Battery Charge Management for Mining Machinery
By generating a charging model based on mining cycles in the battery charging management system of mining machinery, the peak load problem of power grid caused by charging management of battery-powered machinery in mines is solved, and efficient power management of battery-powered machinery is realized, which extends battery life and improves the battery life The efficiency of mining operations is achieved.
Patent Information
- Application Number
- CN201980045098.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2018-07-04
- Filing Date
- 2019-07-02
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2039-07-02
AI Technical Summary
In mines, the charging management of battery-powered mining machinery has peak load problems, resulting in overload of the power grid. The existing technology fails to effectively consider the impact of charging load on power consumption.
Using a battery charging management system, including a battery management system (BMS) and a battery charging control unit, reduce battery loss and prolong work by generating a charging model based on the extraction cycle, scheduling battery charging, predicting battery operating status, and optimizing charging time and temperature. cycle.
It effectively reduces the power consumption of battery-powered mining machinery, optimizes the grid load of mining operations, extends the service life of the battery, and improves the efficiency of mining operations.
Smart Images

Figure CN112385111B_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to systems, methods, control units, and computer program products for battery charge management of one or more battery-powered mining machines. Background Art
[0002] Work is ongoing to adapt mining machinery to operate using electricity, and more specifically, to operate at least partially in a battery-powered mode. In addition to mining machinery, there are other devices that are powered by electricity, such as ventilation fans, cranes, lighting devices, etc. These other devices may also be at least partially battery-powered. The switch from fuel-driven machinery (and devices) to electrically driven and battery-powered machinery increases the electrical energy consumption in mines, and the charging of batteries will have a significant impact on the power consumption in mines. Conventional battery charging solutions for mine applications disclose the use of a battery management system / energy management system (BMS / EMS) to optimize the charging of batteries or battery-powered vehicles, but do not take into account the load impact of charging.
[0003] US2018 / 0111496 discloses a charge controller for an electric mining vehicle, which is configured to determine the amount of charge to be provided to a battery of a mining machine. In the disclosed solution, the battery charge is adapted to the specific load demand previously experienced by the electric motor of the mining vehicle.
[0004] The daily operations of mining typically involve more mining operations in addition to the transportation used by the mining vehicles. The operations include the following cycles: drilling, blasting, ventilation, and loading, transporting and dumping of the material that has been cut during the mining operation cycle (i.e., the mining cycle). Mining operations involve a variety of mining machines, such as face drills, production drills, bolting devices, cable bolting devices, concrete sprayers, loaders, transporters and dumpers. The listed mining machines require considerable power during operation, and mining machines generally have high power requirements during predictable phases of the mining cycle. When considering each mining machine individually, most mining machines can be considered to operate according to a cyclic mining cycle (i.e., a cycle of mining operations defined for a particular machine).
[0005] Multiple operations performed simultaneously within a mine result in a corresponding multiple mining cycles that place demands on power that are unique to mining. In the field of mining, the power grid is often at the edge of its capacity or even below standard in order to meet the power needs of multiple simultaneous mining operations, especially when the operating cycles mean intermittent power demands on the grid. Some of the power demands may come from one or more battery-powered mining machines with simultaneous battery charging needs, which will result in peak loads on the grid in the mine. Therefore, charging one or more machines (especially when performed during the time when other power tools are operating in the mine) may result in overload within the existing, already highly loaded main mining grid.
[0006] Therefore, there is a need for improved charging management. Summary of the invention
[0007] An object of the present disclosure is to solve or mitigate, alleviate or eliminate at least some of the above-mentioned deficiencies in the prior art and to provide a solution for improved charging management.
[0008] According to a first aspect, the object is achieved by a system for battery charging management of one or more battery-powered mining machines. The system comprises: one or more batteries; at least one battery management system (BMS) arranged to collect battery data representing the operating status of the respective batteries; one or more battery chargers; and a battery charging control unit. Each battery is configured to be used in a respective battery-powered mining machine, which is configured to operate in a predetermined mining cycle. Each battery management system (BMS) is configured to provide battery data to the battery charging control unit. The battery charging control unit is configured to generate at least one charging model and schedule the charging of a respective battery in the one or more batteries via one or more battery chargers based on the at least one charging model.
