A hot primary air heating system for a secondary reheat coal-fired generator set

By designing a parallel external steam cooler and hot primary air heater system in the secondary reheat coal-fired generating unit, the problem of insufficient primary air temperature caused by high extraction superheat is solved, and the boiler's response to high moisture and low calorific value is improved. The coal blending ratio and variable load operation performance realize the cascade utilization of extraction heat.

CN111749744BActive Publication Date: 2024-10-29XIAN THERMAL POWER RES INST CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010735586.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-28
Publication Date
2024-10-29
Estimated Expiration
2040-07-28

AI Technical Summary

Technical Problem

The high degree of superheat of the extraction steam in the secondary reheat coal-fired power generation unit results in insufficient primary air temperature, which affects the boiler's blending ratio of high-moisture and low-calorific-value coal and its variable-load operation performance.

Method used

A system including a steam turbine two-stage extraction system, a four-stage extraction system and a hot primary air heating system is designed. Through the parallel arrangement of an external steam cooler and a hot primary air heater, the flow rates of extraction steam and feed water are adjusted. Achieve flexible control of primary air temperature and feed water temperature, and improve the coal type adaptability and variable load operation performance of the boiler.

Benefits of technology

It effectively increases the mixing ratio of high-moisture lignite in secondary reheat coal-fired boilers, expands the adaptability range of coal types, improves variable load operation performance, and realizes the cascade utilization of the second-stage and fourth-stage extraction heat.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111749744B_ABST
    Figure CN111749744B_ABST
Patent Text Reader

Abstract

A hot primary air heating system for a secondary reheat coal-fired generator set includes a steam turbine second-stage extraction system, wherein the steam turbine second-stage extraction is connected to an external steam cooler and a hot primary air heater respectively, and the extraction steam passes through the external steam cooler and the hot primary air heater and then merges and connects to the No. 2 high-pressure heater; the steam turbine fourth-stage extraction is connected to an external steam cooler and a hot primary air heater respectively, and then passes through the external steam cooler and the hot primary air heater and then merges and connects to the No. 4 high-pressure heater; the hot primary air inlet duct is connected to an air preheater, and the hot primary air inlet duct is connected to the hot primary air outlet duct through two sets of hot primary air heaters arranged in parallel; the flow regulating valve on the feed water bypass of the external steam cooler can adjust the feed water flow passing through the external steam cooler. The system can increase the blending ratio of the secondary reheat coal-fired boiler to high-moisture and low-calorific value coal, and improve the variable load operation performance of the secondary reheat boiler.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal-fired power generation, and in particular to a hot primary air heating system for a secondary reheat coal-fired power generation unit. Background Art

[0002] At present, coal-fired power generation units are still the main body of my country's power production and the basic guarantee for the long-term stable development of my country's national economy. In recent years, secondary reheating technology has gradually been applied to the field of coal-fired power generation due to its clean and efficient operation. However, in the thermal system of the secondary reheating unit, the superheat of each stage of extraction steam is relatively large, especially the superheat of the extraction steam after two-stage reheating is the largest, up to about 300°C. In order to make full use of the superheat of extraction steam and realize the cascade utilization of extraction steam heat, an external steam cooler is generally installed on the second and fourth stage extraction steam pipelines after two-stage reheating, or the second and fourth stage extraction steam are introduced into the heat recovery steam turbine to perform work.

[0003] Among the huge reserves of coal resources in my country, a large part is lignite with high moisture content and low calorific value. The primary air temperature required for stable combustion of lignite in boilers is relatively high, especially under low load conditions, high-temperature hot primary air is required to increase the output of the coal mill and improve the combustion characteristics of the boiler. When the primary air temperature is low and the output of the pulverizing system is to be guaranteed, the primary air rate needs to be increased, which will increase the resistance of the primary air system and easily cause steam temperature overheating. Therefore, appropriately increasing the primary air temperature can effectively utilize high-moisture and low-calorific value coal resources, improve the coal type adaptability and variable load operation characteristics of power station boilers, and alleviate boiler steam temperature overheating. Summary of the invention

