A RDE data post-processing method, device, equipment and storage medium

By acquiring and processing RDE test data and emission delay schedules, the limitation of RDE data post-processing software is solved, and rapid and accurate analysis of data from different RDE emission equipment is achieved. The calculation process is clear and the results are reliable.

CN111930818BActive Publication Date: 2024-10-18CHINA FAW CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202010743661.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-29
Publication Date
2024-10-18
Estimated Expiration
2040-07-29

AI Technical Summary

Technical Problem

Existing RDE data post-processing software can only process test data collected by specific RDE emission equipment, which has limitations and cannot be applied to data processing of different RDE emission equipment.

Method used

By obtaining the vehicle's RDE test data and emission delay schedule, the data is translated and filtered, the data format is unified, the average emission is determined according to the time window planned by regulations, and the emission test results are calculated.

Benefits of technology

It realizes rapid analysis and calculation of data collected from different RDE emission equipment, obtains accurate and reliable test results, and solves the problem of software limitations. The calculation process is clear and the results are accurate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111930818B_ABST
    Figure CN111930818B_ABST
Patent Text Reader

Abstract

The present invention discloses a RDE data post-processing method, device, equipment and storage medium. The method includes: obtaining the RDE test data and emission delay schedule of the vehicle; performing data translation on the RDE test data according to the emission delay schedule, screening out the RDE calculation data that meets the preset requirements and unifying the data format; dividing the time window according to the regulations, determining the average emission set corresponding to each time window according to the RDE calculation data, and determining the emission test results corresponding to each average emission in the average emission set. The present invention is applicable to RDE test data collected by different RDE emission equipment, and solves the problem that the existing RDE data post-processing software can only process the RDE test data collected by specific RDE emission equipment, and has limitations. It can conveniently and quickly analyze and calculate the RDE test data to obtain the test results, and the calculation process is clear, and the results are accurate and reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present invention relate to data processing technology, and in particular to an RDE data post-processing method, device, equipment and storage medium. Background Art

[0002] The national standard GB18352-2016 has released the RDE test standard. Its test data post-processing algorithm is complex. After completing the RDE test of the vehicle, a lot of calculations are often required to obtain the test results.

[0003] There are some RDE data post-processing software for whole vehicle RDE tests, but they can only process RDE test data collected by the RDE emission equipment supplier's own equipment, which has certain limitations. Summary of the invention

[0004] The present invention provides an RDE data post-processing method, device, equipment and storage medium, which are suitable for RDE test data collected by different RDE emission equipment, and can conveniently and quickly analyze and calculate the RDE test data to obtain test results.

[0005] In a first aspect, an embodiment of the present invention provides a RDE data post-processing method, comprising:

[0006] Obtain vehicle RDE test data and emission delay schedule;

[0007] Performing data translation on the RDE test data according to the emission delay schedule, screening out RDE calculation data that meets preset requirements and unifying the data format;

[0008] The time windows are divided according to the regulations, the average emission set corresponding to each time window is determined according to the RDE calculation data, and the emission test results corresponding to each average emission in the average emission set are determined.

[0009] In a second aspect, an embodiment of the present invention further provides an RDE data post-processing device, the device comprising:

[0010] An information acquisition module, used to obtain the vehicle's RDE test data and emission delay schedule;

[0011] A data processing module, used to perform data translation on the RDE test data according to the emission delay schedule, filter out RDE calculation data that meets preset requirements and unify the data format;

[0012] The data calculation module is used to divide the time window according to the regulations, determine the average emission set corresponding to each time window according to the RDE calculation data, and determine the emission test results corresponding to each average emission in the average emission set.

[0013] In a third aspect, an embodiment of the present invention further provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the RDE data post-processing method as described in any embodiment of the present invention is implemented.

[0014] In a fourth aspect, an embodiment of the present invention further provides a storage medium comprising computer executable instructions, which, when executed by a computer processor, are used to execute the RDE data post-processing method as described in any embodiment of the present invention.

