Through the acquisition, movement and control components of the transformer test management system, the test path is automatically planned and executed, which solves the problems of low efficiency and high labor cost in the existing technology and realizes efficient automation of transformer tests.

CN112630697BActive Publication Date: 2024-10-18HUNAN YUHUAN INTELLIGENT EQUIP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202011547492.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-24
Publication Date
2024-10-18
Estimated Expiration
2040-12-24

AI Technical Summary

Technical Problem

The existing transformer testing methods are inefficient, have high labor costs, and require a lot of manual monitoring and transportation, resulting in low efficiency.

Method used

A transformer test management system is designed, including a collection component, a mobile component and a control component. By collecting transformer information, the test path and parameters are automatically planned, and the mobile component is controlled to transport the transformer to the test component to realize automated testing.

Benefits of technology

It greatly improves the test efficiency, reduces manual operations, can plan the shortest test path according to the location and status of multiple transformers, automatically controls the test process, and reduces labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112630697B_ABST
    Figure CN112630697B_ABST
Patent Text Reader

Abstract

The present invention discloses a transformer test management system and method, which collects and identifies product information of a transformer to be tested; determines the test items and test paths of the transformer to be tested according to the product information; controls a moving component to transport the transformer to be tested to the test components corresponding to each test item in sequence according to the test path; and controls the test components to test the transformer to be tested. Compared with the existing manual transformer testing method, the present invention automatically controls the moving component to move the transformer to be tested to the test component, and controls the test component to perform the test, which can greatly free the hands of the staff and improve the test efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of transformer test management, and in particular to a transformer test management system and method. Background Art

[0002] The existing transformer test generally uses manually controlled transport vehicles to transport the transformers to be tested to the test stations in sequence, and then manually adjusts the parameters of the test equipment for testing. This not only requires a lot of manpower costs to monitor, but also has low efficiency. Therefore, the existing manual transformer testing method is inefficient and has high manpower costs, which has become a technical problem that needs to be urgently solved by technical personnel in this field. Summary of the invention

[0003] The invention provides a transformer test management system and method, which are used to solve the technical problems of low efficiency and high labor cost of the existing manual transformer test method.

[0004] In order to solve the above technical problems, the technical solution proposed by the present invention is:

[0005] A transformer test management system, comprising: a collection component, a mobile component, a control component and a plurality of test components for detecting different components / functions of the transformer, wherein the collection component, the mobile component and the test component all establish communication with the control component;

[0006] The acquisition component is used to collect and identify the product information of the transformer to be tested, and send the product information to the control component; the control component is used to receive the product information, and determine the test items and test path of the transformer to be tested based on the product information, and control the moving component to transport the transformer to be tested to the test components corresponding to each test item in sequence according to the test path, and control the test component to test the transformer to be tested.

[0007] Preferably, the control component includes a storage module and a data processing module, the storage module is used to store a first mapping relationship between product information, corresponding test items and location information of their corresponding test components, the data processing module is used to receive product information, and call the first mapping relationship according to the product information to find the corresponding test items and the location information of the corresponding test components, and plan the test path according to the location information of the corresponding test components.

[0008] Preferably, the data processing module is also used to inquire about the status of each test component corresponding to the transformer to be tested, and plan the test path with the shortest total test time as the goal based on the status feedback from each test component and the location information of each test component, wherein the status includes idle, faulty and working.

[0009] Preferably, the storage module also stores the test parameters of the test items corresponding to the product information and the second mapping relationship between their binary values. The data processing module is also used to search for the test parameters of each test item corresponding to the product information according to the second mapping relationship, and send the test parameters of each test item to the corresponding test component. Each test component is used to receive and test the transformer to be tested corresponding to the product information according to the test parameters.

[0010] Preferably, each test component is also used to send the product information of the tested transformer and the corresponding test results and test data to the data processing module. The data processing module is also used to receive the test results and test data, and perform visual analysis on the test results and test data, and store the test results, test data and results of the visual analysis in a structured form in the storage module.

