Reinjecting NCG into peak zones of the reservoir using targeted NCG wells addresses efficiency challenges in SAGD operations, enhancing hydrocarbon recovery and reducing steam loss by establishing a gas cap above SAGD arrays.

CA3222053CActive Publication Date: 2026-11-10SUNCOR ENERGY INC
0 Cites 0 Cited by

Patent Information

Application Number
CA3222053
Authority / Receiving Office
CA · CA
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-12-05
Publication Date
2026-11-10
Estimated Expiration
2043-12-05

AI Technical Summary

Technical Problem

SAGD operations face challenges in efficiency and performance regarding the management of steam-assisted gravity drainage in bitumen recovery from oil sands reservoirs, particularly in maintaining optimal gas cycling and separation within the reservoir.

Method used

Reinjecting non-condensable gas (NCG) into peak zones of the reservoir using dedicated NCG wells that follow the reservoir's topology, avoiding low permeability zones to establish and maintain an NCG zone above the SAGD well array, enhancing separation and reducing gas cycling.

Benefits of technology

This approach improves hydrocarbon recovery efficiency by targeting peak zones, reducing steam leak-off and heat loss, and promoting lateral steam chamber growth, thereby increasing hydrocarbon production rates and reducing operational costs.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

This disclosure concerns techniques related to in situ recovery of hydrocarbons using well pairs, such as SAGD well pairs, arranged in an array and an NCG well located above the array and following peak zones of the pay zone. The NCG can be obtained by separating gas from production fluid or casing gas without removal of contaminants. The targeted NCG injection along the peak zones can facilitate formation of an NCG zone for enhanced performance of the overall SAGD operation as well as reduced surface processing of recovered gases.
Need to check novelty before this filing date? Find Prior Art

Description

NCG RE-INJECTION INTO RESERVOIR PEAK ZONES ABOVE SAGD ARRAYS TECHNICAL FIELD

[001] The technical field generally relates to in situ recovery of hydrocarbons, and more particularly to reinjecting non-condensable gas (NCG) into peak zones of a reservoir above an array of steam-assisted gravity drainage (SAGD) wells. BACKGROUND

[002] SAGD operations are often used to recover bitumen from oil sands reservoirs. There are various challenges with respect to efficiency and performance in terms of management of SAGD operations and there is a need for technologies that provide enhancements or overcome certain challenges. SUMMARY

[003] Various techniques are described herein for recovering hydrocarbons from a reservoir using a SAGD operation with NCG re-injection into certain zones of the reservoir. Re-injection of NCG into peak zones of a continuous reservoir using an NCG injection well that extends into the high regions of the reservoir can facilitate enhanced separation between the NCG well and SAGD wells while reducing potential gas cycling in the reservoir. Targeting peak zones of the reservoir can facilitate various efficiencies and performance enhancements. Various implementations related to systems and processes for in situ recovery of hydrocarbons are described in detail in the present description.

[004] In some implementations, there is provided an in situ hydrocarbon recovery system comprising: an array of well pairs located in a bottom zone of a pay zone of a reservoir, each well pair comprising a production well underlying an injection well, wherein the pay zone is located below a boundary region separating the pay zone from an overlying low permeability zone and wherein the boundary region defines peak zones and trough zones; at least one non-condensable gas (NCG) well extending into the reservoir and being configured to follow a set of the peak zones; a gas retrieval unit located at surface and configured to separate NCG from production fluid and / or retrieve casing gas obtained from the array, and producing an NCG stream; and a gas injection unit in fluid communication with the gas retrieval unit and configured to reinject at least a portion of the NCG stream via the NCG well into the set of peak zones to establish and maintain an NCG zone above the array.

[005] In some implementations, the NCG well comprises a deviated NCG well section comprising a plurality of curved well sections configured to access the set of peaks. In some implementations, the deviated NCG well section is arranged to extend diagonally across the well pairs in the array in plan view. In some implementations, the deviated NCG well section is located in an upper region of the pay zone below the boundary region. In some implementations, the deviated NCG well section is located in a lower region of the low permeability zone above the boundary region. In some implementations, the deviated NCG well section comprises pay zone well sections located below the boundary region, and low permeability zone well sections located above the upper boundary region. In some implementations, the deviated NCG well section is located within 5 meters of the upper boundary region. In some implementations, the deviated NCG well section is positioned to pass through at least the two highest peak zones located vertically above the array. In some implementations, the at least one NCG well is a single NCG well provided above the array. In some implementations, the deviated NCG well section extends above at least two arrays of well pairs. In some implementations, the at least one NCG well comprises multiple vertical wells extending into respective peak zones. In some implementations, the gas injection unit is configured to inject only the NCG stream obtained from the gas retrieval unit. In some implementations, the gas injection unit is configured to initially inject NCG prior to operation of the well pairs using NCG obtained from a distinct NCG source, and wherein the gas injection unit is configured to continue injection of NCG during operation of the well pairs using the NCG stream. In some implementations, the at least one NCG well is provided as a single wellbore. In some implementations, the at least one NCG well is provided as a multilateral well comprising uptracks and / or laterals extending in the peak zone. In some implementations, the NCG well is provided as an open wellbore. In some implementations, the NCG well is provided with a completion assembly comprising a perforated tubular in at least a portion of the deviated NCG well section. In some implementations, the completion assembly comprises at least one packer. In some implementations, the gas retrieval unit comprises a gas separation unit to separate the NCG stream from other compounds. In some implementations, the gas separation unit comprises a cooler that receives the casing gas to produce a cooled gas and a water removal unit that receives the cooled gas and removes water therefrom to produce a dehydrated gas as the NCG stream, and the gas injection unit comprises a compressor that receives the NCG stream and produces a compressed NCG stream for reinjection. In some implementations, the gas separation unit is configured to leave H<com:Sub>2< / com:Sub>S in the NCG stream for reinjection. In some implementations, the gas separation unit is configured to leave contaminants in the NCG stream for reinjection. In some implementations, the gas retrieval unit is configured to receive the casing gas and provide the casing gas without processing to an ejector assembly for combination with pipeline gas to form a gas mixture with pressure enabling injection via the NCG well. In some implementations, the well pairs of the array are steam-assisted gravity drainage (SAGD) well pairs. In some implementations, the system includes a steam injection unit configured for co-injection of steam and the NCG stream during startup of the NCG well to increase injectivity in the peak zones.

