PROCEDURE AND SHEET PANEL FOR INSTALLING A SHEETED TRENCH IN THE GROUND

The use of smaller, lighter steel sheet piling plates with central folds and fastening elements addresses the challenges of manual installation, ensuring safer and more efficient trench construction with reduced costs and risks.

BE1033509A1Pending Publication Date: 2026-11-09SMET-F & C NV
0 Cites 0 Cited by

Patent Information

Application Number
BE2025005227
Authority / Receiving Office
BE · BE
Patent Type
Applications
Current Assignee / Owner
Filing Date
2025-04-07
Publication Date
2026-11-09

AI Technical Summary

Technical Problem

The manual installation of large and heavy concrete sheet piling plates in confined spaces is physically strenuous, poses a risk of injury, and incurs high costs and risks during storage, transport, and delivery, while the use of cranes for delivery is hazardous due to swinging or falling slabs.

Method used

A method using smaller, lighter steel sheet piling plates with central folds and fastening elements, allowing for efficient and safe manual installation in confined spaces, reducing physical strain and costs, and minimizing the risk of injury and damage during delivery.

Benefits of technology

The method enables safer and more efficient installation of sheet piling trenches with reduced material and transportation costs, lower risk of injury, and improved handling of sheet piling plates.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention concerns a method for installing a shored trench in the ground using shored sheets which are essentially rectangular in shape, with a short side of 25 to 100 cm in length and a long side of 90 to 250 cm in length, where the shored sheets include fastening elements on both long sides, and where the shored sheets include a central fold running parallel to the long side, the central fold comprising an out-of-plane section extending from the plane of the shored sheet. The invention further concerns a method for installing an underground pillar or wall in the shored trench and also concerns a shored sheet for shoreing a trench in the ground.
Need to check novelty before this filing date? Find Prior Art

Description

BE2025 / 5227 to lift 2 sheet piling plates, so that a good connection with the sheet piling plates overlying can be achieved. The concrete sheet piling plates used in the method typically have dimensions of 150 x 40 x 5 cm and typically weigh approximately 75 kilograms each. Manually maneuvering sheet piling plates of such size and mass in a confined space results in significant physical strain. Additionally, when manually positioning the heavy sheet piling plates on wooden beams and spikes, there is a risk that fingers, toes, and / or limbs may become trapped, resulting in bruises or other injuries. A disadvantage of this well-known method is therefore a high physical load on and an increased risk of injury for the person manually installing the shored trench.10 An additional disadvantage of the use of concrete shored slabs in the well-known method is that, due to their dimensions, they entail mass extra costs and / or risks during storage, transport and / or delivery. Due to the large dimensions of theSheet piling slabs occupy more volume during storage and transport, which entails extra costs. The high mass also results in higher transport costs and requires a crane truck upon delivery. The use of a crane truck upon delivery entails, in addition to costs, a risk of damage and injury, because slabs can swing out or fall during hoisting. The invention aims to provide a method with associated sheet piling that reduces the disadvantages of the state of the art. More specifically, the invention aims to provide an efficient and safe method for manually installing a sheet piling trench in the ground at a location that cannot be reached by an excavator or other large mechanical aids. In addition, the invention aims to provide sheet piling that can be easily used in the method, that requires lower costs for storage, transport and delivery, and that results in a reduced risk of damage and injury upon delivery. SUMMARY OF THE INVENTIONThe inventors have found a new method for manually installing a shored trench in the ground at a location that cannot be reached with an excavator or other large mechanical aids, using a new shored slab that has a smaller volume and a lower mass and is easier to position. The new method can be performed more efficiently and safely than the methods disclosed in the state of the art. The new 2025 / 5227 BE2025 / 5227 3 shored slab for use in the new method can be stored, transported and / or delivered more cheaply and safely than the shored slabs disclosed in the state of the art. The new method can be applied, for example, to install an underground pillar or wall in the shored trench in the ground. 5 The inventors have found that one or more of the disadvantages of the state of the art can be overcome by making use, when installing a shored trench in the ground, of shored plates which contain a central fold and fastening elements.The decentralized fold increases the section modulus of the sheet piling, making it possible to use a thinner sheet piling when installing a sheet piling trench in the ground. A reduction in the thickness of the sheet piling results in a reduction in the mass and volume of the sheet piling. A state-of-the-art concrete sheet piling of 150 x 40 x 5 cm with a mass of approximately 75 kilograms can thus be replaced by, for example, a steel sheet piling of 150 x 40 x 0.3 cm with a mass of approximately 15 kilograms. A lower mass of the sheet piling results in a reduction in physical strain for the person installing the sheet piling, a reduced risk of damage and injury during deliveries, and a reduction in costs related to storage, transport, and delivery. The fastening elements make it possible to position a new sheet piling plate to be installed20 relative to the sheet piling plates above without the use of wooden beams and wedges. The reduction of mass and the facilitation of positioningThe sheet piling reduces the risk of fingers, toes and / or limbs being trapped, resulting in bruises or other injuries. 25 Accordingly, the invention provides in a first aspect a method for installing a backed trench(20) in the ground, comprising the steps of: (A) providing backing plates(10), which are mainly rectangular in shape, with a short side(1) with a length(L1) of 25 to 100 cm and a long side(2) with a length(L2) of 90 to 250 cm, where the backing plates(10) comprise 30 fastening elements(11) on both long sides(2), and where the backing plates(10) comprise a central fold(12) which runs parallel to the long side(2), where the central fold(12) comprises an out-of-plane section(4) which extends from the plane(3) of the backing plate(10); 2025 / 5227 BE2025 / 5227 4 (B)the digging, preferably by hand, of a trench(20')in the ground, where the trench(20') has first side walls(21)with length(L21)and depth(23)and second side walls(22)with length(L22)and depth(23), where the length(L21)of the first sidewalls(21)is at least 1 times the length(L2)of the long side(2)of the sheet piling(10), and where the depth(23)is from 0.75 to 1.5 times the length(L1)of the short side5 (1)of the sheet piling(10); (C) positioning sheet piling (10,10') which are mainly rectangular in shape, with a short side (1) with a length (L1) of 25 to 100 cm and a long side (2) with a length (L2) of 90 to 250 cm against the