[0011] Preferably, it also includes an alarm component and multiple monitoring components corresponding to the test components. The monitoring component and the alarm component both establish communication with the control component. The monitoring component is used to monitor the operating parameters of each test component and send the operating parameters of each test component to the control component. The control component is used to receive the operating parameters of each test component and perform fault detection based on the operating parameters to determine whether there is a fault in the test component. When a fault occurs, the alarm component is controlled to sound an alarm to alert the staff.

[0012] Preferably, the control component also includes a communication module, through which the control component establishes communication with the remote terminal, and the control component is also used to send test results / test data / visual analysis results / operating parameters / fault detection results to the remote terminal.

[0013] Preferably, the test components include a 10 kV test system, a 35 kV test system and a physical and chemical test system. The 10 kV test system includes a 10 kV test host computer and multiple 10 kV routine test components and multiple 10 kV temperature rise test components respectively connected to the 10 kV test host computer. The 10 kV test host computer is connected to the data processing module. The 35 kV test system includes a 35 kV test host computer, multiple 35 kV routine test components, multiple 35 kV temperature rise test components, multiple lightning impulse test components, and multiple 10 kV temperature rise test components. assemblies and multiple shielded partial discharge test assemblies; multiple 35 kV routine test assemblies, multiple 35 kV temperature rise test assemblies, multiple lightning impulse test assemblies and multiple shielded partial discharge test assemblies are all connected to the 35 kV test host computer, and the 35 kV test host computer is connected to the data processing module; the test assembly includes a physical and chemical test system, the physical and chemical test system includes a physical and chemical test host computer and multiple physical and chemical test assemblies, multiple physical and chemical test assemblies are all connected to the physical and chemical test host computer, and the physical and chemical test host computer is also connected to the data processing module.

[0014] A transformer test management method comprises the following steps:

[0015] Collect and identify product information of the transformer to be tested;

[0016] Determine the test items and test paths of the transformer to be tested based on the product information.

[0017] According to the test path, the mobile component is controlled to transport the transformer to be tested to the test components corresponding to each test item in sequence, and the test component is controlled to test the transformer to be tested.

[0018] Preferably, determining the test items and test paths of the transformer to be tested according to the product information specifically includes the following steps:

[0019] Query the location information and working status of the test components corresponding to the test items of the transformer to be tested according to the product information;

[0020] According to the location information and working status of the test components corresponding to the test items of the transformer to be tested, the test path is planned with the goal of minimizing the total test time, where the status includes idle, faulty and working.

[0021] The present invention has the following beneficial effects:

[0022] 1. The transformer test management system and method of the present invention collects and identifies product information of the transformer to be tested; determines the test items and test paths of the transformer to be tested according to the product information, controls the mobile component to transport the transformer to be tested to the test components corresponding to each test item in sequence according to the test path, and controls the test component to test the transformer to be tested. Compared with the existing manual transformer testing method, the present invention automatically controls the mobile component to move the transformer to be tested to the test component, and controls the test component to perform the test, which can greatly free the hands of the staff and improve the test efficiency.

[0023] 2. In the preferred embodiment, when there are multiple transformers that need to be tested, the present invention can also plan the test paths of multiple transformers according to the location information and working status of the test components corresponding to the test items of the transformers to be tested, with the goal of minimizing the total test time, thereby further improving the work efficiency of the test.

[0024] 3. In the preferred embodiment, the present technical solution can also perform multiple visual analyses on the test results and test data, and store the test results, test data and the results of the visual analysis in a structured form in the storage module, which can be retrieved from the storage module for browsing when the user needs it.

[0025] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0027] Figure 1 This is a simplified structural diagram of a transformer test management system in a preferred embodiment of the present invention;

[0028] Figure 2 It is a communication network topology diagram of a transformer test management system in a preferred embodiment of the present invention. DETAILED DESCRIPTION

[0029] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.