[0009] The present disclosure provides the following advantages: Improved battery charging / battery management for battery powered mining machines is achieved. Charging is controlled using charging models; each battery charging model is based on expected battery consumption during a mining cycle and the operating state of the battery.
[0010] In some embodiments, a battery management system (BMS) is configured to collect battery data during one or more mining cycles, and a battery charging control unit is configured to schedule charging of a corresponding battery within at least one subsequent mining cycle based on a charging model, wherein the subsequent mining cycle includes a set of mine operations similar to the mine operations performed during the collection of data.
[0011] In some implementations, the battery data includes at least one of a charge level and a temperature limit of the corresponding battery.
[0012] In some embodiments, the battery charging control unit is configured to adjust an internal temperature of a corresponding battery based on the temperature limit.
[0013] In some embodiments, the charging model includes predicting an operating state of the battery during a future portion of a predetermined mining cycle. The prediction is based on the battery data and historical operating state information for a corresponding mining machine in the one or more mining machines.
[0014] According to some embodiments, the predicted operating state of the battery is based on at least one of a vehicle model and a mine model. The vehicle model represents historical operating state information for the mining machine. The mine model represents historical operating state information corresponding to a mine route.
[0015] According to a second aspect of the present disclosure, the object is achieved by a method performed in a battery charging control unit of a system according to the first aspect. The method includes receiving battery data from one or more battery management systems (BMS), which are arranged to collect battery data representing the operating state of the corresponding battery when used in a battery-powered mining machine, and the battery-powered mining machine is configured to operate in a predetermined mining cycle. The method also includes: generating at least one charging model for a battery configured to be used in a battery-powered mining machine based on the battery data; and scheduling the charging of corresponding batteries among a plurality of batteries based on the at least one charging model.
[0016] In some embodiments, generating at least one charging model includes predicting an operating state of the battery during a subsequent mining cycle and determining a charging requirement for the battery. The prediction is based on the battery data and historical operating state information for a corresponding mining machine in the one or more mining machines.
[0017] In some embodiments, the charging requirement includes at least one of a time period for charging, a minimum charge level, a maximum charge level, an optimal operating temperature of the battery, and a temperature limit of the battery.
[0018] According to a third aspect of the present disclosure, the object is achieved by a battery charging control unit for controlling battery charging management of batteries for one or more battery-powered mining machines. The battery charging control unit includes a processing circuit configured to receive battery data from one or more battery management systems (BMS). Each battery management system (BMS) is arranged to collect battery data representing the operating state of a corresponding battery when used in a battery-powered mining machine, the battery-powered mining machine being configured to operate in a predetermined mining cycle. The BMS is also arranged to: generate at least one charging model for a battery configured to be used in a battery-powered mining machine based on the battery data; and schedule the charging of a corresponding battery among a plurality of batteries based on at least one charging model.
[0019] According to a fourth aspect of the present disclosure, the object is achieved by a computer program, the computer program comprising computer program code which, when executed, causes the battery charging control unit according to the third aspect to perform the method according to the first aspect.
[0020] Embodiments provide the following advantages: Battery charge management of one or more battery-powered mining machines is controlled based on battery data representing the power consumption of all battery-powered devices within the respective mining machine or a group of mining machines. Battery charge management allows for reduced wear of batteries used in battery-powered mining machines and can also be used to extend or otherwise optimize operating cycles. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The foregoing will be more readily understood from the following detailed description of example embodiments, as illustrated in the accompanying drawings, in which like reference numerals refer to like parts throughout the different views. The drawings are not necessarily drawn to scale, emphasis instead being placed upon illustrating example embodiments.
[0022] Figure 1 An underground mine including a plurality of battery-powered mining machines is schematically illustrated;
[0023] Figure 2 A battery charging management system is schematically shown;
[0024] Figure 3 A battery powered mining machine including a battery charging control unit is schematically illustrated;
[0025] Figure 4 is a flow chart illustrating exemplary method steps for battery charge management of one or more mining machines;
[0026] Figure 5 is a block diagram illustrating an example battery charging control unit;
[0027] Figure 6 is a block diagram illustrating modules configured to generate a charging model;
[0028] Figure 7
[0029] a. illustrates various aspects of signaling in an example charging management system;
[0030] b. illustrates aspects of signaling in an example charging management system;
[0031] c. illustrates aspects of signaling in an example charging management system. DETAILED DESCRIPTION
[0032] The following will describe various aspects of the present disclosure more fully with reference to the accompanying drawings. However, the apparatus and methods disclosed herein can be implemented in many different forms and should not be construed as being limited to the aspects set forth herein. The same numbers in the accompanying drawings always refer to the same elements.
