring device corresponding to the target production task, and ensures accurate correspondence between a target communication unit asset number and a target monitoring unit asset number in the target monitoring device.

[0028] It should be understood that the content described in this part is not intended to identify key or important features of the embodiments of the present disclosure, nor is it used to limit the scope of the present disclosure. Other features of the present disclosure will become apparent from the following description. BRIEF DESCRIPTION OF DRAWINGS

[0029] In order to more clearly illustrate the technical solutions in the embodiments of the present disclosure, the drawings needed in the embodiment description will be briefly introduced as follows. Obviously, the drawings in the following description are only some embodiments of the present disclosure, and other drawings can be obtained by those skilled in the art without creative labor.

[0030] FIG. 1 is a flowchart of a method for assembling a monitoring device based on an electric energy meter and an asset number of a collection terminal according to an embodiment of the present disclosure;

[0031] FIG. 2 is a flow chart of a method for assembling a monitoring device based on an electric energy meter and a terminal asset number according to an embodiment of the present disclosure;

[0032] FIG. 3 is an example diagram of a target asset number mapping table according to an embodiment of the present disclosure;

[0033] FIG. 4 is an interface for enabling carrier nameplate binding according to an embodiment of the present disclosure;

[0034] FIG. 5 is a flow chart of a method for assembling a monitoring device based on an electric energy meter and a terminal asset number according to an embodiment of the present disclosure;

[0035] FIG. 6 is a structural diagram of a system for assembling a monitoring device based on an electric energy meter and a terminal asset number according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0036] In order to make the personnel in the technical field better understand the present disclosure, the technical solutions in the embodiments of the present disclosure will be clearly and completely described below with reference to the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are only a part of the embodiments of the present disclosure, not all the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by those skilled in the art without creative labor should be within the scope of protection of the present disclosure.

[0037] It should be noted that the terms "first", "second", etc. in the specification and claims of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and do not necessarily describe a specific order or sequence. It should be understood that the data thus used can be interchanged under appropriate circumstances, so that the embodiments of the present disclosure described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusion, for example, a process, method, system, product or device including a series of steps or units does not necessarily have to be limited to those steps or units clearly listed, but can include other steps or units not clearly listed or inherent to these processes, methods, products or devices.

[0038] FIG. 1 is a flow chart of a method for assembling a monitoring device based on an electric energy meter and a terminal asset number according to an embodiment of the present disclosure. The present embodiment can be applied to the case of assembling a current communication unit and a current monitoring unit belonging to the same monitoring device according to a pre-allocated asset number. The method can be performed by a system for assembling a monitoring device based on an electric energy meter and a terminal asset number, which can be realized in the form of hardware and / or software. As shown in FIG. 1, the method comprises:

[0039] S110, receiving, by the production execution subsystem, a target production task to be assembled, establishing a target asset number mapping table corresponding to the target production task based on the target production task, and sending the target asset number mapping table to the communication unit transfer device and the monitoring unit transfer device.

[0040] The production execution subsystem can be a set of production informatization management system for the execution layer of the manufacturing enterprise workshop. For example, the production execution subsystem can be MES (Manufacturing Execution System). The target production task can be a device production task in the order placed by the customer. For example, the target production task can include a single-phase table for a certain place. The target asset number mapping table can be a mapping table representing the mapping relationship between the target communication unit asset number and the target monitoring unit asset number of the same product in the target production task. The communication unit transfer device can be configured to select and transfer the communication unit corresponding to the specific asset number. The monitoring unit transfer device can be configured to select and transfer the monitoring unit corresponding to the specific asset number.

[0041] Specifically, the order placed by the customer is scanned by the order scanning device to obtain the target production task to be assembled, and the target production task is sent to the production execution subsystem, so that the production execution subsystem receives the target production task to be assembled, establishes a target asset number mapping table corresponding to the target production task based on the target production task, and sends the target asset number mapping table to the communication unit transfer device and the monitoring unit transfer device.

[0042] S120, determining, by the communication unit transfer device, a current communication unit based on the target communication unit asset number in the received target asset number mapping table and a preset transfer sequence, and transferring the current communication unit to the assembly device.

[0043] The target communication unit asset number can be the communication unit asset number of the target communication unit to be assembled. The preset transfer sequence can be a preset asset number selection sequence. For example, the preset transfer sequence can be selected in the order of asset number from small to large. The current communication unit can be the communication unit corresponding to the currently selected communication unit asset number. The current communication unit can be the currently selected communication unit for transfer. The communication unit can be a communication module with data transmission function. For example, the communication unit can be configured to communicate between the power user electricity information acquisition system master station and the acquisition terminal, between the acquisition terminal and the collector, and between the collector / acquisition terminal and the electric meter. The assembly device can be configured for product assembly.

