Construction method of combined bridge structure
By introducing prestressed and movable support structures into the cover beam structure, the problems of weight and connection quality of traditional prefabricated cover beams are solved, and efficient connection between steel cover beams and concrete load-bearing structures is achieved, which reduces construction costs and environmental impacts. It is suitable for Areas with high intensity of earthquakes.
Patent Information
- Application Number
- CN202010886181.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-28
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2040-08-28
AI Technical Summary
Traditional on-site pouring concrete construction methods lead to traffic blockade and environmental pollution in urban elevated bridge projects, and the weight and connection quality of large prefabricated cover beams are difficult to guarantee, especially in areas with high earthquake intensity.
Using a combined bridge structure, including the cover beam body and a constant carrier, the compressive stress is applied in advance on the tensile side through the prestressed structure, combined with the movable support seat and fixed connector, the bending moment is released in stages, the stress on the cover beam structure is optimized, and the stress on the cover beam structure is reduced. Impact load and bending risk to columns.
Effectively reduce the design thickness and weight of the cover beam structure, reduce construction costs and environmental impact, improve the rationality of resource allocation, is suitable for the connection between steel cover beams and concrete bearing structures, reduce the amount of steel structure, and is suitable for seismic highs. Intensity area.
Smart Images

Figure CN111979901B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, in particular to a construction method of a combined bridge structure. Background Art
[0002] In the construction of urban or highway bridges, especially for elevated bridge projects in urban areas with busy ground traffic, the traditional on-site cast concrete construction method directly carries out on-site construction at the bridge site, which will block traffic for a long time and cause great construction pollution, and cannot meet the current requirements for ecological construction and environmental protection; and the repeated configuration of construction equipment and auxiliary facilities causes problems such as large consumption of resources and energy, and waste of financial and material resources.
[0003] Different from the traditional cast-in-place construction method, the "prefabricated bridge construction method" that adopts factory prefabrication and on-site assembly completes most of the work in the factory. With the increase of the assembly rate, on-site construction work becomes very small, which can not only avoid the impact on traffic to a large extent, but also effectively reduce the impact on the surrounding environment during the construction process, and improve the rationality of resource allocation. It is a concrete manifestation of "green building" and "building industrialization" in bridge engineering.
[0004] There are many structural forms and many years of practical experience in the prefabrication of superstructures in municipal bridges. Prefabricated columns have also been used in recent years. However, the weight of concrete bridge cap beams with six lanes or more in both directions is generally more than 250t. On the one hand, prefabrication is difficult and requires customized specially processed formwork and tire frames. On the other hand, transportation and lifting are difficult, and construction costs increase significantly. In addition, the connection quality between the heavy cap beam and the bottom column cannot be guaranteed. All these limit the application of large prefabricated cap beams, especially in areas with high earthquake intensity.
[0005] In order to solve this problem, the use of steel cap beams can be considered, which can reduce the weight of the upper prefabricated structure to a certain extent. However, the force exerted by the steel cap beam on the columns is still very large, and the lateral bending moment borne by the top of the columns is relatively strong. In addition, during the construction process, the steel cap beam and the columns are directly and simply combined and connected, and the structure has poor stress resistance. Especially when the constant load is constructed on the cap beam, it will continuously apply severe impact loads to the columns, and it is also easy to increase the bending moment borne by the columns. Once the bending moment reaches a certain value, it is easy to cause the columns to bend and crack. Summary of the invention
[0006] Based on this, it is necessary to provide a construction method for a combined bridge structure to address the problem that the bending moment imposed on the columns by the steel cap beam is large and the structural stress resistance of the connection method is poor.
[0007] A combined bridge structure, comprising:
[0008] load-bearing structure;
[0009] A cap beam structure, comprising a cap beam body and a constant carrier, wherein the cap beam body comprises a compression side and a tension side, wherein the compression side faces the bearing structure, the tension side faces away from the bearing structure and forms a prestressed structure, and the constant carrier is arranged on a surface of the tension side;
[0010] A connecting support structure is arranged between the bearing structure and the cap beam structure, and includes a movable support seat pre-placed between the bearing structure and the cap beam body for supporting the cap beam body, and a fixed connecting body arranged lagging behind the constant carrier and filling between the movable support seat, the bearing structure and the cap beam body.