opposite unbacked first side walls (21), where the long sides (2) of the sheet piling (10,10') run mainly parallel to the bottom of the trench (20'); (D) stabilizing and fixing the opposite sheet piling (10,10') in their position by means of props (30); (E) deepening the trench(20'), preferably by hand, with an additional depth(24) of 1 to 1.5 times the length(L1) of the short side(1) of the sheet piling(10) as defined entry(A); (F) positioning additional sheet piling(10) as defined entry(A),against the opposite unshodged parts of the first sidewalls(21), where each unfixed shoring plate(10) is positioned mainly underneath and adjacent to an already fixed shoring plate(10,10'), where the 20 long sides(2) of adjacent shoring plates(10,10') run parallel and where the out-of-plane parts(4) of the central folds(12) of the additional shoring plates(10) are oriented towards the opposite first sidewall(21); (G) attaching the additional sheet piling (10) to the sheet piling (10) already fixed directly above it by making the fastening elements (11) on one long side (2) of an already fixed sheet piling (10) work together with the fastening elements (11) on the long adjacent side (2) of the additional sheet piling (10); (H) stabilizing and fixing the entry (G) opposite additional sheet piling (10) by means of props (30) the ends of which 30(31) be applied at the height of the respective out-of-plane sections(4) of the central folds(12) of the sheet piling(10); and (I) repeat the steps(E)-(H) until a sheet piling trench(20) with the desired depth(25) is reached. 2025 / 5227 BE2025 / 5227 5 In addition, in a second aspect, the invention provides a method for installing an underground pillar or wall(40), comprising the steps of: (i) installing a shored trench(20) in the ground, obtained by or obtainable via the method according to the first aspect; (ii) positioning reinforcement(41) in the shored trench(20), where the reinforcement(41) preferably consists of steel bars, mesh or cables; and (iii) pouring concrete into the shored trench(20) provided with reinforcement(41), preferably up to at least the opening of the shored trench(20) at ground level. shoring of a trench(20') in the ground, which is mainly rectangular in shape, ashort side(1) has a length(L1) of 25 to 100 cm and a long side(2) with a length(L2) of 90 to 250 cm, where the sheet piling(10) includes fastening elements(11) on both long sides(2), and where the sheet piling(10) includes a central fold(12) which runs parallel to the long side(2), where the central fold(12) includes an out-of-plane section(4) which extends from the plane(3) of the sheet piling(10). Finally, the invention in a fourth aspect provides the use of a sheet piling(10) according to the third aspect for shoring a trench(20') in the ground. DEFINITIONS The term 'fastening elements' is used here to denote elements located on, in, or attached to the sheet piling, as well as external elements, where the fastening elements work together to attach sheet piling to each other. Examples of fastening elements on, in, or attached to the sheet piling are folds, holes, rings, or protrusions. Examples of external fastening elements are pins, rings, hooks, or clips.It should be noted that the length(L1) of the short side(1) of the sheet piling as provided in entry(A) must be measured including the fastening elements. 2025 / 5227 BE2025 / 5227 6 The 'plane' of the sheet piling refers to the area with the short side(1) with length(L1) and the long side(2) with length(L2). The term 'out-of-plane part' therefore refers to parts of the sheet piling which do not lie in this plane. See numbers(3) and(4) in Figure 1a. Where reference is made to the 'starting level' of the trench in the ground and 'ground level', 'the level of the ground directly adjacent to the trench' is meant. It may occur that the level of the ground directly adjacent to the trench is not equal to the earth's surface, for example when a shored trench is installed in a basement. BRIEF DESCRIPTION OF THE FIGURES10 Figure 1a shows a schematic and design form of the shored-up slab according to the third aspect of the invention; Figure 1b shows a design form of the shored-up slab according to the third aspect of the invention;Figure 1c shows a schematic representation of a connection between the fastening elements of two adjacent sheet piling plates; Figure 2a shows a stacking sheet piling plate according to a representation of the third aspect of the invention; Figure 2b shows a stacking sheet piling plate according to the state of the art; Figure 3 shows a schematic representation of the method according to the first aspect of the invention; Figure 4 shows cross-sections of different representations of the central fold of the sheet piling plates; Figure 5 shows a screw jack whose end works in conjunction with the central fold of a sheet piling plate; Figure 6 shows different representations of the fastening elements of the sheet piling plates; Figure 7 shows a shored trench obtained according to a form of execution of the method according to the first aspect of the invention, in which additional alternative shored-up slabs are used; Figure 8 schematically depicts the method according to the second aspect of the invention;Figure 8b shows a shored trench with reinforcement for pouring concrete to construct an underground pillar or wall. 2025 / 5227 BE2025 / 5227 7 DETAILED DESCRIPTION OF THE INVENTION Method for installing a shored trench in the ground In a first aspect, the invention refers to a method for installing a shored trench(20) in the ground, comprising the steps of: (A) providing sheet piling(10), which are mainly rectangular in shape, with a short side(1) with a length(L1) of 25 to 100 cm and a long side(2) with a length(L2) of 90 to 250 cm, where the sheet piling(10) include fastening elements(11) on both long sides(2), and where the sheet piling(10) include a central fold(12) which runs parallel to the long side(2), where the central fold(12) encloses an out-of-plane part(4) which extends from the plane(3) of the sheet piling(10); (B) the digging, preferably by hand, of a trench(20') in the ground, where the trench(20') has first side walls(21) with length(L21) and depth(23) and second side walls(22)15with length(L22)and depth(23), where the length(L21)of the first sidewalls(21)is at least 1 times the length(L2)of the long side(2)of the sheet piling(10), and where the depth(23)is from 0.75 to 1.5 times the length(L1)of the short side(1)of the sheet piling(10); (C) positioning sheet piling (10,10') which are mainly rectangular in shape, with a short side (1) with a length (L1) of 25 to 100 cm and a long side (2) with a length (L2) of 90 to 250 cm against the opposite unbacked first side walls (21), where the long sides (2) of the sheet piling (10,10') run mainly parallel to the bottom of the trench (20'); (D) stabilizing and fixing the opposite sheet piling (10,10') by means of props (30); (E) deepening the trench(20'), preferably by hand, with an additional depth(24) of 1 to 1.5 times the length(L1) of the short side(1) of the sheet piling(10) as defined in entry(A); (F) positioning additional sheet piling(10) as defined in entry(A),30against the opposing unshodled sections of the first sidewalls(21), where each unfixed shoring plate(10) is positioned mainly underneath and adjacent to an already fixed shoring plate(10,10'), where the long sides(2) of adjacent shoring plates(10,10') run parallel and where 