[0044] Specifically, the communication unit conveying device determines the conveying order of the target communication unit corresponding to each target communication unit asset number based on the target communication unit asset numbers in the received target asset number mapping table and the preset conveying order, and sequentially selects the current communication unit for conveying in the conveying order, and conveys the current communication unit to the assembly device, so that manual selection is not required, the selection efficiency of the current communication unit is improved, and the correspondence relationship of first assembly and then recording is adjusted to first establish a mapping relationship and then select a specific current communication unit based on the accurate mapping relationship to configure the assembly, thereby further improving the assembly accuracy.

[0045] On the basis of the above technical solutions, the "communication unit conveying device determines the current communication unit for conveying based on the target communication unit asset numbers in the received target asset number mapping table and the preset conveying order, and conveys the current communication unit to the assembly device" can include: the communication unit conveying device determines the current communication unit asset number for conveying based on the target communication unit asset numbers in the received target asset number mapping table and the preset conveying order; the communication unit conveying device identifies the asset number of the current communication unit for conveying to obtain a reference communication unit asset number, and continues to convey the current communication unit to the assembly device when the reference communication unit asset number is the current communication unit asset number.

[0046] The current communication unit asset number can be the current communication unit asset number of the current communication unit for conveying determined from the target asset number mapping table according to the preset conveying order. The reference communication unit asset number can be the actual communication unit asset number of the current communication unit for conveying.

[0047] Specifically, the communication unit conveying device determines the conveying order of the target communication unit corresponding to each target communication unit asset number based on the target communication unit asset numbers in the received target asset number mapping table and the preset conveying order, and sequentially selects the current communication unit for conveying in the conveying order, and determines the current communication unit asset number for conveying. The communication unit conveying device identifies the asset number of the current communication unit for conveying to obtain a reference communication unit asset number. If the reference communication unit asset number is the same as the current communication unit asset number, the current communication unit is continued to be conveyed to the assembly device. If the reference communication unit asset number is different from the current communication unit asset number, the conveying is stopped and the current communication unit is adjusted until the reference communication unit asset number is the same as the current communication unit asset number, and then the conveying is started, so that the asset number of the current communication unit to be assembled can be checked before assembly, and accurate communication units can be conveyed to the assembly device, thereby further improving the assembly accuracy of the monitoring device.

[0048] Exemplarily, the communication unit conveying device can scan and check the communication units on the conveying belt in a preset conveying order (asset number from small to large), and once the asset number order is found to be inconsistent with the preset conveying order, the conveying can be immediately stopped for adjustment processing, and after the adjustment is completed, the conveying and scanning check are continued.

[0049] In S130, the monitoring unit conveying device determines a current monitoring unit based on the target monitoring unit asset number in the received target asset number mapping table and the preset conveying order, and conveys the current monitoring unit to the assembly device.

[0050] The target monitoring unit asset number can refer to the monitoring unit asset number of the target monitoring unit to be assembled. The current monitoring unit can refer to the monitoring unit corresponding to the currently selected monitoring unit asset number. The current monitoring unit can be the monitoring unit currently selected for conveying. The monitoring unit can refer to a module or component with data acquisition function.

[0051] Specifically, the monitoring unit conveying device determines the conveying order of the target monitoring unit corresponding to each target monitoring unit asset number based on the target monitoring unit asset number in the received target asset number mapping table and the preset conveying order, and selects the current monitoring unit in turn according to the conveying order for conveying, and conveys the current monitoring unit to the assembly device, thereby improving the selection efficiency of the current monitoring unit without manual selection, and further improving the assembly accuracy by establishing the mapping relationship first and then selecting a specific current monitoring unit based on the accurate mapping relationship.

[0052] On the basis of the above technical solutions, the monitoring unit comprises at least one of a voltmeter, an ammeter, a watt-hour meter, a fire meter, an electric energy meter, and a kilowatt-hour meter; and the communication unit comprises an acquisition terminal.

[0053] In the embodiment of the present disclosure, the communication unit can comprise an acquisition terminal, and thus the communication unit asset number can be understood as or equivalent to the acquisition terminal asset number.

[0054] Exemplarily, the "transferring the current monitoring unit to the assembling device by the monitoring unit transferring device based on the target monitoring unit asset number in the received target asset number mapping table and the preset transfer sequence" can include: determining, by the monitoring unit transferring device, a current monitoring unit asset number of a current monitoring unit for current transfer based on the target monitoring unit asset number in the received target asset number mapping table and the preset transfer sequence; performing, by the monitoring unit transferring device, asset number identification on the current monitoring unit for current transfer to obtain a reference monitoring unit asset number, and continuing to transfer the current monitoring unit to the assembling device when the reference monitoring unit asset number is the current monitoring unit asset number.

[0055] The current monitoring unit asset number can refer to a current monitoring unit asset number of a current monitoring unit for current transfer determined from the target asset number mapping table according to the preset transfer sequence. The reference monitoring unit asset number can refer to an actual monitoring unit asset number of the current monitoring unit for current transfer.