[0033] The terms used herein are for the purpose of describing particular aspects of the present disclosure only and are not intended to limit the present disclosure.As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise.
[0034] In some implementations, and according to some aspects of the present disclosure, the functions or steps marked in the box may not occur in the order marked in the operation diagram. For example, two boxes shown in succession may actually be performed substantially simultaneously, or the two boxes may sometimes be performed in reverse order, depending on the functions / actions involved. In addition, according to some aspects of the present disclosure, the functions or steps marked in the box may be performed continuously and cyclically.
[0035] It should be emphasized that when the term "comprises / comprising" is used in this specification, it is used to specify the presence of the stated features, integers, steps or components, but does not exclude the presence or addition of one or more other features, integers, steps, components or groups thereof. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise.
[0036] Figure 1An underground mine including a battery charge management system (BMS) is shown. A plurality of battery-powered mining machines are located in a mine tunnel AD. One or more battery chargers 14 are provided for charging the battery 12 of each battery-powered mining machine at a charging station separate from the mining machine, or at a charging station for onboard charging of the mining machine. The charging station is arranged near the working site of the mining machine for efficient charging. The mining machine is typically operated in a mining cycle, which means that the mining operations are performed in a repeated sequence within a given period of time. The charging cycle may change over time as the mine expands and the subsequent charging station is moved, but such changes are slow and do not affect the function of the present invention. As shown in the mine tunnel CD, the operation of the mining machine may mean that the mining machine moves, so that various aspects of the mine may affect the power consumption of the battery. Depending on the working cycle, the mining machine may be able to generate energy that can be stored in the battery. In this case, in order to allow the storage of such regenerated energy, it is best not to have a fully charged battery. For the opposite situation, when a battery-powered mining machine needs to perform a high-power operation, this high-power operation may cause the temperature of the battery to increase. In this case, it may be beneficial to take the battery temperature into account as a parameter in the battery charging management, for example, to allow cooling of the battery before starting the operation. Pre-cooling the battery to an initial temperature that is lower than the temperature of the ambient air can ensure that the battery operates within the temperature interval allowed by the battery. Optionally, when the battery-powered machine is to perform low-power operations, the cooling of the battery during charging can be interrupted or reduced. A slightly higher internal temperature of the battery reduces the internal resistance and can reduce power losses during operation. Therefore, mine model aspects need to be considered in battery charging management.
[0037] Steering Figure 2 , a system 200 for charge management of one or more battery-powered mining machines 210a, 210b is disclosed. The system includes: one or more batteries 220a-f; at least one BMS 230a-f, which is arranged to collect battery data representing the operating status of the corresponding battery; one or more battery chargers 240a-b; and a battery charging control unit 250. Each battery is configured to be used in a corresponding battery-powered mining machine, which is configured to operate in a predetermined mining cycle. Each BMS is configured to provide battery data to the battery charging control unit. The battery charging control unit is configured to generate at least one charging model and schedule the charging of a corresponding battery in the one or more batteries via one or more battery chargers based on the at least one charging model.
[0038] In the present disclosure, the term battery is used to refer to a rechargeable energy storage device that is capable of supplying energy / power for operating the power system of a mining machine. Such a power system can be configured to provide power to, for example, a motor of a power tool or electrical equipment in a mining machine. Therefore, the term battery should be interpreted as referring to any of a rechargeable battery, a supercapacitor, a rechargeable fuel cell, and a flywheel. It will also be understood that the term battery can also reflect a plurality of rechargeable batteries co-located in a mining machine or a single battery unit comprising a plurality of battery cells, wherein one or more of the plurality of battery cells can define a rechargeable battery. According to some aspects, the battery is a lithium-ion battery. Each battery is configured to be used in a corresponding battery-powered mining machine configured to operate with a predetermined mining cycle. One or more batteries can be provided on the mining machine, but one or more batteries can also be removed from the mining machine for charging at a charging station during charging by a corresponding battery charger.