2025 / 5227 BE2025 / 5227 8 the out-of-plane sections(4) of the central folds(12) of the additional shoring plates(10) are oriented towards the opposing first sidewall(21); (G) attaching the additional sheet piling (10) to the sheet piling (10) already fixed directly above it by making the fastening elements (11) on one long side (2) of an already fixed sheet piling (10) work together with the fastening elements (11) on the long adjacent side (2) of the additional sheet piling (10); (H) stabilizing and fixing the entry (G) opposite additional sheet piling (10) by means of props (30) the ends of which(31) be installed at the height of the respective out-of-plane sections(4) of the central folds(12) of the sheet piling(10); and (I) repeat the steps(E)-(H) until a sheet piling trench(20) with the desired depth(25) is reached. The dimensions of the sheet piling(10) as provided in entry(A) are limited in such a way that both a safe and an efficient execution of the method can be ensured. Safety regarding the risk of collapse is ensured by providing sheet piling (10) with a short side (1) with a length (L1) of up to 100 cm. The greater the length (L1), the further the trench (20') must be excavated in steps (B), (E), and (I). This increases the risk of collapse of the unbacked part of the first side wall (21) of the trench (20'), which may also create a risk of collapse of any overlying already backed parts of the first side wall (21) of the trench (20'). Efficiency is ensured by providing sheet piling (10) with a short side (1) with a length (L1) of 25 cm.and a long side (2) with a length (L2) of 90 to 250 cm. The shorter the short side (1) with a length (L1), the more sheet piling (10) and props (30) must be installed, which leads to an increase in the time and associated costs for providing a sheet piling trench (20) in the ground. For a long side (2), a length (L2) of 90 cm or more is necessary to create sufficient working space between the props (30), while a length greater than 250 cm makes it difficult to accurately align the sheet piling (10). In addition, for sheet piling (10) with a length (L2) greater than 250 cm, extra props (30) must be placed. The actual length (L2) used depends further, within the stated bandwidth of 90 to 250 cm, depending on the desired dimensions of the underground pillar or wall to be installed (40). 2025 / 5227 BE2025 / 5227 9 The sheet piling (10) should preferably have a mass of at most 30 kg, for example at most 25 kg, at most 20 kg, at most 15 kg, or at most 10 kg. As the professional will understand, it is necessary that the sheet piling (10) asprovides (A) a sufficient moment of resistance to distribute the pressure of the stamp (30) over the entire contact surface between the sheet piling (10) and the first side wall (21) of the trench (20'). The central fold (12) increases the moment of resistance of the sheet piling (10) by increasing the geometric stiffness of the sheet piling (10), making the sheet piling (10) more resistant to bending stresses. In one design, the sheet piling (10) comprises more than one of the mentioned central folds (12) which run parallel to the long side (2). The use of more than one of the 10 mentioned central folds (12) is preferred for greater lengths (L1) of the short side (1) and / or for greater desired depths (25). In the entrance (B), a trench is dug in the ground, preferably manually, with first side walls (21) with length (L21) and depth (23) and second side walls (22) with length (L22) and depth (23). The length (L21) of the first side walls (21) and the depth (23) of the trench are matched to the dimensions of the sheet piling (10,10'). Naturally, theThe length(L22) of the second sidewalls(22) and the length(L21) of the first sidewalls(21) are also adapted to the desired dimensions of the underground pillar or wall(40) to be installed. The length(L22) of the second sidewalls(22) is limited in such a way that both a safe and an efficient execution of the work is ensured. The first sidewalls(21)of the trench have a length(L21)of at least 1 times the length(L2)of the long side(2)of the sheet piling(10,10'). If the length(L21) is greater than the length(L2), the length(L21) is preferably a multiple of the length(L2), for example 2 times the length(L2), 3 times the length(L2), 4 times the length(L2), etcetera.25 When the sheet piling(10,10') to be installed have different lengths(L2)of the long side(2), the length(L21)of the first sidewalls(21)of the trench(20') is preferably at least 1 times the highest value of the length(L2)of the sheet piling(10,10'). 30 The trench that is dug in the entrance(B) has a depth(23) of 0.75 to 1.5 times the length(L1) of the short side(1) of the sheet piling(10,10'). A depth(23) greaterIf the depth is greater than 1.5 times the length (L1), the risk of caving or collapse of the unshod first and second side walls (21,22) increases. At a depth (23) less than 1 times the length (L1) of the 2025 / 5227 BE2025 / 5227 10 the short side (1) of the shoring slab (10,10') will partially protrude above ground level. This creates an upright edge at the entry (C), which is desirable to prevent soil, tools, or other items from falling into the trench (20') during steps (D) up to and including (I). Also when the depth (23) is greater than 1 times the length (L1) of the shoring slab (10,10'), an upright edge can be created by the 5 to position and fix the sheet piling (10,10') in the instep(C) and(D) higher than the bottom of the trench(20'). The sheet piling (10,10') installed in the instep(C) preferably protrude 0.05 to 0.25 times the length(L1) of the short side(1) above the opening of the sheet piling trench(20) at ground level, preferably 0.10 to 0.25 times the length(L1), with a greater preference for 0.15 to 0.25 times the length(L1). The sheet piling 10(10,10') should preferably not extend more than 0.25 times the length(L1) of the short side(1) of the sheet piling(10) above ground level. When the sheet piling(10,10') extends more than 0.25 times the length(L1) of the short side(1) above ground level, there is a chance that one or more pressure points of the support(30) attached to the sheet piling(10,10') will be located above ground level, which may result in the sheet piling(10,10') not being sufficiently fixed. Therefore, the depth(23) of the trench(20') in the inlet(B) shall be at least 0.75 times the length(L1) of the short side(1) of the sheet piling(10,10'). Simple sheet piling can be installed against the second side walls (22) or sheet piling can be omitted. Simple sheet piling can consist of wooden boards or other sheet piling material, without using props to fix the sheet piling against the second side walls (22). These props would extend in a direction perpendicular to the props (30) used to fix sheet piling (10).against the first side walls(21). This would significantly limit the working space and make the working method significantly more complex and time-consuming. Using simple 25 sheet piling without props or omitting sheet piling against the second side walls(22) increases the risk of the second side walls(22) scalding or collapsing. This risk is reduced by keeping the length(L22) of the second side walls(22) as small as possible. The length(L22) of the second side walls(22) of the trench(20') is preferably at least 80cm, preferably 80-140cm, preferably 80-120cm, and preferably 80-100cm. A minimum length of 80cm is preferred to create sufficient working space. 