[0030] Embodiment 1:

[0031] like Figure 1 As shown, this embodiment discloses a transformer test management system, including: a collection component, a mobile component, a control component, and a plurality of test components for detecting different components / functions of the transformer, and the collection component, the mobile component, and the test component all establish communication with the control component;

[0032] The acquisition component is used to collect and identify the product information of the transformer to be tested, and send the product information to the control component; the control component is used to receive the product information, and determine the test items and test path of the transformer to be tested based on the product information, and control the moving component to transport the transformer to be tested to the test components corresponding to each test item in sequence according to the test path, and control the test component to test the transformer to be tested.

[0033] In addition, in this embodiment, a transformer test management method is also disclosed, comprising the following steps:

[0034] Collect and identify product information of the transformer to be tested;

[0035] Determine the test items and test paths of the transformer to be tested based on the product information.

[0036] According to the test path, the mobile component is controlled to transport the transformer to be tested to the test components corresponding to each test item in sequence, and the test component is controlled to test the transformer to be tested.

[0037] The transformer test management system and method in the present invention collect and identify product information of the transformer to be tested; determine the test items and test paths of the transformer to be tested according to the product information, control the moving component to transport the transformer to be tested to the test components corresponding to each test item in sequence according to the test path, and control the test component to test the transformer to be tested. Compared with the existing manual transformer testing method, the present invention automatically controls the moving component to move the transformer to be tested to the test component, and controls the test component to perform the test, which can greatly free the hands of the staff and improve the test efficiency.

[0038] Embodiment 2:

[0039] Embodiment 2 is a preferred embodiment of embodiment 1. The difference between embodiment 2 and embodiment 1 is that the structure and function of the transformer test management system are expanded. Figure 2 As shown, a transformer test management system is disclosed, including a collection component, a control component, a plurality of test components, a mobile component, an alarm component, and a plurality of monitoring components corresponding to the test components;

[0040] The test components include a 10 kV test system, a 35 kV test system and a physical and chemical test system, among which the 10 kV test system, the 35 kV test system and the physical and chemical test system are all set up in the same test area;

[0041] The 10kV test system includes a 10kV test host computer, multiple 10kV routine test components and multiple 10kV temperature rise test components; among them, the 10kV routine test component includes a 10kV routine test system, multiple 10kV routine test instruments controlled by the 10kV routine test system, and a barcode scanner set at the working position of the 10kV routine test instrument. The 10kV routine test instrument establishes communication with the 10kV routine test system through Ethernet and switches. The 10kV temperature rise test component includes 1 10 kV temperature rise test system, multiple 10 kV temperature rise test instruments controlled by the 10 kV temperature rise test system, and a barcode scanner set at the working position of the 10 kV temperature rise test instrument. The 10 kV temperature rise test instrument establishes communication with the 10 kV temperature rise test system through Ethernet and switches. The 10 kV routine test system and the 10 kV temperature rise test system both establish communication with the 10 kV test host computer through Ethernet and switches. The 10 kV test host computer is connected to the application server and storage server through the switch.

[0042] The 35 kV test system includes a 35 kV test host computer, multiple 35 kV routine test components, multiple 35 kV temperature rise test components, multiple lightning impulse test components and multiple shielded partial discharge test components; among them, the 35 kV routine test component includes a 35 kV routine test system, multiple 35 kV routine test instruments controlled by the 35 kV routine test system, and a barcode scanner set at the working position of the 35 kV routine test instrument. The 35 kV routine test instrument establishes communication with the 35 kV routine test system through Ethernet and switches; the 35 kV temperature rise test component includes a 35 kV temperature rise test system, multiple 35 kV temperature rise test instruments controlled by the 35 kV temperature rise test system, and a barcode scanner set at the working position of the 35 kV temperature rise test instrument. The code gun and the 35 kV temperature rise test instrument establish communication with the 35 kV temperature rise test system through Ethernet and switches; the lightning impulse test component includes multiple lightning impulse test equipment, a code scanning gun arranged at the working condition of the lightning impulse test equipment, and a lightning impulse test system that establishes communication with the lightning impulse test equipment through Ethernet and switches, and controls the lightning impulse test equipment to perform tests; the shielding partial discharge test component includes multiple shielding partial discharge test equipment, a code scanning gun arranged at the working condition of the shielding partial discharge test equipment, and a shielding partial discharge test system that establishes communication with the shielding partial discharge test equipment through Ethernet and switches, and controls the shielding partial discharge test equipment to perform tests. The 35 kV test host computer is connected to the application server and the storage server through the switch;