[0039] In the present disclosure, the BMS is configured to monitor the operating state of the battery, such as the charge level or temperature of the battery. According to aspects of the present disclosure, the BMS may also be configured to control the operating state of the battery so as to protect the battery from charging beyond a predetermined maximum charge level or from losing less than a minimum charge level. This control may also be applied to the internal temperature of the battery, whereby the BMS may interrupt the power supply from the battery when the internal temperature deviates from the optimal temperature of the battery, for example, rising above or below a predetermined temperature limit. In the most general context of the present disclosure, each BMS is configured to provide battery data to a battery charging control unit. According to some aspects, each battery includes a respective BMS.
[0040] According to some aspects, the battery data includes at least one of a state of charge (SoC), a depth of discharge (DoD), a state of health, and an internal temperature. Thus, the battery data reflects information about how much electrical energy is still available in each battery and the operating state of the battery. Rechargeable batteries will gradually lose health as they are recharged over many recharging cycles. The life of a rechargeable battery can be extended by not completely depleting it before recharging. It should be recognized that the battery also provides power to the auxiliary power systems of the mining machine, and the power consumption of these auxiliary systems must also be considered when developing the charging model. Therefore, an important aspect of the present invention is to develop a charging model based on the battery data rather than based on consumption data from the electric motor that drives the tool or power transmission mechanism of the corresponding mining machine.
[0041] In addition, batteries are often associated with a charge interval status representing a charge interval associated with a relatively low wear of the battery. The charging of a battery may represent excessive wear of a particular battery when charging the battery to a higher charge level or allowing the battery to wear to a lower charge level.
[0042] An important factor in maintaining maximum efficiency of mining operations is to ensure as few interruptions as possible. One potential source of interruptions is the gradual reduction of battery life. Two important factors that have an impact on battery life are the state of charge of the battery and the temperature of the battery. According to aspects of the present disclosure, the battery data includes at least one of the charge level and the temperature of the corresponding battery. Completely depleting or fully charging the battery will usually significantly shorten the battery life. Therefore, during operation of the mining machine, it is preferred to use only a portion of the total energy of the battery. Similarly, excessively high temperatures or rapid temperature changes may have an adverse effect on battery life. Therefore, according to some aspects, the maximum charge level and the maximum discharge level are based on the desired state of charge (SoC) of the rechargeable battery. According to some aspects, the maximum charge level and the maximum discharge level are based on the temperature of the battery. Therefore, the combination of the state of charge and the battery temperature can achieve optimized loss reduction of the battery.
[0043] The battery charging control unit is configured to generate at least one charging model and schedule the charging of corresponding batteries in one or more batteries via one or more battery chargers based on the at least one charging model. According to various aspects of the present disclosure, the battery charging control unit can provide control of the corresponding one or more battery chargers to ensure compliance with charging according to the charging model. However, such control can also be assigned to the corresponding BMS, whereby the BMS controls the charging of the corresponding battery based on information received from the battery charging control unit.
[0044] Alternatively, the battery charging control unit may provide control of the respective battery charger or chargers based on a determined or predicted load in the main grid of the mine or in a local grid to which the battery chargers are connected.
[0045] In accordance with the present disclosure, a charging model is created for one or more batteries of a mining machine or batteries of multiple mining machines. The charging model may include multiple partial charging models or sub-models that represent operational needs or requirements for specific batteries or mining machines. As will be discussed further below, the charging model may include the desired SoC and / or temperature of the battery, as well as the time intervals when charging may occur so as not to overload any part of the mine's power grid. Therefore, the present disclosure recognizes that a separate charging model may be required for each individual battery, and that the use of multiple charging models in a system including multiple batteries will achieve improved grid control in addition to optimizing the operation and battery life of a single mining machine. In accordance with some aspects of the present disclosure, each charging model is based on a mine model combined with a vehicle model, as will be further described below.
[0046] According to aspects of the present disclosure, the BMS is configured to collect battery data during one or more mining cycles, and the battery charging control unit is configured to schedule the charging of the corresponding battery in at least one subsequent mining cycle based on the charging model. The subsequent mining cycle includes a set of mine operations similar to the mine operations performed during the collection of data, for example, the mine operations of the subsequent mining cycle are performed in the same mining environment using the same type of mining machinery as the operations performed during the one or more mining cycles for data collection. Therefore, the collected battery data can be considered to also represent the subsequent mining cycle. According to aspects of the present disclosure, the mining cycle and the subsequent mining cycle include a set of similar mine operations performed within the same time interval. Alternatively, the subsequent mining cycle may represent a sub-cycle of one or more mining cycles, for example, a time interval shorter than the time interval during which the battery data is collected. Figure 6 The disclosure in further illustrates these aspects of the present disclosure.
