Method and wireless electronic device for obtaining location information of user equipment

By using beam information and control signaling in wireless communication systems to optimize PRS transmission, the problems of inefficient and delayed resource use in multi-beam deployment are solved, and more efficient resource utilization and positioning accuracy is achieved, suitable for 5G NR Determine the location in the system.

CN112771947BActive Publication Date: 2024-11-19SONY GROUP CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201980062959.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2018-09-27
Filing Date
2019-08-21
Publication Date
2024-11-19
Estimated Expiration
2039-08-21

AI Technical Summary

Technical Problem

In multi-beam deployed wireless communication systems, inefficient use of resources and delay in position reference signal (PRS) transmission are issues of concern, especially in cases where there may be no synchronization between base stations, affecting user equipment (UE) ) Determine the location in the network.

Method used

By performing a method in a wireless device, sending beam information to the network to define a beam suitable for sending a positioning reference signal (PRS), the reception control signaling includes PRS scheduling information, performs measurements based on the information, and provides measurements to the network As a result, resource usage and delay in multi-beam systems are improved. The method includes receiving PRS from one or more base stations using a suitable beam at a particular time and frequency, enabling on-demand position determination.

Benefits of technology

This approach improves resource usage efficiency, reduces latency, and supports higher positioning accuracy in 5G NR systems, suitable for use cases that support drones or other mobile objects, overcomes signaling overhead caused by beam scanning and Data delivery delay problem.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112771947B_ABST
    Figure CN112771947B_ABST
Patent Text Reader

Abstract

The present application relates to a method and a wireless electronic device for obtaining location information of a user equipment. A method for obtaining location information of a user equipment UE in a wireless communication system, which is performed in a wireless device, is described. The method comprises: sending an indication including beam information to a network, the beam information defining a beam suitable for sending a positioning reference signal PRS to the wireless device; receiving control signaling from the network, the control signaling including PRS scheduling information for an upcoming transmission of the PRS in the beam; performing measurement on the PRS based on the received PRS scheduling information; and providing the measurement result to the network.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Various embodiments described herein relate to methods, devices, and computer program products for wireless communication systems, and more particularly to nodes in wireless communication systems. Background Art

[0002] Wireless communication between two devices, such as a network node and a mobile device or user equipment, involves signals transmitted between antennas of the mobile device and the network node. Wireless communication systems may use multiple antenna elements to combine signals into one or more beams. Beams from one or more devices may need to be aligned with each other for proper communication. Beam selection for transmitting signals between nodes and mobile devices in a wireless network is important for efficient, high-quality communication. Summary of the invention

[0003] Beam selection is used to select beams from various antennas to transmit signals between network elements and mobile devices in a wireless network. Base stations and user equipment (UE) can be deployed with multiple antenna beam operations. One or more beams of a multi-beam operation can be used to transmit a position reference signal (PRS) to determine the location of the UE in the network. However, in multi-beam deployments, inefficient use of resources and delays in PRS transmission for position determination are of concern. For example, there may be no synchronization between base stations for beam scanning in a multi-beam deployment. The embodiments described herein use on-demand position determination of the UE to improve resource usage and / or delay in a multi-beam system. Specifically, the embodiments described herein can solve problems related to beams received by the UE from multiple base stations at different times and / or frequencies.

[0004] Various embodiments of the present invention relate to a method for obtaining location information of a user equipment UE in a wireless communication system, performed in a wireless device. The method includes sending an indication including beam information to a network, the beam information defining a beam suitable for sending a positioning reference signal PRS to the wireless device. The method includes receiving control signaling from the network, the control signaling including PRS scheduling information for an upcoming transmission of a PRS in a beam; performing measurements on the PRS based on the received PRS scheduling information; and providing measurement results to the network. The PRS scheduling information may include cell information using a beam associated with the beam selection. The PRS scheduling information may include a time and / or frequency of using a beam associated with the beam selection. The PRS scheduling information may include information indicating a cell and a beam for sending the PRS. The PRS scheduling information may also include a time and / or frequency of sending the PRS. In response to a PRS command from a positioning node, the PRS may be received from one or more base stations at a given time using a given beam suitable for sending the PRS.