[0043] The physical and chemical test system includes a physical and chemical test host computer and multiple physical and chemical test components that communicate with the physical and chemical test host computer through switches and Ethernet. The multiple physical and chemical test components include multiple physical and chemical test instruments, barcode scanners set at the physical and chemical test instrument workstations, and industrial computers. The physical and chemical test host computer is connected to the application server and the storage server through the switch Ethernet.

[0044] Among them, the collection components include equipment codes set on each transformer, which are marked with product information of each transformer, and a barcode scanning gun set at the entrance station of the test area.

[0045] Among them, the mobile component includes a running track arranged in the test area, passing through the inspection stations of various test instruments and the entrance station of the test area, and an RGV (Rail Guided Vehicle) running on the running track for transporting transformers. The controller of the RGV is connected to the control component through wireless communication.

[0046] The monitoring component is used to monitor the operating parameters of each test component and send the operating parameters of each test component to the control component.

[0047] The control component includes a storage server and an application server; wherein the storage server stores a first mapping relationship between product information of the transformer to be tested, corresponding test items and location information of their corresponding test components; a second mapping relationship between test parameters of the test items corresponding to the product information and their binary values; test results, test data and visual analysis results of the transformer; operating parameters and machine fault detection results of each test component monitored by the monitoring component; and, in addition, the storage server also stores the communication address of each test component.

[0048] Among them, the application server is used to inquire about the status of each test component corresponding to the transformer to be tested, and plan the test path with the shortest total test time as the goal according to the status fed back by each test component and the location information of each test component; it is also used to find the test parameters of each test item corresponding to the product information according to the second mapping relationship, and send the test parameters of each test item to the corresponding test component; it is also used to receive test results and test data, and perform visual analysis on the test results and test data, and send the test results, test data and results of the visual analysis to the storage service for storage in a structured form; it is also used to perform fault detection according to the operating parameters, determine whether the test component has a fault, and send the operating parameters of each test component and the fault detection results to the storage server for storage.

[0049] Specifically, planning the test path with the goal of minimizing the total test time includes the following steps:

[0050] Construct the target equation of the test path and total test time of the transformer to be tested:

[0051] That is: F(k i )=X(k i )+Y(k i )+Z(k i )

[0052] Among them, k i is the i-th test path generated iteratively, F(k i ) is the waiting time of the i-th path to be tested; X(k i ) is the waiting time of the i-th test path, including the transportation waiting time and the test waiting time; Y(k i ) is the transportation time of the i-th path to be tested; Z(k i ) is the test time of the i-th proposed test path;

[0053] The first constraint is that the test items of the transformer to be tested under the same test system must be completed in sequence, the second constraint is that the test time of the same test equipment does not conflict with other transformers to be tested, and the third constraint is that the transportation time under the same operating track does not conflict with other transformers to be tested. The goal is to minimize the total test time, and the simulated annealing algorithm is used to find the optimal solution of the objective equation. If there are multiple optimal solutions, the test path corresponding to the optimal solution with the shortest path is selected from the multiple optimal solutions as the target planning path.