[0015] The present invention obtains the RDE test data and emission delay schedule of the vehicle, pre-processes and screens the RDE test data, unifies the data format, determines the average emission of each emission corresponding to the time window divided according to regulations, and then determines the emission test results of each emission. The present invention is applicable to the RDE test data collected by different RDE emission equipment, solves the problem that the existing RDE data post-processing software can only process the RDE test data collected by specific RDE emission equipment and has limitations, and can conveniently and quickly analyze and calculate the RDE test data to obtain the test results, and the calculation process is clear and the results are accurate and reliable. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 is a flow chart of a RDE data post-processing method provided in Embodiment 1 of the present invention;

[0017] Figure 2 is a flow chart of a RDE data post-processing method provided by Embodiment 2 of the present invention;

[0018] Figure 3 It is a schematic diagram of a parameter setting interface of an RDE data post-processing method provided in the second embodiment of the present invention;

[0019] Figure 4 This is a schematic diagram of an emission test result display interface of an RDE data post-processing method provided in Embodiment 2 of the present invention;

[0020] Figure 5 is a structural block diagram of an RDE data post-processing device provided in Embodiment 3 of the present invention;

[0021] Figure 6 It is a structural block diagram of a computer device provided in Embodiment 4 of the present invention. DETAILED DESCRIPTION

[0022] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention are shown in the accompanying drawings, rather than all structures. In addition, the embodiments of the present invention and the features in the embodiments may be combined with each other without conflict.

[0023] Embodiment 1

[0024] Figure 1 A flowchart of an RDE data post-processing method provided in Example 1 of the present invention. This embodiment can be applied to analyzing RDE test data collected by RDE emission equipment to obtain emission test results. The method can be executed by an RDE data post-processing device, which can be implemented by software and / or hardware.

[0025] like Figure 1 As shown, the method specifically comprises the following steps:

[0026] Step 110: Obtain the RDE test data and emission delay schedule of the vehicle.

[0027] Among them, RDE (Real Drive Emission) refers to the pollutant emissions when the vehicle is driving on actual roads. RDE test data can be understood as the pollutant emission data collected when the vehicle is subjected to RDE testing. After the vehicle emits pollutants, the RDE measurement equipment will delay for a certain period of time before collecting the pollutants, and the time required to collect each type of vehicle emission is different. For example, some emissions are collected with a delay of 2s, and some emissions are collected with a delay of 5s. The emission delay timetable can record the delay time when collecting various emissions from the vehicle.

[0028] Specifically, the RDE test data collected when the vehicle is undergoing the RDE test can be obtained, and the corresponding emission delay schedule can be obtained according to factors such as the RDE equipment model for collecting the RDE test data, the vehicle model, and the RDE test environment. The emission delay schedule can be preset or temporarily set and adjusted by the user to meet the needs of different scenarios.

[0029] Step 120: Shift the RDE test data according to the emission delay schedule, select the RDE calculation data that meets the preset requirements and unify the data format.

[0030] Among them, the RDE calculation data can be understood as the data information that can be used to determine the emission test results after preprocessing the RDE test data.

[0031] Specifically, since the time required for the RDE measurement equipment to collect each type of vehicle emission is different, the data information of each emission in the RDE test data is not aligned in time. Therefore, the corresponding emission data in the RDE test data can be shifted according to the delay time of various emissions in the emission delay time table. The RDE test data after data shifting can be conditionally screened, and the data that does not meet the measurement standards can be eliminated according to regulations to obtain RDE calculation data. For example, the data corresponding to the vehicle speed less than 1km / h can be eliminated, and it can also be selected whether to eliminate the cold start data. If you choose to eliminate the cold start data, the data can be screened according to the cold start data judgment conditions. Because the RDE equipment and RDE test environment for collecting RDE test data may be different, in order to facilitate the subsequent steps to obtain emission test results more conveniently and quickly, the RDE calculation data can be corrected and its data format can be unified in combination with the environmental parameters of the RDE test, such as unifying the measurement units of each emission.