[0011] The above-mentioned combined bridge structure has at least the following beneficial technical effects:
[0012] In this embodiment, a prestressed structure is arranged on the tension side of the upper edge of the cap beam body to apply prestress in advance. A certain compressive stress is stored in advance on the tension side by the prestress to reduce the stress borne by the cap beam structure in the subsequent use stage, thereby improving the stress conditions of the top and bottom plates of the steel cap beam, which is conducive to reducing the design thickness of the top and bottom plates, and further conducive to reducing the lateral bending moment on the top of the bearing structure; at the same time, the prestressed structure on the tension side of the cap beam body applies prestress in advance, which can also generate an upward reverse bending moment in the cap beam body, which can directly reduce the compressive bending moment effect on the top of the column;
[0013] During the construction process, the cap beam structure and the bearing structure are not directly rigidly connected as a whole. Instead, the entire cap beam structure is divided into a cap beam body and a constant carrier. A movable support seat is first set up to provide temporary support, and then the cap beam body is hoisted in turn and the constant carrier is laid on the cap beam body. Before the construction of the constant carrier stage, a temporary hinged movable support seat is set up to release the bending moment of the cap beam body and the constant carrier on the top of the bearing structure in stages, thereby avoiding continuous severe impact loads and bending moments on the columns during construction. The release of the bending moment effectively reduces the risk of bending and cracking of the bearing structure.
[0014] The subsequently filled fixed connector and the cap beam body with prestressed upper edge together form an integral combined structure, which optimizes the stress of the cap beam structure and enhances the structural rigidity, which is conducive to further reducing the design thickness of the top and bottom plates of the cap beam body. When the thickness of the top and bottom plates is reduced, the pressure and bending moment on the bearing structure will also be reduced.
[0015] Since the fixed connector is filled last in this embodiment, the bearing structure has sufficient time to shrink and settle to finalize. After finalization, the fixed connector is filled to form a post-casting strip, so that the settlement of the bearing structure will not cause deformation cracks at the connection, thereby ensuring the safety of the force at the connection.
[0016] The design of this embodiment can reduce the amount of steel structure used as much as possible, thereby saving engineering costs.
[0017] This embodiment can be applied to the connection and installation of steel cap beams and concrete bearing structures, which significantly reduces the structural weight of prefabricated cap beams, has low requirements for construction equipment, and effectively realizes the full prefabrication of bridge structures. The cap beam structure can generally be pre-prepared in a processing plant, and the on-site foundation engineering and bridge structure can be constructed simultaneously; it is light in weight, easy to transport and install, reduces construction costs, and shortens construction period.
[0018] Since the cap beam structure can be manufactured in a factory with high processing precision and strict quality inspection, the quality of on-site connection and welding is relatively controllable. Since on-site manufacturing is not required, the impact on traffic can be avoided to a large extent, and the impact on the surrounding environment during construction can be effectively reduced. It can also improve the rationality of resource allocation and avoid waste of resources and financial consumption.
[0019] In one of the embodiments, the prestressed structure includes a tensioning structure laid on the tension side along the length direction of the cap beam body.
[0020] In one of the embodiments, the tensioning structure includes a plurality of prestressed steel bars distributed along the width direction of the cap beam body, and the length direction of the prestressed steel bars is consistent with the length direction of the cap beam body.
[0021] In one of the embodiments, the cap beam structure further includes a second-stage constant load structure, which is disposed on a surface of the constant load body facing away from the tension side.
[0022] In one embodiment, the movable support seat includes a pad stone and a plate support arranged on the surface of the pad stone.
[0023] In one of the embodiments, the connection support structure further includes a peripheral connection component, which is arranged around the bearing structure and the cap beam structure for circumferentially connecting the bearing structure and the cap beam structure.
[0024] In one embodiment, the peripheral connection component includes:
[0025] A flange is arranged around the circumference of the cap beam structure, and a connection hole is provided on the surface of the flange;
[0026] A connecting rib, comprising an anchor end and a connecting end, wherein the anchor end is anchored to the bearing structure, and the connecting end extends toward the cap beam structure and passes through the bottom plate of the cap beam structure and the connecting hole in sequence;
[0027] A fastener is installed at the connection end, and the fastener can abut against the surface of the flange to fasten the bearing structure and the cap beam structure.
[0028] In one of the embodiments, the connecting ribs are embedded in the bearing structure and prefabricated integrally with the bearing structure.
[0029] In one embodiment, the fixed connection body comprises UHPC.
[0030] In one of the embodiments, a protective layer is provided on the surface of the bearing structure.
[0031] In one of the embodiments, a steel mesh is provided in the protective layer.
[0032] In one embodiment, the bearing structure includes at least two columns arranged side by side.
[0033] In one of the embodiments, the combined bridge structure further includes a bridge structure foundation, which is disposed at the bottom of the bearing structure and is used to support the bearing structure.
