A method for energy system visualization

Through the energy system visualization method of sand table carrier, combined with calculation analysis and simulation, the problem of unreality of virtualization simulation models in the existing technology is solved, and the intuitive display of the dependence relationship between the energy system and the building group is realized, and the demonstration of engineering projects is improved. efficiency.

CN111090241BActive Publication Date: 2024-12-27CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN201811239899.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-10-24
Publication Date
2024-12-27
Estimated Expiration
2038-10-24

AI Technical Summary

Technical Problem

In the early theoretical demonstration stage of establishing an energy system, the virtualization simulation model is not real and cannot intuitively reflect the dependence relationship between the energy system and the building group where it is located.

Method used

Using sand tables as carriers, through calculation analysis and simulation, optimize the layout of the energy system, combine historical load types and demand data, and use energy system simulation software for real-time simulation and display to demonstrate the optimal operating parameters and dependencies of the energy system.

Benefits of technology

It realizes the intuitive visual display of the energy system, provides strong support for early demonstration, and improves the work efficiency and research level of management and design units.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111090241B_ABST
    Figure CN111090241B_ABST
Patent Text Reader

Abstract

The present invention relates to an energy system visualization method, which takes energy system basic data as the core, performs global energy consumption analysis on the system through an integrated energy system simulation platform, comprehensively considers various links of energy production, storage, transmission and distribution, takes the optimization of integrated energy network operation as the goal, simulates the best operating parameters of each energy station, and uses a mold as a carrier to display the corresponding real-time operating parameters of the energy system and each energy device. The technical solution provided by the present invention solves the technical problem that the virtual energy system model established by the energy system simulation method in the prior art is not real and cannot intuitively reflect the dependency relationship between energy systems and the local building groups.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of energy system simulation, and in particular to an energy system visualization method. Background Art

[0002] At present, energy and environment have become the main bottlenecks restricting the sustainable development of the national economy. The trend has shifted from traditional extensive energy utilization to refined and decentralized sustainable low-carbon energy utilization. Therefore, the development of distributed low-carbon energy stations plays an important role in improving the overall efficiency of energy and the absorption capacity of renewable energy. The development of various energy conversion equipment (such as cogeneration, heat pumps, electric heating, electric hydrogen, etc.) provides a means for the coordination and complementarity of multiple types of energy. Distributed low-carbon energy stations, high-tech and equipment, are a new type of energy system that can achieve cascade utilization of energy and improve energy utilization. The development of distributed low-carbon energy stations can reduce environmental pollution, strengthen energy security, optimize energy structure, and improve energy utilization. Research on the joint optimization and regulation technology of distributed energy stations is a prerequisite for vigorously developing the efficient operation of distributed energy systems. It is also the technical basis for developing a demonstration project of low-carbon energy stations with electricity as the core and comprehensive energy optimization configuration on the demand side. It provides support for the transformation of energy configuration methods and the premise for promoting changes in production and life. It has become an important part of promoting energy transformation and the third industrial revolution.

[0003] However, in the prior art, in the early theoretical demonstration stage of establishing an energy system, virtual simulation is mostly performed in the form of software. The virtual energy system model established is not real and cannot intuitively reflect the dependency relationship between the energy system and the local building complex. Summary of the invention

[0004] The present invention proposes an energy system visualization method, which intuitively displays the simulation effect of the energy system in the form of a sand table, providing strong support for the early theoretical demonstration of the engineering project.

[0005] The present invention proposes an energy system visualization method, which is characterized by comprising:

[0006] Step S100: Calculate and analyze energy production costs and demands;

[0007] Step S200: forming an energy system layout by optimizing the configuration, and simulating the energy system to obtain the optimal operating parameters of each energy substation;

[0008] Step S300: Visually display the energy system using a sandbox.

[0009] Preferably, the step S100 further includes:

[0010] During the calculation and analysis process, a data model can be established by combining the historical load types and historical load demand data of the location to analyze and predict energy generation costs and demands.