2025 / 5227 BE2025 / 5227 11 First execution form In a first execution form of the method according to the first phase, in steps (C) and (D) the sheet piling plates (10) are used as provided in step (A), whereby in step (C) the out-of-plane parts (4) of the central folds (12) of both sheet piling plates (10) are directed towards the opposite first side walls (21), and whereby 5instep(G) the additional sheet piling plates(10) are attached to the sheet piling plates(10) already fixed directly above. The sheet piling (10) provided in entry (A) is positioned in entry (C) against the opposite unpadded first sidewalls (21). In doing so, the sheet piling (10), one per first sidewall (21), is positioned horizontally, which means that the long sides (2) of the sheet piling (10) run mainly parallel to the bottom of the trench (20'). When positioning the sheet piling (10), the out-of-plane parts (4) of the central folds (12) of both sheet piling (10) are preferably directed towards the opposite first sidewall (21), so that the plane (3) of each sheet piling (10) rests against a first sidewall (21). This creates voids (26) between 15 the out-of-plane sections(4)of the central folds(12)of the sheet piling(10)and the first side walls(21)of the sheet piling trench(20).See Figure 3(C) in this box. The cavities(26)between the out-of-plane sections(4)of the central folds(12)of theThe sheet piling (10) and the first side walls (21) of the trench (20') are preferably filled with a filling material, preferably before positioning the sheet piling (10) against the first 20 side walls (21). This helps prevent soil directly adjacent to the sheet piling trench (20) from filling these voids (26) later, which can cause subsidence of the soil at the edges of the sheet piling trench (20). The filling material preferably consists of a polymer. Examples of filling materials that contain a polymer are polymer foams, such as polyurethane foam or expanded polystyrene. The polymer filling material can also consist of a plastic bag, container, or box, which is filled with air, water, soil, or another filling agent. The filling agent is preferably cheap, lightweight, and mainly not harmful to the soil or groundwater. In a form of execution, the voids (26) between the out-of-plane parts (4) of the central folds (12) of the sheet piling (10) and the first side walls (21) of the trench (20') are not filled with a filling material. 30 When positioning the sheet piling (10) serving as entry (C)The sheet piling plates (10) should preferably be positioned in such a way that not only the out-of-plane parts (4) of the central folds (12) of both sheet piling plates (10) are oriented towards the opposite first sidewall (21), but also any out-of-plane parts (4) of the fastening elements (11) on the underlying long sides (2) of both sheet piling plates (10) are oriented towards the opposite first sidewall (21). The reason for this is explained in the description of step (G). The facing sheet piling (10) is fixed in place (D) by means of props (30). Screw props are preferably used for this purpose, so that the length of the prop (30) can be easily adjusted. By extending the screw prop, pressure can be exerted on the facing sheet piling (10) in the horizontal direction, i.e. parallel to the bottom of the trench (20') and perpendicular to the plane (3) of the sheet piling (10), so that these against the first side walls 10(21) be fixed. The ends(31) of the props(30) are placed at the height of the respective out-of-plane sections(4) of the central folds(12) of the sheet piling(10). Such positioning ensures that the pressure from the props(30) is mainly applied in the middle of the sheet piling(10). Preferably, the ends(31) of the props(30) comprise a head and foot plate which work together15 with the out-of-plane sections(4) of the central folds(12) of the sheet piling(10) placed opposite each other. By using such head and foot plates, pressure can be applied along a central axis of the sheet piling(10), possibly without bending stress being applied to the central fold(12). In addition, with a such a shape prevents the stamps(30) from shifting in a vertical direction, 20 in a direction perpendicular to the bottom of the trench(20') and parallel to the plane(3) of the sheet piling(10). After fixing the first sheet piling(10) in the entry(D), the trench(20') is instep(E) deepened. The additional depth(24) is at least equal to 1 times the length(L1) of the short side(1) of the sheet piling(10) at the end of the trench(20') positioned in the entry(F), so that the entire sheet piling(10) can be positioned under the entry(D) in the trench(20') fixed sheet piling(10). The additional depth(24) is at most 1.5 times the length(L1) of the short side(1) of the sheet piling(10) to limit the risk of the first side walls(21) of the trench(20') collapsing.30 In one execution form the trench(20') entry(E) is deepened with an additional depth(24) of 1 to 1.4 times the length(L1) of the short side(1) of the sheet piling (10), preferably 1 to 1.3 times, with more preference of 1 to 1.2 times, with even more 2025 / 5227 BE2025 / 5227 13 preference of 1 to 1.1 times. The additional depth(24) is preferably as small as possible to reduce the risk of collapse of the unshod first and second side walls(21,22). In the entry(F), additional sheet piling (10) are placed against each other.lying unshodled sections of the first sidewalls(21) are positioned. Each unfixed shoring plate(10) is positioned mainly underneath and adjacent to an already fixed shoring plate(10), with the long sides(2) of adjacent shoring plates(10) running parallel and with the out-of-plane sections(4) of the central folds(12) of the additional shoring plates(10) directed towards the opposite first sidewall(21). When the fastening elements(11) along the long sides(2) comprise one or more sections extending in an out-of-plane(3) direction of the shoring plate(10), the shoring plate(10) should preferably be positioned in such a way that not only the out-of-plane parts(4)of the central folds(12)of both sheet piling plates(10) are directed towards the opposite first side wall(21), but also that the out-of-plane parts(4)of the fastening elements(11)on the underlying 15 long sides(2)of both sheet piling plates(10) are directed towards the opposite first side wall(21).Next, in step(G), the additional sheet piling plates(10) are attached to the sheet piling plates(10) located directly above them by making the fastening elements(11) on one long side(2) of the sheet piling plate(10) work together with the fastening elements(11) on the long adjacent side(2) of the additional sheet piling plate(10). It will be clear to the craftsman that this concerns the lower long side(2) of the sheet piling plate(10) and the upper long side(2) of the additional sheet piling plate(10). When the sheet piling plates(10) include fastening elements(11) which extend in a direction out of the plane(3) of the sheet piling plate(10), the fastening of additional sheet piling plates(10) facilitated by positioning the fastening elements(11) on the underlying long sides(2) such that the out-of-plane parts(4) are oriented towards the opposite first side wall(21). The fastening elements(11) which 30extending in one direction from the plane(3)of the sheet piling(10) are then easily accessible for working together with the fastening elements(11)of additional sheet piling(10). 