[0032] Step 130: divide the time windows according to the regulations, determine the average emission set corresponding to each time window according to the RDE calculation data, and determine the emission test results corresponding to each average emission in the average emission set.

[0033] The time window can be understood as a time period divided on the time axis, and each time window has a start time and an end time. The average emission set can be understood as a summary of the average emission of each emission in the RDE calculation data. The emission test results can indicate whether the vehicle's emissions meet the standards when undergoing the RDE test.

[0034] Specifically, multiple time windows are divided according to regulations, and the time periods of each time window can overlap, and the time period lengths of each time window can also be different. For example, 1s to 1000s is the first time window, 2s to 1001s is the second time window, and 3s to 2000s is the third time window. Each data in the RDE calculation data can be mapped to each time window, and the average emissions of all emissions in each time window can be calculated. Then, the final emission test results can be determined based on the average emissions of each emission in different time windows.

[0035] The technical solution of this embodiment obtains the RDE test data and emission delay schedule of the vehicle, pre-processes and screens the RDE test data, unifies the data format, determines the average emission of each emission corresponding to the time window divided according to regulations, and then determines the emission test results of each emission. It is applicable to RDE test data collected by different RDE emission equipment, and solves the problem of existing RDE data post-processing software that can only process RDE test data collected by specific RDE emission equipment and has limitations. It can conveniently and quickly analyze and calculate the RDE test data to obtain test results, and the calculation process is clear and the results are accurate and reliable.

[0036] Embodiment 2

[0037] Figure 2 This is a flow chart of a RDE data post-processing method provided in Embodiment 2 of the present invention. Based on the above embodiment, this embodiment further optimizes the above RDE data post-processing method.

[0038] like Figure 2 As shown, the method specifically includes:

[0039] Step 210: Obtain the RDE test data and emission delay schedule of the vehicle.

[0040] Optionally, the RDE test data includes test data of at least one emission of the vehicle, and the emission delay schedule includes a delay time for each emission in the RDE test data.

[0041] Specifically, the RDE test data collected when the vehicle is subjected to the RDE test is obtained. The RDE test data may include test data of various vehicle emissions, such as CO2, CO, NO x The emission delay schedule can be obtained according to the different factors such as the RDE equipment model, vehicle model and RDE test environment for collecting RDE test data. The emission delay schedule can be preset or temporarily set and adjusted by the user to meet the needs of different scenarios, such as Figure 3 As shown, this interface is used to add relevant parameters of the vehicle and set the delay time of each emission in the RDE test data. After the user sets the delay time of each emission, an emission delay schedule can be formed. When the RDE data post-processing method is implemented, the corresponding emission delay schedule can be obtained based on relevant information such as the vehicle.

[0042] Step 220: Obtain the delay time of each emission in the RDE test data from the emission delay time table, and perform data translation on the test data of the corresponding emission according to the delay time.

[0043] Specifically, since the RDE measurement equipment takes different amounts of time to collect each type of vehicle emission, the data information of each emission in the RDE test data is not aligned in time. Therefore, the delay time for collecting various emissions in the emission delay time table can be obtained, and the corresponding emission data in the RDE test data can be shifted according to the delay time of various emissions.

[0044] Step 230 , obtaining the vehicle speed when the RDE test data is collected, and eliminating the RDE test data with a speed less than a preset test speed value to obtain RDE calculation data.

[0045] Among them, the preset test speed value can be understood as a judgment value of whether the vehicle speed meets the measurement requirements in the RDE test.

[0046] Specifically, according to the regulations, RDE test data with a vehicle speed less than a preset test speed value does not meet the test standard, so it is necessary to eliminate the RDE test data with a vehicle speed less than the preset test speed value. Optionally, cold start data can also be eliminated. After eliminating the data that does not meet the measurement requirements, the RDE calculation data is obtained.