[0034] A construction method for a combined bridge structure comprises the following steps:
[0035] Construction of load-bearing structures;
[0036] The movable support seat is arranged on the surface of the bearing structure, and then the cap beam body is suspended on the movable support seat, and the movable support seat is used to provide temporary support for the cap beam body;
[0037] A flange is arranged around the circumference of the cap beam structure, and the connection ends of the connection ribs anchored to the bearing structure are passed through the bottom plate of the cap beam structure and the connection holes of the flange in sequence, thereby temporarily connecting the bearing structure and the cap beam structure around the circumference;
[0038] Arrange a constant carrier on the surface of the cap beam body, install a fastener on the connection end, and make the fastener abut against the surface of the flange to fasten and connect the bearing structure and the cap beam structure;
[0039] A fixed connecting body is filled between the movable supporting seat, the bearing structure and the cap beam body. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 A schematic diagram of a combined bridge structure provided by an embodiment of the present invention;
[0041] Figure 2 for Figure 1 AA section view;
[0042] Figure 3 A schematic diagram of a cap beam body hanging device on a movable support seat is provided for one embodiment of the present invention;
[0043] Figure 4 A schematic diagram of arranging a constant carrier on the surface of the cap beam body;
[0044] Figure 5 A schematic diagram of filling a fixed connection body between a movable support seat, a load-bearing structure and a cap beam body to form a connection support structure and applying a second-stage constant load structure on the surface of a constant carrier;
[0045] Figure 6 A schematic diagram of a connection support structure provided by an embodiment;
[0046] Figure 7 for Figure 6 A top view of
[0047] Figure 8 for Figure 7 BB section view;
[0048] In the figure, 100, a bearing structure; 110, a column;
[0049] 200, cap beam structure; 210, cap beam body; 211, tension side; 2111, prestressed structure; 2111a, prestressed steel bars; 212, compression side; 220, constant load carrier; 230, second-phase constant load structure; 201, bottom plate;
[0050] 300, connecting support structure; 310, movable support seat; 311, pad stone; 312, plate support; 320, fixed connection body; 330, peripheral connection component; 331, flange; 331a, connection hole; 332, connection rib; 333, fastener;
[0051] 400. Foundation of bridge structure. DETAILED DESCRIPTION
[0052] The present invention will be further described below in conjunction with the accompanying drawings.
[0053] To facilitate understanding of the present invention, various embodiments defined by the claims of the present invention will be described more fully below with reference to the relevant drawings. Preferred embodiments of the present invention are given in the drawings, which contain various specific details to assist in this understanding, but these details should be regarded as exemplary only. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. Accordingly, those of ordinary skill in the art will recognize that changes and improvements may be made to the various embodiments described herein without departing from the scope of the present invention defined by the appended claims. In addition, for the sake of clarity and brevity, descriptions of well-known functions and configurations may be omitted.
[0054] It will be apparent to those skilled in the art that the following description of various embodiments of the present invention is provided for illustrative purposes only and not for the purpose of limiting the invention as defined by the appended claims.
[0055] Throughout the specification and claims of this application document, the words "include" and "comprise" and variations of the words, such as "include" and "include" mean "including but not limited to", and are not intended to (and will not) exclude other components, integers or steps. Features, integers or characteristics described in conjunction with a particular aspect, embodiment or example of the present invention will be understood to be applicable to any other aspect, embodiment or example described herein, unless incompatible therewith.
[0056] It should be understood that the singular forms "a", "an", and "the" include plural references unless the context clearly dictates otherwise. The expressions "including" and / or "may include" used in the present invention are intended to indicate the presence of corresponding functions, operations, or elements, and are not intended to limit the presence of one or more functions, operations, and / or elements. In addition, in the present invention, the terms "including" and / or "having" are intended to indicate the presence of characteristics, quantities, operations, elements, and components, or combinations thereof, disclosed in the application documents. Therefore, the terms "including" and / or "having" should be understood as additional possibilities of one or more other characteristics, quantities, operations, elements, and components, or combinations thereof.
[0057] In the present invention, the expression "or" includes any or all combinations of the words listed together. For example, "A or B" may include A or B, or may include both A and B.
[0058] It should be understood that when an element is referred to as being "fixed to" another element, it can be directly on the other element or there can also be an intervening element; when an element is considered to be "connected" or "coupled" to another element, it can be directly or coupled to the other element or there can also be an intervening element.
[0059] The terms “upper”, “lower”, “left”, “right”, etc. mentioned in the text are only used to indicate relative position relationships. When the absolute position of the object being described changes, the relative position relationship may also change accordingly.
[0060] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art to which the present invention belongs. It should also be understood that terms, such as those defined in commonly used dictionaries, should be interpreted as having a meaning consistent with the context of the relevant field and this specification, and should not be interpreted in an idealized or overly formal sense unless explicitly defined as such herein. The term "and / or" as used herein includes any and all combinations of one or more of the relevant listed items.
[0061] like Figure 1 As shown, in one embodiment of the present invention, a combined bridge structure is provided, comprising:
[0062] A load-bearing structure 100;
[0063] The cap beam structure 200 includes a cap beam body 210 and a constant carrier 220. The cap beam body 210 includes a compression side 212 and a tension side 211. The compression side 212 faces the bearing structure 100, and the tension side 211 faces away from the bearing structure 100 and forms a prestressed structure 2111. The constant carrier 220 is arranged on the surface of the tension side 211.