2025 / 5227 BE2025 / 5227 14 In the entry (H), the additional sheet piling plates (10) are stabilized and fixed using props (30). As in the entry (D), screw props are preferably used, which preferably include ends (31) with a head and foot plate, where the foot plate and head plate work together with the out-of-plane parts (4) of the central folds (12) of the sheet piling plates (10) placed opposite each other. 5 In the entry (I), steps (E)-(H) are finally repeated until the desired depth (25) of the sheet piling trench (20) is reached. The desired depth (25) of the sheet piling trench (20) is preferably at least 0.5 meters, for example at least 3 meters, at least 5 meters, at least 6 meters, or at least 7 meters. Preferably the desired depth(25) is less than 4010 m. Second execution form In a second execution form of the method according to the first aspect becomestep(A) provides additional alternative sheet piling slabs(10') which are mainly rectangular in shape, with a short side(1) with a length(L1) of 25 to 100 cm and a long side(2) with a length(L2) of 90 to 250 cm, where the alternative sheet piling slabs(10') consist of concrete and do not include central folds or fastening elements on both long sides(2), where the concrete preferably contains reinforcement, where in steps(C)and(D) the alternative concrete sheet piling slabs(10') are used, where in steps(F)and(G) use is made of sheet piling slabs(10) with fastening elements(11) and central fold(12) as provided entry (A), and where at entry (G) the non-fixed additional sheet piling (10) are preferably not attached to the already fixed alternative sheet piling (10') located directly above.25 Such alternative sheet piling (10') are comparable to or similar to the sheet piling as is generally applied in the method according to the state of the arttechnique. The alternative sheet piling plates (10') have, for example, a mass of at least 35 kg, for example, at least 40 kg, at least 50 kg, at least 60 kg, at least 70 kg, or at least 75 kg.30 When repeating steps (E)–(H) according to step (I), the non-fixed additional sheet piling plates (10) are attached to other already fixed additional sheet piling plates (10). The sheet piling trench (20) thus consists of sheet piling plates (10) which are connected to each other in the vertical direction with 2025 / 5227 BE2025 / 5227 15 fastening elements (11), with the exception of the top alternative sheet piling plate (10') and the sheet piling plate (10) located directly below it. An advantage of working with the alternative sheet piling plates (10') is that the underground pillar or wall (40) provided according to the second aspect of the invention will have a full concrete finish on the side of the underground pillar or wall (40)5 directly adjacent to the ground level. Method for providing an underground pillar or wall (40)In a second aspect, the invention refers to a method for providing an underground pillar or wall(40), comprising the steps of:10 (i) providing a shod trench(20) in the ground, obtained by or obtainable via the method according to the first aspect; (ii) positioning reinforcement(41) in the shod trench, where the reinforcement(41) preferably consists of steel bars, mesh or cables; and (iii) pouring concrete into the shod trench(20) provided with reinforcement(41), preferably up to at least the opening of the shod trench(20) at ground level. As a result of the use of the shoring trench(20) obtained with or obtainable via the method according to the first aspect in providing an underground pillar or wall(40) according to the second aspect the shoring plates(10,10') and props(30) become an integral part of the underground pillar or wall(40). Therefore it may be preferable to select the dimensions of the shoring plates(10,10') in such a way that the required number of props(30) can be minimized.The reinforced (41) shod trench(20) is preferably filled with 25 concrete up to at least the opening of the shod trench(20) at ground level. However, it is also possible to install formwork above ground level and to place the reinforcement (41) in step(ii) in such a way that an underground pillar or wall(40) is provided which extends to one level above the opening of the shod trench(20) at ground level. In addition, it is possible to place reinforcement (41) in step(ii) and to pour 30 concrete in step(iii) in such a way that a sunken underground pillar or wall(40) is provided which extends to one level below the opening of the shod trench(20) at ground level. The shoring which extends above the level of the sunken underground pillar or wall(40) can be removed after the concrete has hardened, whereby 2025 / 5227 BE2025 / 5227 16 the method for installing a shored trench(20) in the ground according to the first aspect must be carried out in the opposite direction. Shoring plate(10)In one aspect the invention provides a sheet piling (10) for backing a trench (20') in the ground, which is mainly rectangular in shape, has a short side (1) with a length (L1) of 25 to 100 cm and a long side (2) with a length (L2) of 90 to 250 cm, where the sheet piling (10) includes fastening elements (11) on both long sides (2), and where the sheet piling (10) includes a central fold (12) which runs parallel to the long side (2), where the central fold (12) includes an out-of-plane section (4) which extends from the plane (3) of the sheet piling (10). The sheet piling (10) according to the third aspect is suitable for use in the method according to the first aspect. In execution form, the sheet piling (10) according to the third aspect is therefore a sheet piling (10) for installing a sheet piling trench (20) in the ground according to the method according to the first aspect.15 The sheet piling (10) according to the third aspect preferably has a short side (1) with a length (L1) of 25 to 80 cm, with more preference of 30 to 60 cm, with even morepreferably 35 to 50 cm. The sheet piling (10) also preferably has a ratio of a length (L1) of a short side (1) to a length (L2) of a long side 20 (2) of 1:1.5 to 1:10, with more preference 1:2 to 1:5, with even more preference 1:3 to 1:4. The sheet piling (10) also preferably has a sheet thickness (5) of at least 3 mm, such as 3 to 10 mm, such as 3 to 9 mm, 3 to 8 mm, 3 to 7 mm, 3 to 6 mm, 3 to 5 mm or 3 to 4 mm. The sheet piling (10) preferably has a mass of at most 30 kg, for example at most 25 kg, at most 20 kg, at most 15 kg, or at most 10 kg. The 25 The sheet piling (10) is preferably made of a metal or a metal alloy. Examples of suitable metals are iron, aluminium, copper, zinc, and nickel. Examples of suitable metal alloys are steel, bronze, brass, and monel. The sheet piling (10) is preferably made of iron or an iron alloy, with steel being more preferred. 