[0004] In order to increase the blending ratio of high-moisture and low-calorific-value coal in secondary reheat coal-fired boilers and improve the variable-load operation performance of the boiler, combined with the characteristic of large superheat of extraction steam of secondary reheat units, the present invention proposes a hot primary air heating system for secondary reheat coal-fired power generation units, which can not only realize the cascade utilization of extraction steam heat of secondary reheat units, but also improve the coal type adaptability of secondary reheat coal-fired boilers and improve the variable-load operation performance of secondary reheat boilers.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is:

[0006] A hot primary air heating system for a double reheat coal-fired power generation unit, comprising a steam turbine second-stage steam extraction system, a steam turbine fourth-stage steam extraction system, a hot primary air heating system and a feed water heating system;

[0007] The hot primary air heating system comprises an air preheater 1, the air preheater 1 is connected to one end of a hot primary air heater inlet duct 2, the other end of the hot primary air heater inlet duct 2 is connected to a hot primary air heater outlet duct 4 via a hot primary air heater 3A and a hot primary air heater 3B on their cold sides, and the hot primary air heater 3A and the hot primary air heater 3B are connected in parallel with each other;

[0008] In the steam turbine second-stage extraction system, the steam turbine second-stage extraction is divided into two paths, which are respectively connected to the hot side inlet of the external steam cooler 10A and the hot primary air heater 3A. The extraction steam passes through the external steam cooler 10A and the hot primary air heater 3A and then merges after heat release, and then is connected to the inlet of the No. 2 high-pressure heater 12.

[0009] In the steam turbine four-stage steam extraction system, the steam turbine four-stage steam extraction is divided into two paths, which are respectively connected to the hot side inlet of the external steam cooler 10B and the hot primary air heater 3B, and merge after heat release through the external steam cooler 10B and the hot primary air heater 3B, and then connected to the inlet of the No. 4 high-pressure heater 19;

[0010] In the feed water heating system, the feed water is divided into two routes, which are respectively connected to the cold side inlets of the external steam cooler 10A and the external steam cooler 10B. The feed water is merged after absorbing heat through the external steam cooler 10A and the external steam cooler 10B, and then enters the boiler.

[0011] The steam turbine two-stage steam extraction system includes a two-stage steam extraction pipeline 7, one end of which is connected to the steam extraction port of the high-pressure cylinder 6, and the other end is connected to the exhaust pipeline 11 of the hot primary air heater of group A and the external steam cooler through the hot primary air heater 3A; a two-stage steam extraction pipeline branch 8 is provided on the two-stage steam extraction pipeline 7, one end of which is connected to the inlet of the hot primary air heater 3A, and the other end is connected to the exhaust pipeline 11 of the hot primary air heater of group A and the external steam cooler through the external steam cooler 10A; the inlet of the high-pressure cylinder 6 is connected to the high-pressure cylinder air inlet pipeline 5, and the exhaust pipeline 11 of the hot primary air heater of group A and the external steam cooler of the hot primary air heater 3A and the external steam cooler 10A is connected to the inlet of the No. 2 high-pressure heater 12.

[0012] The second-stage steam extraction pipeline branch 8 is equipped with a flow regulating valve 9 on the second-stage steam extraction pipeline branch. The flow regulating valve 9 on the second-stage steam extraction pipeline branch is used to adjust the steam flow flowing through the external steam cooler 10A and the hot primary air heater 3A, thereby adjusting the outlet air temperature of the hot primary air heater.

[0013] The four-stage steam extraction system of the steam turbine includes a four-stage steam extraction pipeline 15, one end of which is connected to the steam extraction port of the intermediate pressure cylinder 14, and the other end is connected to the exhaust pipeline 18 of the hot primary air heater of group B and the external steam cooler through the hot primary air heater 3B; the four-stage steam extraction pipeline 15 is provided with a four-stage steam extraction pipeline branch 16, one end of the four-stage steam extraction pipeline branch 16 is connected to the inlet of the hot primary air heater 3B, and the other end is connected to the exhaust pipeline 18 of the hot primary air heater of group B and the external steam cooler through the external steam cooler 10B; the inlet of the intermediate pressure cylinder 14 is connected to the intermediate pressure cylinder air inlet pipeline 13, and the exhaust pipeline 18 of the hot primary air heater of group B and the external steam cooler of the hot primary air heater 3B and the external steam cooler 10B is connected to the inlet of the No. 4 high-pressure heater 19.

