Tunnel lining trolley

By combining the crescent-shaped high-lift section formwork with the fixed formwork of the tunnel lining trolley, the problems of long assembly time, low construction efficiency and insufficient safety in the existing technology are solved, and more efficient and safe tunnel lining construction is achieved.

CN111396093BActive Publication Date: 2025-03-28CHINA FIRST HIGHWAY ENGINEERING CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010454241.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-26
Publication Date
2025-03-28
Estimated Expiration
2040-05-26

AI Technical Summary

Technical Problem

In the prior art, the high-lift section of the vent in tunnel construction adopts the "shaped steel + small-piece flat mold" assembly method, resulting in too long manual splicing time and reducing construction efficiency and safety factor.

Method used

A tunnel lining trolley is designed, including a high-lift section template and a fixed formwork. The high-lift section template is crescent-shaped, which can fit with the tunnel contour and can be detachably fixedly connected to reduce assembly time.

Benefits of technology

Through this design, the assembly time of construction workers is reduced, the stability and construction safety of tunnel lining trolleys are improved, and the fit and appearance quality of concrete lining are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111396093B_ABST
    Figure CN111396093B_ABST
Patent Text Reader

Abstract

The present invention provides a tunnel lining trolley, which relates to the technical field of tunnel lining construction. The tunnel lining trolley includes a raised section template and a fixed template; the raised section template is crescent-shaped, and the curved surface of the raised section template can fit the tunnel contour; the raised section template is buckled on the top template of the fixed template, and the raised section template is detachably fixedly connected to the fixed template. Since the raised section template is crescent-shaped, it only needs to be buckled on the top template during construction, which can save the assembly time of construction workers and improve the stability of the tunnel lining trolley; at the same time, reducing the assembly time also improves the safety of construction. In addition, since the raised section template is crescent-shaped and the curved surface can fit the tunnel contour, during the concrete lining construction, the tunnel lining trolley can better fit the tunnel contour, improve the lining construction effect, and ensure the appearance quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel lining construction, in particular to a tunnel lining trolley. Background Art

[0002] Tunnel lining trolley is a special equipment that must be used in the secondary lining of the tunnel construction process. It is used for the concrete lining construction of the inner wall of the tunnel. Tunnel lining trolley is an indispensable non-standard product for the secondary lining of the tunnel construction process. It mainly includes simple lining trolley, fully hydraulic automatic walking lining trolley and grid lining trolley.

[0003] At present, the number of newly built expressways in mountainous areas is increasing, and the number of extra-long tunnels is increasing. Often, during the construction of tunnels, especially in the construction of long and large tunnels, the cross-section changes a lot. In the existing technology, the vent elevation section is assembled by "steel profile + small flat mold" for concrete pouring. However, the "steel profile + small flat mold" assembly method takes too long to manually splice, which reduces the construction efficiency and the safety factor of the construction. Summary of the invention

[0004] The purpose of the present invention is to provide a tunnel lining trolley to alleviate the technical problems existing in the prior art of "steel section + small flat mold" assembly method, that is, the manual splicing time is too long, the construction efficiency is reduced, and the safety factor of the construction is reduced.

[0005] The tunnel lining trolley provided by the present invention comprises: a raised section template and a fixed template; the fixed template is arc-shaped; the raised section template is crescent-shaped, and the arc surface of the raised section template can fit the tunnel contour; the raised section template is buckled on the top template of the fixed template, and the raised section template is detachably fixedly connected to the fixed template.

[0006] Furthermore, the tunnel lining trolley also includes a plurality of columns; a plurality of first grooves cooperating with the columns and a plurality of second grooves cooperating with the columns are respectively provided on the elevated section template and the top template; the plurality of columns are arranged between the elevated section template and the top template, and the plurality of columns are used to limit the relative movement between the elevated section template and the top template.

[0007] Furthermore, the elevated section template includes a plurality of sub-molds; the plurality of sub-molds are arranged at intervals along the extension direction of the top mold, and the side walls of two adjacent sub-molds are in contact with each other.

[0008] Furthermore, a panel is provided at each end of the elevated section template; the panel is fixedly connected to the elevated section template, and the panel is detachably fixedly connected to the top template.