[006] In some implementations, there is provided an in situ hydrocarbon recovery process comprising: operating an array of well pairs located in a bottom zone of a pay zone of a reservoir; retrieving non-condensable gas (NCG) from production fluid and / or casing gas obtained from the array, and producing an NCG stream; and reinjecting at least a portion of the NCG stream directly into a set of peak zones defined by a boundary region between the pay zone and an overlying low permeability zone of the reservoir while avoiding direct injection into trough zones. In some implementations, the process can includes one or more features of the system and / or as described herein.

[007] In some implementations, there is provided an in situ hydrocarbon recovery system comprising: an array of well pairs located in a bottom zone of a pay zone of a reservoir, each well pair comprising a production well underlying an injection well, wherein the pay zone is located below a boundary region separating the pay zone from an overlying low permeability zone and wherein the boundary region defines peak zones and trough zones; and at least one non-condensable gas (NCG) well extending into the reservoir and being configured to intersect with one or more of the peak zones and to inject NCG into the one or more peak zones to establish and maintain an NCG zone above the array.

[800] In some implementations, the NCG well is configured to intersect with a set of the peak zones. In some implementations, the system includes a gas injection unit in fluid communication with the one or more NCG well and configured to reinject NCG previously retrieved from the reservoir back into the reservoir via the NCG well. In some implementations, the NCG that is reinjected at least partially comprises casing gas obtained from the array. In some implementations, the system includes a gas retrieval unit located at surface and configured to separate NCG from production fluid and / or retrieve casing gas obtained from the array, and producing an NCG stream; and wherein the gas injection unit is in fluid communication with the gas retrieval unit and configured to reinject at least a portion of the NCG stream via the NCG well.

[009] In some implementations, there is provided an in situ hydrocarbon recovery process comprising: operating an array of well pairs located in a bottom zone of a pay zone of a reservoir; and injecting non-condensable gas (NCG) directly into one or more peak zones defined by a boundary region between the pay zone and an overlying low permeability zone of the reservoir while avoiding direct injection into trough zones.

[0010] In some implementations, the process includes retrieving NCG from production fluid and / or casing gas obtained from the array, and producing an NCG stream; and wherein the NCG injected into the peak zones comprises at least a portion of the NCG stream. In some implementations, the NCG injected into the peak zones was previously retrieved from the reservoir and is thus reinjected into the reservoir. In some implementations, the NCG that is reinjected at least partially comprises casing gas obtained from the array. In some implementations, the NCG that is reinjected at least partially comprises NCG separated from production fluid obtained from the array.

[0011] A method of placing non-condensable gas (NCG) above an array of well pairs located in a bottom zone of a pay zone of a reservoir, the method comprising injecting NCG into the reservoir via at least one NCG well extending into the reservoir with a trajectory to intersect with one or more peak zones located within a boundary region that separates the pay zone from an overlying low permeability zone, the peak zones being identified based on determining an elevation map of the pay zone above the array, the at least one NCG well being configured for injection of NCG into the peak zones to establish and maintain an NCG zone above the array.

[0012] A well pattern comprising a plurality of NCG wells extending into the reservoir above at least one array of well pairs located in a pay zone of the reservoir, each NCG well having a trajectory intersecting with one or more pre-determined peak zones located within a boundary region that separates the pay zone from an overlying low permeability zone, each NCG well being configured for injection of NCG into the one or more pre- determined peak zones to establish and maintain an NCG zone above the at least one array. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The attached figures illustrate various features, aspects and implementations of the technology described herein.

[0014] Fig 1 is a partial perspective, partial plan view of an in situ hydrocarbon recovery system including an NCG well located above an array of well pairs.

[0015] Fig 2 is an elevation view of NCG wells overlying arrays of well pairs accessing peak zones of the reservoir.

[0016] Fig 3 is a side plan view of an NCG well following an upper pay zone boundary and located above a well pair.

[0017] Fig 4 is a top plan view of an NCG well having an arced trajectory to access peaks of the pay zone.

[0018] Fig 5 is a top plan view of an NCG well having an arced trajectory to access an elongated peak region of the pay zone.

[0019] Fig 6 is a top plan view of an NCG well having a curved trajectory with inflection point ("S" shaped) to access a peak zone of the pay zone.

[0020] Fig 7 is a side plan view of an NCG well having a trajectory accessing peak regions.

[0021] Fig 8 is a process diagram showing remote well pads and a central processing facility (CPF) and fluid exchanges between the two.

[0022] Fig 9 is a process diagram showing remote well pads and a central processing facility (CPF) with remote gas separation units.

[0023] Fig 10 is a side plan view of multiple NCG wells that each extend in to a corresponding peak zone of the reservoir.

[0024] Fig 11 is another side plan view of multiple NCG wells that extend in to corresponding peak zones of the reservoir.

[0025] Fig 12 is another side plan view of multiple NCG wells that extend in to corresponding peak zones of the reservoir.

[0026] Fig 13 is a side plan view of an NCG well extending in peak zones of the reservoir. DETAILED DESCRIPTION

[0027] The present description relates to techniques for recovering hydrocarbons using a SAGD well array disposed near the bottom of the pay zone along with one or more NCG injection wells located above the SAGD well array and accessing peak zones of the reservoir's pay zone for targeted injection into the peak zones. The NCG well can be generally horizontal and can follow the topology of one or more peaks zones. There can be a set of NCG wells that access different peak zones of the reservoir. For instance, there can be one or more vertical NCG wells that extend into certain peak zones, and one or more horizontal wells that have a trajectory following respective peak zones overlying the SAGD array. The NCG well can have a trajectory that deviates vertically and / or laterally to access peak zones and inject gas into those zones. The NCG wells can be configured to reinject NCG gas that is recovered from reservoir fluids, such as casing gas and / or gases present in production fluid. The injected gas can include flue gas, H2S, solvents, and other gas compounds that are light so as to remain at the top of the reservoir. Overall summary of system and process

[0028] Referring to Fig 1, the in situ hydrocarbon recovery system 8 includes an array 10 of well pairs 12 can be located in a reservoir 14 that has a pay zone 16, a reservoir base 18, and a low permeability zone 20. The pay zone 16 and the low permeability zone 20 are separated by a boundary region 22. The system 8 can also include an NCG well 24 that accesses peaks zones of the reservoir. The NCG well 24 can be designed, drilled and operated to inject gas into the peak zones while avoiding or minimizing injection into low zones. The NCG well 24 can have various trajectories and designs to achieve this peak zone targeted injection.