[0005] According to various embodiments, performing measurement on the PRS may include: performing observed time difference of arrival (OTDOA) measurement based on the PRS; and transmitting reference signal time difference measurement (RSTD) information based on the OTDOA measurement.

[0006] According to various embodiments, the method may include: receiving a positioning request from the network in response to a triggering event before sending the indication. Receiving control signaling may include: receiving PRS scheduling information from the positioning node using the LTE positioning protocol LPP. The method may include providing an update to the positioning node in response to determining that the UE location information has changed. The update may include an update to a cell and / or beam. The method may include receiving additional control signaling including updated PRS scheduling information from the network in response to providing the update. The method may include: receiving a subsequent PRS on an updated beam associated with the updated PRS scheduling information; and providing an updated measurement result including updated UE location information in response to receiving a subsequent PRS signal.

[0007] Various embodiments described herein may provide a method for obtaining location information of a user equipment UE in a wireless communication system performed by a network. The network may include one or more network nodes, such as a positioning node, a positioning server, a location server, an SMLC, an e-SMLC, and / or a gNB. The positioning node or the positioning server may include an SMLC or an e-SMLC. The method includes: receiving an indication including beam information from a UE, the beam information defining a beam suitable for a positioning reference signal PRS for the UE; based on the received receive beam information, sending control signaling to the UE, the control signaling including PRS scheduling information for an upcoming transmission of the PRS; triggering the sending of the PRS to the UE; and receiving measurement results including the location information of the UE from the UE based on the PRS scheduling information. The PRS scheduling information may include information indicating one or more cells and one or more beams in which the PRS is sent. The PRS scheduling information may include time and / or frequency for the PRS in one or more cells and one or more beams. In response to a PRS command from a positioning node, the positioning node may receive the PRS from a base station using a given beam suitable for sending the PRS at a given time.

[0008] According to various embodiments, sending control signaling may include: sending a positioning request to the UE in response to an institutional request to determine the location of the UE. The method may include: sending a positioning request in response to a triggering event before sending the PRS scheduling information. Sending control signaling may include: sending the PRS scheduling information from the positioning node to the UE using the LTE positioning protocol LPP. The method may include: receiving an update from the UE, the update including updated information associated with a cell and / or a beam. The method may include: sending additional control signaling including updated PRS scheduling information in response to receiving the update. The method may include: sending a subsequent PRS on an updated beam associated with the updated PRS scheduling information; and receiving an updated measurement result including updated UE location information in response to sending the subsequent PRS.

[0009] According to various embodiments, receiving a positioning request from the network in response to a triggering event may include: sending an indication of an activity from the UE that the network requires UE location information, and receiving a positioning request from the network in response to the indication of the activity. Receiving a positioning request from the network in response to a triggering event may include: receiving a positioning request from the network in response to a request from an agency to the network to determine the location of the UE. Receiving PRS scheduling information may include receiving PRS scheduling information directly from a serving mobile location center SMLC. Receiving PRS transmissions on beams associated with beam selection may include: receiving PRS transmissions from a base station in response to a PRS command from a serving mobile location center SMLC. The method may include: providing a cell update and / or a beam update to the serving mobile location center SMLC in response to determining that the UE location information has changed. The method may include: receiving updated PRS scheduling information including updated beam selection and / or updated cell information from the network in response to providing a cell update and / or a beam update. The method may include: receiving a subsequent PRS transmission on an updated beam associated with the updated beam selection; and / or providing an updated positioning measurement report including updated UE location information in response to receiving the subsequent PRS transmission.

[0010] Various embodiments described herein may provide a method for obtaining location information of a user equipment UE in a wireless communication system, performed by a network such as an SMLC and / or a gNB. The method includes sending a positioning request to the UE in response to a triggering event; receiving an indication including beam information from the UE; sending positioning reference signal PRS scheduling information including beam selection; sending PRS transmission on a beam associated with the beam selection; and receiving a positioning measurement report including the location information of the UE in response to the PRS transmission. The PRS scheduling information includes cell information using the beam associated with the beam selection. Sending the PRS scheduling information may include sending the PRS scheduling information directly to the UE from the serving mobile location center SMLC. Sending the PRS transmission on the beam associated with the beam selection may include sending the PRS transmission to the UE in response to a PRS command from the serving mobile location center SMLC to the gNB.