[0011] Preferably, the step S200 further includes:

[0012] The load type and load demand calculated in step S100 are modeled and simulated through energy system simulation software, the energy storage consumption of each energy subsystem and the overall energy consumption of the system are analyzed, the mechanical kinetic energy loss, electrical energy loss and thermal energy loss are analyzed, and the operating parameters of the energy system are adjusted through vertical and horizontal benchmarking.

[0013] Preferably, the step S400 further includes:

[0014] Each building and energy station model in the sandbox is equipped with a main control board. The main control boards of the buildings and energy stations communicate with each other through a serial bus. The serial bus is connected to a host computer, in which energy system simulation software runs. The energy system simulation software is used to simulate the operation of the energy system in real time, and the operation parameters of each energy station are sent to each energy station model on the sandbox through the serial bus at certain time intervals.

[0015] Preferably, the step S400 further includes:

[0016] The header of the operating parameter data stream sent to each energy station on the sandbox is provided with identification information corresponding to each energy station. The main control board of each energy station on the sandbox receives the operating parameter information with specific identification from the serial bus and displays it on the LED display device.

[0017] The present invention provides an energy system visualization method, which takes the basic data of the energy system as the core, performs global energy consumption analysis on the system through an integrated energy system simulation platform, comprehensively considers each link of energy production, storage, transmission, and distribution, takes the optimization of the operation of the integrated energy network as the goal, simulates the optimal operating parameters of each energy station, and uses a mold as a carrier to display the corresponding real-time operating parameters of the energy system and each energy device. The technical solution provided by the present invention solves the technical problem that the virtual energy system model established by the energy system simulation method in the prior art is not real and cannot intuitively reflect the dependency relationship between the energy systems and the local building groups. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0019] Figure 1 This is a flow chart of an energy system visualization method in Embodiment 1 of the present invention;

[0020] Figure 2 A simplified energy flow diagram of an exemplary energy substation in the second embodiment of the present invention;

[0021] Figure 3 This is an exemplary urban energy system planning diagram in the second embodiment of the present invention. DETAILED DESCRIPTION

[0022] Now, the preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

[0023] Embodiment 1

[0024] This embodiment discloses a method for visualizing an energy system. Figure 1 As shown, the following steps are included:

[0025] Step S100: Calculate and analyze energy production costs and demands.

[0026] Specifically, based on the renewable energy, external clean energy, resource advantages, resource quantity, and building distribution of the local area, the load type and load demand of each area are analyzed.

[0027] Specifically, during the calculation and analysis process, a data model can be established in combination with the historical load types and historical load demand data of the location to analyze and predict the energy generation cost and demand.

[0028] Step S200: simulating the energy system using software, and adjusting the energy system to reduce energy consumption losses.

[0029] Specifically, the load type and load demand calculated in step S100 are modeled and simulated through energy system simulation software, the energy storage consumption of each energy subsystem and the overall energy consumption of the system are analyzed, the mechanical kinetic energy loss, electrical energy loss and thermal energy loss are analyzed, and the operating parameters of the energy system are adjusted through vertical and horizontal benchmarking.

[0030] Step S300: forming an energy system layout by optimizing the configuration, and using software to simulate the energy system to obtain the optimal operating parameters of each energy substation.

[0031] Specifically, based on the comprehensive energy load forecast on the demand side and the resource analysis on the source side, combined with the regional control planning, considering each link of energy production, storage, transmission and distribution, from the perspective of the integrated energy network, with the optimal integrated energy network construction cost, the optimal total construction and operation and maintenance cost throughout the life cycle, the optimal total construction and operation and maintenance cost throughout the life cycle, carbon emissions and energy efficiency as the goals, a mathematical optimization model is established to form the addressing, capacity determination and network path parameters of energy stations in the region.

[0032] Specifically, the configuration within each energy station is optimized, and the composition of the internal energy subsystems and the recommended annual working hours of each energy station are determined based on the regional optimized layout, addressing and capacity.

[0033] Step S400: Visually display the energy system using a sandbox.

[0034] Specifically, according to the energy system layout obtained after the optimized configuration in step S300 and the optimal operating parameters of each energy station obtained through simulation, a model is built for the local building group on the sand table.