[0056] Specifically, the monitoring unit transferring device determines a transfer sequence of a target monitoring unit corresponding to each target monitoring unit asset number based on the target monitoring unit asset number in the received target asset number mapping table and the preset transfer sequence, and sequentially selects a current monitoring unit for transfer according to the transfer sequence, and determines a current monitoring unit asset number of the current monitoring unit for current transfer. The monitoring unit transferring device performs asset number identification on the current monitoring unit for current transfer to obtain a reference monitoring unit asset number. If the reference monitoring unit asset number is the same as the current monitoring unit asset number, the current monitoring unit is continued to be transferred to the assembling device. If the reference monitoring unit asset number is different from the current monitoring unit asset number, the transfer is stopped and the current monitoring unit is adjusted until the reference monitoring unit asset number is the same as the current monitoring unit asset number, and then the transfer is started. Thus, the asset number of the current monitoring unit to be assembled can be checked before assembly, so that the accurate monitoring unit can be transferred to the assembling device, and the accuracy of the assembled monitoring device is further improved.

[0057] S140, encapsulating, by the assembling device, the received current communication unit and the current monitoring unit to obtain a target monitoring device corresponding to the target production task.

[0058] The target monitoring device can refer to an assembled monitoring device. The target monitoring device can be configured to be provided to a customer to complete a target production task. For example, if the monitoring unit is a voltmeter, the monitoring device is a smart voltmeter, and the smart voltmeter can be configured to periodically send the power voltage value of the user to the data center. If the monitoring unit is an ammeter, the monitoring device is a smart ammeter, and the smart ammeter can be configured to periodically send the power current value of the user to the data center.

[0059] Specifically, the received current communication unit is packaged into the current monitoring unit by the assembling device to complete the packaging, and the current monitoring device is obtained. After all the target monitoring units and target communication units are packaged, the target monitoring device corresponding to the target production task is obtained.

[0060] The technical scheme of the embodiment of the present disclosure receives the target production task to be assembled by the production execution subsystem, establishes the target asset number mapping table corresponding to the target production task based on the target production task, and sends the target asset number mapping table to the communication unit conveying device and the monitoring unit conveying device. The target communication unit asset number in the target asset number mapping table received and the preset conveying sequence are used to determine the current communication unit conveyed by the communication unit conveying device, and the current communication unit is conveyed to the assembling device. The target monitoring unit asset number in the target asset number mapping table received and the preset conveying sequence are used to determine the current monitoring unit conveyed by the monitoring unit conveying device, and the current monitoring unit is conveyed to the assembling device. The current communication unit and the current monitoring unit received are packaged by the assembling device to accurately and conveniently obtain the target monitoring device corresponding to the target production task, and the accurate correspondence between the target communication unit asset number and the target monitoring unit asset number in the target monitoring device is ensured.

[0061] FIG. 2 is a flowchart of a method for assembling a monitoring device based on an electric energy meter and a collection terminal asset number according to an embodiment of the present disclosure. The embodiment describes in detail the process of conveying the current monitoring unit to the assembling device by the monitoring unit conveying device based on the above-mentioned embodiment. The explanations of the same or corresponding terms in the above-mentioned embodiments are not repeated here. As shown in FIG. 2, the method comprises:

[0062] S210, receiving the target production task to be assembled by the production execution subsystem, establishing the target asset number mapping table corresponding to the target production task based on the target production task, and sending the target asset number mapping table to the communication unit conveying device and the monitoring unit conveying device.

[0063] Based on the above technical scheme, the target asset number mapping table corresponding to the target production task can be established based on the target production task, which can include: determining the target accessory information corresponding to each target product in the target production task; and establishing the target asset number mapping table corresponding to the target production task based on the target communication unit asset number corresponding to the target communication unit and the target monitoring unit asset number corresponding to the target monitoring unit in each target accessory information.

[0064] The target product can be the target monitoring device. The target accessory information can refer to the target communication unit and the target monitoring unit included in the target monitoring device.

[0065] Specifically, the target production task is analyzed and processed to determine the target accessory information corresponding to each target product in the target production task. Based on the correspondence between the target accessory information and the target product, the target communication unit asset number corresponding to the target communication unit in each target accessory information and the target monitoring unit asset number corresponding to the target monitoring unit are used to establish the mapping relationship between the target communication unit asset number and the target monitoring unit asset number under each target product and form a mapping table, so as to obtain the target asset number mapping table corresponding to the target production task. Then, the mapping relationship between the target communication unit asset number corresponding to the target communication unit in the target monitoring device and the target monitoring unit asset number corresponding to the target monitoring unit can be verified through the pre-established target asset number mapping table, so as to ensure the accurate correspondence between the communication unit asset number and the monitoring unit asset number in the monitoring device.