[0064] The connecting support structure 300 is arranged between the bearing structure 100 and the cap beam structure 200, and includes a movable support seat 310 pre-placed between the bearing structure 100 and the cap beam body 210 for supporting the cap beam body 210, and a fixed connecting body 320 arranged to lag behind the permanent carrier 220 and fill in the movable support seat 310, the bearing structure 100 and the cap beam body 210.
[0065] When doing specific operations, such as Figure 3 During construction, the bearing structure 100 is first formed, and then the movable support seat 310 is set on the surface of the bearing structure 100, and the cap beam body 210 is suspended on the movable support seat 310, and the movable support seat 310 is used to provide temporary support for the cap beam body 210; then refer to Figure 4 , a constant carrier 220 is arranged on the surface of the cap beam body 210; finally, refer to Figure 5 A fixed connection body 320 is filled between the movable support seat 310, the bearing structure 100 and the cap beam body 210. It is worth noting that the above-mentioned permanent carrier 220 may include a cap beam upper structure and a top pad stone.
[0066] In this embodiment, a prestressed structure 2111 is arranged on the tension side 211 of the upper edge of the cap beam body 210, so that prestress can be applied in advance. A certain compressive stress is stored in advance on the tension side 211 through the prestress to reduce the stress borne by the cap beam structure 200 in the subsequent use stage, thereby improving the stress conditions of the top and bottom plates of the steel cap beam, which is conducive to reducing the design thickness of the top and bottom plates, and further conducive to reducing the lateral bending moment on the top of the bearing structure 100; at the same time, the prestressed structure 2111 on the tension side 211 of the cap beam body 210 can also generate an upward reverse bending moment in the cap beam body 210 by applying prestress in advance, which can directly reduce the compressive bending moment effect on the top of the column 110;
[0067] During the construction process, the cap beam structure 200 and the bearing structure 100 are not directly rigidly connected as a whole, but the cap beam structure 200 is divided into a cap beam body 210 and a permanent carrier 220. A movable support seat 310 is first set to provide temporary support, and then the cap beam body 210 is hoisted in turn and the permanent carrier 220 is laid on the cap beam body 210. Before the construction stage of the permanent carrier 220, a temporary hinged movable support seat 310 is set to release the bending moment of the cap beam body 210 and the permanent carrier 220 on the top of the bearing structure 100 in stages, thereby avoiding continuous application of severe impact loads and bending moments to the columns 110 during construction. The release of the bending moment effectively reduces the risk of bending and cracking of the bearing structure 100.
[0068] The subsequently filled fixed connector 320 and the cap beam body 210 with prestress applied on the upper edge together form an integral combined structure, which optimizes the stress on the cap beam structure 200 and enhances the structural rigidity, thereby facilitating further reducing the design thickness of the top and bottom plates of the cap beam body 210. When the thickness of the top and bottom plates is reduced, the pressure and bending moment on the bearing structure 100 will also be reduced.
[0069] Since the fixed connector 320 is filled last in this embodiment, the bearing structure 100 has sufficient time to shrink and settle to finalize. After finalization, the fixed connector 320 is filled to form a post-casting strip, so that the settlement of the bearing structure 100 will not cause deformation cracks at the connection, thereby ensuring the safety of the force at the connection.
[0070] The design of this embodiment can reduce the amount of steel structure used as much as possible, thereby saving engineering costs.
[0071] This embodiment can be applied to the connection and installation of the steel cap beam and the concrete bearing structure 100, which significantly reduces the structural weight of the prefabricated cap beam, has low requirements for construction equipment, and effectively realizes the full prefabrication of the bridge structure. The cap beam structure 200 can generally be pre-prepared in a processing plant, and the on-site foundation engineering and the bridge structure can be constructed simultaneously; it is light in weight, easy to transport and install, reduces construction costs, and shortens construction period.
[0072] Since the cap beam structure 200 can be manufactured in a factory, with high processing precision and strict quality inspection, the quality of on-site connection and welding is relatively controllable. Since on-site manufacturing is not required, the impact on traffic can be avoided to a large extent, and the impact on the surrounding environment during the construction process can be effectively reduced. It can also improve the rationality of resource allocation and avoid waste of resources and financial consumption.
[0073] refer to Figure 2 In some embodiments, the prestressed structure 2111 includes a tensioning structure laid on the tension side 211 along the length direction of the cap beam body 210 .
[0074] Specifically, after the cap beam body 210 is hoisted and set on the movable support seat 310, a tensioning structure can be laid on the surface of the tension side 211 (upper side) of the cap beam body 210 along the length direction. The tensioning structure can provide the cap beam body 210 with tensioning force along the length direction of the cap beam body 210.