[0035] Specifically, each building and energy station model is provided with a main control board, and the main control boards of the buildings and energy stations communicate with each other through a serial bus, and the serial bus is connected to a host computer, wherein energy system simulation software runs in the host computer, and the operation of the energy system is simulated in real time through the energy system simulation software, and the operation parameters of each energy station are sent to each energy station model on the sandbox through the serial bus at certain time intervals.

[0036] Specifically, the header of the operating parameter data stream sent to each energy station on the sandbox is provided with identification information corresponding to each energy station. The main control board of each energy station on the sandbox receives the operating parameter information with a specific identification from the serial bus and displays it on the LED display device.

[0037] This embodiment discloses a method for visualizing an energy system. The optimal layout model and optimal operating parameters of the energy system are obtained through preliminary theoretical verification and modeling simulation. The energy system is visualized using a sand table as a carrier. The real-time operating parameters obtained by simulation of the upper computer are displayed through the buildings and energy stations on the sand table. The method in this embodiment can intuitively reflect the dependency relationship between energy systems and between energy systems and local building groups, providing a powerful means for the preliminary demonstration of engineering projects and effectively improving the work efficiency and research level of management and design units.

[0038] Embodiment 2

[0039] This embodiment proposes an energy system simulation device, which can be used to execute the energy system simulation method in the above-mentioned embodiment 1. The energy system simulation device includes a host computer and a sandbox model.

[0040] Among them, energy system simulation software is running in the host computer, and the operation status of the current energy system is simulated in real time through the energy system simulation software, and the real-time operation parameters of each substation in the energy system are transmitted to the main control board corresponding to the substation on the sand table through the serial bus, and the main control board transmits the real-time operation parameters to the corresponding LED screen for display;

[0041] The sandbox irregularly arranges multiple building energy stations according to actual urban scenes. Each energy station serves various types of buildings such as schools, hospitals, CBDs and residential communities. The energy provided by the energy station includes electricity, heat and cold energy.

[0042] The layout between the building energy station and the building in the sandbox is formed through software optimization configuration. In the optimization configuration, the regional control planning is combined, and the energy production, storage, transmission and distribution links are considered. From the perspective of the integrated energy network, the optimal construction cost of the integrated energy network, the optimal total construction and operation and maintenance cost of the whole life cycle, the optimal total construction and operation and maintenance cost of the whole life cycle, carbon emissions and energy efficiency are respectively set as the goals, and a mathematical optimization model is established to form the addressing, capacity determination and network path parameters of the energy stations in the region;

[0043] Each energy station includes but is not limited to the following energy equipment: substation, natural gas boiler, flue gas heat exchanger (static component), natural gas internal combustion engine, cylinder jacket water heat exchanger (built together with natural gas internal combustion engine), generator, absorption refrigerator, electric refrigerator, cooling tower (static component), power storage equipment, heat storage, cold storage, photovoltaic, wind power generation, 400V power distribution station (represented by box-type structure), cable trench, heat pump, electric boiler;

[0044] Preferably, each of the energy devices comprises a main control board and a display screen, wherein the main control board is used to be connected to a serial bus to receive real-time operating parameters sent by a host computer, and the display screen is used to receive and display the real-time operating parameters from the main control board;

[0045] Preferably, Altium Designer software is used as the main control board production software, and C language is used as the programming language of the main control board.

[0046] The specific implementation methods of some of the above energy devices are as follows:

[0047] 1. Detailed implementation plan for each distributed unit in the energy station:

[0048] 1) 110kV to 10kv substation

[0049]

[0050] Implementation plan:

[0051] a) Use a light strip to represent the buying and selling of electricity. Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed. The main control board controls the LED driver board to indirectly control the flow rate, color and flow direction of the RGB three primary color light strip.

[0052] b) Use the display screen with serial port identification to identify the data sent by the main control board to display the amount of electricity. Materials required to achieve the function: main control board, LED light strip driver board (1 piece), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0053] c) Programming language: C language, control board production software: Altium Designer.

[0054] 2) Natural gas boiler

[0055]

[0056] Implementation plan:

[0057] a) The effect of LED screen playing boiler fuel consumption

[0058] b) Two different light strips represent gas feed and thermal power output respectively

[0059] c) Use the main control board of this site to receive the data sent from the serial port bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed. The main control board controls the LED driver board to indirectly control the flow rate and color of the RGB primary color light strip, as well as the flow direction and the burning and non-burning state of the LED screen.