[0029] In some implementations, as shown in Fig 1, the NCG well 24 can have a deviated NCG well section 26 having a trajectory that follows high-peak zones 28 and low- peak zones 30 of the boundary 22. The NCG well 24 receives NCG gas for injection into the reservoir along higher points of the boundary and thus promotes gas accumulation within the peak zones of the reservoir. One or more NCG wells 24 can be provided to access corresponding peak zones of the reservoir.

[0030] Still Referring to Fig 1, each well pair 12 includes an injection well 32 overlying a production well 34 and the well pairs 12 are generally arranged in parallel with each other to form the array 10 and extending from a common well pad 36 located at surface. The well pairs 12 can be SAGD wells that operate under gravity dominated mechanisms. The injection well 32 can inject steam or a combination of steam and other compounds, such as solvent, surfactant, foam, and so on. The well pair 12 can also be operated in different modes, such as a startup mode to establish fluid communication between the wells where solvents can be circulated and / or injected, a production mode where steam is injected while hydrocarbons and condensate flow down to the production well, and eventually wind down mode where other gases can be injected. The production well 34 enables recovery of a production fluid 38 to the surface where it can be processed.

[0031] Fig 1 illustrates that production fluid 38 can be supplied to a gas separation unit 40 to produce a separated NCG stream 42 and an NCG-depleted stream 44. Surface facilities can have numerous separators and treatment stages where NCG streams are separated. In addition, casing gas 46 can be recovered at the well pad 36 and can also be processed to remove heavier gas components from the methane.

[0032] The system 8 also includes a gas injection unit 48 (e.g., compressor) that receives NCG that is derived from the casing gas 38 and / or the production fluid 38 and re- injects the NCG 50 via the NCG well 24 into the reservoir 14. The system can also include a pre-heater for pre-heating the gas prior to re-injection. NCG well arrangements

[0033] Turning now to Fig 2, the NCG wells 24 can be arranged in various ways above one or more arrays 10 depending on factors such as array orientation and locations within the reservoir and the location, size and elevation of reservoir peaks.

[0034] Drilling and positioning of the NCG wells 24 can be performed using various techniques and can depend on factors such as reservoir characteristics and array location. In some implementations, the NCG wells 24 are located based on a pre-determined evaluation of the reservoir, including determining an elevation map above the array, defining peak zones above the array, and providing an NCG well drilling plan such that the NCG well will pass through some or all of the peak zones. The peak zones can be defined using various methods, such as determining a highest peak, a lowest trough, and an average boundary elevation, and then using an averaging method such that the peak zones are regions above the average elevation of the boundary for the area about the array. It is noted that other methods of determining the peak zones can also be used depending on the geology and characteristics of the given reservoir.

[0035] Fig 2 illustrates an example scenario where peak zones were defined and the NCG well 24 trajectories were determined based on NCG wellhead locations and passage through the peak zones above the respective arrays 10. In addition, the trajectories can be provided to bypass trough regions of the reservoir—that is, regions where the boundary is relatively low, such as below a pre-determined depth-thus remaining substantially or solely in the peak zones. For example, in Fig 2 the peak zones were defined as including the top three highest elevation ranges on the map. It is noted that data from existing geological models and delineation wells as well as tools such as numerical simulation and honoring the progression of heat in the reservoir can help determine and optimize the plan. In this scenario, all NCG wells were kept within or above these peak regions, except for example C where the NCG well passes through a trough. It is noted that in some implementations, a majority or 80%, 90% or more of the well length can be in peak regions for a given array or area including multiple arrays. More specifically, for example A, the NCG well 24 has a proximal well section in the third highest peak zone and a distal well section in the second highest peak zone. For example B, the NCG well 24 has a proximal well section in the second highest peak zone and a distal well section in the third highest peak zone, while also having a curvature in plan view to avoid passing through a trough region to the North West. For example C, the NCG well 24 has proximal and distal sections in the third highest peak zone where the distal well section has curved trajectory to access an isolated peak zone. In this case, the distal well section could have a dip below the boundary or could pass directly through the trough zone without an elevation change. Examples D and E show how two NCG wells 24 can be provided above multiple arrays within a reservoir peak zone that is relatively continuous over that area, and can have trajectories to remain in that peak zone rather than pass through trough zones. It is noted that measurement while drilling (MWD) could be used as well as geo-steering technology for drilling the wells.

[0036] Referring to Figs 3 to 7 and 10 to 13, additional top and side view scenarios are shown to illustrate certain examples of the trajectory of the NCG well with respect to the peak zones. It is noted that the NCG well trajectory can deviate both vertically and laterally to efficiently access and pass through peak zones of the reservoir. The NCG well sections provided to access target peak zones can curve vertically only (i.e., in the z direction) or laterally only (i.e., in the x-y plane), or can have x-y-z directional components, depending on the location of the peak zones. The drilling trajectory for each well section can be determined based on the least distance to access the target peak zone or other factors regarding drilling methods and reservoir characteristics.

[0037] Fig 3 shows an example scenario wherein the NCG well 24 follows the boundary and remains within the pay zone 16. The NCG well 24 has sections that curve into the high-peaks and a section that curves into the lower-peaks to remain in the peak zones.

[0038] Fig 4 shows an example NCG well 24 that accesses three isolated peak zones 28 by having an arcuate shape in top plan view. The curvature of the NCG well 24 can be provided to have a trajectory to access the peaks zones 28 in that area. In this scenario, the NCG well 24 may or may not deviate vertically depending on the elevation of the boundary and the pay zone characteristics in that direction. The NCG wells can be provided to be located in peak zones while respecting and considering drilling limitations, such as dogleg severity as well as completions such as liners run into the wellbore. The liners can include blanks (no openings), wire wraps, slotted liners, incorporated flow control devices (FCD) including injection and inflow, and combinations thereof. In some implementations, the maximum curvature of the well is as shown in Fig 4, although greater curvatures may also be possible.