[0075] In this embodiment, a tensioning structure is arranged on the tension side 211 of the upper edge of the cap beam body 210. The tensioning force provided by the tensioning structure can store a certain compressive stress on the tension side 211 in advance to reduce the stress on the cap beam structure 200 when it is put into use later, thereby improving the stress conditions of the top and bottom plates of the cap beam body 210, which is beneficial to reducing the design thickness of the top and bottom plates of the cap beam body 210. The reduced thickness is beneficial to reducing the lateral bending moment on the top of the bearing structure 100. At the same time, the tensioning force provided by the tensioning structure on the tension side 211 of the cap beam body 210 can also generate a certain upward reverse bending moment in the cap beam body 210, and can also directly reduce the bending moment effect on the top of the column 110. The reduction of the bending moment directly reduces the risk of bending and cracking of the column 110.
[0076] refer to Figure 2 In some embodiments, the tensioning structure includes a plurality of prestressed steel bars 2111a distributed along the width direction of the cap beam body 210 , and the length direction of the prestressed steel bars 2111a is consistent with the length direction of the cap beam body 210 .
[0077] Specifically, after the cap beam body 210 is hoisted and installed on the movable support seat 310, prestressed steel bars 2111a can be laid along the length direction on the surface of the tension side 211 of the cap beam body 210, and tension is applied from both ends to the middle part in the prestressed steel bars 2111a, thereby forming a tension structure.
[0078] In this embodiment, the prestressed steel bar 2111a has a high tensile strength, and can effectively provide the cap beam body 210 with a tensioning force pointing from both ends to the middle part along the length direction of the cap beam body 210, thereby storing a certain compressive stress in advance on the tension side 211, which is beneficial to reducing the load on the cap beam structure 200 to improve the stress conditions of the top and bottom plates of the cap beam body 210, and can also generate obvious reverse bending moment in the cap beam body 210 to resist its own downward bending trend; and the prestressed steel bar 2111a has a strong fatigue resistance, can play a role for a long time, and extend the service life.
[0079] Of course, it is understandable that in some other embodiments, the tensioning structure may adopt other structures, for example, it may include a tensioning net laid on the surface of the cap beam body 210, which is not limited here.
[0080] refer to Figure 5 In some embodiments, a second-stage constant load structure 230 is further included, which is disposed on the surface of the constant load body 220 facing away from the tension side 211. Figure 5 After a constant carrier 220 is formed on the surface of the tension side 211 and a fixed connector 320 is filled between the movable support seat 310, the load-bearing structure 100 and the cap beam body 210, a second-phase constant load structure 230 such as bridge deck pavement, anti-collision guardrail and other structures can be applied to the surface of the constant carrier 220 according to actual usage requirements, so that this embodiment can meet a variety of different usage environments.
[0081] refer to Figure 6 In some embodiments, the movable support seat 310 includes a pad stone 311 and a plate support 312 arranged on the surface of the pad stone 311.
[0082] Specifically, during construction, after the bearing structure 100 is formed, pad stones 311 and plate supports 312 of appropriate sizes are sequentially arranged on the surface of the bearing structure 100, and the cap beam body 210 and the constant carrier 220 are sequentially suspended on the plate supports 312, and the pad stones 311 and the plate supports 312 are used to provide temporary support for the cap beam body 210.
[0083] The pad stone 311 and the plate support 312 in this embodiment have a large contact surface, which can provide stable temporary support for the cap beam body 210, and can release the bending moment of the cap beam body 210 and the constant carrier 220 on the top of the bearing structure 100 in stages in sequence. The release of the bending moment effectively reduces the risk of bending and cracking of the bearing structure 100. In addition, the pad stone 311 of appropriate thickness can be selected as needed to adjust the overall thickness of the movable support seat 310, so that the surface of the cap beam body 210 is maintained at the required height, thereby enhancing the flexibility of use of this embodiment.
[0084] refer to Figure 6 and Figure 7 In some embodiments, the connection support structure 300 further includes a peripheral connection component 330 , which is disposed around the bearing structure 100 and the cap beam structure 200 , and is used to circumferentially connect the bearing structure 100 and the cap beam structure 200 .
[0085] Specifically, after the load-bearing structure 100 is constructed, the movable support seat 310 is set on the surface of the load-bearing structure 100; then the cap beam body 210 is suspended on the movable support seat 310, and the movable support seat 310 is used to provide temporary support for the cap beam body 210, and a peripheral connecting component 330 is set around the load-bearing structure 100 and the cap beam structure 200, so as to circumferentially connect the load-bearing structure 100 and the cap beam structure 200; a constant carrier 220 is arranged on the surface of the cap beam body 210 and finally a fixed connecting body 320 is filled between the movable support seat 310, the load-bearing structure 100 and the cap beam body 210.