[0047] Step 240: Acquire the environmental parameters during RDE test data collection, and unify the data storage unit of the RDE calculation data according to the environmental parameters.

[0048] Among them, the environmental parameters during RDE test data collection may include the data collection frequency of the RDE measuring equipment, the vehicle's real-time fuel consumption, air-fuel ratio parameters, atmospheric pressure, ambient temperature and ambient humidity, etc.

[0049] Specifically, different RDE measurement devices may have different data collection frequencies. The data frequency of RDE calculation data can be adjusted to the preset frequency. For example, the collection frequency of some devices is 10Hz, and the preset frequency is 1Hz. Then, the calculation data of each emission in the RDE calculation data can be selected from the first point, and one data is selected every 10 data, and the data frequency can be changed to 1HZ. The RDE calculation data can also be corrected and the measurement units can be unified according to other environmental parameters.

[0050] Exemplarily, according to the real-time fuel consumption (FB, kg / h) and the air-fuel ratio parameter (λ), the exhaust flow rate (V_EXH, g / s) is calculated as follows:

[0051] V_EXH=(1+λ)*14.7*FB / 3.6 / 1.293,

[0052] According to the atmospheric pressure (P_AIR, mbar), ambient temperature (T_AIR, °C) and ambient humidity (PHI, %), the dry-wet reference conversion coefficient is calculated:

[0053] K_WET=1 / (1+1.85*0.005*(EM_CO2*0.0001+EM_CO*0.0001))-1.068*1.08 / (1000+1.068*1.08),

[0054] K_WET_NOX=1 / (1-0.0329*((6.211*PHI*(EXP((16.78*T_AIR-116.9) / (T_AIR+237.3)) ) / (P_AIR*0.1-(EXP((16.78*T_AIR-116.9) / (T_AIR+237.3)))*PHI*0.01))-10.71)),

[0055] Convert the RDE calculation data from ppm to g / s:

[0056] MF_CO=1.25*V_EXH*EM_CO*K_WET / 100000,

[0057] MF_CO2=1.25*V_EXH*EM_CO2*K_WET / 100000,

[0058] MF_NO X =1.25*V_EXH*EM_NOX*K_WET_NOX / 100000,

[0059] MF_PN=1.25*V_EXH*EM_PN*K_WET / 100000.

[0060] Step 250: Create a two-dimensional window time array according to the regulations to obtain N time windows including start time information and end time information.

[0061] Specifically, multiple time windows are divided according to regulations, and the time periods of each time window can overlap, and the time period lengths of each time window can also be different. The moment information of each time window can be stored by creating a two-dimensional window time array. For example, a two-dimensional window time array with N rows and two columns can be created, where N can be the number of time windows. The first column of the window time array can be used to store the start time of each time window, and the second column of the window time array can be used to store the end time of each time window. According to the created two-dimensional window time array, N time windows including the start time information and the end time information can be obtained.

[0062] Step 260: For each time window, extract the test data of various emissions between the start time and the end time corresponding to the time window in the RDE calculation data.

[0063] Specifically, each time window contains the start time information and the end time information of the window. For a certain time window, the test data of various emissions between the start time and the end time in the RDE calculation data can be searched based on the start time information and the end time information.

[0064] Step 270: Determine the average emission amount of each emission substance in the time window in combination with the average vehicle speed during data collection in the time window.

[0065] The unit of average emissions can be g / km or mg / km, that is, the mass of emissions emitted by the vehicle when it travels 1 km.

[0066] Specifically, the average speed of the vehicle in the time window can be calculated based on the start and end time information of the time window and the distance traveled by the vehicle in the time period, and then the average emission amount of each emission in the time window can be obtained by combining the test data of various emissions in the time window.

[0067] Step 280: Calculate the weighting coefficient of each time window according to the average carbon dioxide emission in each time window.