30 The out-of-plane part (4) of the central fold (12) of the sheet piling (10) preferably extends over the entire length (L2) of the long side (2) and preferably hasa uniform shape along the entire length(L2) of the long side(2). The out-of-plane part(4) 2025 / 5227 BE2025 / 5227 17 of the central fold(12) is preferably located between 1 and 15 cm out of the plane(3) of the sheet piling(10), such as 6, 8 or 10 cm. The decentralized fold(12) increases the section modulus of the sheet piling(10) by increasing the geometric stiffness of the sheet piling(10), making the sheet piling(10) more resistant to bending stresses. The sheet piling(10) preferably has a section modulus of at least 40 cm³ / m, preferably 40 to 300 cm³ / m, preferably 45 to 225 cm³ / m, preferably 50 to 150 cm³ / m. Fastening elements(11) extending along the entire length of the long side(2), where a fold is formed by bending the edge of the long side(2) in a direction out of the plane(3) of the sheet piling(10), can provide additional section modulus. In one execution form the sheet piling (10) comprises more than one of the mentioned central folds (12) which run parallel to the long side (2).The central fold(12) can have any shape that provides the prescribed 15 resistance moment, but preferably has a shape such that the central fold(12) of a first sheet piling(10) mainly works together with the central fold(12) of a second sheet piling(10) when both sheet piling(10) are stacked on top of each other in a direction out of the plane(3) of the sheet piling(10). Examples of such shapes for the central fold(12) are an arc, a trapezoid, or a triangle.20 The sheet piling(10) has fastening elements(11) which are preferably suitable to work together with the fastening elements(11) of an identical sheet piling(10). When the fastening elements(11) on both long sides(2) of the sheet piling(10) extend in a direction out of the plane(3) of the sheet piling(10), it is preferable that the fastening elements(11) on one long side(2) of the sheet piling(10) extend in opposite directions in a direction out of the plane(3)of the sheet piling (10) in relation to the fastening elements (11) on the other long side (2) of the sheet piling (10).30 The fastening elements (11) on both long sides (2) that extend in a direction out of the plane (3) of the sheet piling (10) may be the same or different in shape. When the fastening elements (11) on one long side (2) of the sheet piling (10) differ from the fastening elements (11) on the other long side (2) of the sheet piling (10), 2025 / 5227 BE2025 / 5227 18 the fastening elements (11) on one long side (2) of a sheet piling (10) are preferably suitable to work together with the fastening elements (11) on the other long side (2) of an identical sheet piling (10). Such fastening elements(11) in an out-of-plane(3) direction(3) of the sheet piling(10) may consist of folds on both long sides(2) of the sheet piling(10), where the folds preferably extend over the entire length(L2) of the long side(2) of the sheet piling(10). Such folds can berealized by bending the edges of the sheet piling (10) with long sides (2) in one direction out of the plane (3) of the sheet piling (10), whereby one edge with long side (2) is bent in an opposite direction out of the plane (3) of the sheet piling (10) with respect to the other edge with long side (2). In other designs, the fastening elements(11) on one long side(2) of the sheet piling(10) may be located in the plane(3) of the sheet piling(10) and the fastening elements(11) on the other long side(2) of the sheet piling(10) may extend in a direction away from the plane(3) of the sheet piling(10). The fastening elements(11) located in the plane(3) of the sheet piling(10) preferably consist of holes in the sheet piling(10), but may also consist of hooks or rings which are attached to the edge of the sheet piling(10) with long side(2), for example by welding. The fastening elements(11) that extend in a direction away from the plane(3) of the sheet piling(10) preferably consist of protrusions on or at20the sheet piling plate(10). The protrusions can be created by bending a part of the edge of the sheet piling plate(10) with long side(2) or by attaching hooks to the edge of the sheet piling plate(10) with long side(2), for example by welding. In other designs, the fastening elements(11) on both long sides(2) may be located in the plane(3) of the sheet piling(10), where the fastening elements25(11) of two sheets work together with the aid of a third fastening element, where the third fastening element is preferably a rod or pin. Furthermore, the fastening elements(11) on both long sides(2) may be located in a direction out of the plane(3) of the sheet piling(10), where the fastening elements(11) in the direction out of the plane(3) of the sheet piling(10) consist of protrusions, and where the 30 fastening elements(11) of two sheets work together with the aid of a third fastening element, where the third fastening element is preferably a ring or clip.Such forms of execution require additional fastening elements, therefore 2025 / 5227 BE2025 / 5227 19 less preference because more materials and operations are required for fastening two sheet piling plates(10). Use In a fourth aspect, the invention concerns the use of a sheet piling plate(10)5 according to the third aspect for shoring a trench(20') in the ground. The forms of execution of the invention described in this patent application can be combined in any possible combination unless otherwise indicated. Forms of execution described in the context of the method according to the first aspect are10 as far as possible also applicable to the method according to the second aspect. The execution forms described in the context of the sheet piling (10) according to the third aspect are, as far as possible, also applicable to the working method according to the first and second aspects and to the use according to the fourth aspect. 15 EXAMPLES The invention will now be described in more detail by reference to the following figures, without however being limited thereto.Figure 1a shows a schematic representation of a design of a 20 sheet piling (10) for shoring a trench (20') in the ground according to the third aspect of the invention. Sheet piling (10) has a length (L1) of a short side (1), a length (L2) of a long side (2) and a plate thickness (5). The sheet piling (10) is preferably made of a metal or metal alloy, preferably iron or an iron alloy, preferably steel. The sheet piling (10) contains a central fold (12) which runs parallel to the long side (2), where the central fold (12) contains an out-of-plane part (4) which extends from the plane (3) of the sheet piling (10). The central fold (12) and the out-of-plane part (4) extend over the entire length(L2) of the long side(2). The central fold(12) and the out-of-plane part(4) have a uniform shape over the entire length(L2) of the long side(2). The out-of-plane part(4) of the central fold(12) preferably lies between 1 and 15 cm from the plane(3). 2025 / 5227 BE2025 / 5227 20The sheet piling (10) further comprises fastening elements (11) on both long sides (2). The fastening elements (11) are suitable to work with the fastening elements (11) of an identical sheet piling (10). The fastening elements (11) on both long sides (2) of the sheet piling (10) extend in one direction out of the plane (3) of the sheet piling (10), whereby the fastening elements (11) on one long side (2) of the sheet piling (10) extend in opposite directions in one direction out of the plane (3) of the sheet piling (10) with respect to the fastening elements (11) on the other long side (2) of the sheet piling (10). The fastening elements (11) consist of folds on both long sides sides(2)of the sheet piling(10), where the folds extend over the entire length(10 (L2)of the long side(2)of the sheet piling(10). Figure 1b shows a design of a sheet piling(10) according to the third aspect of the invention. The sheet piling(10) is made of steel and has alength(L1) of a short side(1) of 40 cm, a length(L2) of a long side(2) of 15015 cm, and a plate thickness(5) of 3 mm. The central fold(12) runs parallel to the long side(2) and has a uniform trapezoidal shape over the entire length(L2) of long side(2). The central fold(12) encloses an out-of-plane section(4) that lies 6 cm out of the plane(3) of the sheet piling(10). The sheet piling(10) has a section modulus of approx. 