[0047] According to aspects of the present disclosure, the charging profile includes a predetermined initial battery temperature, such as a temperature interval, and wherein the battery charging control unit is configured to control the temperature of the battery when charging in a subsequent mining cycle so that the internal temperature of the battery is adjusted to be consistent with the predetermined initial battery temperature.
[0048] According to some aspects of the present disclosure, a charging model is based on battery data and operating state information for a corresponding mining machine in one or more mining machines. The operating state of the battery can be based on at least one of a vehicle model and a mine model. The vehicle model represents historical operating state information for the mining machine. The recorded data can be used to establish a general model for the vehicle. Such recorded data can also be used to model driver behavior. The mine model represents historical operating state information corresponding to a mine route. The mine model can include route information related to the distance the mining machine is to travel, the height difference along the route, and the road quality.
[0049] According to aspects of the present disclosure, the battery charging control unit 250 is also configured to generate a charging model and schedule charging of batteries 220c-e for supplying power to infrastructure devices used in the mine, such as ventilation fans (210c), hoists (210d), and lighting devices (210e).
[0050] The battery charging control unit is optionally arranged in the central data center 260. The actual charging of the batteries is primarily intended to be controlled and / or performed by battery chargers or BMS distributed in the mine. However, the battery control unit may be arranged at least in part as a centralized application, which is capable of generating battery charging models for multiple battery chargers and capable of transmitting such battery charging models to locally arranged functions of the battery charging control unit. According to some aspects, the battery charging control unit is arranged to generate charging models for one or more batteries in different battery-powered mining machines and / or infrastructure devices in the mine. The battery charging control unit may also be arranged to generate charging models for multiple batteries used in different parts of at least one mine, or to generate charging models for multiple batteries used in multiple mines.
[0051] Figure 3 An implementation of a charge management system in a mining machine 310 is shown, the mining machine 310 comprising: a battery 320; a BMS 330 arranged to collect battery data representing an operating state of the battery 320. Optionally, a battery charging control unit 30 may be provided in the mining machine, for example as a separate entity or co-located with the BMS. According to aspects of the present disclosure, the mining machine comprises: at least one sensor 380 arranged to collect sensor data representing an operating state of the mining machine; a microprocessor 390 arranged to determine operating state information for a battery-powered mining machine based on the collected sensor data; and a communication unit 370 arranged to provide operating state information to the battery charging control unit (when located at a location remote from the mining machine).
[0052] Figure 4 is a flow chart showing exemplary method steps for battery charge management for one or more mining machines. In its most general form, the method comprises receiving (S41) battery data from one or more BMSs arranged to collect battery data representing an operating state of a respective battery when used in a battery-powered mining machine configured to operate in a predetermined mining cycle. Generating (S42) one or more charging models for the respective batteries based on the received battery data; and scheduling (S45) charging of respective batteries of a plurality of batteries based on the one or more charging models.
[0053] According to aspects of the present disclosure, generating at least one charging model includes: predicting (S43) the operating state of the battery during a future portion of a predetermined mining cycle (e.g., a subsequent mining cycle). The prediction is based on battery data and historical operating state information for a corresponding mining machine in one or more mining machines during the mining cycle. In the context of the present disclosure, a mining cycle and a subsequent mining cycle include a similar set of mine operations, for example, a mine operation in which a subsequent mining cycle is performed in the same mining environment using a mining machine of the same type as the operation performed during the collection of data. Therefore, the collected battery data may also be considered to represent the subsequent mining cycle. Determining (S44) the charging requirements of the battery based on the predicted operating state. According to aspects of the present disclosure, the charging requirements include a time period for charging, a minimum charge level, and a maximum charge level. According to other aspects of the present disclosure, the charging requirements include a battery temperature, i.e., an initial battery temperature. The initial battery temperature may be a temperature interval. Therefore, scheduling the charging of the battery will optionally include scheduling the optimal operating temperature of the battery and / or the temperature limit of the battery. Optionally, the method for battery charging management includes controlling (S46) the charging of the corresponding battery based on the charging model. The charging model may include the desired SoC and / or temperature of the battery, and the time intervals at which charging may occur in order not to overload any part of the mine's electrical grid. Accordingly, the battery charging control unit will be configured to control the temperature of the battery when charging during subsequent mining cycles such that the internal temperature of the battery is regulated to be consistent with the predetermined initial battery temperature.