[0066] On the basis of the above technical solutions, the "establishing the target asset number mapping table corresponding to the target production task based on the target communication unit asset number corresponding to the target communication unit in each target accessory information and the target monitoring unit asset number corresponding to the target monitoring unit" can include: based on the target communication unit asset number corresponding to the target communication unit in each target accessory information and the target monitoring unit asset number corresponding to the target monitoring unit, establishing the target asset number mapping relationship corresponding to each target product; based on the preset asset number sorting mode, sorting each target asset number mapping relationship to obtain the target asset number mapping table corresponding to the target production task.

[0067] The preset asset number sorting mode can refer to the sorting mode of the target asset number mapping relationship in the target asset number mapping table set in advance. For example, the preset asset number sorting mode can refer to ascending arrangement according to the asset number. FIG. 3 shows an example of a target asset number mapping table. Referring to FIG. 3, one production task can correspond to multiple target monitoring devices, each target monitoring device includes one target communication unit asset number and one target detection unit asset number. The target asset number mapping relationship of the target communication unit asset number and the target detection unit asset number is arranged according to the preset asset number sorting mode.

[0068] S220, determining the current communication unit currently transmitted by the communication unit transmission device based on the target communication unit asset number in the received target asset number mapping table and the preset transmission sequence, and transmitting the current communication unit to the assembly device.

[0069] S230, determining the current monitoring unit asset number currently transmitted by the monitoring unit transmission device based on the target monitoring unit asset number in the received target asset number mapping table and the preset transmission sequence.

[0070] Specifically, the monitoring unit conveying device determines the conveying sequence of the target monitoring unit corresponding to each target monitoring unit asset number based on the target monitoring unit asset numbers in the received target asset number mapping table and a preset conveying sequence, and selects the current monitoring unit in turn according to the conveying sequence, and determines the current monitoring unit asset number of the current monitoring unit being conveyed.

[0071] S240, the monitoring unit conveying device performs asset number identification on the current monitoring unit being conveyed to obtain a reference monitoring unit asset number, and when the reference monitoring unit asset number is the current monitoring unit asset number, the current monitoring unit is conveyed to the nameplate installation device, and the current monitoring unit asset number is sent to the nameplate installation device.

[0072] The nameplate installation device can be an installation device of an external nameplate of the monitoring unit.

[0073] Specifically, the monitoring unit conveying device performs asset number identification on the current monitoring unit being conveyed to obtain a reference monitoring unit asset number. If the reference monitoring unit asset number is the same as the current monitoring unit asset number, the current monitoring unit is continuously conveyed to the nameplate installation device, and the current monitoring unit asset number is sent to the nameplate installation device. If the reference monitoring unit asset number is different from the current monitoring unit asset number, the conveying is stopped and the current monitoring unit is adjusted until the reference monitoring unit asset number is the same as the current monitoring unit asset number, and then the conveying is started.

[0074] S250, the nameplate installation device performs nameplate engraving based on the received current monitoring unit asset number to obtain a current device nameplate of the current monitoring unit, and installs the current device nameplate to the received current monitoring unit, and conveys the current monitoring unit with the installed nameplate to the assembly device.

[0075] The current device nameplate can be a nameplate recording information of the current monitoring unit. For example, the current device nameplate can be an external nameplate containing the current monitoring unit asset number.

[0076] Specifically, the nameplate installation device performs nameplate engraving based on the received current monitoring unit asset number to obtain a current device nameplate of the current monitoring unit, and installs the current device nameplate to the received current monitoring unit, and conveys the current monitoring unit with the installed nameplate to the assembly device.

[0077] Exemplarily, the carrier nameplate binding function can also be enabled when the first current monitoring unit asset number of the target production task is received, and the first current monitoring unit asset number is input into the control corresponding to the starting carrier code, so that only one monitoring unit asset number needs to be input, and the asset number changes in the subsequent according to the preset transmission sequence, and then the nameplate is engraved based on the first input monitoring unit asset number and the monitoring unit asset number obtained by subsequent changes, thereby reducing the number of asset number transmissions, avoiding transmission errors caused by interference during transmission, and further improving the accuracy of the nameplate content. Figure 4 shows an interface for enabling the carrier nameplate binding function. Referring to Figure 4, the lower arrow is the function enabling control, which can be enabled by clicking. The "04001EM01016202201386682" in the input control is the first current monitoring unit asset number. The result of the first asset number change is "04001EM01016202201386683", and the result of the second asset number change is "04001EM01016202201386684", that is, it is incremented step by step.

[0078] S260, encapsulating the received current communication unit and the current monitoring unit by the assembly device to obtain a target monitoring device corresponding to the target production task.