[0014] The four-stage steam extraction pipeline branch 16 is equipped with a flow regulating valve 17 on the four-stage steam extraction pipeline branch. The flow regulating valve 17 on the four-stage steam extraction pipeline branch is used to adjust the steam flow flowing through the external steam cooler 10B and the hot primary air heater 3B, thereby adjusting the outlet air temperature of the hot primary air heater.

[0015] The inlet of the external steam cooler 10A and the external steam cooler 10B are connected to the water supply inlet pipe 20, and the outlet is connected to the boiler inlet pipe 23. The inlet of the external steam cooler 10A and the external steam cooler 10B is connected to one end of the external steam cooler water supply bypass 21, and the other end of the external steam cooler water supply bypass 21 is connected to the outlet of the external steam cooler 10A and the external steam cooler 10B.

[0016] The external steam cooler feed water bypass 21 is provided with an external steam cooler feed water bypass flow regulating valve 22, and the external steam cooler feed water bypass flow regulating valve 22 is used to adjust the feed water flow passing through the external steam cooler, thereby adjusting the boiler inlet feed water temperature.

[0017] Beneficial effects of the present invention:

[0018] The hot primary air heating system for a secondary reheat coal-fired power generation unit described in the present invention can make full use of the large superheat degree of the second and fourth stage extraction steam of the secondary reheat unit, and increase the primary air temperature through the hot primary air heater, thereby increasing the blending ratio of high-moisture lignite in the secondary reheat coal-fired boiler and expanding the coal type adaptability range of the secondary reheat boiler.

[0019] Furthermore, the external steam cooler and the hot primary air heater are arranged in parallel, and the flow rate regulating valve added to the steam side of the external steam cooler can adjust the steam extraction flow rate flowing through the hot primary air heater, thereby realizing flexible control of the primary air temperature. The feed water bypass of the external steam cooler and its bypass flow regulating valve can also realize flexible adjustment of the boiler feed water temperature by adjusting the feed water flow rate flowing through the external steam cooler. Therefore, the present invention improves the variable load operation performance of the secondary reheat boiler.

[0020] Furthermore, the second-stage steam extraction and the fourth-stage steam extraction first expand and work in the high-pressure cylinder and the medium-pressure cylinder respectively, and then heat the boiler feed water and the primary air through the external steam cooler and the hot primary air heater, and then enter the second high-pressure heater and the fourth high-pressure heater to heat the feed water, and finally heat the feed water step by step through the drainage pipe and merge into the deaerator. Therefore, the present invention realizes the cascade utilization of the heat of the second-stage steam extraction and the fourth-stage steam extraction.

[0021] In summary, the present invention increases the blending ratio of high-moisture lignite in the secondary reheat coal-fired boiler, expands the coal type adaptability range of the secondary reheat boiler, and improves the variable load operation performance of the secondary reheat boiler; at the same time, it realizes the cascade utilization of the second and fourth stage steam extraction heat of the secondary reheat unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a system schematic diagram of the present invention.

[0023] Among them, 1 is the air preheater, 2 is the hot primary air heater inlet duct, 3A and 3B are hot primary air heaters, 4 is the hot primary air heater outlet duct, 5 is the high-pressure cylinder steam inlet pipe, 6 is the high-pressure cylinder, 7 is the second-stage steam extraction pipe of the steam turbine, 8 is the second-stage steam extraction pipe branch, 9 is the flow control valve on the second-stage steam extraction pipe branch, 10A and 10B are external steam coolers, 11 is the exhaust pipe of the hot primary air heater of group A and the external steam cooler, 12 is the No. 2 high-pressure heater, 13 is the steam inlet pipe of the intermediate pressure cylinder, 14 is the intermediate pressure cylinder, 15 is the four-stage steam extraction pipe of the steam turbine, 16 is the branch of the four-stage steam extraction pipe, 17 is the flow regulating valve on the branch of the four-stage steam extraction pipe, 18 is the exhaust pipe of the hot primary air heater of group B and the external steam cooler, 19 is the No. 4 high-pressure heater, 20 is the feed water inlet pipe of the external steam cooler, 21 is the feed water bypass of the external steam cooler, 22 is the feed water bypass flow regulating valve of the external steam cooler, and 23 is the boiler inlet pipe. DETAILED DESCRIPTION

[0024] The present invention is further described in detail below in conjunction with embodiments.