[0011] Various embodiments of the present invention relate to an electronic device used in a wireless communication system, the wireless electronic device including a processor and a memory connected to the processor, the memory including a computer-readable program code embodied in the memory, when executed by the processor, the computer-readable program code causes the processor to perform operations including the following items: sending an indication including beam information to a network, the beam information defining a beam suitable for sending a positioning reference signal PRS to a wireless device. The method includes receiving control signaling from the network, the control signaling including PRS scheduling information of an upcoming transmission of the PRS in the beam; performing measurement on the PRS based on the received PRS scheduling information; and providing the measurement result to the network.

[0012] Various embodiments of the present invention are directed to a computer program product, the computer program product comprising a tangible non-transitory computer-readable storage medium, the tangible non-transitory computer-readable storage medium comprising a computer-readable program code embodied in the tangible non-transitory computer-readable storage medium. The computer-readable program code comprises: computer-readable code for sending an indication including beam information to a network, the beam information defining a beam suitable for sending a positioning reference signal PRS to a wireless device; computer-readable code for receiving control signaling from the network, the control signaling including PRS scheduling information of an upcoming transmission of the PRS in the beam; computer-readable code for performing measurements on the PRS based on the received PRS scheduling information; and computer-readable code for providing the measurement results to the network.

[0013] Various embodiments of the present invention relate to an electronic device used in a wireless communication system, the wireless electronic device including a processor and a memory connected to the processor, the memory including a computer-readable program code embodied in the memory, and when executed by the processor, the computer-readable program code causes the processor to perform operations including the following items: receiving an indication including beam information from a UE, the beam information defining a beam suitable for a positioning reference signal PRS for the UE; based on the received beam information, sending control signaling to the UE, the control signaling including PRS scheduling information for an upcoming transmission of the PRS; triggering the sending of the PRS to the UE; and receiving measurement results including the UE's location information from the UE based on the PRS scheduling information.

[0014] Various embodiments of the present invention are directed to a computer program product, the computer program product comprising a tangible non-transitory computer-readable storage medium, the tangible non-transitory computer-readable storage medium comprising computer-readable program code embodied in the tangible non-transitory computer-readable storage medium. The computer-readable program code comprises: computer-readable code for receiving an indication including beam information from a UE, the beam information defining a beam suitable for a positioning reference signal PRS for the UE; computer-readable code for sending control signaling to the UE based on the received beam information, the control signaling including PRS scheduling information for an upcoming transmission of the PRS; computer-readable code for triggering the sending of the PRS to the UE; and computer-readable code for receiving measurement results including the UE's location information from the UE based on the PRS scheduling information.

[0015] It should be noted that, although not specifically described, aspects of the inventive concept described with respect to one embodiment may be incorporated into different embodiments. That is, all embodiments and / or features of any embodiment may be combined in any manner and / or combination. Other operations according to any of the embodiments described herein may also be performed. These and other aspects of the inventive concept are described in detail in the specification set forth below. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A wireless communication system according to various embodiments described herein is illustrated.

[0017] Figure 2 and Figure 3 is a signal flow diagram according to various embodiments described herein.

[0018] Figures 4 to 19 is a flow diagram of operations for on-demand positioning in accordance with various embodiments described herein.

[0019] Fig. 20and Fig.21 is a block diagram of an apparatus for on-demand positioning according to various embodiments described herein. DETAILED DESCRIPTION

[0020] Various embodiments will be described more fully below with reference to the accompanying drawings. Other embodiments may take many different forms and should not be construed as limited to the embodiments set forth herein. Throughout the text, the same reference numerals represent the same elements.