[0079] The technical scheme of the embodiment of the present disclosure determines the current monitoring unit asset number of the current transmission based on the target monitoring unit asset number in the received target asset number mapping table and the preset transmission sequence through the monitoring unit transmission device; the monitoring unit asset number of the reference monitoring unit is obtained through the asset number identification of the current monitoring unit transmitted by the monitoring unit transmission device, and when the reference monitoring unit asset number is the current monitoring unit asset number, the current monitoring unit is transmitted to the nameplate installation device, and the current monitoring unit asset number is sent to the nameplate installation device, so that the asset number of the current monitoring unit to which the nameplate will be installed can be checked before the nameplate is installed, ensuring that the accurate monitoring unit is transmitted to the nameplate installation device, further improving the accuracy of the monitoring device nameplate installation; the nameplate is engraved based on the received current monitoring unit asset number through the nameplate installation device to obtain the current device nameplate of the current monitoring unit, and the current device nameplate is installed on the received current monitoring unit, thereby realizing the externalization of the current monitoring unit asset number of the current monitoring unit, so that the accurate monitoring unit asset number of the monitoring unit can be directly identified from the nameplate, thereby improving the accuracy and efficiency of the monitoring unit asset number identification, and the current monitoring unit with the installed nameplate is transmitted to the assembly device.

[0080] FIG. 5 is a flowchart of a method for assembling a monitoring device based on an electric energy meter and a collection terminal asset number according to an embodiment of the present disclosure. The embodiment is based on the above-described embodiments and describes in detail the process of obtaining a target monitoring device corresponding to a target production task through an assembly device. The same or corresponding terms are not described again here. As shown in FIG. 5, the method includes the following steps.

[0081] S510, receiving, by the production execution subsystem, a target production task to be assembled, and establishing a target asset number mapping table corresponding to the target production task based on the target production task, and sending the target asset number mapping table to the communication unit transfer device and the monitoring unit transfer device.

[0082] S520, sending, by the production execution subsystem, the target asset number mapping table to the checking device.

[0083] The checking device can refer to a device for secondary checking of the correspondence between the communication unit asset number and the monitoring unit asset number of the monitoring device.

[0084] S530, determining, by the communication unit transfer device, a current communication unit based on the target communication unit asset number in the received target asset number mapping table and a preset transfer sequence, and transferring the current communication unit to the assembly device.

[0085] S540, determining, by the monitoring unit transfer device, a current monitoring unit based on the target monitoring unit asset number in the received target asset number mapping table and a preset transfer sequence, and transferring the current monitoring unit to the assembly device.

[0086] S550, encapsulating, by the assembly device, the received current communication unit and the current monitoring unit to obtain a candidate monitoring device corresponding to a current product, and transferring the candidate monitoring device to the checking device.

[0087] The candidate monitoring device can refer to a monitoring device that needs to be checked again after encapsulation.

[0088] Specifically, the assembly device encapsulates the received current communication unit into the current monitoring unit to obtain a candidate monitoring device corresponding to a current product, and transfers the candidate monitoring device to the checking device.

[0089] S560, identifying, by the checking device, the asset number of the received candidate monitoring device to obtain a candidate communication unit asset number and a candidate monitoring unit asset number corresponding to the candidate monitoring device.

[0090] The to-be-selected communication unit asset number can be a communication unit asset number that needs to be double-checked by using the asset number identification method. The to-be-selected monitoring unit asset number can be a monitoring unit asset number that needs to be double-checked by using the asset number identification method.

[0091] Specifically, the to-be-selected monitoring device is subjected to asset number identification by the checking device based on a preset asset number identification method, so as to obtain the to-be-selected communication unit asset number and the to-be-selected monitoring unit asset number corresponding to the to-be-selected monitoring device.

[0092] On the basis of the above technical solution, the asset number identification of the to-be-selected monitoring device received by the checking device can include: the to-be-selected monitoring device is subjected to nameplate scanning by the checking device, so as to obtain the to-be-selected monitoring unit asset number corresponding to the to-be-selected monitoring device; and the to-be-selected monitoring device is subjected to communication identification by the checking device, so as to obtain the to-be-selected communication unit asset number corresponding to the to-be-selected monitoring device.

[0093] Specifically, the to-be-selected monitoring device is subjected to nameplate scanning by the checking device, so as to obtain the to-be-selected monitoring unit asset number corresponding to the to-be-selected monitoring device, and the to-be-selected monitoring device is subjected to data communication by the checking device to realize communication identification, so as to obtain the to-be-selected communication unit asset number corresponding to the to-be-selected monitoring device. Thus, whether the monitoring unit asset number in the nameplate content can accurately correspond to the communication unit asset number is checked, so as to further ensure the accurate correspondence between the communication unit asset number and the monitoring unit asset number in the monitoring device.

[0094] S570, if the checking device detects, based on the received target asset number mapping table, that there is a mapping relationship between the to-be-selected communication unit asset number and the to-be-selected monitoring unit asset number, the to-be-selected monitoring device is determined as a current monitoring device corresponding to a current product, and target monitoring devices corresponding to a target production task are obtained based on each current monitoring device.