50 cm³ / m. The design of a sheet piling(10) as shown in Figure 1 is an example of a sheet piling(10) with folds on both long sides(2) of the sheet piling(10), where the folds on both long sides(2) are identical, whereby The fastening elements(11), the folds, of one sheet piling(10) can work together with the fastening elements(11) of another sheet piling(10), as shown schematically in Figure 1c. Figure 2a shows sheet piling(10) which enclose a central fold(12), where the central fold(12) of an overlying sheet piling(10) mainly30cooperates with the central fold(12) of an underlying sheet piling(10) when both sheet piling(10) are stacked on top of each other in a direction out of the plane(3) of the sheet piling(10). This allows the sheet piling(10) to be stacked close together. Figure 2b shows sheet piling according to the state of the art. 2025 / 5227 BE2025 / 5227 21 The difference in stacking density is shown with the white frame. Within the white frame of both Figure 2 and Figure 2b, twenty sheet piling slabs are included. As can be seen, the sheet piling slabs (10) according to the third aspect of the invention are substantially thinner and the shape of the central fold (12) provides a stacking of the sheet piling slabs (10) that has a higher density than the stacking of sheet piling slabs5 as known in the state of the art. Figure 3 schematically shows a method for shoring a trench (20') in the ground according to the first implementation forms of the first aspect of the invention. In Figure 3 (A), sheet piling slabs (10), such as for example according to the third 10aspect of the invention, provided. In Figure 3(B), a trench(20') is dug in the ground, preferably by hand, where the trench(20') has first sidewalls(21) with length(L21) and depth(23) and second sidewalls(22) with length(L22) and depth(23), where the length(L21) of the first sidewalls(21) is at least 1 times the length(L2) of the sheet piling(10), and where the depth(23) is 15 from 0.75 to 1.5 times the length(L1) of the short side(1) of the sheet piling(10). In Figure 3(C), sheet piling plates(10) are positioned as defined in the entry (A) against the opposite unbacked first side walls(21), where the long sides(2) of the sheet piling plates(10) run mainly parallel to the bottom of the 20 trench(20') and where the out-of-plane parts(4) of the central folds(12) of both sheet piling plates(10) are oriented towards the opposite first side wall(21). The sheet piling plates(10) in Figure 3(C) protrude above the opening of the trench(20') at ground level. The protruding part is approximately 0.25 times the length(L1) of the short side(1).25In Figure 3(D), facing sheet piling plates(10) are stabilized and fixed in their position by means of props(30), the ends of which (31) are placed at the height of the respective out-of-plan sections(4) of the central folds(12) of the sheet piling plates(10). The prop(30) in Figure 3(D) is a screw prop with a screw piece(32) and ends(31), where the foot plate and head plate at the ends(31) of the prop(30) work together with the out-of-plan sections(4) of the central folds(12) of the facing sheet piling plates(10). 2025 / 5227 BE2025 / 5227 22 In Figure 3(E), the trench (20') is deepened with an additional depth (24) of 1-1.5 times the length (L1) of the short side (1) of the sheet piling (10) as defined in step (A). Deepening the trench (20') is preferably done manually. In Figure 3(F), additional sheet piling (10) is defined in step (A) against the opposing unshod parts of the first side walls (21)5positioned, whereby each non-fixed sheet (10) is positioned mainly underneath and adjacent to an already fixed sheet (10), where the long sides (2) of adjacent sheet (10) run parallel and where the out-of-plan parts (4) of the central folds (12) of the additional sheet (10) are oriented towards the opposite first side wall (21).10 In Figure 3 (G), the additional sheet (10) are attached to the already fixed sheet (10) located directly above by making the fastening elements (11) on one long side (2) of an already fixed sheet (10) work together with the fastening elements (11) on the long adjacent side side(2)of the additional sheet piling (10) as already described in Figure 1c.15 In Figure 3(H), the additional sheet piling (10) are stabilized and fixed in their position by means of props. Figure 3(G) is placed opposite each other.(30) whose ends(31) are placed at the height of the respective out-of-plan sections(4) of the central folds(12) of the sheet piling(10). Finally, Figure 3(I) shows the result of the repeated steps from Figure 3(E)-20 Figure 3(H) which lead to a sheet piling trench(20) with the desired depth(25). Figure 4 shows execution forms of the shape of the central fold(12). The representations are a cross-section of the sheet piling(10) through a plane perpendicular to the plane(3) of the sheet piling(10) and parallel to the short side(1). The central fold(12) is characterized by a height(13), a base(14), and two base angles (15,16). The height(13) is preferably between 1 and 15 cm, the base(14) is preferably 0.1-0.5 times the short length(L1) of side(1) of the sheet piling(10), and the base angles (15,16) are greater than 0° and not greater than 90°, where at most one of the two base angles(15,16) can be 90°.30 In a first form of execution the central fold(12) has the shape of an isoscelestrapezoid with large base(14) and small base(14'). See Figure 4A. A special variant of this version has a small base(14') of 0 cm, so that the solid-sided trapezoid reduces to an isosceles triangle. 2025 / 5227 BE2025 / 5227 23 In a second version, the central fold(12) has the shape of a right-angled trapezoid with large base(14) and small base(14') and one base angle(15,16) of 90°. See Figure 4B. A special variant of this version has a small base(14') of 0 cm, so that the right-angled trapezoid reduces to a right-angled triangle. In a third version, the central fold(12) has the shape of an arc. See Figure 4C. In a fourth design form, the central fold (12) has the shape of a trapezoid with a rounded small base (14'). See Figure 4D. The base angles (15,16) of the solid-bone trapezoid are equal to the base angles (15',16') of the arc located on the side of the small base (14').10 For each design form described above, an example is shown of the stacking of six sheet piling slabs (10), where the central fold (12) of aoverlying sheet piling (10) mainly interacts with the central fold (12) of an underlying sheet piling (10) when both sheet piling (10) are stacked on top of each other in a direction out of the plane (3) of the sheet piling (10). As can be seen 15, it is preferable that the central fold (12) has a shape with a symmetrical cross-section, so that a dense stacking is achieved. Therefore, the second design is less preferred. Although one of the four described design forms is preferably applied in the sheet piling (10), it is not excluded that the central fold (12) may take on another shape, provided that the desired section modulus is achieved and provided that the shape allows for a dense stacking of sheet piling (10) in the direction out of the plane (3) of the sheet piling (10) by allowing the central folds (12) of stacked sheet piling (10) to work together. 