[0009] Furthermore, the panel and the top mold are connected by bolts.

[0010] Furthermore, the panel is welded to the elevated section template.

[0011] Furthermore, a pouring port for pouring concrete is provided on the elevated section template.

[0012] Furthermore, the tunnel lining trolley also includes a gantry system, a hydraulic system and a traveling system; the fixed formwork cover is arranged on the outside of the gantry system; the hydraulic system is used to adjust the distance between the gantry system and the fixed formwork; the traveling system is arranged at the bottom of the gantry system, and the traveling system is used to drive the gantry system and the hydraulic system to move.

[0013] Furthermore, a gantry ground supporting device is provided at the bottom of the gantry system; a template ground supporting device is provided at the opening of the fixed template; a first limiting structure is provided at the end of the gantry ground supporting device away from the gantry system; the first limiting structure is used to limit the moving range of the gantry system; a second limiting structure is provided at the end of the template ground supporting device away from the fixed template; the second limiting structure is used to limit the moving range of the fixed template.

[0014] Furthermore, the elevated section formwork and the fixed formwork are made of steel.

[0015] The tunnel lining trolley provided by the present invention, during use, when the tunnel lining trolley travels to the elevated section, the elevated section template is buckled on the top template and fixedly connected to the top template, so that the arc surface of the elevated section fits the contour of the tunnel, and then concrete is poured. When the elevated section is completed, the elevated section template is removed from the top template for next use.

[0016] As can be seen from the above, since the elevated section template is crescent-shaped, it only needs to be buckled on the top template during construction. Compared with the existing technology, this can save the assembly time of construction workers and improve the stability of the tunnel lining trolley; at the same time, since the safety risk factor of the assembly construction process is high, reducing the assembly time also improves the safety of construction. In addition, since the elevated section template is crescent-shaped and the curved surface can fit the tunnel contour, the tunnel lining trolley can better fit the tunnel contour during concrete lining construction, improving the lining construction effect and ensuring the appearance quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 A front view of a tunnel lining trolley provided in an embodiment of the present invention;

[0019] Figure 2 A schematic diagram of the structure of a tunnel lining trolley provided in an embodiment of the present invention;

[0020] Figure 3 A side view of a tunnel lining trolley provided in an embodiment of the present invention.

[0021] Icons: 1-lifting section formwork; 2-fixed formwork; 3-top formwork; 4-column; 5-sub-formwork; 6-panel; 7-pouring port; 8-gantry ground support device; 9-formwork ground support device; 10-first limiting structure; 11-second limiting structure; 12-fixing bolts; 13-bracket crossbeam; 14-bracket column; 15-upper longitudinal beam; 16-gantry crossbeam; 17-gantry column; 18-gantry diagonal brace; 19-lower longitudinal beam; 20-translational hydraulic device; 21-lateral hydraulic device; 22-vertical hydraulic device; 23-active walking device; 24-walking system power device; 25-passive walking device; 26-walking rails; 27-sleepers; 28-ladder; 29-side formwork. DETAILED DESCRIPTION

[0022] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] Figure 1 A front view of a tunnel lining trolley provided in an embodiment of the present invention; Figure 1 As shown, the tunnel lining trolley provided by the embodiment of the present invention includes: an elevated section template 1 and a fixed template 2; the fixed template 2 is arc-shaped; the elevated section template 1 is crescent-shaped, and the arc surface of the elevated section template 1 can fit the tunnel contour; the elevated section template 1 is buckled on the top template 3 of the fixed template 2, and the elevated section template 1 and the fixed template 2 are detachably fixedly connected.

[0024] During use of the tunnel lining trolley provided in the embodiment of the present invention, when the tunnel lining trolley travels to the elevated section, the elevated section template 1 is buckled on the top template 3 and fixedly connected to the top template 3, so that the arc surface of the elevated section fits the contour of the tunnel, and then concrete is poured. When the elevated section is completed, the elevated section template 1 is removed from the top template 3 for next use.