[0095] Specifically, if the checking device detects, based on the received target asset number mapping table, that there is no mapping relationship between the to-be-selected communication unit asset number and the to-be-selected monitoring unit asset number, the to-be-selected monitoring device is returned and subjected to manual checking, and according to the manual checking result, the to-be-selected monitoring device is subjected to unpacking and reassembling or other adjustment operations. If the checking device detects, based on the received target asset number mapping table, that there is a mapping relationship between the to-be-selected communication unit asset number and the to-be-selected monitoring unit asset number, it indicates that the to-be-selected communication unit asset number and the to-be-selected monitoring unit asset number of the to-be-selected monitoring device can accurately correspond to each other, the to-be-selected monitoring device is determined as a current monitoring device corresponding to a current product, and target monitoring devices corresponding to a target production task are obtained based on each current monitoring device.

[0096] The technical scheme of the embodiment of the present disclosure is that the production execution subsystem sends the target asset number mapping table to the checking device. The assembling device encapsulates the received current communication unit and current monitoring unit to obtain a candidate monitoring device corresponding to the current product, and transmits the candidate monitoring device to the checking device. The checking device identifies the asset number of the received candidate monitoring device to obtain a candidate communication unit asset number and a candidate monitoring unit asset number corresponding to the candidate monitoring device. If the checking device detects, based on the received target asset number mapping table, that there is a mapping relationship between the candidate communication unit asset number and the candidate monitoring unit asset number, the candidate monitoring device is determined as the current monitoring device corresponding to the current product, so as to realize the re-checking of the communication unit asset number and the monitoring unit asset number included in the monitoring device, further guarantee the accurate correspondence between the communication unit asset number and the monitoring unit asset number in the monitoring device, and obtain the target monitoring device corresponding to the target production task based on each current monitoring device.

[0097] The following is an embodiment of a system for assembling a monitoring device based on an electric energy meter and a collection terminal asset number provided by the present disclosure. The system and the method for assembling a monitoring device based on an electric energy meter and a collection terminal asset number described above belong to the same inventive concept. Details not described in the embodiment of the system for assembling a monitoring device based on an electric energy meter and a collection terminal asset number can be referred to the embodiment of the method for assembling a monitoring device based on an electric energy meter and a collection terminal asset number described above.

[0098] FIG. 6 is a structural schematic diagram of a system for assembling a monitoring device based on an electric energy meter and a collection terminal asset number according to an embodiment of the present disclosure. As shown in FIG. 6, the system includes a production execution subsystem 610, a communication unit transmission device 620, a monitoring unit transmission device 630, and an assembling device 640.

[0099] The production execution subsystem 610 is configured to receive a target production task to be assembled, establish a target asset number mapping table corresponding to the target production task based on the target production task, and send the target asset number mapping table to the communication unit transmission device 620 and the monitoring unit transmission device 630. The communication unit transmission device 620 is configured to determine a current communication unit to be transmitted based on a target communication unit asset number in the received target asset number mapping table and a preset transmission sequence, and transmit the current communication unit to the assembling device 640. The monitoring unit transmission device 630 is configured to determine a current monitoring unit to be transmitted based on a target monitoring unit asset number in the received target asset number mapping table and a preset transmission sequence, and transmit the current monitoring unit to the assembling device 640. The assembling device 640 is configured to encapsulate the received current communication unit and current monitoring unit to obtain a target monitoring device corresponding to the target production task.

[0100] The technical scheme of the embodiment of the present disclosure receives a target production task to be assembled by the production execution subsystem 610, establishes a target asset number mapping table corresponding to the target production task based on the target production task, and sends the target asset number mapping table to the communication unit transfer device 620 and the monitoring unit transfer device 630; determines a current communication unit to be currently transferred based on the target communication unit asset number in the received target asset number mapping table and the preset transfer sequence by the communication unit transfer device 620, and transfers the current communication unit to the assembly device 640; determines a current monitoring unit to be currently transferred based on the target monitoring unit asset number in the received target asset number mapping table and the preset transfer sequence by the monitoring unit transfer device 630, and transfers the current monitoring unit to the assembly device 640; and encapsulates the received current communication unit and the current monitoring unit by the assembly device 640, accurately and conveniently obtains a target monitoring device corresponding to the target production task, and ensures the accurate correspondence between the target communication unit asset number and the target monitoring unit asset number in the target monitoring device.

[0101] On the basis of the above technical scheme, the monitoring unit comprises at least one of a voltmeter, an ammeter, a watt-hour meter, a fire meter, an electric energy meter and a kilowatt-hour meter; and the communication unit comprises an acquisition terminal.

[0102] On the basis of the above technical scheme, the production execution subsystem 610 is further configured to determine target accessory information corresponding to each target product in the target production task; and establish a target asset number mapping table corresponding to the target production task based on a target communication unit asset number corresponding to a target communication unit and a target monitoring unit asset number corresponding to a target monitoring unit in each target accessory information.