[0068] Specifically, the average carbon dioxide emissions in each time window can be obtained, and a weighting coefficient can be determined for each time window according to regulations. After the weighting coefficient of each time window is calculated, steps 290-1 and 290-2 can be performed to obtain the total trip emission test results and the urban emission test results respectively.

[0069] Step 290 - 1 : Determine the first weighted average value of each emission according to the average emission amount of each emission corresponding to each time window and the corresponding weighting coefficient, and use each first weighted average value as the corresponding total trip emission test result.

[0070] Specifically, for a type of emission, its average emission in each time window and the weighting coefficient of each time window can be obtained, all average emissions are multiplied by the corresponding weighting coefficient and then added, and then divided by the sum of all weighting coefficients to obtain the first weighted average value of the emission and the total trip emission test result of the emission. The first weighted average value of each emission is calculated in turn and determined as the corresponding total trip emission test result.

[0071] Exemplarily, there are three time windows, the average CO emissions in the first time window is 1g / km, the weighting coefficient of the first time window is 0.1, the average CO emissions in the second time window is 2g / km, the weighting coefficient of the second time window is 0.3, the average CO emissions in the third time window is 1.5g / km, the weighting coefficient of the third time window is 0.2, then, the total trip emission test result of CO is (1×0.1+2×0.3+1.5×0.2) / (0.1+0.3+0.2)g / km.

[0072] Step 290-2, determine the first time window in which the average vehicle speed is below the preset area speed value, and determine the second weighted average value of each emission according to the average emission amount of each emission corresponding to the first time window and the corresponding weighting coefficient, and use each second weighted average value as the corresponding urban emission test result.

[0073] The preset area speed value can be understood as a speed determination value for dividing the vehicle driving area. When the average speed is less than the preset area speed value, it can be considered that the vehicle is driving in the urban area, and the preset area speed value can be 60km / h.

[0074] Specifically, the average vehicle speed in each time window can be obtained, and the average vehicle speed corresponding to a certain time window can be compared with the vehicle speed value of the preset area. When the average vehicle speed is less than the vehicle speed value of the preset area, the time window can be determined as the first time window. For a type of emission, its average emission in each first time window and the weighting coefficient of each first time window can be obtained, and the average emission of all first time windows can be multiplied by the corresponding weighting coefficient and then added, and then divided by the sum of the weighting coefficients of all first time windows to obtain the second weighted average value of the emission and the urban emission test result of the emission. The second weighted average value of each emission is calculated in turn and determined as the corresponding urban emission test result.

[0075] Exemplarily, there are three time windows, the average CO emissions in the first time window are 1g / km, the average vehicle speed is 40km / h, the weighting coefficient of the first time window is 0.1, the average CO emissions in the second time window are 2g / km, the average vehicle speed is 80km / h, the weighting coefficient of the second time window is 0.3, the average CO emissions in the third time window are 1.5g / km, the average vehicle speed is 50km / h, and the weighting coefficient of the third time window is 0.2, then, the urban emission test result of CO is (1×0.1+1.5×0.2) / (0.1+0.2)g / km.

[0076] like Figure 4A schematic diagram of an emission test result display interface of an RDE data post-processing method is shown, which can display two emission test results of different emissions and related parameters in the RDE test.

[0077] The technical solution of this embodiment, by acquiring the RDE test data and emission delay schedule of the vehicle, performs data translation on the RDE test data, screens the data according to the regulations, and unifies the data format according to the environmental parameters during data collection, so as to improve the speed and accuracy of data calculation; divides the time window by creating a two-dimensional window time array, and obtains the corresponding test data according to the same two-dimensional window time array when calculating the average emission of each emission, so as to ensure the consistency of the time windows of different emissions; combines the average vehicle speed during data collection in the time window, determines the two emission test results of each emission, and more comprehensively displays the emission of vehicle pollutants. The embodiment of the present invention is applicable to the RDE test data collected by different RDE emission equipment, solves the problem that the existing RDE data post-processing software can only process the RDE test data collected by specific RDE emission equipment, and has limitations, and can conveniently and quickly analyze and calculate the RDE test data to obtain the test results, and the calculation process is clear, and the results are accurate and reliable.