[0021] Observed Time Difference of Arrival (OTDOA) is a radio access technology (RAT) related positioning technology that has been widely deployed in LTE networks. When using OTDOA, a device or user equipment (UE) can receive reference signals from multiple eNodeBs (eNBs) and then perform time difference of arrival (TDOA) measurements. The measurement results can be sent from the UE to a location server (LS) via a base station such as an eNodeB (eNB) using the LTE Positioning Protocol (LPP). The location server can perform positioning estimation or triangulation based on information from at least three eNodeBs. As used herein, the term "network" may include any entity other than the UE in a wireless network, such as a positioning node, a positioning server, a location server, and a base station, eNB and / or gNB that may include, for example, an SMLC or an eSMLC. As used herein, a base station may include a network element that communicates with one or more UEs. In LTE technology, a base station may be referred to as an eNB, and in 5G NR technology, a base station may be referred to as a gNB, but the use of the term "base station" is not limited to the above technology.

[0022] The Positioning Reference Signal (PRS) is a reference signal used in the LTE network to help determine the UE positioning using the OTDOA technology. The UE can use the PRS to estimate the arrival time (TOA) of the signal. When the UE receives a reference signal (such as a PRS) and then cross-correlates with a locally generated reference signal, the TOA of the signal from each base station can be determined. The cross-correlations from different transmit antennas, receive antennas and / or subframes can be accumulated or aggregated so that a suitable cross-correlation peak can be obtained. The measured time delay can be obtained based on the phase information of the cross-correlation peak. Using the reference signal, cross-correlation can be performed multiple times to obtain the time delays from multiple eNodeBs such as a reference base station and / or a neighboring base station. The reference signal time difference (RSTD) measurement result can be obtained by subtracting the time delay of the neighboring eNodeB from the time delay of the reference base station or the serving base station. The UE can judge and classify the RSTD measurement quality. The UE can send the RSTD measurement result and the RSTD measurement quality to the location server.

[0023] In LTE, PRS may be transmitted by a base station assuming that the base station has omni-directional and / or sector antennas. However, in LTE, there may not be an indication of the beam of the antenna being used for PRS transmission. Similarly, in LTE, it may be expected that a UE receives a beam using an omni-directional or relatively wide antenna. As long as the UE is within the cell range, it may be expected that the UE receives the PRS signal.

[0024] In 5G NR systems, base stations and / or UEs may be deployed with multi-beam operation. For example, the synchronization signal block (SSB) in NR may operate with up to 64 narrow beams. Beams are typically transmitted using beam scanning in order to cover the entire cell coverage, where the beams are transmitted continuously in time. Therefore, PRSs will be transmitted in different beams at different points in time. In other words, PRSs will be scanned together with the beams. Therefore, each individual UE may receive PRSs of one or more beams from each base station or gNodeB (gNB). PRSs of different beams may be transmitted at different points in time.

[0025] Due to the maturity of OTDOA-based positioning in LTE, a similar approach can be adopted for 5G NR positioning. However, NR has different scenarios and various new features, such as wider bandwidth, multi-beam operation, operation at higher frequencies, etc. Therefore, some adjustments may be required to obtain higher positioning accuracy, such as using beam-based broadcast PRS transmission.

[0026] Various embodiments described herein may arise from the recognition that an improved method for beam scanning to select a beam for wireless communication between devices is needed to reduce signaling overhead and / or reduce latency in data delivery between devices. In some techniques, continuous PRS transmission in multiple narrow beams may ensure that the gNB covers the entire cell coverage area. However, this operation may increase latency and increase resource utilization. 5G NR is expected to support strict positioning requirements regarding latency and accuracy, and may need to support various use cases using drones or other mobile objects. Therefore, according to various embodiments described herein, on-demand positioning may be a potential solution to overcome latency issues, reduce resource utilization, reduce interference, and / or achieve 5G positioning goals. On-demand positioning may be used to supplement OTDOA positioning.