[0103] On the basis of the above technical scheme, the production execution subsystem 610 is further configured to establish a target asset number mapping relationship corresponding to each target product based on a target communication unit asset number corresponding to a target communication unit and a target monitoring unit asset number corresponding to a target monitoring unit in each target accessory information; and sort each target asset number mapping relationship based on a preset asset number sorting manner to obtain a target asset number mapping table corresponding to the target production task.

[0104] On the basis of the above technical scheme, the communication unit transfer device 620 is further configured to determine a current communication unit asset number to be currently transferred based on the target communication unit asset number in the received target asset number mapping table and the preset transfer sequence; perform asset number identification on the current communication unit to be currently transferred to obtain a reference communication unit asset number, and continue to transfer the current communication unit to the assembly device 640 when the reference communication unit asset number is the current communication unit asset number.

[0105] On the basis of the above technical solutions, the monitoring unit conveying device 630 is further configured to determine a current monitoring unit asset number of a current conveying based on the target monitoring unit asset number in the target asset number mapping table and a preset conveying sequence received;

[0106] The monitoring unit conveying device 630 is further configured to perform asset number identification on the current monitoring unit of the current conveying, obtain a reference monitoring unit asset number, and when the reference monitoring unit asset number is the current monitoring unit asset number, convey the current monitoring unit to the nameplate installation device and send the current monitoring unit asset number to the nameplate installation device;

[0107] The nameplate installation device is configured to perform nameplate engraving based on the received current monitoring unit asset number, obtain a current device nameplate of the current monitoring unit, install the current device nameplate to the received current monitoring unit, and convey the current monitoring unit with the installed nameplate to the assembly device 640.

[0108] On the basis of the above technical solutions, the production execution subsystem 610 is further configured to send the target asset number mapping table to the checking device.

[0109] On the basis of the above technical solutions, the assembly device 640 is further configured to package the received current communication unit and the current monitoring unit to obtain a candidate monitoring device corresponding to the current product, and convey the candidate monitoring device to the checking device.

[0110] The checking device is configured to perform asset number identification on the received candidate monitoring device to obtain a candidate communication unit asset number and a candidate monitoring unit asset number corresponding to the candidate monitoring device.

[0111] The checking device is further configured to determine the candidate monitoring device as a current monitoring device corresponding to the current product if it is detected based on the received target asset number mapping table that there is a mapping relationship between the candidate communication unit asset number and the candidate monitoring unit asset number, and obtain a target monitoring device corresponding to a target production task based on each current monitoring device.

[0112] On the basis of the above technical solutions, the checking device is further configured to perform nameplate scanning on the received candidate monitoring device to obtain a candidate monitoring unit asset number corresponding to the candidate monitoring device.

[0113] The checking device is further configured to perform communication identification on the received candidate monitoring device to obtain a candidate communication unit asset number corresponding to the candidate monitoring device.

[0114] It should be understood that the various forms of flow shown above can be used to reorder, add or delete steps. For example, each step described in the present disclosure can be executed in parallel, sequentially or in a different order, as long as the desired results of the technical solutions of the present disclosure can be achieved, which is not limited herein.

[0115] The above detailed description does not constitute a limitation on the protection scope of the present disclosure. Those skilled in the art should understand that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present disclosure shall be included in the protection scope of the present disclosure. Industrial applicability

[0116] The method and system for assembling monitoring equipment based on the electric energy meter and the asset number of the collection terminal provided by the embodiments of the present disclosure can accurately and conveniently realize the assembly of the monitoring equipment corresponding to the production task, and ensure the accurate correspondence between the asset number of the communication unit in the monitoring equipment and the asset number of the monitoring unit.

Claims

1. A method for assembling a monitoring device based on an electric energy meter and a collection terminal asset number, characterized by, The application relates to a production task management method and device. The target production task is received by a production execution subsystem, a target asset number mapping table corresponding to the target production task is established based on the target production task, and the target asset number mapping table is sent to a communication unit conveying device and a monitoring unit conveying device; A current communication unit is determined based on a target communication unit asset number in the received target asset number mapping table and a preset conveying sequence by the communication unit conveying device, and the current communication unit is conveyed to an assembly device; A current monitoring unit is determined based on a target monitoring unit asset number in the received target asset number mapping table and a preset conveying sequence by the monitoring unit conveying device, and the current monitoring unit is conveyed to the assembly device; The current communication unit and the current monitoring unit are packaged by the assembly device to obtain a target monitoring device corresponding to the target production task.

2. The method of claim 1, wherein, The monitoring unit comprises at least one of a voltmeter, an ammeter, a watt-hour meter, a fire meter, an electric energy meter and a kilowatt-hour meter; and the communication unit comprises a collection terminal.