[0054] In this embodiment, if Figure 2 As shown in the figure, the workflow of the transformer test management system is as follows:

[0055] The mobile component transports the transformer to be tested to the entrance station of the test area. The barcode scanner at the entrance station scans the equipment code of the transformer to be tested, reads the product information in the equipment code, and sends the product information to the application server. The application server calls the first mapping relationship to find the corresponding test item according to the product information, and finds the communication address of the corresponding test equipment in the test component corresponding to the test item, and then sends an inquiry signal through the switch to inquire about the status of the corresponding test equipment, and the corresponding test equipment uploads its own status;

[0056] The application server selects a preferred test device from the corresponding test component and plans a preferred test path based on the state of the test device and the location information of each test component, with the goal of minimizing the total test time, and sends the preferred test path to the mobile component. In addition, the application server also obtains the test parameters of each test item corresponding to the product information according to the second mapping relationship from the storage server, and sends the test parameters of each test item and the product parameters of the transformer to be tested to the corresponding preferred test device in the corresponding test component;

[0057] The mobile component transports the transformer to be tested to the preferred test equipment in sequence according to the preferred test path. At each test station of a test equipment, the barcode scanner at the test station scans and reads the product parameters of the transformer to be tested, and retrieves the corresponding test parameters sent by the application server according to the product parameters to test the transformer to be tested. When the test is completed, the test results, test data and the test completion signal are sent to the application server. The application server receives and sends the test results and test data to the storage server for storage, and controls the mobile component according to the test completion signal to transport the transformer to be tested to the experimental station of the preferred test equipment corresponding to the next test item for testing.

[0058] In addition, in this embodiment, the application server also has the following functional modules:

[0059] Standard library management system: mainly completes the functions of inputting, updating, modifying and reviewing relevant standards. The content of the standard library should include necessary fields such as standard code, standard name, standard category, project code, project name, project standard value, project standard unit, inspection method, inspection department, etc.

[0060] Test information management module: The test information management module mainly organizes and manages the relevant information with the test product as the core in a structured manner, and mainly includes sub-modules such as test project management, test route management, equipment route management, project parameter management, and historical data query.

[0061] Test project scheme management module: unified management of all basic information of test projects involved in the laboratory and test project parameter information. The basic information of the test project includes: test project name, test type, test content, judgment standard, test principle, basic performance requirements of the instrument, test personnel requirements, safety work requirements, test conditions, result analysis method, test record table Chinese and English and notes. Name, equipment status, check-in and check-out time, entrusted unit and other detailed information. Display system operation status, current test material information, current test project, automatic logistics system status display, and interact with logistics equipment information. Instrument type and test standard are further added as a secondary interface. Each test project has different parameter records and needs to be managed uniformly. The test item daily parameter information mainly includes: parameter Chinese and English, unit, alias, standard value, upper and lower limits, parameter sorting, precision, length, data type, whether it is a condition and remarks. The management module corresponding to each test project is configured in detail.

[0062] Sample management module: In quality management, sample registration, analysis and inspection, data review and final analysis report constitute the sample management process. According to different organizational structures, different responsibilities of organizational members and different sample types, this process is organized into a sample management process that can be operated in the most standardized and effective way through configuration, and the entire process and its various links are precisely controlled during operation, thereby improving the efficiency of sample management.

[0063] Historical data query module: relevant information can be queried according to the authorization level. Quickly find the required information from the system, and perform specific and customized searches. All query results can be sorted, classified, and counted. Information query can quickly reflect each step of historical data from raw data to processed data, including test parameter curves and test data, and provide horizontal or vertical comparative analysis functions for a certain optional test data in different voltage levels and different equipment types. Test data query provides users with the function of querying the historical test data and test results of the tested products. Data query can be combined according to multiple conditions, and detailed ledger data can be exported; the test results are automatically judged by comparing with the latest test procedures, and the data is automatically stored. It is also possible to query personnel information and the progress of test projects.

[0064] Test report management module: automatic generation of test reports. The system automatically generates a test report in a standardized format based on the test report template program and all the test data of the test product in the laboratory. The system provides functions such as report upload and download, as well as report template addition, deletion, and editing. The report can be exported to electronic document formats such as PDF and Word for easy viewing and archiving. The basic requirements for the test report content include: test product information, test items, equipment and instrument information, test data, judgment basis, test results, review and approval, procedures, standards, basis, etc. The types of reports can be conventional inspection reports, analysis reports, quality reports, management reports, etc. The test report is in Chinese and English.