[0086] In this embodiment, during the construction process, since the cap beam structure 200 and the bearing structure 100 are not directly and integrally rigidly connected, horizontal relative movement may occur easily in the event of a disaster such as an earthquake. Therefore, the peripheral connecting component 330 is used to circumferentially connect the bearing structure 100 and the cap beam structure 200, so as to lock the horizontal relative position between the cap beam structure 200 and the bearing structure 100, thereby preventing the bearing structure 100 and the cap beam structure 200 from horizontally sliding relative to each other in unexpected circumstances, thereby ensuring the stability of the overall horizontal position and preventing safety accidents caused by position offset.
[0087] refer to Figure 7 and Figure 8 In some embodiments, the peripheral connection component 330 includes:
[0088] A flange 331 is arranged around the circumference of the cap beam structure 200, and a connection hole 331a is provided on the surface of the flange 331;
[0089] The connecting rib 332 includes an anchoring end and a connecting end, wherein the anchoring end is anchored to the bearing structure 100, and the connecting end extends toward the cap beam structure 200 and passes through the bottom plate 201 of the cap beam structure 200 and the connecting hole 331a in sequence;
[0090] The fastener 333 is installed at the connection end, and the fastener 333 can abut against the surface of the flange 331 to fasten the support structure 100 and the cap beam structure 200 .
[0091] Specifically, after the construction and installation of the bearing structure 100, the movable support seat 310 is set on the surface of the bearing structure 100, and then the cap beam body 210 is suspended on the movable support seat 310, and the movable support seat 310 is used to provide temporary support for the cap beam body 210; a flange 331 is set around the circumference of the cap beam structure 200, and the connecting ends of the connecting ribs 332 are passed through the bottom plate 201 of the cap beam structure 200 and the connecting holes 331a in turn, and the fasteners 333 are temporarily installed on the connecting ends, thereby temporarily connecting the bearing structure 100 and the cap beam structure 200 around the circumference; a constant carrier 220 is arranged on the surface of the cap beam body 210, and then the fasteners 333 are operated to make the fasteners 333 firmly abut against the surface of the flange 331, thereby fastening the bearing structure 100 and the cap beam structure 200; finally, a fixed connector 320 is filled between the movable support seat 310, the bearing structure 100 and the cap beam body 210.
[0092] In this embodiment, the connecting ribs 332 arranged around the circumference can temporarily connect the cap beam structure 200 and the bearing structure 100, and can limit the relative position between the cap beam structure 200 and the bearing structure 100 in the horizontal direction during the installation process, thereby avoiding relative horizontal slippage between the bearing structure 100 and the cap beam structure 200 in unexpected situations, ensuring the stability of the overall horizontal position, and avoiding safety accidents caused by position deviation.
[0093] Finally, the fastener 333 is firmly abutted against the surface of the flange 331. The fastener 333 can limit the cap beam structure 200 from moving upward away from the bearing structure 100 in case of an accident; the flange 331 has the ability to bear and resist pressure, and can absorb the load when the cap beam structure 200 is bearing, avoiding excessive pressure on the bearing structure 100 below. Therefore, the peripheral connection component 330 of this embodiment can effectively limit the upper and lower positions of the cap beam structure 200, avoiding it from detaching from the bearing structure 100 below or applying excessive pressure on the bearing structure 100, thereby improving the safety of use.
[0094] In some embodiments, the connecting ribs 332 are pre-buried in the bearing structure 100, that is, the connecting ribs 332 are directly prefabricated as one piece with the bearing structure 100. The one-piece prefabrication method can avoid damage to the bearing structure 100 when the connecting ribs 332 are anchored inside the bearing structure 100 after the bearing structure 100 is formed, and can ensure the stability of the connection between the connecting ribs 332 and the bearing structure 100.
[0095] Of course, in some other embodiments, the connecting ribs 332 may be drilled directly into the interior of the bearing structure 100 after the bearing structure 100 is constructed and installed, which is not limited here.
[0096] In some embodiments, the fixed connector 320 includes UHPC. Specifically, UHPC (Ultra-High Performance Concrete) has ultra-high durability and ultra-high mechanical properties, and its compressive strength is greater than 120 MPa. The design theory of ultra-high performance concrete is the maximum packing density theory (densified particle packing), and its constituent materials of different particle sizes form the most densely packed particles in the best proportion, that is, the gaps between the millimeter-level particles (aggregates) are filled with micron-level particles (cement, fly ash, mineral powder), and the gaps between the micron-level particles are filled with submicron-level particles (silica ash).