[0025] As can be seen from the above, since the elevated section template 1 is crescent-shaped, it only needs to be buckled on the top template 3 during construction. Compared with the existing technology, this can save the assembly time of construction workers and improve the stability of the tunnel lining trolley; at the same time, since the safety risk factor of the assembly construction process is relatively high, reducing the assembly time also improves the safety of construction. In addition, since the elevated section template 1 is crescent-shaped and the curved surface can fit the tunnel contour, during the concrete lining construction, the tunnel lining trolley can better fit the tunnel contour, improve the lining construction effect, and ensure the appearance quality.

[0026] like Figure 1 As shown, on the basis of the above embodiment, further, the tunnel lining trolley also includes a plurality of columns 4; a plurality of first grooves cooperating with the columns 4 and a plurality of second grooves cooperating with the columns 4 are respectively provided on the elevated section template 1 and the top template 3; the plurality of columns 4 are all arranged between the elevated section template 1 and the top template 3, and the plurality of columns 4 are used to limit the relative movement between the elevated section template 1 and the top template 3.

[0027] Among them, the column 4 is made of steel.

[0028] Furthermore, the elevated section formwork 1 and the fixed formwork 2 are made of steel.

[0029] Specifically, the elevated section template 1 can be plugged or snap-connected with the fixed template 2.

[0030] Preferably, the first grooves are evenly spaced on the elevated section template 1 , which can make the elevated section template 1 more evenly stressed and improve the stability of the support of the columns 4 .

[0031] In this embodiment, during use, the two ends of the plurality of columns 4 are respectively embedded in the corresponding first groove and the second groove. The plurality of columns 4 can support the elevated section template 1 and also limit the relative movement between the elevated section template 1 and the top template 3.

[0032] Figure 2 A schematic diagram of the structure of a tunnel lining trolley provided in an embodiment of the present invention; Figure 2 As shown, on the basis of the above embodiment, further, the elevated section template 1 includes a plurality of sub-molds 5; the plurality of sub-molds 5 are arranged at intervals along the extension direction of the top mold 3, and the side walls of two adjacent sub-molds 5 are in contact with each other.

[0033] Specifically, the plurality of sub-molds 5 can be directly limited and matched by the arrangement of a plurality of uprights 4 without the need for connection parts.

[0034] Alternatively, two adjacent sub-moulds 5 are connected by bolts. The sub-moulds 5 are provided with connecting ears, and the connecting ears are provided with threaded holes matched with the bolts. During the construction process, the construction personnel screw the bolts into the threaded holes on the two adjacent connecting ears in sequence, so that the two sub-moulds 5 are fixedly connected, further enhancing the stability of the setting.

[0035] The shapes and sizes of the plurality of sub-molds 5 are all the same.

[0036] In this embodiment, during use, the construction personnel sequentially buckle the multiple sub-moulds 5 on the top mould 3, and make the side walls of the adjacent sub-moulds 5 fit together to ensure the airtightness of the structure. The arrangement of multiple sub-moulds 5 can facilitate the storage of the elevated section formwork 1 and facilitate the subsequent maintenance and replacement.

[0037] like Figure 2 As shown, on the basis of the above embodiment, further, a panel 6 is provided at both ends of the elevated section formwork 1 respectively; the panel 6 is fixedly connected to the elevated section formwork 1, and the panel 6 is detachably fixedly connected to the top formwork 3.

[0038] Wherein, the panel 6 is made of steel.

[0039] Specifically, a sealed cavity can be formed between the two panels 6 , the top mold 3 and the elevated section mold 1 .

[0040] The projection shape of the panel 6 is a crescent shape.

[0041] Furthermore, the panel 6 is welded to the elevated section formwork 1 .

[0042] The panel 6 and the top mold 3 can be connected by snap-fit ​​connection or bolt connection.

[0043] When the panel 6 and the top form 3 are connected by bolts, specifically, a first connection portion and a second connection portion are respectively provided on the panel 6 and the top form 3. The first connection portion and the second connection portion are respectively provided with a first threaded hole and a second threaded hole that match the fixing bolt 12. During the connection process, the construction personnel screw the fixing bolt 12 into the first threaded hole and the second threaded hole, so that the panel 6 and the top form 3 are detachably fixedly connected by the fixing bolt 12.