3. The method of claim 1, wherein, The target asset number mapping table corresponding to the target production task is established based on the target production task, and comprises: Target accessory information corresponding to each target product in the target production task is determined; A target asset number mapping table corresponding to the target production task is established based on a target communication unit asset number corresponding to a target communication unit and a target monitoring unit asset number corresponding to a target monitoring unit in each target accessory information.

4. The method of claim 3, wherein, The target asset number mapping table corresponding to the target production task is established based on the target communication unit asset number corresponding to the target communication unit and the target monitoring unit asset number corresponding to the target monitoring unit in each target accessory information, and comprises: A target asset number mapping relationship corresponding to each target product is established based on a target communication unit asset number corresponding to a target communication unit and a target monitoring unit asset number corresponding to a target monitoring unit in each target accessory information; Each target asset number mapping relationship is sorted based on a preset asset number sorting mode to obtain a target asset number mapping table corresponding to the target production task.

5. The method of claim 1, wherein, The current communication unit is determined based on the target communication unit asset number in the received target asset number mapping table and the preset conveying sequence by the communication unit conveying device, and the current communication unit is conveyed to the assembly device, and comprises: The current communication unit asset number is determined based on the target communication unit asset number in the received target asset number mapping table and the preset conveying sequence by the communication unit conveying device; The current communication unit is conveyed to the assembly device when the reference communication unit asset number is the current communication unit asset number.

6. The method of claim 1, wherein, The monitoring unit conveying device determines a current monitoring unit to be conveyed based on the target monitoring unit asset number in the target asset number mapping table received and a preset conveying sequence, and conveys the current monitoring unit to the assembly device, including: The monitoring unit conveying device determines a current monitoring unit to be conveyed based on the target monitoring unit asset number in the target asset number mapping table received and a preset conveying sequence; The monitoring unit conveying device performs asset number identification on the current monitoring unit to be conveyed, obtains a reference monitoring unit asset number, and when the reference monitoring unit asset number is the current monitoring unit asset number, conveys the current monitoring unit to the nameplate installation device and sends the current monitoring unit asset number to the nameplate installation device; The nameplate installation device performs nameplate engraving based on the current monitoring unit asset number received, obtains a current device nameplate of the current monitoring unit, installs the current device nameplate to the current monitoring unit received, and conveys the current monitoring unit with the installed nameplate to the assembly device.

7. The method of claim 1, wherein, The method further includes: The production execution subsystem sends the target asset number mapping table to the checking device.

8. The method of claim 7, wherein, The assembly device encapsulates the current communication unit and the current monitoring unit received to obtain a target monitoring device corresponding to the target production task, including: The assembly device encapsulates the current communication unit and the current monitoring unit received to obtain a candidate monitoring device corresponding to the current product, and conveys the candidate monitoring device to the checking device; The checking device performs asset number identification on the candidate monitoring device received to obtain a candidate communication unit asset number and a candidate monitoring unit asset number corresponding to the candidate monitoring device; If the checking device detects a mapping relationship between the candidate communication unit asset number and the candidate monitoring unit asset number based on the target asset number mapping table received, the checking device determines the candidate monitoring device as a current monitoring device corresponding to the current product, and obtains a target monitoring device corresponding to the target production task based on each current monitoring device.

9. The method of claim 8, wherein, The checking device performs asset number identification on the candidate monitoring device received to obtain a candidate communication unit asset number and a candidate monitoring unit asset number corresponding to the candidate monitoring device, including: The checking device performs nameplate scanning on the candidate monitoring device received to obtain a candidate monitoring unit asset number corresponding to the candidate monitoring device; The checking device performs communication identification on the candidate monitoring device received to obtain a candidate communication unit asset number corresponding to the candidate monitoring device.

10. A system for assembling a monitoring device based on an electric energy meter and a collection terminal asset number, characterized by, It includes: A production execution subsystem configured to receive a target production task to be assembled, establish a target asset number mapping table corresponding to the target production task based on the target production task, and send the target asset number mapping table to a communication unit conveying device and a monitoring unit conveying device; The communication unit conveying device is configured to determine a current communication unit to be conveyed currently based on a target communication unit asset number in the target asset number mapping table received and a preset conveying sequence, and convey the current communication unit to the assembling device; The monitoring unit conveying device is configured to determine a current monitoring unit to be conveyed currently based on a target monitoring unit asset number in the target asset number mapping table received and a preset conveying sequence, and convey the current monitoring unit to the assembling device; The assembling device is configured to package the current communication unit and the current monitoring unit received to obtain a target monitoring device corresponding to the target production task.

Citation Information

Patent Citations

  • Asset management method and an apparatus of a communication unit

    CN109376817A

  • Battery pack production management system

    CN112700095A

  • Asset information confirmation method and system and medium

    CN112948902A

  • Production task progress automatic feedback method and device, storage medium and processor

    CN115545568A

  • Method and system for assembling monitoring equipment based on electric energy meter and acquisition terminal asset number

    CN119046095A