[0054] Figure 5 is a block diagram illustrating an example battery charging control unit 50 for controlling battery charging management of batteries for one or more battery-powered mining machines. The battery charging control unit includes a processing circuit 51 configured to receive battery data from one or more BMSs arranged to collect battery data representing an operating state of a corresponding battery when used in a battery-powered mining machine configured to operate in a predetermined mining cycle. The processing circuit is also configured to: generate at least one charging model for a battery configured to be used in a mining machine for battery charging; and schedule charging of a corresponding battery of a plurality of batteries based on the at least one charging model.
[0055] Figure 5Also shown is an example computer program product 52 having a computer program thereon, the computer program comprising instructions. The computer program product comprises a computer readable medium such as, for example, a universal serial bus (USB) memory, a plug-in card, an embedded drive, or a read-only memory (ROM). The computer readable medium has stored thereon a computer program comprising program instructions. The computer program may be loaded into a processing circuit 51 included in the apparatus 50. When loaded into the processing circuit 51, the computer program may be stored in a memory 51b associated with or included in the processing circuit, and executed by a processor 51a. According to some embodiments, when the computer program is loaded into and run by the processing circuit, the computer program may cause, for example, Figure 4 The methods shown or otherwise described herein perform method steps.
[0056] Thus, the computer program may be loaded into a data processing circuit, e.g. Figure 5 The processing circuit 51 is configured to perform an embodiment of battery charge management for one or more mining machines.
[0057] Figure 6 A block diagram showing a charging model generation module is disclosed. As shown, the charging model generation is based on battery data from a log database (e.g., resident in a battery charging control unit). The log database includes historical data from a defined mine location and historical data from a specific type of vehicle or mining machine. The charging model is generated by the battery charging control unit and provided to the battery charger. The charging model generation module includes logic for generating a mine model and a vehicle model. As an alternative to a mine model based on historical data representing a route traveled by a mining machine or vehicle, the mine model can also be based on CAD modeling. The mine model can include information related to the height and road quality of the mine route (e.g., about an identified portion along a route or path). The model can be generated from logged data or extracted from a CAD system that includes data related to the geometry of the mine. The mine model may be the same for all vehicle types. Therefore, although the mine model can be based on data obtained by a specific machine or vehicle, the model can be used for any other type of machine or vehicle that performs an operation or travels along the same route.
[0058] Modeling a machine or vehicle includes taking into account the type of machine / vehicle and operating data, such as the speed or loading of the vehicle. Since aspects of the vehicle model may depend on driver preferences, modeling may also include information related to driver behavior and modeling of behavior appropriate for a particular driver. When considering aspects of a mine truck, power requirements depend on, for example, the amount of energy required during loading / unloading of the mine truck, power losses in the vehicle's drive train, and power consumed by heating / cooling the vehicle's cab. Figure 6 The use of recorded data as input to optimize general aspects of battery preparation for a specific mining cycle, for example based on previous experience from the same mining cycle, is disclosed. The recorded data for a specific route can be used to calculate input values for the charge management process. The recorded data can also be used to build a general model for vehicles, mine geometry and driver behavior. The model is then used to calculate input values for battery charge management, i.e. values related to charging and temperature regulation of the battery.
[0059] Figures 7a to 7c Aspects of signaling in an example charging management system are shown.
[0060] like Figure 7a As shown, the BMS is configured to collect battery data and provide the battery data to a receiving battery charging control unit. The battery charging control unit is configured to generate at least one charging model based on the battery data and schedule charging of at least one battery charger based on the battery charging model.
[0061] Apart from Figure 7a In addition to the public content of Figure 7b Providing the recorded data for use in generating a charging model in a battery charging control unit is also disclosed.
[0062] Figure 7c Further details of battery charging management and charging model generation in the above disclosed battery charging management system are shown.