[0039] Fig 5 shows an example NCG well 24 that accesses a peak zone 28 that is relatively continuous at that elevation while having an irregular shape. In particular, the NCG well 25 follows the shape of the peak zone 28 having an arcuate trajectory in top plan view. The curvature of the NCG well 24 can be provided to have a trajectory to follow an irregularly shaped peak zone, for example to access its main portions and remain generally in a central position of the peak zone 28. Fig 2 illustrates another example scenario where the NCG wells 24 are positioned and have trajectories to generally remain in a central region of the peak zones to efficiently provide gas to the high peaks of the reservoir. In this regard, the NCG well trajectories can remain within corresponding peak zones while still having certain constraints in terms of length and curvature, e.g., avoiding overly high degrees of curvature and lengths.

[0040] Fig 6 shows an example NCG well 24 that accesses three isolated peak zones 28 by having an S-shape trajectory in top plan view. The curvatures of the NCG well 24 can be provided to have a trajectory to access the peaks zones 28 in that area. It is noted that the NCG well can be designed to have multiple inflection points to access isolated peak zones and / or irregularly shaped peak zones.

[0041] Fig 7 shows another example NCG well 24 that is provided with a trajectory to access the peak zones 28 while not necessarily dipping to remain below the boundary for certain regions of the reservoir. It may be more efficient in terms of drilling and operations to have NCG well sections in the lower regions above the boundary and / or aligned in trajectory with well sections that are in peak zones. Thus, in some implementations, the primary consideration can be to locate the NCG well 24 in the peak zones when passing through the peak areas, but not necessarily deviating the NCG well 24 to always be close to the boundary for lower regions, especially deeper trough regions that would require significant vertical deviation of the well section. Dip limitations for NCG wells can include drilling, completion, and proximity to well pairs, for example.

[0042] Turning now to Fig 10, NCG wells 24 can be provided as vertical wells extending into respective peak zones 28. Targeted drilling of the NCG wells 24 into peak zones 28 can include vertical or deviated wells that have injection sections present only in the peak zones to deliver the gas into those target regions. Fig 11 shows a scenario where peak zones are accessed by both vertical and horizontal NCG wells 24. Vertical NCG wells can extend into the peak zones such that the lower extremity of the wells or the lowest gas injection section terminate within a peak zone to facilitate injection into the peaks zones and not lower areas of the reservoir. In some implementations, when multiple NCG wells are used above one or more arrays, the NCG wells can be distributed to have only one well per peak zone.

[0043] Referring now to Fig 12, the NCG well 24 can include injection sections that are present in the peak zones and blank sections 51 for other regions that may be low or above the pay zone boundary. The blank sections can include a non-perforated completion tube provided in the wellbore, while the injection well sections include a perforated completion assembly or another configuration enabling fluid injection. Providing blank sections in this manner can facilitate placement of the NCG gas specifically into target peak zones. This configuration can also facilitate drilling a relatively straight wellbore for the NCG well, as shown in Fig 12, to access the peak zones while the well sections in regions with a low boundary are prevented from injecting gas. Thus, both gas placement and drilling can be facilitated.

[0044] Referring to Fig 13, in some implementations, the NCG well 24 can follow the boundary within peak zones 28 while being relatively level when passing over trough zones of the reservoir. In this manner, the gas can be injected and placed directly in the higher zones of the reservoir while not having to dip in lower zones. In the lower zones, the NCG well 24 can be completed with blank well sections to ensure no injection of gas into those zones. In some scenarios, the zones above the boundary through which the NCG well passes can have a low permeability and thus gas injection can be inhibited in those zones by the low permeability property of the reservoir itself.

[0045] It is also noted that providing the NCG well can be done to ensure that vertical deviations during the drilling are relatively conservative to not penetrate overlying cap rock, monitoring zones, or too close to the SAGD well pairs. Thus, the NCG wells can be drilled to be offset from certain regions of the reservoir, e.g., offset at least 1-2 meters, at least 5 meters or at least 10 meters from certain regions like cap rock or a mud layer.

[0046] When gas is injected into the peak zones, the gas will penetrate into the zones and the penetration region of the NCG can depend on various factors—such as NCG reinjection pressure, NCG composition, reservoir properties and so on. Gas penetration can also be evaluated as a variable when considering NCG well placement. The penetration region can cover the entire peak zone above the array, although it can leave certain peaks that are relatively small and / or remote from the main trajectory of the NCG well 24.

[0047] The NCG wells 24 can be completed in various ways. As mentioned above, the NCG well can include blank well sections and perforated well sections. The NCG well can include perforated tubing or other completions to enable injection of gas and the apertures can be designed accordingly to enable gas injection while avoiding wellbore collapse. In addition, in some implementations, the NCG wells can be completed to enable both gas injection for an NCG injection phase, as well as production for a production phase that can occur later in the life of the recovery operation. The production phase can be performed after the economic life of the SAGD operation to recover NCG gas that was injected along with other gases that may be present in the high zones of the reservoir. The completion assembly could also include flow control devices for controlling flow characteristics of the gas at different sections along the well. Regarding FCDs, depending on the data obtained during drilling or from model or from logs, the installation of the FCDs can be defined; in principle one can target to inject gas in more effective areas and provide an even distribution. For example, if some part of the well has higher injectivity, then injection can be reduced in that part by installing an FCD in that area to achieve greater conformance of injection along the well. Alternatively, the NCG well can in some cases be open-hole wells. In some applications, the well design including completion can be determined by running a numerical model and optimizing the design based on the results of forward modeling.

[0048] In addition, the NCG wells can be equipped with packers. Unlike wells that operate with steam injection at very high temperatures, the NCG wells can operate at much lower temperatures which facilitates the use of conventional packer equipment. Packers can facilitate rapid and efficient shut-down of a well, if desired. Packers can also provide various flow control options for operators. For example, packers can be provided for wellbore integrity, e.g., to reduce corrosion on the casing and / or provide an additional resistance to possible leaks and contaminations to the other zones.