[0078] Embodiment 3

[0079] The RDE data post-processing device provided in the embodiment of the present invention can execute the RDE data post-processing method provided in any embodiment of the present invention, and has the functional modules and beneficial effects corresponding to the execution method. Figure 5 is a structural block diagram of an RDE data post-processing device provided in Embodiment 3 of the present invention, such as Figure 5 As shown, the device includes: an information acquisition module 310, a data processing module 320 and a data calculation module 330.

[0080] The information acquisition module 310 is used to acquire the RDE test data and emission delay schedule of the vehicle.

[0081] The data processing module 320 is used to perform data translation on the RDE test data according to the emission delay schedule, filter out the RDE calculation data that meets the preset requirements and unify the data format.

[0082] The data calculation module 330 is used to divide the time window according to the regulations, determine the average emission set corresponding to each time window according to the RDE calculation data, and determine the emission test results corresponding to each average emission in the average emission set.

[0083] The technical solution of this embodiment obtains the RDE test data and emission delay schedule of the vehicle, pre-processes and screens the RDE test data, unifies the data format, determines the average emission of each emission corresponding to the time window divided according to regulations, and then determines the emission test results of each emission. It is applicable to RDE test data collected by different RDE emission equipment, and solves the problem of existing RDE data post-processing software that can only process RDE test data collected by specific RDE emission equipment and has limitations. It can conveniently and quickly analyze and calculate the RDE test data to obtain test results, and the calculation process is clear and the results are accurate and reliable.

[0084] Optionally, the RDE test data includes test data of at least one emission of the vehicle, and the emission delay time table includes a delay time for each emission in the RDE test data.

[0085] Optionally, performing data shifting on the RDE test data according to the emission delay schedule includes:

[0086] Obtaining a delay time for each emission in the RDE test data from the emission delay time table;

[0087] The test data of the corresponding emissions are respectively shifted according to the delay time.

[0088] Optionally, screening out RDE calculation data that meets preset requirements and unifying the data format includes:

[0089] Obtaining the vehicle speed when the RDE test data is collected, and eliminating the RDE test data whose speed is less than a preset test vehicle speed value, to obtain the RDE calculation data;

[0090] The environmental parameters when the RDE test data is collected are obtained, and the data storage unit of the RDE calculation data is unified according to the environmental parameters.

[0091] Optionally, dividing the time window according to regulations includes:

[0092] Create a two-dimensional window time array according to the regulations, where the two-dimensional window time array has N rows and two columns;

[0093] N time windows including start time information and end time information are obtained.

[0094] Optionally, determining the average emission set corresponding to each time window according to the RDE calculation data includes:

[0095] For each time window, extracting test data of various emissions between the start time and the end time corresponding to the time window in the RDE calculation data;

[0096] Combined with the average vehicle speed during data collection in the time window, the average emission amount corresponding to each of the emissions in the time window is determined.

[0097] Optionally, determining the emission test result corresponding to each average emission in the average emission set includes:

[0098] Calculating a weighting coefficient for each time window according to the average carbon dioxide emissions in each time window;

[0099] Determine a first weighted average value of each emission according to the average emission amount of each emission corresponding to each time window and the corresponding weighting coefficient, and use each first weighted average value as the corresponding total trip emission test result;

[0100] Determine a first time window in which the average vehicle speed is below the preset area speed value, and determine a second weighted average value of each emission according to the average emission amount of each emission corresponding to the first time window and the corresponding weighting coefficient, and use each of the second weighted average values ​​as the corresponding urban emission test result.