25 Figure 5 shows a photo of props (30), more specifically screw props,as used in the method according to the first aspect. Furthermore, the photo provides a representation of the ends(31) of the stamps(30) with foot or head plates which work together with the out-of-plane parts(4) of the central folds(12) of the sheet piling(10). 30 Figure 6 shows execution forms of the shape of the fastening elements(11). The first four rows consist of sheet piling(10) with four fastening elements(11) each, but a smaller or larger number of fastening elements(11) is also possible. When using 2025 / 5227 BE2025 / 5227 24 of only one fastening element(11), this should mainly be centered on the long side(2) of the sheet piling(10). The top row of four design forms are examples of fastening elements (11) that lie in the plane (3) of the sheet piling (10). Such fastening elements (11) in the plane (3) can consist of holes in the sheet piling (5) or a ring, loop, or hook attached to the long side (2) of the sheet piling (10).The designs shown have a round shape, but can take on any desired shape, as long as the shape works together with a fastening element(11) which is located in a direction off-plane(3)of the sheet piling(10). The second and third row of four designs are examples of 10 fastening elements(11) which are fitted on the edge of the long side(2) and extend in a direction off-plane(3)of the sheet piling(10). The fastening elements(11) can consist of straight, angled or curved rods or pins. The second row shows fastening elements(11) which extend from the long side(2) in one direction out of the plane(3) of the sheet piling(10), while the third row shows fastening elements(11) which first extend in the plane(3) of the sheet piling(10) before extending in one direction out of the plane(3) of the sheet piling(10). The fourth row of three execution forms are examples of fastening elements(11) which are installed by making notches in the edge with the long side(2) and these20notches to bend in a direction out of the plane(3)of the sheet piling(10). The fifth of three design forms are examples of fastening elements(11) that extend over the entire length of the long side(2), where a fold is formed by bending the edge of the long side(2) in a direction out of the plane(3)of the sheet piling(10). The design forms according to the fifth are preferably used25 because the fastening elements(11) in the form of folds that extend over the entire length of the long side(2) provide extra resistance moment. The fastening elements(11) on one long side(2) of the sheet piling(10) may be the same or different from the fastening elements(11) on the other long side30 (2) of the sheet piling(10). In addition, the fastening elements(11) on one long side(2) of a sheet piling(10) must be suitable to work together with the fastening elements(11) on the other long side(2) of an identical sheet piling(10). 2025 / 5227 BE2025 / 5227 25The fastening elements(11) of the type shown in the first row of versions can work together with fastening elements(11) of the type shown in the second, third or fourth row of versions. In addition, the fastening elements(11) of the type shown in the first row of versions can work together with the help of a third fastening element in the form of a pin, rod, ring or clip. The fastening elements(11) of the type shown in the second and third row of versions can work together with fastening elements(11) of the type shown in the first, fourth or fifth row of versions. Preferably they work together with fastening elements(11) of the type shown in the first row of 10 versions. In addition, the fastening elements(11) of the type shown in the second and third row of versions can work together with the help of a third fastening element in the form of a ring or clip. The fastening elements(11) of the type shown in the fourth row ofThe fastening elements (11) can work together with fastening elements (11) of each type shown. Preferably, they work together with fastening elements (11) of the type shown in the fourth and fifth row of design forms. For cooperation with fastening elements (11) of the type shown in the first and second row of design forms, the connection can be facilitated by using a third fastening element in the form of a ring or clip. The fastening elements (11) of the type shown in the fifth row of design forms can work together with fastening elements (11) of the type shown in the second, third, fourth, and fifth row of design forms. Preferably, they work together with fastening elements (11) of the type shown in the fourth and fifth row of design forms. The fastening elements (11) which protrude from the surface (3) of the sheet piling plate (10) stretches, preferably have a lowest point that is lower than the end of the fastening element(11). When sheet piling plates(10) are fastened together, restthe lowest point of the fastening element(11) of a first sheet pile(10) at 30 preferably at the lowest point of the fastening element(11) of a second sheet pile(10). Loosening the sheet piles hanging one above the other(10) then requires that the lower sheet pile(10) be lifted. The greater the height difference between the lowest point at the end of a fastening element(11), the higher the 2025 / 5227 BE2025 / 5227 26 sheet pile(10) must be lifted. This reduces the chance that a lower sheet pile(10) can come loose due to, for example, a blow before it is fixed with props(30). The first design forms of the second and third row of four design forms show fastening elements(11) that are perpendicular to the surface(3) of the sheet piling plate5 (10). These fastening elements(11) therefore do not have a lowest point use of such fastening elements(11) as the bottom fastening element(11) of a sheet piling plate(10) is therefore not preferred. However, as the topfastening elements(11)of a sheet piling(10)can provide extra stability by being pressed into the first side walls(21)of the trench(20')10. Figure 7 shows a photograph of a sheet piling trench(20)according to a design of the invention, in which additional alternative sheet piling(10') are used. The alternative sheet piling slabs (10') are, like the sheet piling slabs (10), essentially rectangular in shape, with a short side (1) with a length (L1) of 25 to 100 cm and a long side (2) with a length (L2) of 90 to 250 cm. However, the alternative sheet piling slabs (10') consist of concrete that preferably contains reinforcement, and contain no central folds and no fastening elements on either long side (2). In steps (C) and (D) of the second execution form of the method according to the first aspect of the invention 20 the alternative concrete sheet piling slabs (10') were used, while in steps (F)-(H) for the additional sheet piling slabs use was made of the sheet piling slabs (10)with fastening elements(11) and central fold(12). Because the alternative sheet piling plates(10') do not include fastening elements, the non-fixed additional sheet piling plates(10) are not attached to the already fixed alternative sheet piling plates(10'). Figure 8a schematically shows a method for installing an underground pillar or wall(40) according to the second aspect of the invention. At the entry(i), a sheet piling trench(20) is installed in the ground according to the method30 of the first aspect of the invention. At the entry(ii), reinforcement(41) is positioned in the sheet piling trench(20), where the reinforcement(41) preferably consists of steel bars, mesh or cables.