[0027] According to various embodiments described herein, on-demand positioning can be used when the base station and / or UE is equipped with an antenna system that supports multiple antenna beams for sending and receiving signals. The UE can perform positioning measurements at specific times, such as when there is a request from the network, from an agency such as the police, or when the UE makes an emergency call. When an emergency call is made, the need for positioning information may be triggered. The base station can send a positioning reference signal in a beam selected based on conditions suitable for communication or in a beam being used to communicate with the base station. Based on beam and / or cell information, a reporting mechanism from the UE to the network can be used. The network can command the base station to send PRS at a given time and / or on a specific beam. On-demand positioning can be triggered asynchronously, that is, not based on periodic location information requests. Since PRS transmission can be triggered after a request and intelligent selection of beams can be used, the use of PRS on demand can improve resource utilization. In some embodiments, on-demand PRS resources can be allocated immediately after traditional or other non-on-demand PRS resources. For example, PRS resources can be sent periodically every 1 second for a duration of 20 milliseconds. The on-demand PRS may be sent continuously after the 20 millisecond PRS interval. In other words, some embodiments may include sending the on-demand PRS resources immediately after the non-on-demand PRS resources.

[0028] Various embodiments described herein support location-on-demand operations. Figure 1 A wireless communication system including a UE and various gNBs is illustrated. Figure 1, gNB 111, gNB 112, gNB 113, and / or gNB 114 may be base stations in a wireless communication system. gNB 111 may have antennas that may use beams 121, 122, 123, and / or 124 in a cell including UE 100. gNB 112 may have antennas that may use beams 131, 132, and / or 133 in a cell including UE 100. gNB 113 may have antennas that may use beams 141, 142, and / or 143 in a cell including UE 100. gNB 114 may not have a beam that transmits near UE 100 or a beam with poor signal quality at UE 100. Therefore, PRS may not be transmitted from gNB 114 to UE 100. The on-demand positioning measurements may be based on the selected cells associated with gNB 111, gNB 112, and / or gNB 113 and the beams 121, 131, and 141 associated therewith, respectively. Beams 121, 131, and / or 141 may be selected based on criteria such as mitigating interference between devices, improving signal interference and / or signal-to-noise ratio, and / or having a higher signal strength at the receiver. For a given UE, if a suitable beam is not available for the UE, the PRS may not be activated. Thus, a limited number of PRSs on a corresponding limited number of beams are activated, thereby being able to reduce resource usage and improve network latency due to the use of stronger reliable beams for PRSs.

[0029] In some embodiments, a network node such as a positioning server, a serving mobile location center (SMLC) 150, or an enhanced SMLC (e-SMLC) may indicate to the UE 100 to provide and / or update positioning related information. Such indications from the SMLC 150 may be useful in situations where an agency such as a police station, a fire department, or a medical team needs to know the location of the UE 100 and / or wants to track the location of the UE 100. The UE 100 may provide information to the network (including the SMLC 150 and / or the gNB 111, gNB 112, gNB 113). The information provided by the UE 100 may include beams of appropriate selected cells and / or surrounding cells so that the corresponding base station or gNB can send PRS directly to the network using the reported beams. The indication and information may be sent via a higher layer protocol such as the LTE Positioning Protocol (LPP). The SMLC / e-SMLC 150 may typically be located in the core network. The SMLC and / or e-SMLC 150 may communicate 155 with a base station using LTE Positioning Protocol A (LPPa), or may communicate 160 directly with a UE using the LPP protocol. In other words, the UE may provide information about the selected cell and / or beam to the SMLC / e-SMLC using the LPP protocol.

[0030] Communications between the SMLC 150 and the UE 100 may be relayed by the gNB 111, gNB 112, and / or gNB 113. For example, the gNB 113 may relay the communication 160, but the gNB is not aware of the context of the data. In other words, the gNB relays communications that would otherwise be conducted directly between the SMLC 150 and the UE 100. In some embodiments, the UE 100 may not need to be aware of beam selection at the gNB because the gNB may handle the beam selection. For communications carrying LPP protocol payloads, the SMLC 150 does not need to worry about beam selection because the gNB 111, gNB 112, and / or gNB 113 will be responsible for beam selection. Selecting the beam of the cell and / or surrounding cells used between the gNB 111, gNB 112, and / or gNB 113 and the UE 100 may be a prerequisite for PRS transmission.