[0049] In some implementations, the NCG wells can include multilateral or branched wells that include a main well section and laterals and / or uptracks that extend horizontally or vertically from the main well section into certain regions of the peak zone. Multilateral wells can facilitate placement of NCG in certain types of peak zones, such as those with a shape where a single well section would be difficult to access without significant curvatures or deviations. The laterals or uptracks could be open-hole while the main well section could have a completion assembly. Surface facilities and NCG production

[0050] The NCG that is reinjected into the reservoir via the NCG wells can be derived from reservoir fluids that are processed at surface. As noted above, the NCG can be derived from casing gas and / or production fluid. The casing gas has a high methane content, and it can be processed to remove other components, such as water, and optionally H<com:Sub>2< / com:Sub>S and C<com:Sub>2< / com:Sub>+ compounds, before being reinjected. All or some of the casing gas NCG can be reinjected and any remainder can be used as fuel. The casing gas can be processed at a CPF 52 as shown in Fig 8, or at or near the well pads as illustrated in Fig 9. In some implementations, the casing gas is only subjected to cooling and water removal before being compressed and reinjected into the reservoir, which presents notable efficiencies compared to conventional processing of casing gas at surface.

[0051] It is also noted that since the NCG reinjected into the reservoir may not require high purity as it would in other applications, the processing to generate the NCG stream can be adapted to reduce energy consumption and increase efficiency. For example, the NCG processing can forgo H<com:Sub>2< / com:Sub>S removal that would be used for methane intended to be used as fuel if the NCG stream is used for reservoir reinjection. The composition of the NCG stream can thus be adapted based on the end-use of reinjection and its processing can be reduced or minimized. In some implementations, the casing gas is reinjected substantially as-is without separation or processing, except for cooling followed by water removal. The dehydration of the gas can be performed to avoid compressor issues such as blow out and corrosion, and can depend on compressor specifications. Furthermore, the reinjection process can facilitate operational flexibility, as operations may not need to treat the produced gas which can be reinjected. This can also reduce the impact of gas handing on surface facilitates. In addition, it is also possible to utilize ejector systems where produced gas at low pressure is added to pipeline specification gas at high pressure and the gas mixture is then injected via the NCG well without the need for dehydrating or contaminant removal of the produced gas.

[0052] The NCG stream that is injected into the reservoir can include various gas sources and compounds. For example, the NCG can include CO<com:Sub>2< / com:Sub>, N<com:Sub>2< / com:Sub>, flue gas, dehydrated casing gas, gas derived from production fluid, raw pipeline natural gas, acid gas, or mixtures thereof. When pipeline natural gas is injected, it can be used to provide the pressure required for injection and thus other gases can be added to the pipeline gas stream for injection, thus forgoing a dedicated compressor for gas reinjection. It is also noted that the processing of the gas for reinjection can depend on the design and characteristics of the compressor used for injection.

[0053] Furthermore, the NCG that is injected can be substantially or fully derived from reservoir fluid sources, and this can include the particular array of well pairs and / or adjacent arrays that are part of the same oil field that is connected to the same CPF. However, it is also possible to inject NCG obtained from other sources. For example, during startup of an operation, if no NCG is being generated, then another source of NCG (e.g., gas obtained from a pipeline) can be used temporarily until NCG generation from reservoir derived fluid sources has ramped up. In some implementations, as the reservoir- derived gas is introduced and ramped up, the use of pipeline gas can be tapered down until the sole gas injected is the reinjected reservoir-derived gas.

[0054] It is also noted that the NCG can be selected and provided based on the in situ process that is used in the pay zone. The in situ process can include SAGD, solvent- assisted SAGD, solvent dominated gravity drainage, or other processes. For example, when a solvent dominated process is used, the surface facilities can be as described in CA 3,138,297 as one example. When steam-based SAGD processes are used, other surface facility setups can be implemented to recover and reinject NCG. Thus, depending on the surface facilitates and the in situ recovery process, the NCG that is reinjected can have different compositions and properties. In some implementations, the NCG that is injected can be primarily methane with minor quantities of C<com:Sub>2< / com:Sub>+ hydrocarbons and other gas components depending on the source of the gas. Monitoring and process control

[0055] In some implementations, the NCG reinjection can be accompanied by monitoring and / or control related to gas injection. For example, a number of variables related to the gas reinjection can be monitored to promote pressurization of the peak zones by the gas, as well as displacement of water from the peak zones and corresponding reduction of water saturation. Example variables include the injection rate of the gas, the locations of the NCG wells and the volume of gas reinjected.

[0056] In some implementations, the NCG well is operated to reinject NCG into the peak zone to increase the peak zone pressure, for instance close to the underlying in situ process operating pressures (e.g., SAGD operating pressures), and displace water therefrom, thus reducing steam leak-off and heat loss from the steam chamber to surrounding reservoir regions by forming a pressurized gas cap in the peak zones over the pay zone.

[0057] It is also noted that the pressurization of the peak zones can be monitored according to various techniques. A first technique based on mathematical relationships between flow rate, pressure and time, called pressure transient analysis (PTA), allows estimation of the size and shape of the gas-enriched region around an NCG well. In one implementation of the PTA technique, an NCG well is shut in and the rate of pressure fall- off is measured. Shut-ins could be performed using downhole shut in valves, downhole check valves or via wellhead shut-in. The NCG well can be equipped with pressure sensing instrumentation that is downhole and may be distributed along the relevant section or sections of the NCG well, which may be within the peak zones. Surface pressure sensors can also be used. The rate of pressure fall-off obtained is indicative of the size of the gas-enriched region surrounding that particular NCG well. Performing this type of technique at multiple locations in the peak zones can facilitate the mapping of the gas- enriched region. By having a better overview of the shape and size of the gas-enriched region, decisions can be made regarding the operation of the NCG wells, such as whether to add more NCG wells at given locations or to shut in NCG wells at other given locations, adjust the gas injection rate, and so on.