[0060] d) Use the display screen with serial port identification to identify the data sent by the main control board to display the size of the gas feed and the size of the thermal power output.

[0061] e) Materials required to realize the function: main control board, LED light strip driver board (2 pieces), a display screen with serial port (7 inches), 5 meters of light strip, LED screen, and 2 sets of programs.

[0062] f) Programming language: C language, control board production software: Altium Designer.

[0063] 3) Flue gas heat exchanger (Note: static component)

[0064] 4) Natural gas internal combustion engine (the input is natural gas, the output is thermal power connected to the generator, the high-temperature flue gas is connected to the absorption refrigerator, and the other part is connected to the cylinder jacket water)

[0065]

[0066] Implementation plan:

[0067] a) A light strip is used to indicate the amount of gas feed. The main control board of this station receives the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed. The main control board controls the LED driver board to indirectly control the flow rate of the RGB three-primary color light strip to indicate different gas input status. A faster flow rate indicates more input, and a slower flow rate indicates less input.

[0068] b) Use a display screen with serial port identification to identify the data sent by the main control board and display the size of the gas feed in real time.

[0069] c) Materials required to realize the function: main control board, LED light strip driver board (1 piece), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0070] d) Programming language: C language, control board production software: Altium Designer.

[0071] 5) Cylinder jacket water heat exchanger (Note: built together with natural gas internal combustion engine)

[0072]

[0073] Implementation plan:

[0074] a) Use the display screen to display the supply and return water temperatures of the cylinder jacket water. Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed, and the main control board controls the display screen to display different temperature data in real time.

[0075] b) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0076] c) Programming language: C language, control board production software: Altium Designer.

[0077] 6) Generator

[0078]

[0079]

[0080] Implementation plan:

[0081] a) Two light strips are used to indicate the amount of electric power output and the speed of the motor respectively.

[0082] b) Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed. The main control board controls the LED driver board to indirectly control the flow rate of the RGB primary color light strip to indicate the amount of electric power and the speed of the motor. A faster flow rate means more input, and a slower flow rate means less input.

[0083] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the power and motor speed in real time.

[0084] d) Materials required to realize the function: main control board, LED light strip driver board (2 pieces), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0085] e) Programming language: C language, control board production software: Altium Designer.

[0086] 7) Absorption refrigeration machine (Note: Input: flue gas recovery and jacket water heat exchanger as input, jacket water preheating input and flue gas recovery input; Output: output connected to the main pipe)

[0087]

[0088]

[0089] Implementation plan:

[0090] a) Two light strips are used to indicate the amount of electric power output and the cooling and heating status of the refrigerator respectively.

[0091] b) Use the main control board of this site to receive the data sent from the serial port bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed. The main control board controls the LED driver board to indirectly control the flow rate of the RGB primary color light strip and the color change of the light strip to indicate the return water temperature and outlet water temperature of the refrigerator as well as the cooling and heating status (light strip color change).

[0092] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the temperature transmitted by the refrigerator in real time.

[0093] d) Materials required to realize the function: main control board, LED light strip driver board (2 pieces), a display screen with serial port (7 inches), 5 meters of light strip, and 3 sets of programs.

[0094] e) Programming language: C language, control board production software: Altium Designer.

[0095] 8) Electric refrigerator (Note: the input is electrical energy, the output is connected to the cold water main pipe, and the flow rate and temperature are displayed)

[0096]

[0097]

[0098] Implementation plan:

[0099] a) Two light strips are used to indicate the amount of electric power output and the cooling and heating status of the refrigerator respectively.

[0100] b) Use the main control board of this site to receive the data sent from the serial port bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed. The main control board controls the LED driver board to indirectly control the flow rate of the RGB primary color light strip and the color change of the light strip to indicate the return water temperature and outlet water temperature of the refrigerator as well as the cooling and heating status (light strip color change).

[0101] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the temperature transmitted by the refrigerator in real time.