[0097] In this embodiment, UHPC is used as the fixed connector 320, which can enhance the compressive performance of the bearing structure 100. The filled UHPC and the cap beam body 210 with prestress applied on the upper edge together form an integral combined structure, which optimizes the force of the cap beam structure 200 and enhances the structural rigidity, which is beneficial to further reduce the design thickness of the top and bottom plates of the cap beam body 210. When the thickness of the top and bottom plates is reduced, the pressure and bending moment on the bearing structure 100 will also be reduced.
[0098] In some embodiments, a protective layer is provided on the surface of the bearing structure 100. Specifically, the protective layer can prevent the bearing structure 100 from being subjected to excessive bending moment at the top in an accidental situation, thereby further improving the safety of use.
[0099] In some embodiments, a steel mesh is provided in the protective layer, which can connect the protective layer into a whole, further enhancing the ability to resist bending and surface fragmentation.
[0100] refer to Figure 1 In some embodiments, the supporting structure 100 includes at least two columns 110 arranged side by side.
[0101] Specifically, multiple contact points are formed between at least two columns 110 arranged side by side and the cap beam structure 200, which provide better support balance for the cap beam structure 200 and enable the cap beam structure 200 to maintain a stable usage state.
[0102] refer to Figure 3 In some embodiments, a bridge structure foundation 400 is further included, which is disposed at the bottom of the bearing structure 100 and is used to support the bearing structure 100 .
[0103] In some areas with complex terrain, the ground is uneven, and it is difficult to ensure that the length direction of the bearing structure 100 is exactly perpendicular to the horizontal plane. Therefore, a bridge structure foundation 400 is set on the ground in advance, and then the bearing structure 100 is installed on the bridge structure foundation 400. This can ensure that the length direction of the bearing structure 100 is exactly perpendicular to the horizontal plane, thereby avoiding safety accidents caused by the tilt of the bearing structure 100.
[0104] Another embodiment of the present invention provides a construction method of a combined bridge structure, comprising the following steps:
[0105] Construction of load bearing structure 100;
[0106] The movable support seat 310 is arranged on the surface of the bearing structure 100, and then the cap beam body 210 is suspended on the movable support seat 310, and the movable support seat 310 is used to provide temporary support for the cap beam body 210, and the tension side 211 of the cap beam body 210 facing away from the bearing structure 100 forms a prestressed structure 2111;
[0107] A flange 331 is arranged around the circumference of the cap beam structure 200, and the connecting ends of the connecting ribs 332 anchored to the bearing structure 100 are passed through the bottom plate 201 of the cap beam structure 200 and the connecting holes 331a of the flange 331 in sequence, thereby temporarily connecting the bearing structure 100 and the cap beam structure 200 around the circumference;
[0108] The constant carrier 220 is arranged on the surface of the cap beam body 210, and the fastener 333 is installed on the connection end, and the fastener 333 is abutted against the surface of the flange 331 to fasten and connect the bearing structure 100 and the cap beam structure 200;
[0109] A fixed connection body 320 is filled between the movable support seat 310 , the bearing structure 100 and the cap beam body 210 .
[0110] In this embodiment, the prestressed structure 2111 is arranged on the tension side 211 of the upper edge of the cap beam body 210, so that prestress can be applied in advance. A certain compressive stress is stored in advance on the tension side 211 through the prestress to reduce the stress borne by the cap beam structure 200 in the subsequent use stage, thereby improving the stress conditions of the top and bottom plates of the steel cap beam, which is conducive to reducing the design thickness of the top and bottom plates, and further conducive to reducing the lateral bending moment on the top of the bearing structure 100; at the same time, the prestressed structure 2111 on the tension side 211 of the cap beam body 210 can also generate an upward reverse bending moment in the cap beam body 210 by applying prestress in advance, which can directly reduce the compressive bending moment effect on the top of the column 110;
[0111] During the construction process, the cap beam structure 200 and the bearing structure 100 are not directly rigidly connected as a whole, but the cap beam structure 200 is divided into a cap beam body 210 and a permanent carrier 220. A movable support seat 310 is first set to provide temporary support, and then the cap beam body 210 is hoisted in turn and the permanent carrier 220 is laid on the cap beam body 210. Before the construction stage of the permanent carrier 220, a temporary hinged movable support seat 310 is set to release the bending moment of the cap beam body 210 and the permanent carrier 220 on the top of the bearing structure 100 in stages, thereby avoiding continuous application of severe impact loads and bending moments to the columns 110 during construction. The release of the bending moment effectively reduces the risk of bending and cracking of the bearing structure 100.
[0112] The subsequently filled fixed connector 320 and the cap beam body 210 with prestress applied on the upper edge together form an integral combined structure, which optimizes the stress on the cap beam structure 200 and enhances the structural rigidity, thereby facilitating further reducing the design thickness of the top and bottom plates of the cap beam body 210. When the thickness of the top and bottom plates is reduced, the pressure and bending moment on the bearing structure 100 will also be reduced.