[0065] Equipment monitoring management module: record the frequency of equipment use, set action or usage time thresholds for maintenance information, and monitor the operating status of each device. Equipment status monitoring data + health diagnosis model, predictive analysis of equipment health status, the host computer has VPN (virtual private network) function, which can realize remote problem diagnosis and processing.

[0066] Equipment monitoring alarm management module: Equipment prompt alarm category: main alarm information of equipment, equipment problem module alarm, equipment temperature alarm, equipment status maintenance prompt module. With VPN function, the problem of equipment can be diagnosed and processed through the upper computer network.

[0067] Energy consumption monitoring module: monitoring and management of the power quality of electrical equipment (power quality, peak, flat and valley statistics).

[0068] Test route management and monitoring module: Different types of power distribution equipment or different testing requirements have different test routes. The system standardizes the test routes of different equipment types, which is conducive to the standardized and normalized scheduling management of test items. At the same time, the system provides the function of customizing test routes to meet the testing requirements in special circumstances.

[0069] Performance monitoring module: Test data: test time, batch (raw materials), time, test environment data, test efficiency and beat data statistics, such as the time of each test, the set value and actual value of the test parameters. Test problem fault prompts.

[0070] Equipment route management module: The test routes of different equipment of the same equipment type are not completely the same. In the actual operation of the system, the final test route needs to be determined according to the specific equipment parameters of the test product. The equipment route management module adds equipment 24, call / interaction category: The preceding equipment of the laboratory system is the equipment of the automation integration manufacturer, so it is necessary to realize the linkage with the preceding and following equipment. The information interaction here is mainly the communication between the equipment PLC. Connect the test product entry and exit signals with the transfer cart.

[0071] Safety signal management module: emergency stop, hard-wired wires, the manufacturer reserves at least two sets of dual-circuit safety points with auxiliary contacts, and adds safety relays or safety modules according to the actual number of points. Safety interlocking alarm, test site video monitoring, heating equipment can be triggered by infrared detection; alarm button trigger; safety linkage trigger. Remote safety monitoring and alarm can be carried out through smart mobile terminals.

[0072] Report module: Monthly statistics of completed test products generate performance parameter reports to the technical department. Monthly statistics of test personnel test product lists form reports for man-hour accounting and performance appraisal. Generate quality reports based on test results; not only can it simply reflect the internal data of the system, but it can also process the data to generate quality trend reports, quality fluctuation charts, etc. Equipment use, maintenance, and energy consumption reports can be generated based on equipment test results

[0073] Employee knowledge base module: supports employee test training functions, establishes a skill matrix for test personnel, and uses the matrix to implement test content that employees have permission to use. Establishes a training content knowledge base, supports online data viewing and query in various ways such as pictures, videos, and documents. Implements system management of test instrument operating procedures, quality manuals, and procedure files, and supports test guidance; parameters are used to determine the test route of the equipment.

[0074] In summary, the transformer test management system and method in the present invention collects and identifies product information of the transformer to be tested; determines the test items and test paths of the transformer to be tested according to the product information, controls the mobile component to transport the transformer to be tested to the test components corresponding to each test item in sequence according to the test path, and controls the test component to test the transformer to be tested. Compared with the existing method of manually testing transformers, the present invention automatically controls the mobile component to move the transformer to be tested to the test component, and controls the test component to perform the test, which can greatly free the hands of the staff and improve the test efficiency.