[0102] d) Materials required to realize the function: main control board, LED light strip driver board (2 pieces), a display screen with serial port (7 inches), 5 meters of light strip, and 3 sets of programs.

[0103] e)5. Programming language: C language, control board production software: Altium Designer.

[0104] 9) Cooling tower (Note: static component)

[0105] 10) Storage equipment (Note: cabinet-type storage battery, static model, connected to 10kV busbar)

[0106]

[0107] Implementation plan:

[0108] a) Use a light strip to indicate the charge and discharge status of the power storage device

[0109] b) Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed, and the main control board controls the LED driver board to indirectly control the state (input or output) of the RGB three primary color light strip.

[0110] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the actual power of charging and discharging and the current power of the storage device in real time.

[0111] d) Materials required to realize the function: main control board, LED light strip driver board (2 pieces), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0112] e) Programming language: C language, control board production software: Altium Designer.

[0113] 11) Heat storage (Note: connected to the hot water bus, cold water (low temperature) goes through the lower pipe, and hot water (high temperature) goes through the upper pipe)

[0114]

[0115] Implementation plan:

[0116] a) Two light strips are used to indicate the water inlet and water outlet status respectively.

[0117] b) Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed, and the main control board controls the LED driver board to indirectly control the flow rate of the RGB three primary color light strip.

[0118] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the transmitted temperature and actual flow rate in real time.

[0119] d) Materials required to realize the function: main control board, LED light strip driver board (2 pieces), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0120] e) Programming language: C language, control board production software: Altium Designer.

[0121] 12) Cold storage (Note: connected to the cold water bus, cold water (low temperature) goes through the pipe below, hot water (high temperature) goes through the pipe above)

[0122]

[0123] Implementation plan:

[0124] a) Use two light strips to indicate the water inlet and water outlet status respectively.

[0125] b) Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed, and the main control board controls the LED driver board to indirectly control the state (input or output) of the RGB three primary color light strip.

[0126] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the temperature and flow in real time.

[0127] d) Materials required to realize the function: main control board, LED light strip driver board (2 pieces), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0128] e) Programming language: C language, control board production software: Altium Designer.

[0129] 13) Photovoltaic (Note: Connect to transformer and 10kV bus)

[0130]

[0131] Implementation plan:

[0132] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0133] b) Use a display screen with serial port identification to identify the data sent by the main control board and display the temperature and flow in real time.

[0134] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0135] d) Programming language: C language, control board production software: Altium Designer.

[0136] 14) Wind power generation: Connected to the wind substation and 10kV busbar, the wind turbine generator can rotate.

[0137]

[0138] Implementation plan:

[0139] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0140] b) Use a display screen with serial port identification to identify the data sent by the main control board and display the temperature and flow in real time.

[0141] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0142] d) Programming language: C language, control board production software: Altium Designer.

[0143] 15) 400V substation: box-type structure is adopted.

[0144] 16) Cable trench: Just display one section.

[0145] 17) Heat Pump

[0146]

[0147] Implementation plan:

[0148] a) Use a light strip to indicate the heat flow status of the heat pump.

[0149] b) Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed, and the main control board controls the LED driver board to indirectly control the state (flow rate) of the RGB three-primary color light strip.

[0150] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the temperature and flow in real time.

[0151] d) Materials required to realize the function: main control board, LED light strip driver board (1 piece), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0152] e) Programming language: C language, control board production software: Altium Designer.

[0153] 18) Electric boiler:

[0154]

[0155] Implementation plan:

[0156] a) Use a light strip to indicate the water supply status of the electric boiler.

[0157] b) Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed, and the main control board controls the LED driver board to indirectly control the state (flow rate) of the RGB three-primary color light strip.

[0158] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the temperature and flow in real time.

[0159] d) Materials required to realize the function: main control board, LED light strip driver board (1 piece), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0160] e) Programming language: C language, control board production software: Altium Designer.

[0161] 2. Detailed implementation plan for the load side

[0162] 1) Charging piles (Note: In residential or commercial areas, connect electric vehicles and put 2 in each load.)

[0163]

[0164] According to functional zoning: divide the land into industrial parks, residential areas, office areas, and business areas.