[0113] In the above description, although expressions such as "first" and "second" may be used to describe various elements of the present invention, they are not intended to limit the corresponding elements. For example, the above expressions are not intended to limit the order or importance of the corresponding elements. The above expressions are used to distinguish one component from another component.
[0114] The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention. A singular expression includes a plural expression unless there is a significant difference in context or scheme therebetween.
[0115] The above description is merely an exemplary embodiment of the present invention and is not intended to limit the protection scope of the present invention. The protection scope of the present invention is determined by the appended claims.
[0116] Those skilled in the art will understand that the various technical features of the above-described embodiments may be omitted, added or combined in any manner accordingly. To make the description concise, not all possible combinations of the various technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, and the simple transformation methods that can be thought of by those skilled in the art and the solutions for making adaptive and functional structural transformations to the prior art should be considered to be within the scope of this specification.
[0117] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the invention patent. It should be pointed out that although the present invention has been shown and described with reference to various embodiments, for ordinary technicians in the field, various deformations and improvements in several forms and details can be made without departing from the concept of the present invention, and without departing from the scope of the present invention defined by the attached claims, all of which belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.
Claims
1. A construction method of a combined bridge structure, using a combined bridge structure, It is characterized in that The combined bridge structure includes a bearing structure, a cap beam structure and a connecting support structure, the cap beam structure includes a cap beam body and a constant carrier, the cap beam body includes a compression side and a tension side, the compression side faces the bearing structure, the tension side faces away from the bearing structure and forms a prestressed structure, and the constant carrier is arranged on the surface of the tension side; the connecting support structure is arranged between the bearing structure and the cap beam structure, including a movable support seat pre-placed between the bearing structure and the cap beam body for supporting the cap beam body, and a fixed connection body arranged and filled between the movable support seat, the bearing structure and the cap beam body after the constant carrier; wherein, the cap beam structure also includes a second-phase constant load structure, which is arranged on the surface of the constant carrier facing away from the tension side; the connecting support structure The supporting structure also includes a peripheral connecting component, which is arranged around the bearing structure and the cap beam structure and is used to circumferentially connect the bearing structure and the cap beam structure; the peripheral connecting component includes a flange, connecting ribs and fasteners, the flange is arranged around the circumference of the cap beam structure, and the surface of the flange is provided with connecting holes, the connecting ribs include an anchoring end and a connecting end, the anchoring end is anchored to the bearing structure, the connecting end extends toward the cap beam structure and passes through the bottom plate of the cap beam structure and the connecting hole in sequence, the fastener is installed at the connecting end, and the fastener can abut against the surface of the flange to fasten the bearing structure and the cap beam structure; the connecting ribs are pre-buried in the bearing structure and prefabricated integrally with the bearing structure; The above-mentioned construction method includes the following steps: constructing a bearing structure; setting a movable support seat on the surface of the bearing structure, and then hanging a cap beam body on the movable support seat, using the movable support seat to provide temporary support for the cap beam body; setting a flange around the circumference of the cap beam structure, and passing the connecting ends of the connecting ribs anchored to the bearing structure through the bottom plate of the cap beam structure and the connecting holes of the flange in turn, thereby temporarily connecting the bearing structure and the cap beam structure around the circumference; arranging a constant carrier on the surface of the cap beam body, installing a fastener on the connecting end, and making the fastener abut against the surface of the flange to fasten the bearing structure and the cap beam structure; filling a fixed connector between the movable support seat, the bearing structure and the cap beam body.
2. The construction method of the combined bridge structure according to claim 1, It is characterized in that The prestressed structure includes a tensioning structure laid on the tension side along the length direction of the cap beam body.
3. The construction method of the combined bridge structure according to claim 2, It is characterized in that The tensioning structure includes a plurality of prestressed steel bars distributed along the width direction of the cap beam body, and the length direction of the prestressed steel bars is consistent with the length direction of the cap beam body.
4. The construction method of the combined bridge structure according to claim 1, It is characterized in that The movable support seat comprises a cushion stone and a plate-type support seat arranged on the surface of the cushion stone.
5. The construction method of the combined bridge structure according to claim 1, It is characterized in that The fixed connection body includes UHPC.
6. The construction method of the combined bridge structure according to claim 1, It is characterized in that A protective layer is provided on the surface of the bearing structure.
7. The construction method of the combined bridge structure according to claim 6, It is characterized in that A steel mesh is arranged in the protective layer.
8. The construction method of the combined bridge structure according to claim 1, It is characterized in that The bearing structure comprises at least two columns arranged side by side.
9. The construction method of the combined bridge structure according to claim 1, It is characterized in that The combined bridge structure also includes a bridge structure foundation, which is arranged at the bottom of the bearing structure and is used to support the bearing structure.