[0058] In some implementations, the water contained in the peak zone or a portion thereof is monitored for gas content in order to determine whether injected gas has advanced through the peak zone. A gas detector can be installed to perform this detection. It should be noted that gas detection in general can be performed by other methods, such as observation wells provided through the peak zone, the observation wells being equipped with appropriate devices for directly and / or indirectly detecting gas and relaying the information so that certain appropriate actions can be taken. The observation well can be a separate well drilled in a selected location of the reservoir for the dedicated purpose of observing parameters, such as fluid levels, gas content and pressure within the reservoir. The observation well can be an existing well that is equipped with appropriate instrumentation to provide suitable data, such as pressure data. In an example scenario, an observation well can be equipped with pressure gauges to monitor the extent of the gas-enriched region in the peak zone. A first pressure gauge can be installed in a first (e.g., upper) region of the peak zone and a second pressure gauge can be installed in a second (e.g., lower) region of the peak zone, at a predetermined distance from the first pressure gauge. It can then be inferred from the pressure differential between the first and the second pressure gauges whether a water or gas column is present in the peak zone at the location of a given observation well. For instance, for a distance of 10 meters between the first and the second pressure gauges, if the pressure differential is approximately 100 kPa (the pressure at the bottom of the observation well being higher than the pressure at the top thereof), it can be indicative that water is present in the observation well. However, if the pressure differential is lower than what would be dictated by the presence of water only, it can be indicative that gas is also present in the observation well. Observation wells can be provided at various points in the peak zone (higher and lower regions) as well as other zones of the reservoir (e.g., lower in the pay zone, above the boundary, etc.).

[0059] Volumetric estimates can also be performed, such as measurement of the volumetric sweep efficiency, which evaluates the mobility of fluids by determining the proportion of the volume of the peak zone that has been contacted with the injected gas. In some implementations, a 10% to 15% volumetric sweep efficiency in a peak zone having a radius of about 1.2 kilometers and a thickness of about 2 meters or more can be obtained. Different volumetric sweep efficiencies can be obtained depending on the operating conditions of the NCG wells and reservoir parameters such as permeability, thickness and structure.

[0060] Furthermore, reservoir saturation logs can be used to characterize the geological formation penetrated by an NCG well or an observation well, and provide insights into certain profiles along the depth of the NCG well or the observation well by evaluating parameters such as the density, the porosity, and the resistivity log responses. For instance, in an overall formation, a low resistivity can be associated with a high water saturation and thus be indicative of the presence of a peak zone that is lean in terms of hydrocarbon content. In contrast, a higher resistivity can be indicative of a region having higher saturations of bitumen. In some implementations, several saturation logs are obtained over a period of time to monitor the gas and water displacements, which can facilitate the process of mapping the gas cap and the monitoring of the gas leaks off of the peak zones. Peak zones can be lean in bitumen compared to the underlying pay zone of the reservoir, but peak zones can also be bitumen rich in some cases.

[0061] Time lapsed seismic, also referred to as 4D seismic, is another technique that can be used to monitor the water saturation level in the peak zones and evaluate the size of the peak zones which are lean in bitumen, by evaluating the changes in the acoustic and elastic properties of the geological formation. In such 4D seismic analysis, changes in amplitude and velocity are compared with baseline seismic interpretation, and maps are then generated to monitor the size, or extent, of the gas cap.

[0062] In some implementations, tracking methods can be used in order to detect various parameters of the process. For example, a tracer chemical can be included in the NCG injected into the peak zone via the NCG well. The tracer chemical can be injected in various ways, such as co-injected with the NCG via one, more or all of the NCG wells, or other injection means. Tracer chemicals can be for gas phase, water phase or oil phase tracing. The tracer chemical can be pre-injected into water present in the reservoir and / or peak zone in order to better determine the location and origin of the water being displaced and produced (e.g., from native water in the reservoir or from injected fluid in the form of condensed steam). Tracer chemicals can thus be used in connection with various aspects of the operations described herein, for various purposes, such as detecting gas breakthroughs, detecting and tracking water displacement, and so on.

[0063] It may also be beneficial to manage potential interactions between the in situ recovery operation and gas-enriched peak zones. For example, in some implementations, the gas-enriched peak zone can be formed well before potential heat or fluid losses from the underlying SAGD could occur. However, it should be noted that various timing strategies can be used for the gas pressurization and the SAGD operation. For example, the gas pressurization can be commenced prior to drilling the SAGD wells and / or prior to start-up of the SAGD wells. Alternatively, the gas pressurization can begin after start-up of the SAGD wells, ideally as long as the growth of the SAGD steam chambers is such that the gas-enriched peak zone is formed before the SAGD steam chambers reach the peak zone.

[0064] In one example, the NCG well is operated to establish a gas-enriched peak zone prior to operating SAGD in the underlying main pay zone. At some stage, SAGD wells are drilled, completed, and started up. As mentioned above, the timing of drilling, completion and start-up activities can depend on a number of factors. After startup of the SAGD well pairs to establish fluid communication between each pair, steam chambers are formed above respective SADG well pairs. In some scenarios, by the time steam chambers begin to form and grow upward, the gas-enriched peak zone has been formed and is being maintained. Eventually the steam chambers approach the lower part of the peak zone. It should be noted that there is some heat conducted upward from the upper edge of the steam chambers and can reach the peak zone before the steam chambers themselves. As heat and steam reach the peak zone, the gas-enriched peak zone provides insulation and pressurization to reduce heat and fluid losses.

[0065] Typically, a bitumen reservoir is developed in stages, where a first array of SAGD wells is provided and operated in a first portion of the reservoir as a first stage of reservoir development, and then a second array of SAGD wells is provided and operated in another portion of the reservoir as a subsequent stage of reservoir development. The first and second arrays of SAGD wells can be located adjacent to each other, and the arrays can be generally parallel to each other or at various angles, depending on the reservoir geology and hydrocarbon distribution in the pay zones. As new arrays of SAGD wells are provided and operated, new NCG wells can also be provided in close proximity thereto to form a gas-enriched zone that follows the SAGD operations.