[0165] Loads: commercial buildings, industrial buildings, residential buildings, public buildings (schools and hospitals).

[0166] Implementation plan:

[0167] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0168] b) Use a display screen with serial port identification to identify the data sent by the main control board and display the charging power and actual power in real time.

[0169] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0170] d) Programming language: C language, control board production software: Altium Designer.

[0171] 2) Commercial building load display:

[0172]

[0173] Implementation plan:

[0174] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0175] b) Using a display screen with serial port identification, the data sent by the main control board is identified to display the actual power demand of commercial building users, heat demand, and cooling demand in real time.

[0176] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0177] d) Programming language: C language, control board production software: Altium Designer.

[0178] 3) Industrial building load display:

[0179]

[0180] Implementation plan:

[0181] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0182] b) Using a display screen with serial port identification, the data sent by the main control board is identified to display the actual power demand of industrial building users, user heat demand, and user cooling demand in real time.

[0183] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0184] d) Programming language: C language, control board production software: Altium Designer.

[0185] 4) Residential building load display:

[0186]

[0187]

[0188] Implementation plan:

[0189] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0190] b) Using a display screen with serial port identification, the data sent by the main control board is identified to display the actual power demand of industrial building users, user heat demand, and user cooling demand in real time.

[0191] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0192] d) Programming language: C language, control board production software: Altium Designer.

[0193] 5) Public building load display:

[0194]

[0195] Implementation plan:

[0196] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0197] b) Using a display screen with serial port identification, the data sent by the main control board is identified to display the actual power demand of public building users, heat demand, and cooling demand in real time.

[0198] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0199] d) Programming language: C language, control board production software: Altium Designer.

[0200] 6) Commercial building load and main pipe heat exchanger

[0201]

[0202] Implementation plan:

[0203] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0204] b) Use a display screen with serial port identification to identify the data sent by the main control board and display the actual temperature of the primary return water temperature, primary water supply temperature, secondary return water temperature, and secondary water supply temperature of the commercial building in real time.

[0205] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0206] d) Programming language: C language, control board production software: Altium Designer.

[0207] 7) Industrial building load and main pipe heat exchanger

[0208]

[0209]

[0210] Implementation plan:

[0211] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0212] b) Use a display screen with serial port identification to identify the data sent by the main control board and display the actual temperature of the primary return water temperature, primary water supply temperature, secondary return water temperature, and secondary water supply temperature of the industrial building in real time.

[0213] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0214] d) Programming language: C language, control board production software: Altium Designer.

[0215] 8) Heat exchanger between residential building load and main pipe

[0216]

[0217] Implementation plan:

[0218] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0219] b) Use a display screen with serial port identification to identify the data sent by the main control board and display the actual temperature of the primary return water temperature, primary water supply temperature, secondary return water temperature, and secondary water supply temperature of the residential building in real time.

[0220] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0221] d) Programming language: C language, control board production software: Altium Designer.

[0222] 9) Heat exchanger between public building load and main pipe

[0223]

[0224] Implementation plan:

[0225] a) Use the main control board of this station to receive the data sent from the serial bus for identification. After identifying the unique address code of this station (this address code needs to be confirmed according to the point number table provided in the discussion) and the following data, it is identified and processed. The display screen with serial port identification is controlled by the main control board, and the data sent by the main control board is identified to display the power generated by photovoltaic power in real time.

[0226] b) Use a display screen with serial port identification to identify the data sent by the main control board and display the actual temperature of the primary return water temperature, primary water supply temperature, secondary return water temperature, and secondary water supply temperature of the public building in real time.

[0227] c) Materials required to realize the function: main control board, a display screen with serial port (7 inches), and a set of programs.

[0228] d) Programming language: C language, control board production software: Altium Designer.

[0229] 3. Detailed implementation plan for interconnection between energy stations

[0230] As an example, Figure 2 A simplified energy flow diagram of an energy substation is shown, which can use local biogas resources to provide electricity, heating and cooling for buildings; as an example, Figure 3A city energy system planning diagram is shown. There are 4 energy substations in the city. The energy substations provide various energy sources to surrounding buildings respectively. The energy substations can also be interconnected to exchange and supply energy:

[0231] Energy station 1: CCHP (natural gas internal combustion engine, generator, jacket water heat exchanger, flue gas heat exchanger, absorption chiller), electric chiller, photovoltaic, electricity storage, heat storage, cold storage, natural gas boiler.