[0025] like Figure 1As shown: A hot primary air heating system for a double reheat coal-fired power generation unit, comprising a steam turbine second-stage steam extraction system, a steam turbine fourth-stage steam extraction system, a hot primary air heating system and a feed water heating system. Among them;

[0026] The second stage steam extraction of the steam turbine is divided into two routes, which are respectively connected to the inlet of the external steam cooler 10A and the hot primary air heater 3A. The steam extraction passes through the external steam cooler 10A and the hot primary air heater 3A and then merges. After merging, it is connected to the inlet of the No. 2 high-pressure heater 12; the fourth stage steam extraction of the steam turbine is also divided into two routes, which are respectively connected to the inlet of another group of external steam coolers 10B and the hot primary air heater 3B. After passing through the external steam cooler 10B and the hot primary air heater 3B, it merges and then connects to the inlet of the No. 4 high-pressure heater The inlet of the air preheater 19; one end of the hot primary air heater inlet duct 2 is connected to the outlet of the air preheater 1, and the other end of the hot primary air heater inlet duct 2 is connected to the hot primary air heater outlet duct 4 via the hot primary air heater 3; the external steam cooler feed water inlet pipe 20 is divided into two routes, which are respectively connected to the inlets of the external steam cooler 10A and the external steam cooler 10B, and the feed water is merged after absorbing heat through the external steam cooler 10A and the external steam cooler 10B, and then connected to the boiler inlet pipe 23.

[0027] The hot primary air heating system comprises an air preheater 1, a hot primary air heater inlet duct 2, hot primary air heaters 3A and 3B, and a hot primary air heater outlet duct 4. Among them, one end of the hot primary air heater inlet duct 2 is connected to the air preheater 1, and the other end is connected to the hot primary air heater outlet duct 4 through the hot primary air heaters 3A and 3B.

[0028] The second-stage steam extraction system of the steam turbine includes a high-pressure cylinder steam inlet pipe 5, a high-pressure cylinder 6, a second-stage steam extraction pipe 7, a second-stage steam extraction pipe branch 8, a flow regulating valve 9 on the second-stage steam extraction pipe branch 8, a hot primary air heater 3A, an external steam cooler 10A, a hot primary air heater and an external steam cooler A group of hot primary air heaters and an external steam cooler exhaust pipe 11, and a No. 2 high-pressure heater 12. Among them, one end of the second-stage steam extraction pipeline 7 is connected to the steam extraction port of the high-pressure cylinder 6, and the other end is connected to the exhaust pipe 11 of the hot primary air heater of group A and the external steam cooler through the hot primary air heater 3A; one end of the second-stage steam extraction pipeline branch 8 is connected to the inlet of the hot primary air heater 3A, and the other end is connected to the exhaust pipe 11 of the hot primary air heater of group A and the external steam cooler through the external steam cooler 10A; the flow regulating valve 9 on the second-stage steam extraction pipeline branch 8 is installed, and the flow regulating valve 9 on the second-stage steam extraction pipeline branch is used to adjust the steam flow through the external steam cooler 10A and the hot primary air heater 3A, and then adjust the outlet air temperature of the hot primary air heater. In addition, the high-pressure cylinder air intake pipeline 5 is connected to the inlet of the high-pressure cylinder 6, and the exhaust pipe 11 of the hot primary air heater of group A and the external steam cooler of the hot primary air heater 3A and the external steam cooler 10A is connected to the inlet of the second high-pressure heater 12.

[0029] The four-stage steam extraction system of the steam turbine includes an intermediate pressure cylinder steam inlet pipe 13, an intermediate pressure cylinder 14, a four-stage steam extraction pipe 15, a four-stage steam extraction pipe branch 16, a flow regulating valve 17 on the four-stage steam extraction pipe branch 16, a hot primary air heater 3B, an external steam cooler 10B, a hot primary air heater and a group B hot primary air heater of the external steam cooler and an exhaust pipe 18 of the external steam cooler, and a No. 4 high-pressure heater 19. Among them, one end of the four-stage steam extraction pipeline 15 is connected to the steam extraction port of the intermediate pressure cylinder 14, and the other end is connected to the exhaust pipe 18 of the hot primary air heater of group B and the external steam cooler through the hot primary air heater 3B; one end of the four-stage steam extraction pipeline branch 16 is connected to the inlet of the hot primary air heater 3B, and the other end is connected to the exhaust pipe 18 of the hot primary air heater of group B and the external steam cooler through the external steam cooler 10B; the flow regulating valve 17 on the four-stage steam extraction pipeline branch 16 is installed, and the flow regulating valve 17 on the four-stage steam extraction pipeline branch is used to adjust the steam flow through the external steam cooler 10B and the hot primary air heater 3B, and then adjust the outlet air temperature of the hot primary air heater. In addition, the intermediate pressure cylinder air intake pipeline 13 is connected to the inlet of the intermediate pressure cylinder 14, and the exhaust pipe 18 of the hot primary air heater of group B and the external steam cooler of the hot primary air heater 3B and the external steam cooler 10B is connected to the inlet of the No. 4 high-pressure heater 19.