[0101] The technical solution of this embodiment, by acquiring the RDE test data and emission delay schedule of the vehicle, performs data translation on the RDE test data, screens the data according to the regulations, and unifies the data format according to the environmental parameters during data collection, so as to improve the speed and accuracy of data calculation; divides the time window by creating a two-dimensional window time array, and obtains the corresponding test data according to the same two-dimensional window time array when calculating the average emission of each emission, so as to ensure the consistency of the time windows of different emissions; combines the average vehicle speed during data collection in the time window, determines the two emission test results of each emission, and more comprehensively displays the emission of vehicle pollutants. The embodiment of the present invention is applicable to the RDE test data collected by different RDE emission equipment, solves the problem that the existing RDE data post-processing software can only process the RDE test data collected by specific RDE emission equipment, and has limitations, and can conveniently and quickly analyze and calculate the RDE test data to obtain the test results, and the calculation process is clear, and the results are accurate and reliable.

[0102] Embodiment 4

[0103] Figure 6 A structural block diagram of a computer device provided in Embodiment 4 of the present invention, such as Figure 6As shown, the computer device includes a processor 410, a memory 420, an input device 430, and an output device 440; the number of processors 410 in the computer device can be one or more. Figure 6 A processor 410 is taken as an example; the processor 410, memory 420, input device 430 and output device 440 in the computer device can be connected via a bus or other means. Figure 6 The example of connecting through bus is taken in the following.

[0104] The memory 420, as a computer-readable storage medium, can be used to store software programs, computer executable programs and modules, such as program instructions / modules corresponding to the RDE data post-processing method in the embodiment of the present invention (for example, the information acquisition module 310, the data processing module 320 and the data calculation module 330 in the RDE data post-processing device). The processor 410 executes various functional applications and data processing of the computer device by running the software programs, instructions and modules stored in the memory 420, that is, realizes the above-mentioned RDE data post-processing method.

[0105] The memory 420 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system and at least one application required for a function; the data storage area may store data created according to the use of the terminal, etc. In addition, the memory 420 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some instances, the memory 420 may further include a memory remotely arranged relative to the processor 410, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0106] The input device 430 may be used to receive input digital or character information and generate key signal input related to user settings and function control of the computer device. The output device 440 may include a display device such as a display screen.

[0107] Embodiment 5

[0108] Embodiment 5 of the present invention further provides a storage medium comprising computer executable instructions, wherein the computer executable instructions are used to execute a RDE data post-processing method when executed by a computer processor, the method comprising:

[0109] Obtain vehicle RDE test data and emission delay schedule;

[0110] Performing data translation on the RDE test data according to the emission delay schedule, screening out RDE calculation data that meets preset requirements and unifying the data format;

[0111] The time windows are divided according to the regulations, the average emission set corresponding to each time window is determined according to the RDE calculation data, and the emission test results corresponding to each average emission in the average emission set are determined.

[0112] Of course, the storage medium containing computer executable instructions provided in an embodiment of the present invention is not limited to the method operations described above, and can also execute related operations in the RDE data post-processing method provided in any embodiment of the present invention.

[0113] Through the above description of the implementation methods, the technicians in the relevant field can clearly understand that the present invention can be implemented by means of software and necessary general hardware, and of course it can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as a computer floppy disk, read-only memory (ROM), random access memory (RAM), flash memory (FLASH), hard disk or optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, server, or network device, etc.) to execute the methods described in each embodiment of the present invention.

[0114] It is worth noting that in the embodiment of the above-mentioned RDE data post-processing device, the various units and modules included are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.

[0115] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. A RDE data post-processing method, characterized in that: include: Obtain vehicle RDE test data and emission delay schedule; Performing data translation on the RDE test data according to the emission delay schedule, screening out RDE calculation data that meets preset requirements and unifying the data format; Divide the time windows according to the regulations, determine the average emission set corresponding to each time window according to the RDE calculation data, and determine the emission test results corresponding to each average emission in the average emission set; The RDE test data of the vehicle is collected by RDE measuring equipment, and different RDE measuring equipment have different data collection frequencies, and the data frequency of the RDE calculation data is adjusted to a preset frequency; The emission delay schedule is obtained according to the RDE measurement equipment model, vehicle model and RDE test environment.