[0232] Energy Station 2: CCHP (natural gas internal combustion engine, generator, cylinder jacket water heat exchanger, flue gas heat exchanger, absorption chiller), electric chiller, photovoltaic, electricity storage, heat storage, cold storage, heat pump.

[0233] Energy station 3: electric refrigerator, photovoltaic, electricity storage, heat storage, cold storage, electric boiler.

[0234] Energy station 4: CCHP (natural gas internal combustion engine, generator, cylinder jacket water heat exchanger, flue gas heat exchanger, absorption chiller), photovoltaic, electricity storage, heat storage, cold storage, wind power generation.

[0235] Connection between energy stations: The layout of the pipeline network depends on the load and the layout of the energy stations.

[0236] 1) Display form of the pipeline network: The outlet of energy station 1 displays electricity, cold and heat. Electric power, and its cold and hot temperatures and flows.

[0237]

[0238]

[0239] Implementation plan:

[0240] a) Use a light strip to indicate the flow status of energy station 1.

[0241] b) Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed, and the main control board controls the LED driver board to indirectly control the state (flow rate) of the RGB three-primary color light strip.

[0242] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the actual power, temperature and flow in real time.

[0243] d) Materials required to realize the function: main control board, LED light strip driver board (1 piece), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0244] e) Programming language: C language, control board production software: Altium Designer.

[0245] 2) Display form of the pipeline network: The outlet of energy station 2 displays electricity, cold and heat. Electric power, and its cold and hot temperatures and flows.

[0246]

[0247]

[0248] Implementation plan:

[0249] a) Use a light strip to indicate the flow status of energy station 2.

[0250] b) Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed, and the main control board controls the LED driver board to indirectly control the state (flow rate) of the RGB three-primary color light strip.

[0251] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the actual power, temperature and flow in real time.

[0252] d) Materials required to realize the function: main control board, LED light strip driver board (1 piece), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0253] e) Programming language: C language, control board production software: Altium Designer.

[0254] 3) Display form of the pipeline network: The outlet 3 of the energy station displays electricity, cold and heat. The electric power, and the temperature and flow of cold and hot.

[0255]

[0256]

[0257] Implementation plan:

[0258] a) Use a light strip to indicate the flow status of energy station 3.

[0259] b) Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed, and the main control board controls the LED driver board to indirectly control the state (flow rate) of the RGB three-primary color light strip.

[0260] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the actual power, temperature and flow in real time.

[0261] d) Materials required to realize the function: main control board, LED light strip driver board (1 piece), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0262] e) Programming language: C language, control board production software: Altium Designer.

[0263] 4) Display form of the pipeline network: The 4 outlets of the energy station display electricity, cold and heat. Electric power, and its cold and hot temperatures and flows.

[0264]

[0265]

[0266] Implementation plan:

[0267] a) A light strip is used to indicate the flow status of the energy station 4.

[0268] b) Use the main control board of this site to receive the data sent from the serial bus for identification. After identifying the unique address code of this site (this address code needs to be confirmed according to the point number table provided for discussion) and the following data, it is identified and processed, and the main control board controls the LED driver board to indirectly control the state (flow rate) of the RGB three-primary color light strip.

[0269] c) Use a display screen with serial port identification to identify the data sent by the main control board and display the actual power, temperature and flow in real time.

[0270] d) Materials required to realize the function: main control board, LED light strip driver board (1 piece), a display screen with serial port (7 inches), 5 meters of light strip, and 2 sets of programs.

[0271] e) Programming language: C language, control board production software: Altium Designer.