[0044] In this embodiment, the panel 6 can support the elevated section formwork 1 and also limit the elevated section formwork 1 and the top formwork 3, thereby enhancing the stability of the elevated section formwork 1.

[0045] like Figure 1As shown, on the basis of the above embodiment, further, a pouring port 7 for pouring concrete is provided on the elevated section formwork 1.

[0046] There are multiple pouring ports 7 , which are evenly spaced on the elevated section template 1 .

[0047] Specifically, a cover plate is provided at the pouring port 7. One end of the cover plate is hinged to the elevated section template 1, and the other end is detachably connected to the elevated section template 1. When it is necessary to pour concrete, the construction workers lift the cover plate to expose the pouring port 7.

[0048] A plurality of injection ports 7 are also provided on the fixed template 2 .

[0049] In this embodiment, during the construction process, the pouring port 7 is used to pour concrete into the tunnel.

[0050] Figure 3 A side view of a tunnel lining trolley provided in an embodiment of the present invention; Figure 1 and Figure 3 As shown, on the basis of the above embodiment, further, the tunnel lining trolley also includes a gantry system, a hydraulic system and a traveling system; the fixed template 2 cover is arranged on the outside of the gantry system; the hydraulic system is used to adjust the distance between the gantry system and the fixed template 2; the traveling system is arranged at the bottom of the gantry system, and the traveling system is used to drive the gantry system and the hydraulic system to move.

[0051] Specifically, the tunnel lining trolley further includes a bracket crossbeam 13 and a bracket column 14; the bracket crossbeam 13 and the bracket column 14 are arranged inside the fixed formwork 2; the two ends of the bracket column 14 are respectively fixedly connected to the fixed formwork 2 and the bracket crossbeam 13. The portal system includes an upper longitudinal beam 15, a portal crossbeam 16, a portal column 17, a portal diagonal brace 18 and a lower longitudinal beam 19. The upper longitudinal beam 15 and the lower longitudinal beam 19 are both arranged along the extension direction of the fixed formwork 2, the upper longitudinal beam 15 is arranged between the bracket crossbeam 13 and the portal crossbeam 16, and the upper longitudinal beam 15 is fixedly connected to the bracket crossbeam 13; the portal column 17 is arranged between the portal crossbeam 16 and the lower longitudinal beam 19, and is arranged perpendicularly to the portal crossbeam 16 and the lower longitudinal beam 19; the two ends of the portal diagonal brace 18 are respectively connected to the portal crossbeam 16 and the lower longitudinal beam 19 to play a supporting role.

[0052] The hydraulic system includes a translation hydraulic device 20, a lateral hydraulic device 21 and a vertical hydraulic device 22. The vertical hydraulic device 22 is arranged at one end of the lower longitudinal beam 19 away from the portal column 17. There are four vertical hydraulic devices 22, which are arranged at the four corners of the bottom of the portal system. They can be raised and lowered synchronously and can be adjusted individually, and are used to complete the erection and demoulding of the top form 3 and the upper and lower alignment with the fixed form 2. The lateral hydraulic device 21 is arranged between the portal column 17 and the side form of the fixed form 2, that is, it is arranged on both sides of the portal system, and is used to complete the erection and demoulding of the side form 29 and the left and right alignment with the fixed form 2. One end of the translation hydraulic device 20 is connected to the upper longitudinal beam 15, and the other end is connected to the portal cross beam 16, and is used to push the fixed form 2 to move left and right as a whole, so that the fixed form 2 can be translated left and right relative to the portal system, thereby realizing the alignment of the center of the fixed form 2 with the center of the tunnel.

[0053] The walking system includes four walking components, which are respectively arranged at the four corners of the bottom of the gantry system. The walking components include an active walking device 23, a walking system power device 24, a passive walking device 25, a walking rail 26 and a sleeper 27.

[0054] When the tunnel lining trolley is moving, the power device 24 of the traveling system provides power to drive the active traveling device 23, which drives the reducer, and then drives the active traveling device 23 through chain transmission to drive the gantry system to move on the traveling rails 26 and sleepers 27, and the passive traveling device 25 moves with it. The traveling system also includes a rail clamp to ensure that the gantry system will not slide automatically, especially in places with large slopes, which can improve the stability of the gantry system.