[0075] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A transformer test management system, It is characterized in that include: A collection component, a mobile component, a control component and a plurality of test components for detecting different components / functions of the transformer, wherein the collection component, the mobile component and the test component all establish communication with the control component; The acquisition component is used to collect and identify product information of the transformer to be tested, and send the product information to the control component; the control component is used to receive the product information, and determine the test items and test path of the transformer to be tested according to the product information, and control the moving component to transport the transformer to be tested to the test components corresponding to each test item in sequence according to the test path, and control the test component to test the transformer to be tested; The control component includes a storage module and a data processing module, the storage module is used to store a first mapping relationship between the product information, the corresponding test items and the location information of the corresponding test components, and the data processing module is used to receive the product information, and call the first mapping relationship according to the product information to find the corresponding test items and the location information of the corresponding test components, and plan the test path according to the location information of the corresponding test components; The data processing module is also used to inquire about the status of each test component corresponding to the transformer to be tested, and plan the test path with the shortest total test time as the goal based on the status fed back by each test component and the location information of each test component, wherein the status includes idle, faulty and working.

2. The transformer test management system according to claim 1, It is characterized in that The storage module also stores the test parameters of the test items corresponding to the product information and a second mapping relationship between their binary values. The data processing module is also used to search for the test parameters of each test item corresponding to the product information according to the second mapping relationship, and send the test parameters of each test item to the corresponding test component. Each test component is used to receive and test the transformer to be tested corresponding to the product information according to the test parameters.

3. The transformer test management system according to claim 2, It is characterized in that Each test component is also used to send the product information of the tested transformer and the corresponding test results and test data to the data processing module. The data processing module is also used to receive the test results and test data, and perform visual analysis on the test results and test data, and store the test results, test data and results of the visual analysis in a structured form in the storage module.

4. The transformer test management system according to claim 3, It is characterized in that It also includes an alarm component and multiple monitoring components corresponding to the test components. The monitoring component and the alarm component both establish communication with the control component. The monitoring component is used to monitor the operating parameters of each test component and send the operating parameters of each test component to the control component. The control component is used to receive the operating parameters of each test component and perform fault detection based on the operating parameters to determine whether the test component has a fault. When a fault occurs, the alarm component is controlled to sound an alarm to alert the staff.

5. The transformer test management system according to claim 4, It is characterized in that The control component also includes a communication module, through which the control component establishes communication with a remote terminal, and the control component is also used to send the test results / test data / visual analysis results / operating parameters / fault detection results to the remote terminal.

6. The transformer test management system according to claim 5, It is characterized in that The test components include a 10 kV test system, a 35 kV test system and a physical and chemical test system. The 10 kV test system includes a 10 kV test host computer and multiple 10 kV routine test components and multiple 10 kV temperature rise test components respectively connected to the 10 kV test host computer. The 10 kV test host computer is connected to the data processing module; the 35 kV test system includes a 35 kV test host computer, multiple 35 kV routine test components, multiple 35 kV temperature rise test components, multiple lightning impulse test components and multiple screens. Shielded partial discharge test components; the multiple 35 kV routine test components, multiple 35 kV temperature rise test components, multiple lightning impulse test components and multiple shielded partial discharge test components are all connected to the 35 kV test host computer, and the 35 kV test host computer is connected to the data processing module; the test components include a physical and chemical test system, and the physical and chemical test system includes a physical and chemical test host computer and multiple physical and chemical test components, and the multiple physical and chemical test components are all connected to the physical and chemical test host computer, and the physical and chemical test host computer is also connected to the data processing module.

7. A transformer test management method, applied to the transformer test management system according to any one of claims 1 to 6, It is characterized in that The following steps are involved: Collect and identify product information of the transformer to be tested; Determine the test items and test paths of the transformer to be tested according to the product information, According to the test path, the moving component is controlled to transport the transformer to be tested to the test components corresponding to each test item in sequence, and the test component is controlled to test the transformer to be tested.

8. The transformer test management method according to claim 7, It is characterized in that Determining the test items and test paths of the transformer to be tested according to the product information specifically includes the following steps: Query the location information and working status of the test components corresponding to the test items of the transformer to be tested according to the product information; According to the location information and working status of the test components corresponding to the test items of the transformer to be tested, a test path is planned with the goal of minimizing the total test time, wherein the status includes three states: idle, faulty and working.