[0272] The communication protocol between the energy equipment and buildings in the sandbox is as follows:

[0273] A. Baud rate: 9600 Check bit: no check Stop bit: 1 bit

[0274] B. Energy station first character 0XEX+ main control board address code 0Xxx+ temperature data 0Xxx+ pressure data 0Xxx+ outflow flow data 0Xxx+ inflow flow data 0Xxx+ light strip flow direction 0Xxx+ light strip flow speed 0Xxx+ light strip color 0Xxx+ tail address end code 0X0d;

[0275] C. 0XE1-0XE4 represent: energy station 1 to energy station 4 respectively;

[0276] D. The address code of the main control board is 0X01 to 0X45;

[0277] F. Display range of temperature data: 0----255;

[0278] G. Display range of pressure data: 0----255;

[0279] H. Display range of outflow flow data: 0----255;

[0280] I. Display range of outflow flow data: 0----255;

[0281] J. Flow direction of light strip: 0X01 is forward flow, 0X02 is reverse flow;

[0282] K. Light strip flow speed: 0X01 for fast flow, 0X02 for slow flow;

[0283] L. Light strip flow color: 0X01 is red (hot), 0X02 is blue (cold), 0X03 is orange (gas), and 0X04 is green (electricity).

[0284] An energy system simulation device proposed in this embodiment can visualize the energy system simulated by the energy system simulation software in the host computer through a sand table, and the real-time operating parameters of the energy system will be transmitted to the buildings and energy substations on the sand table in real time through the serial bus for display. The method in this embodiment can intuitively reflect the dependency relationship between energy systems and between energy systems and local building groups, providing a powerful means for the early demonstration of engineering projects and effectively improving the work efficiency and research level of management and design units.

[0285] In the several embodiments provided by the present invention, it should be understood that the disclosed methods and terminals can be implemented in other ways. For example, the device embodiments described above are only illustrative, for example, the division of the modules is only a logical function division, and there may be other division methods in actual implementation.

[0286] In addition, the technical solutions in the above embodiments may be combined and replaced with each other without any contradiction.

[0287] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0288] In addition, each functional module in each embodiment of the present invention may be integrated into one processing unit, each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional modules.

[0289] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any accompanying figure mark in the claims should not be regarded as limiting the claims involved. In addition, it is obvious that the word "comprising" does not exclude other units or steps, and the singular does not exclude the plural. Multiple modules or devices stated in the system claim can also be implemented by one module or device through software or hardware. The words first, second, etc. are used to indicate names, and do not indicate any particular order.

[0290] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A method for visualizing an energy system, characterized in that: include: Step S100: Calculate and analyze energy production costs and demands; Step S200: forming an energy system layout by optimizing the configuration, and simulating the energy system to obtain the optimal operating parameters of each energy substation; Step S300: Visually display the energy system using a sandbox as a carrier; The step S100 further includes: During the calculation and analysis process, a data model can be established by combining the historical load types and historical load demand data of the location to analyze and predict the energy generation cost and demand; The step S200 further includes: Model and simulate the load type and load demand calculated in step S100 through energy system simulation software, analyze the energy storage consumption of each energy subsystem, the overall energy consumption of the system, the mechanical kinetic energy loss, the electrical energy loss and the thermal energy loss, and adjust the operating parameters of the energy system through vertical and horizontal benchmarking; The step S300 further includes: Each building and energy station model in the sandbox is equipped with a main control board. The main control boards of the buildings and energy stations communicate with each other through a serial bus. The serial bus is connected to a host computer, in which energy system simulation software runs. The energy system simulation software is used to simulate the operation of the energy system in real time, and the operation parameters of each energy station are sent to each energy station model on the sandbox through the serial bus at certain time intervals.

2. An energy system visualization method as claimed in claim 1, characterized in that: The step S300 further includes: The header of the operating parameter data stream sent to each energy station on the sandbox is provided with identification information corresponding to each energy station. The main control board of each energy station on the sandbox receives the operating parameter information with specific identification from the serial bus and displays it on the LED display device.

Citation Information

Patent Citations

  • Urban intelligent energy resource management system

    CN106295900A

  • Intelligent sand tray demonstration system and intelligent sand tray demonstration method

    CN106920455A

  • Multi-source coupled integrated energy system planning method

    CN107665377A

  • Regional comprehensive energy device and network dual-layer optimization configuration method

    CN108446809A

  • Dispatch early warning auxiliary device based on static safety of electric wire netting

    CN206790215U