[0055] The tunnel lining trolley further comprises a ladder 28 for construction workers to climb up.

[0056] Furthermore, a gantry ground supporting device 8 is provided at the bottom of the gantry system; a template ground supporting device 9 is provided at the opening of the fixed template 2; a first limiting structure 10 is provided at the end of the gantry ground supporting device 8 away from the gantry system; the first limiting structure 10 is used to limit the moving range of the gantry system; a second limiting structure 11 is provided at the end of the template ground supporting device 9 away from the fixed template 2; the second limiting structure 11 is used to limit the moving range of the fixed template 2.

[0057] The first limiting structure 10 and the second limiting structure 11 can both be steel pipes, a portion of which is inserted into the ground, and the remaining portion is used to abut against the gantry ground supporting device 8 or the formwork ground supporting device 9 .

[0058] Specifically, there are two symmetrical gantry ground supporting devices 8, and both are inclined toward the center line of the gantry system. The first limiting structure 10 should be set at the end of the gantry ground supporting device 8 close to the center line of the gantry system; there are two symmetrical formwork ground supporting devices 9, and both are inclined toward the center line of the fixed formwork 2. The second limiting structure 11 should be set at the end of the formwork ground supporting device 9 close to the center line of the fixed formwork 2.

[0059] In this embodiment, during use, the first limiting structure 10 is used to limit the movement range of the portal system; the second limiting structure 11 is used to limit the movement range of the fixed template 2. The first limiting structure 10 and the second limiting structure 11 are provided to increase the stability of the tunnel lining trolley and prevent it from shifting left and right, which may cause a large deviation in the concrete thickness of the tunnel lining trolley, or even cause the concrete thickness to fail to meet the design requirements.

[0060] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A tunnel lining trolley, characterized in that: The tunnel lining trolley comprises: a raised section template and a fixed template; The fixed template is arc-shaped; the elevated section template is crescent-shaped, and the arc surface of the elevated section template can fit the tunnel contour; the elevated section template is buckled on the top template of the fixed template, and the elevated section template is detachably fixedly connected to the fixed template; The tunnel lining trolley further comprises a plurality of columns; the elevated section template and the top template are respectively provided with a plurality of first grooves matched with the columns and a plurality of second grooves matched with the columns; The plurality of columns are arranged between the elevated section template and the top template, and the plurality of columns are used to limit the relative movement between the elevated section template and the top template; The elevated section template includes a plurality of sub-molds; The plurality of sub-moulds are arranged at intervals along the extension direction of the top mould, and the side walls of two adjacent sub-moulds are in contact with each other; A panel is provided at each end of the elevated section template; The panel is fixedly connected to the elevated section template, and the panel is detachably fixedly connected to the top template.

2. The tunnel lining trolley according to claim 1, characterized in that: The panel and the top mold are connected by bolts.

3. The tunnel lining trolley according to claim 1, characterized in that: The panel is welded to the elevated section template.

4. The tunnel lining trolley according to claim 1, characterized in that: The elevated section template is provided with a pouring port for pouring concrete.

5. The tunnel lining trolley according to claim 1, characterized in that: The tunnel lining trolley also includes a gantry system, a hydraulic system and a traveling system; The fixed formwork cover is arranged on the outside of the gantry system; the hydraulic system is used to adjust the distance between the gantry system and the fixed formwork; the walking system is arranged at the bottom of the gantry system, and the walking system is used to drive the gantry system and the hydraulic system to move.

6. The tunnel lining trolley according to claim 5, characterized in that: A gantry ground supporting device is provided at the bottom of the gantry system; a template ground supporting device is provided at the opening of the fixed template; A first limiting structure is provided at one end of the gantry ground supporting device away from the gantry system; the first limiting structure is used to limit the movement range of the gantry system; A second limiting structure is provided at one end of the template supporting device away from the fixed template; the second limiting structure is used to limit the moving range of the fixed template.

7. The tunnel lining trolley according to any one of claims 1 to 6, characterized in that: The elevated section template and the fixed template are made of steel.

Citation Information

Patent Citations

  • Tunnel lining trolley

    CN212337301U