[0066] It is noted that the peak zone gas pressures and SAGD pressure can both be monitored and adjusted so that the pressure difference is within a desired range. For instance, during early steam chamber development, the pressure difference between the pressure of the gas-enriched peak zone and the pressure of the underlying SAGD steam chamber pressures can be maintained within 200 kPa. The pressure difference that is achieved can depend on various factors, such as the geology of the pay zone and peak zones, and the economics of NCG reinjection and heat loss for the given in-situ hydrocarbon recovery operation. It should be noted that, conventionally, the pressure difference between an upper lean zone and SAGD steam chambers could be modified by adjusting the SAGD steam injector. When NCG wells are provided for pressurizing lean peak zone, the pressure difference can be adjusted using two levers, i.e., the NCG wells and the SAGD steam injector, which facilitates additional options for process control.

[0067] As mentioned above, the gas pressurization of the peak zone provides an insulation layer and pressurization above the in situ recovery operation to reduce heat and fluid losses to the peak zone due to advection and to help delay the development of the steam chambers into the peak zone. In addition, a pressurized peak zone can encourage lateral growth of the steam chambers within the main pay zone. This promoted lateral growth of steam chambers can also delay the steam chambers expanding into the peak zone and increase hydrocarbon recovery and production rates since higher saturations of hydrocarbons are typically found in such lateral directions within a main pay zone.

[0068] Furthermore, when an in-situ recovery operation has reached maturity, and / or a desired hydrocarbon recovery factor has been achieved in a given pay zone, a portion of the gas that has been injected into the peak zone can be produced back and recycled in various other processes. In some implementations, it can be advantageous to produce back the injected gas for re-injection into another formation, for injection into another peak zone, or for use in an enhanced oil recovery (EOR) process. In addition, when the NCG comprises a light hydrocarbon, such as methane, the recovered NCG component can be used as a fuel for steam generation or heating processes. Producing back the NCG can include recovering a mixture comprising a portion of NCG and water from the peak zone. The mixture can also include other components that are present in the peak zone, such as oil. Once the mixture is produced to the surface, it can be processed in various ways. For example, the mixture can be separated according to known methods of gas-liquid separation, thus producing a recovered NCG component and a water component. In some implementations, the NCG well can be converted to a peak zone production well to produce back the injected NCG. Alternatively, new wells can be drilled and operated for producing the mixture. The peak zone production wells can be operated in various ways to enhance gas recovery from the peak zone, for example by using flow control devices to promote flow of gas from certain parts of the peak zone with high gas saturation and low water saturation. The composition of the mixture can be monitored over time to assess gas content, and once the gas content notably decreases the production can be ceased or adjusted. In other implementations, the NCG well can also be converted to produce bitumen and / or water present in the peak zone.

[0069] In addition, in some cases, the presence of the gas in the peak zone can alter properties of various components in the peak zone, and such changes can later be leveraged advantageously. For example, some NCG such as CO<com:Sub>2< / com:Sub> and methane can reduce the viscosity of heavier hydrocarbons, such as bitumen, particularly when allowed to remain in contact with the bitumen over longer periods of time. Thus, when the peak zone includes heavy oil or bitumen that has been mobilized due to contact with the injected gas, the mixture that is produced can include mobilized hydrocarbons from the reservoir that can be recovered. In such cases, the mixture can be subjected to a separation process at surface to produce a hydrocarbon enriched component for further processing or transportation, and a hydrocarbon depleted component. In some implementations, the mixture is fed into a gas separator to recover gas, and then is fed into a water-hydrocarbon separator to recover a hydrocarbon enriched component. The resulting produced water component can be recycled in various ways, e.g., supplied to a water treatment facility prior to being used as boiler feed water in a once-through steam generator (OTSG), or supplied directly to a direct-contact steam generator (DCSG). In some cases, the mixture can be directly supplied to a DCSG such that the water, gas, and recovered hydrocarbons produce a steam-and-CO<com:Sub>2< / com:Sub> mixture that can be used for SAGD or other thermal in-situ recovery applications.

[0070] It is also noted that various methods, including monitoring and process control, described in Canadian patent No. 3,113,483 can be used in conjunction with and adapted to the technology described herein.

[0071] Furthermore, in some implementations, the reinjected NCG can be monitored for certain properties, such as composition, prior to reinjection. For example, H<com:Sub>2< / com:Sub>S content, C2+ content, methane content, and other components can be measured continuously or intermittently. The composition measurements can be used as a variable in process control and regulatory reporting, for example.

[0072] In terms of operating strategy for the NCG wells, in some implementations the gas injection is performed conservatively or non-aggressively where the injection pressure is provided to ensure that the gas does not displace to the production wells of the well pairs. It is possible to inject the gas continuously, or intermittently such as only or mainly during the summer. For intermittent injection (e.g., summer only or all seasons except winter), the gas could be over-injected to provide a gas blanket that is larger than designed and then it would last during the non-injection period (e.g., winter) as well, which can have advantages in terms of gas prices which are higher in winter. Thus, the recovered NCG gas could be used and / or sold during winter when gas prices are high, and the recovered NCG could be reinjected during the periods when gas prices are low. This type of intermittent gas injection could also be applied on a shorter time basis rather than seasonal.

[0073] In some implementations, the NCG can be pre-heated prior to re-injection to avoid freezing and / or Jule Thompson cooling. The NCG can be metered at surface and a pre-heater can be provided to pre-heat the gas prior to reinjection. The level of pre-heating can be tailored to the particular in situ recovery process conditions and geology of the reservoir.

Claims

CLAIMS 1. An in situ hydrocarbon recovery system comprising: an array of well pairs located in a bottom zone of a pay zone of a reservoir, each well pair comprising a production well underlying an injection well, wherein the pay zone is located below a boundary region separating the pay zone from an overlying low permeability zone and wherein the boundary region defines peak zones and trough zones; at least one non-condensable gas (NCG) well extending into the reservoir and being configured to follow a set of the peak zones; a gas retrieval unit located at surface and configured to separate NCG from production fluid and / or retrieve casing gas obtained from the array, and producing an NCG stream; and a gas injection unit in fluid communication with the gas retrieval unit and configured to reinject at least a portion of the NCG stream via the NCG well into the set of peak zones to establish and maintain an NCG zone above the array.

2. The in situ hydrocarbon recovery system of claim 1, wherein the NCG well comprises a deviated NCG well section comprising a plurality of curved well sections configured to access the set of peaks.

3. The in situ hydrocarbon recovery system of claim 2, wherein the deviated NCG well section is arranged to extend diagonally across the well pairs in the array in plan view.