2. The RDE data post-processing method according to claim 1, characterized in that: The RDE test data includes test data of at least one emission of the vehicle, and the emission delay schedule includes a delay time for each emission in the RDE test data.

3. The RDE data post-processing method according to claim 2, characterized in that: The performing data translation on the RDE test data according to the emission delay schedule includes: Obtaining a delay time for each emission in the RDE test data from the emission delay time table; The test data of the corresponding emissions are respectively shifted according to the delay time.

4. The RDE data post-processing method according to claim 1, characterized in that: The method of screening out RDE calculation data that meets preset requirements and unifying the data format includes: Obtaining the vehicle speed when the RDE test data is collected, and eliminating the RDE test data whose speed is less than a preset test vehicle speed value, to obtain the RDE calculation data; The environmental parameters when the RDE test data is collected are obtained, and the data storage unit of the RDE calculation data is unified according to the environmental parameters.

5. The RDE data post-processing method according to claim 2, characterized in that: The time windows divided according to regulations include: Create a two-dimensional window time array according to the regulations, where the two-dimensional window time array has N rows and two columns; N time windows including start time information and end time information are obtained.

6. The RDE data post-processing method according to claim 5, characterized in that: Determining the average emission set corresponding to each time window according to the RDE calculation data includes: For each time window, extracting test data of various emissions between the start time and the end time corresponding to the time window in the RDE calculation data; Combined with the average vehicle speed during data collection in the time window, the average emission amount corresponding to each of the emissions in the time window is determined.

7. The RDE data post-processing method according to claim 6, characterized in that: The determining of the emission test result corresponding to each average emission amount in the average emission amount set includes: Calculating a weighting coefficient for each time window according to the average carbon dioxide emissions in each time window; Determine a first weighted average value of each emission according to the average emission amount of each emission corresponding to each time window and the corresponding weighting coefficient, and use each first weighted average value as the corresponding total trip emission test result; Determine a first time window in which the average vehicle speed is below the preset area speed value, and determine a second weighted average value of each emission according to the average emission amount of each emission corresponding to the first time window and the corresponding weighting coefficient, and use each of the second weighted average values ​​as the corresponding urban emission test result.

8. An RDE data post-processing device, characterized in that: include: An information acquisition module, used to obtain the vehicle's RDE test data and emission delay schedule; A data processing module, used to perform data translation on the RDE test data according to the emission delay schedule, filter out RDE calculation data that meets preset requirements and unify the data format; A data calculation module, used to divide the time windows according to the regulations, determine the average emission set corresponding to each time window according to the RDE calculation data, and determine the emission test results corresponding to each average emission in the average emission set; The RDE test data of the vehicle is collected by RDE measuring equipment, and different RDE measuring equipment have different data collection frequencies, and the data frequency of the RDE calculation data is adjusted to a preset frequency; The emission delay schedule is obtained according to the RDE measurement equipment model, vehicle model and RDE test environment.

9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the RDE data post-processing method as described in any one of claims 1-7 is implemented.

10. A storage medium containing computer executable instructions, characterized in that: The computer executable instructions are used to perform the RDE data post-processing method as described in any one of claims 1 to 7 when executed by a computer processor.

Citation Information

Patent Citations

  • Automotive exhaust emission data fusion system

    CN106650825A

  • Motor vehicle tail gas pollutant full-component discharge testing method

    CN108181432A

  • Motor vehicle tail gas remote measuring result modification method

    CN108226046A

  • Car-following testing system and method for heavy-duty car exhaust gas emission

    CN109061071A

  • Method for obtaining emission factor of tail gas pollutant of heavy-duty vehicle in real time

    CN109165461A