[0030] In addition, the present invention also includes an external steam cooler feed water inlet pipe 20, an external steam cooler feed water bypass 21, an external steam cooler feed water bypass flow regulating valve 22, external steam coolers 10A and 10B, an external steam cooler feed water outlet pipe or a boiler inlet pipe 23. The inlet of the external steam coolers 10A and 10B is connected to the feed water inlet pipe 20, and the outlet is connected to the boiler inlet pipe 23. One end of the external steam cooler feed water bypass 21 is connected to the inlet of the external steam coolers 10A and 10B, and the other end is connected to the outlet of the external steam coolers 10A and 10B. The external steam cooler feed water bypass 21 is equipped with an external steam cooler feed water bypass flow regulating valve 22. The external steam cooler feed water bypass flow regulating valve 22 is used to adjust the feed water flow flowing through the external steam cooler, thereby adjusting the boiler inlet feed water temperature.

[0031] When the present invention is applied, a primary air temperature measuring point is installed on the hot primary air heater outlet duct 4. According to the primary air temperature on the hot primary air heater outlet duct 4, the steam extraction flow entering the hot primary air heater is adjusted through the flow regulating valve 9 on the second-stage steam extraction pipeline branch 8 and the flow regulating valve 17 on the fourth-stage steam extraction pipeline branch 16, thereby realizing the control of the hot primary air heater outlet air temperature. The control strategy can be realized by simple feedback regulation and added to the control logic of the unit.

[0032] When the present invention is applied, a feed water temperature measuring point is installed on the boiler inlet feed water pipe 23, and the feed water flow entering the external steam cooler is adjusted according to the feed water temperature on the boiler feed water pipe 23 through the flow regulating valve 22 located on the external steam cooler feed water bypass 21, thereby realizing the control of the boiler inlet feed water temperature. This control strategy can be realized by simple feedback regulation and added to the control logic of the unit.

[0033] When the present invention is applied, the control of the outlet air temperature of the hot primary air heater and the control of the inlet feed water temperature of the boiler can effectively improve the variable load operation performance of the secondary reheat boiler.