4. The in situ hydrocarbon recovery system of claim 2 or 3, wherein the deviated NCG well section is located in an upper region of the pay zone below the boundary region.

5. The in situ hydrocarbon recovery system of claim 2 or 3, wherein the deviated NCG well section is located in a lower region of the low permeability zone above the boundary region.

6. The in situ hydrocarbon recovery system of claim 2 or 3, wherein the deviated NCG well section comprises pay zone well sections located below the boundary region, and low permeability zone well sections located above the upper boundary region.

7. The in situ hydrocarbon recovery system of any one of claims 2 to 6, wherein the deviated NCG well section is located within 5 meters of the upper boundary region.

8. The in situ hydrocarbon recovery system of any one of claims 2 to 7, wherein the deviated NCG well section is positioned to pass through at least the two highest peak zones located vertically above the array.

9. The in situ hydrocarbon recovery system of any one of claims 1 to 8, wherein the at least one NCG well is a single NCG well provided above the array.

10. The in situ hydrocarbon recovery system of any one of claims 2 to 8, wherein the deviated NCG well section extends above at least two arrays of well pairs.

11. The in situ hydrocarbon recovery system of any one of claims 1 to 8, wherein the at least one NCG well comprises multiple vertical wells extending into respective peak zones.

12. The in situ hydrocarbon recovery system of any one of claims 1 to 11, wherein the gas injection unit is configured to inject only the NCG stream obtained from the gas retrieval unit.

13. The in situ hydrocarbon recovery system of any one of claims 1 to 11, wherein the gas injection unit is configured to initially inject NCG prior to operation of the well pairs using NCG obtained from a distinct NCG source, and wherein the gas injection unit is configured to continue injection of NCG during operation of the well pairs using the NCG stream.

14. The in situ hydrocarbon recovery system of any one of claims 1 to 13, wherein the at least one NCG well is provided as a single wellbore.

15. The n situ hydrocarbon recovery system of any one of claims 1 to 12, wherein the at least one NCG well is provided as a multilateral well comprising uptracks and / or laterals extending in the peak zone.

16. The in situ hydrocarbon recovery system of any one of claims 1 to 15, wherein the NCG well is provided as an open wellbore.

17. The in situ hydrocarbon recovery system of any one of claims 1 to 15, wherein the NCG well is provided with a completion assembly comprising a perforated tubular in at least a portion of the deviated NCG well section.

18. The in situ hydrocarbon recovery system of claim 17, wherein the completion assembly comprises at least one packer.

19. The in situ hydrocarbon recovery system of any one of claims 1 to 18, wherein the gas retrieval unit comprises a gas separation unit to separate the NCG stream from other compounds.

20. The in situ hydrocarbon recovery system of any one of claims 1 to 18, wherein the gas retrieval unit is configured to receive the casing gas and provide the casing gas without processing to an ejector assembly for combination with pipeline gas to form a gas mixture with pressure enabling injection via the NCG well.

21. The in situ hydrocarbon recovery system of any one of claims 1 to 20, further comprising a steam injection unit configured for co-injection of steam and the NCG stream during startup of the NCG well to increase injectivity in the peak zones.

22. An in situ hydrocarbon recovery process comprising: operating an array of well pairs located in a bottom zone of a pay zone of a reservoir; retrieving non-condensable gas (NCG) from production fluid and / or casing gas obtained from the array, and producing an NCG stream; and reinjecting at least a portion of the NCG stream directly into a set of peak zones defined by a boundary region between the pay zone and an overlying low permeability zone of the reservoir while avoiding direct injection into trough zones.

23. An in situ hydrocarbon recovery system comprising: an array of well pairs located in a bottom zone of a pay zone of a reservoir, each well pair comprising a production well underlying an injection well, wherein the pay zone is located below a boundary region separating the pay zone from an overlying low permeability zone and wherein the boundary region defines peak zones and trough zones; and at least one non-condensable gas (NCG) well extending into the reservoir and being configured to intersect with one or more of the peak zones and to inject NCG into the one or more peak zones to establish and maintain an NCG zone above the array.

24. The in situ hydrocarbon recovery system of claim 23, further comprising a gas injection unit in fluid communication with the one or more NCG well and configured to reinject NCG previously retrieved from the reservoir back into the reservoir via the NCG well.

25. The in situ hydrocarbon recovery system of claim 24, wherein the NCG that is reinjected at least partially comprises casing gas obtained from the array.

26. The in situ hydrocarbon recovery system of claim 24, further comprising a gas retrieval unit located at surface and configured to separate NCG from production fluid and / or retrieve casing gas obtained from the array, and producing an NCG stream; and wherein the gas injection unit is in fluid communication with the gas retrieval unit and configured to reinject at least a portion of the NCG stream via the NCG well.

27. An in situ hydrocarbon recovery process comprising: operating an array of well pairs located in a bottom zone of a pay zone of a reservoir; and injecting non-condensable gas (NCG) directly into one or more peak zones defined by a boundary region between the pay zone and an overlying low permeability zone of the reservoir while avoiding direct injection into trough zones.

28. The in situ hydrocarbon recovery process of claim 27, further comprising retrieving NCG from production fluid and / or casing gas obtained from the array, and producing an NCG stream; and wherein the NCG injected into the peak zones comprises at least a portion of the NCG stream.

29. A method of placing non-condensable gas (NCG) above an array of well pairs located in a bottom zone of a pay zone of a reservoir, the method comprising injecting NCG into the reservoir via at least one NCG well extending into the reservoir with a trajectory to intersect with one or more peak zones located within a boundary region that separates the pay zone from an overlying low permeability zone, the peak zones being identified based on determining an elevation map of the pay zone above the array, the at least one NCG well being configured for injection of NCG into the peak zones to establish and maintain an NCG zone above the array.

30. A well pattern comprising a plurality of NCG wells extending into the reservoir above at least one array of well pairs located in a pay zone of the reservoir, each NCG well having a trajectory intersecting with one or more pre-determined peak zones located within a boundary region that separates the pay zone from an overlying low permeability zone, each NCG well being configured for injection of NCG into the one or more pre-determined peak zones to establish and maintain an NCG zone above the at least one array.