River embankment structure integrating pollutant migration prevention with ecological greening, and construction method
A technology for pollution migration and ecology, applied in the field of environmental engineering, to reduce construction costs, ensure soil and water stability, and shape river ecosystems
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2018-08-24
Smart Images

Figure 1
Abstract
Description
technical field
[0001] The invention belongs to the field of environmental engineering, and in particular relates to a river embankment structure and construction method integrating pollution migration and ecological greening, which are used for river channel treatment projects for cross-pollution between polluted soil along the banks of small and medium-sized rivers and river basins. Background technique
[0002] In recent years, with the rapid development of society and economy, the blind mining of mineral resources, the rapid expansion of industrial production, the extensive use of chemical products in agricultural activities, and the large amount of toxic and harmful substances produced by human activities have entered the soil and rivers, and the soil and water, the atmosphere and There is constant material exchange between organisms. Harmful substances pass through "soil → plant → human body", or through "soil → water → human body", or through "water → soil → human body...
Examples
Embodiment 1
[0042] As described in the above steps, first clear the river channel to the river bed 1 elevation according to the plan, and excavate the embankment baseline 5 according to the structural form and size of the ecological gabion 6 and the structural form and size of the clay anti-seepage layer 7; the ecological gabion retaining wall 6 should be based on the flood control of the river channel The level and height of the wall shall be set up to meet the requirements of the dike foundation. After the construction of the dike foundation is completed, the ecological gabion retaining wall 6 shall be constructed on the dike foundation; after the construction of the ecological gabion retaining wall 6 is completed, the ecological gabion A clay protective layer 8 is laid on the water surface, and then a clay anti-seepage layer 7 is backfilled between the coastal polluted soil 4 and the ecological gabion retaining wall 6. The backfill thickness and compaction of the clay anti-seepage layer ...
Embodiment 2
[0044] When the present invention is applied to the slope surface of the polluted soil 4 along the coast, the construction sequence of the clay anti-seepage layer 7 and the ecological gabion retaining wall 6 should be adjusted, that is, the clay anti-seepage layer 7 is constructed first, and then the clay protective layer 8 is laid, and finally the construction is carried out. Ecological construction retaining wall 6, the rest of the construction steps are the same as in Embodiment 1.
Embodiment 3
[0046] The anti-seepage material of the clay anti-seepage layer 7 selects geomembrane, or cement soil, or concrete wall, etc., and its construction steps are consistent with Embodiment 1; Consistent with Example 2.