Claims

1. A hot primary air heating system for a secondary reheat coal-fired power generation unit, characterized in that: It includes the second stage steam extraction system of the steam turbine, the fourth stage steam extraction system of the steam turbine, the hot primary air heating system and the feed water heating system; The hot primary air heating system comprises an air preheater (1), the air preheater (1) is connected to one end of a hot primary air heater inlet duct (2), the other end of the hot primary air heater inlet duct (2) is connected to a hot primary air heater outlet duct (4) via the cold side of hot primary air heater 1 (3A) and hot primary air heater 2 (3B), and the hot primary air heater 1 (3A) and hot primary air heater 2 (3B) are connected in parallel with each other; In the steam turbine second-stage steam extraction system, the steam turbine second-stage steam extraction is divided into two paths, which are respectively connected to the hot side inlet of the external steam cooler (10A) and the hot primary air heater (3A). The extraction steam is combined after passing through the external steam cooler (10A) and the hot primary air heater (3A) to release heat, and then connected to the inlet of the No. 2 high-pressure heater (12). In the steam turbine four-stage steam extraction system, the steam turbine four-stage steam extraction is divided into two paths, which are respectively connected to the hot side inlet of the external steam cooler 2 (10B) and the hot primary air heater 2 (3B), and are combined after heat release by the external steam cooler 2 (10B) and the hot primary air heater 2 (3B), and are connected to the inlet of the No. 4 high-pressure heater (19) after being combined; In the feed water heating system, the feed water is divided into two paths, which are respectively connected to the cold side inlet of the external steam cooler 1 (10A) and the external steam cooler 2 (10B). The feed water is merged after absorbing heat through the external steam cooler 1 (10A) and the external steam cooler 2 (10B), and then enters the boiler; The steam turbine two-stage steam extraction system comprises a two-stage steam extraction pipeline (7), one end of which is connected to the steam extraction port of the high-pressure cylinder (6), and the other end of which is connected to the exhaust pipeline (11) of the hot primary air heater of group A and the external steam cooler via the hot primary air heater one (3A); a two-stage steam extraction pipeline branch (8) is provided on the two-stage steam extraction pipeline (7), one end of which is connected to the inlet of the hot primary air heater one (3A), and the other end of which is connected to the exhaust pipeline (11) of the hot primary air heater of group A and the external steam cooler via the external steam cooler one (10A); the inlet of the high-pressure cylinder (6) is connected to the high-pressure cylinder air inlet pipeline (5), and the exhaust pipeline (11) of the hot primary air heater of group A and the external steam cooler of the hot primary air heater one (3A) and the external steam cooler one (10A) is connected to the inlet of the second high-pressure heater (12); The steam turbine four-stage steam extraction system comprises a four-stage steam extraction pipeline (15), one end of the four-stage steam extraction pipeline (15) is connected to the steam extraction port of the intermediate pressure cylinder (14), and the other end is connected to the exhaust pipeline (18) of the hot primary air heater of group B and the external steam cooler through the hot primary air heater 2 (3B); a four-stage steam extraction pipeline branch (16) is arranged on the four-stage steam extraction pipeline (15), one end of the four-stage steam extraction pipeline branch (16) is connected to the inlet of the hot primary air heater 2 (3B), and the other end is connected to the exhaust pipeline (18) of the hot primary air heater of group B and the external steam cooler through the external steam cooler 2 (10B); the inlet of the intermediate pressure cylinder (14) is connected to the intermediate pressure cylinder air inlet pipeline (13), and the exhaust pipeline (18) of the hot primary air heater of group B and the external steam cooler of the hot primary air heater 2 (3B) and the external steam cooler 2 (10B) is connected to the inlet of the No. 4 high-pressure heater (19).

2. A hot primary air heating system for a secondary reheat coal-fired power generation unit according to claim 1, characterized in that: The second-stage steam extraction pipeline branch (8) is provided with a flow regulating valve (9) on the second-stage steam extraction pipeline branch. The flow regulating valve (9) on the second-stage steam extraction pipeline branch is used to regulate the steam flow passing through an external steam cooler (10A) and a hot primary air heater (3A), thereby regulating the outlet air temperature of the hot primary air heater.

3. The hot primary air heating system of a secondary reheat coal-fired power generation unit according to claim 1, characterized in that: The four-stage steam extraction pipeline branch (16) is provided with a flow regulating valve (17) on the four-stage steam extraction pipeline branch. The flow regulating valve (17) on the four-stage steam extraction pipeline branch is used to regulate the steam flow passing through the external steam cooler 2 (10B) and the hot primary air heater 2 (3B), thereby regulating the outlet air temperature of the hot primary air heater.

4. The hot primary air heating system for a secondary reheat coal-fired power generation unit according to claim 1, characterized in that: The inlet of the external steam cooler 1 (10A) and the external steam cooler 2 (10B) are connected to the water supply inlet pipe (20), and the outlet is connected to the boiler inlet pipe (23). The inlet of the external steam cooler 1 (10A) and the external steam cooler 2 (10B) is connected to one end of the external steam cooler water supply bypass (21), and the other end of the external steam cooler water supply bypass 21 is connected to the outlet of the external steam cooler 1 (10A) and the external steam cooler 2 (10B).

5. A hot primary air heating system for a secondary reheat coal-fired power generation unit according to claim 4, characterized in that: The external steam cooler feed water bypass (21) is provided with an external steam cooler feed water bypass flow regulating valve (22), and the external steam cooler feed water bypass flow regulating valve (22) is used to regulate the feed water flow passing through the external steam cooler, thereby regulating the boiler inlet feed water temperature.

Citation Information

Patent Citations

  • Hot primary air heating system of secondary reheating coal-fired generator set

    CN213175744U