[0063] The description of the example embodiments provided herein has been given for the purpose of illustration. The description is not intended to be exhaustive or to limit the example embodiments to the precise form disclosed; modifications and variations may be made in accordance with the above teachings, or may be obtained from the practice of various alternatives to the provided embodiments. The examples discussed herein are selected and described to illustrate the principles and properties of the various example embodiments and their practical applications, so that those skilled in the art can utilize the example embodiments in various ways and using various modifications suitable for the specific purpose contemplated. The features of the embodiments described herein may be combined in all possible combinations of source nodes, target nodes, corresponding methods, and computer program products. It should be understood that the example embodiments given herein may be implemented in combination with each other.
[0064] The described embodiments and their equivalents may be implemented in software or hardware or a combination thereof. The embodiments may be performed by general purpose circuits. Examples of general purpose circuits include digital signal processors (DSPs), central processing units (CPUs), coprocessor units, field programmable gate arrays (FPGAs), and other programmable hardware. Alternatively or additionally, the embodiments may be performed by dedicated circuits (e.g., application specific integrated circuits (ASICs)). General purpose circuits and / or dedicated circuits may be associated with or included in a device such as a wireless communication device or a network node, for example.
[0065] The embodiments may occur in an electronic device comprising an arrangement, circuitry and / or logic according to any embodiment described herein.Alternatively or additionally, the electronic device may be configured to perform a method according to any embodiment described herein.
[0066] Generally, all terms used herein should be interpreted according to their ordinary meaning in the relevant technical field, unless a different meaning is clearly given and / or implied from the context of their usage.
[0067] Reference has been made herein to various embodiments. However, those skilled in the art will recognize many variations of the described embodiments that will still fall within the scope of the claims.
[0068] For example, the method embodiments described herein disclose example methods by steps performed in a particular order. However, it should be appreciated that the sequence of events may occur in another order without departing from the scope of the claims. In addition, some method steps may be performed in parallel, even if they have been described as being performed sequentially. Therefore, the steps of any method disclosed herein do not have to be performed in the exact order disclosed, unless a step is explicitly described as being after or before another step, and / or implies that a step must be after or before another step.
[0069] In the same way, it should be noted that in the description of the embodiments, the division of the functional block into specific units is not intended to be limiting. On the contrary, these divisions are only examples. The functional block described herein as a unit can be divided into two or more units. In addition, the functional block described herein as being implemented as two or more units can be merged into fewer (e.g., single) units.
[0070] Where appropriate, any feature of any embodiment disclosed herein may be applied to any other embodiment. Likewise, any advantage of any embodiment may be applied to any other embodiment, and vice versa.
[0071] In the drawings and specification, exemplary aspects of the present disclosure have been disclosed. However, many variations and modifications may be made to these aspects without departing substantially from the principles of the present disclosure. Therefore, the present disclosure should be considered illustrative rather than restrictive, and should not be considered limited to the specific aspects discussed above. Therefore, although specific terms are used, they are used only in a general and descriptive sense and not for the purpose of limitation.
[0072] Therefore, it should be understood that the details of the described embodiments are merely examples set forth for illustrative purposes and that all variations coming within the scope of the claims are intended to be embraced therein.
Claims
1. A system (200) for battery charge management of a plurality of battery-powered mining machines (210a-b), the system (200) comprising: a plurality of batteries (220a-f); a respective battery management system BMS (230a-f) arranged to collect battery data representing an operating state of the respective battery; one or more battery chargers (240a-b); and a battery charging control unit (250), wherein: - each battery is configured for use in a respective battery powered mining machine configured to operate in a predetermined mining cycle; - each BMS is configured to provide said battery data to said battery charging control unit; and -The battery charging control unit is configured to: generate at least one charging model based on the battery data and schedule the charging of corresponding batteries among the multiple batteries via the one or more battery chargers based on the at least one charging model, wherein the BMS is configured to collect battery data within one or more mining cycles, wherein the battery charging control unit is configured to schedule the charging of corresponding batteries within at least one subsequent mining cycle based on the charging model, and wherein the at least one subsequent mining cycle includes a group of mine operations similar to the mine operations performed during the collection of data.
2. The system according to claim 1, wherein: The battery data includes at least one of a charge level and a temperature of a corresponding battery.
3. The system according to claim 2, wherein: The charging profile includes a predetermined initial battery temperature within the subsequent mining cycle, and wherein the battery charging control unit is configured to adjust the temperature to the predetermined initial battery temperature.
4. The system according to any one of claims 1 to 3, wherein: The charging model is based on battery data and operating state information for a respective mining machine of the plurality of mining machines.
