Hole-forming method and application of grouting hole-by-hole drilling in advanced tube shed of pebble-accumulated layer tunnel
A technology of accumulating layers and pipe sheds, which is applied in the direction of tunnels, tunnel linings, earthwork drilling, etc., can solve the problems of drill sticking, easy hole collapse, and difficulty in hole formation, so as to achieve the effect of reinforcement, guarantee of construction quality, and good effect. Effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2019-09-06
Smart Images

Figure 1
Abstract
Description
technical field
[0001] The invention relates to a construction method for an advanced pipe shed in a pebble accumulation layer tunnel. Background technique
[0002] The advance pipe shed support construction of the pebble accumulation layer tunnel is a difficult problem in tunnel construction. The traditional advance pipe shed construction uses down-the-hole drilling to form holes. It is difficult to form holes in the pebble accumulation layer, especially when the length of the pipe shed is more than 10m When it is used, it is very easy to have problems such as hole collapse, drill sticking, and failure to drill due to air leakage; the method of surface grouting needs to consume a lot of cement, and the grouting effect is difficult to guarantee. The construction period is long and the environment is polluted. It is still very easy to cause collapse Holes, stuck drills, unable to drill holes due to air leakage, etc.; the use of full-section grouting is costly, the constructio...
Examples
Embodiment Construction
[0025] In this embodiment, the method of drilling holes one by one in the advanced pipe shed of the pebble accumulation layer tunnel and grouting is to group the holes of similar pipe sheds into a group, and firstly drill the holes in the middle of a group of pipe shed holes , when there is a problem of hole collapse, drill sticking or air leakage in the drilled hole and it is impossible to drill, use the grouting pipe to carry out hollow hole grouting for the formed hole section, and consolidate the hole bottom and the surrounding rock around the hole wall of the formed hole section , complete the first drilling, and complete the first drilling one by one for the adjacent holes in the same way; then, complete the second drilling of each hole one by one in the same way as the first drilling, until Drill the hole to the design depth.
[0026] In the specific implementation, cement water glass double grout is used as the grout for hole grouting, and the grouting pressure is 2.5M...