5. The system according to claim 4, wherein: The operating state of the battery is based on at least one of a vehicle model and a mine model, and wherein the vehicle model represents historical operating state information for the mining machine, and wherein the mine model represents historical operating state information corresponding to a mine route.
6. The system according to claim 1, wherein: The battery charging control unit is further configured to generate a charging model and schedule charging of batteries for supplying power to infrastructure devices used in the mine.
7. The system according to claim 6, wherein: The infrastructure device includes a ventilation fan (210c), a hoist (210d) and a lighting device (210e).
8. The system according to claim 1, wherein: The battery charging control unit is comprised in the battery powered mining machine or in the BMS for a battery of the battery powered mining machine.
9. The system according to claim 1, wherein: The battery charging control unit is arranged in a central data center (260).
10. The system according to claim 9, wherein: The battery charging control unit is arranged to generate charging models for a plurality of batteries used in different battery powered mining machines and / or infrastructure devices in a mine.
11. The system according to claim 9 or 10, wherein: The battery charging control unit is arranged to generate a charging model for a plurality of batteries used in different parts of at least one mine and / or a charging model for a plurality of batteries used in a plurality of mines.
12. The system of claim 1, wherein: Each mining machine includes: at least one sensor (270, 370) arranged to collect sensor data representing the operating status of the mining machine; a microprocessor (280, 380) arranged to determine operating status information of the battery-powered mining machine based on the collected sensor data; and a communication unit (290, 390) arranged to provide the operating status information to the battery charging control unit (250).
13. A method performed in a battery charging control unit of a system for battery charging management, the method comprising: - receiving (S41) battery data from a plurality of battery-powered mining machines, each mining machine being configured to operate in a predetermined mining cycle, wherein the battery data is received from a respective battery management system BMS, the respective battery management system BMS being arranged to collect battery data representing an operating state of a respective battery when used in the battery-powered mining machine, the battery-powered mining machine being configured to operate in a predetermined mining cycle; - generating (S42) at least one charging model for the corresponding battery based on the received battery data; and - scheduling (S45) charging of corresponding batteries of the plurality of batteries based on the one or more charging models, wherein generating the at least one charging model comprises: - predicting (S43) an operating state of a battery during a future portion of said predetermined mining cycle, wherein said prediction is based on said battery data and historical operating state information for respective mining machines of said plurality of battery-powered mining machines, and - Determining (S44) charging requirements for the battery.
14. The method according to claim 13, further comprising: - controlling (S46) charging of the respective battery based on the one or more charging models.
15. The method according to claim 13, wherein: The charging requirement includes one or more of a charging time period, a minimum charging level, a maximum charging level, an optimal operating temperature of the battery, and a temperature limit of the battery.
16. A battery charging control unit (50) for controlling battery charging management for batteries of a plurality of battery-powered mining machines, the battery charging control unit comprising a processing circuit (51), the processing circuit (51) being configured to: - receiving battery data from a plurality of battery powered mining machines, each mining machine being configured to operate in a predetermined mining cycle, wherein, the battery data being received from a respective battery management system BMS, the respective battery management system BMS being arranged to collect battery data representing an operational state of the respective battery when used in the battery powered mining machine, the battery powered mining machine being configured to operate in a predetermined mining cycle; - generating at least one charging model for the respective battery based on the received battery data; as well as - scheduling charging of corresponding batteries of the plurality of batteries based on the at least one charging model, wherein generating the at least one charging model comprises: - predicting an operating state of a battery during a future portion of said predetermined mining cycle, wherein said prediction is based on said battery data and historical operating state information for respective ones of said plurality of battery-powered mining machines, and - Determine charging requirements for the battery.
17. A computer program product (52) comprising computer program code which, when executed, causes a battery charging control unit to perform the method according to any one of claims 13 to 15.
Citation Information
Patent Citations
Electric mining vehicle, charge controller, and related process
US20180111496A1
System and method of power control for an energy storage charging station
CN106660461A
Adaptive system and method for optimizing fleet of plug-in vehicles
CN107878218A
Vehicle energy storage system control methods and method for determining battery cycle life projection for heavy duty hybrid vehicle applications
US20050040789A1
Method for using mining vehicle, arrangement in mine, rock drilling rig, and mining vehicle
US20110224859A1