[0031] In some embodiments, on-demand PRS communication between the UE and the SMLC may be triggered by the UE, for example, when a user of the UE makes an emergency call (such as a 911 call or a 112 call). A network such as the SMLC may schedule and / or configure the PRS to be sent based on information received from the UE. A positioning server such as the SMLC may command a base station such as a gNB to send the configured PRS on a specific beam and at a specific time.

[0032] The serving base station may indicate information related to the scheduling of PRS transmissions to the UE 100. The scheduling information may include the time and / or frequency for the PRS transmissions. The PRS transmissions may be one-time transmissions and / or semi-persistent transmissions. In the case where the UE 100 is mobile and therefore may need to send multiple location measurements to establish speed and / or direction of travel, the UE may request semi-persistent PRS transmissions. The PRS scheduling information may include beam and / or time resources sent directly from the SMLC or from one or more gNBs to the UE. A base station such as a gNB may send an on-demand PRS using dedicated resources and / or using resources that overlap with a regular PRS that is different from the on-demand PRS.

[0033] Once the positioning process is established, the UE 100 can report beam measurements directly to the base station. The beam measurements can be based on existing measurements in NR, such as reference signal received power (RSRP) measurements. In cases where semi-persistence is required, the beam can be changed for subsequent measurement reports. In some embodiments, the measurement report can be sent to the SMLC. The SMLC can trigger the base station or gNB to update the beam used for PRS transmission with the UE.

[0034] Figure 2 is a signal flow diagram illustrating various signal transmissions for on-demand positioning according to various embodiments described herein. Figure 2 , UE 200 can communicate with gNB 210 and / or with SMLC 220. Figure 2 200. The present invention is discussed in the context of SMLC, but the present inventive concept can be applied to positioning nodes, positioning servers and / or E-SMLC. A positioning request 230 can be sent from the SMLC 230 to the UE 200. The UE 200 can provide cell and / or beam information 235 to the SMLC 220. A PRS command 240 can be sent from the SMLC 220 to the UE 200. PRS scheduling information 245 can be sent from the gNB 210 to the UE 200. A PRS transmission 250 can be sent from the gNB 210 to the UE 200. The UE 200 can send a positioning measurement report 255 (such as a received signal time difference (RSTD)) to the SMLC 220. The UE 200 can send a cell and / or beam update 260 to the gNB 210. A PRS transmission utilizing the new cell and / or beam 265 that has been updated can be sent from the gNB 210 to the UE 200. UE 200 may provide updated cell and / or beam information 270 to SMLC 220 .

[0035] Figure 3 is a signal flow diagram illustrating various signal transmissions for on-demand positioning according to various embodiments described herein. Figure 3, UE 300 may communicate with gNB 310 and / or with SMLC 320. A positioning request 325 may be sent from SMLC 330 to UE 300. UE 300 may collect recent cell and / or beam measurements and report the appropriate cell and / or beam of the collected measurements to SMLC 320. UE 300 may provide the cell and / or beam information 330 to SMLC 320. SMLC 320 may provide PRS scheduling information to UE 300 and / or gNB 310. PRS scheduling information 335 may be sent from SMLC 320 to UE 300. PRS command 340 may be sent from SMLC 320 to gNB 310. PRS transmission 345 may be sent from gNB 310 to UE 300. UE 300 may receive PRS for one or more gNB 310 and perform time difference calculations (such as TDOA). The UE 300 may send a positioning measurement report 350 (such as a received signal time difference (RSTD)) to the SMLC 320. In the case of requesting periodic positioning and / or if the UE detects a cell and / or beam update, the UE 300 may need to provide the SMLC 320 with updated cell and / or beam information. The UE 300 may send a cell and / or beam update 355 to the SMLC 320. The SMLC 320 may update the PRS scheduling based on the cell and / or beam update and notify the gNB 310 and / or the UE 300. PRS scheduling information 360 including the updated new cell and / or beam may be sent from the SMLC 330 to the UE 300. A PRS command 365 may be sent from the SMLC 320 to the gNB 310 using the updated PRS scheduling information. A PRS transmission 370 may be sent from the gNB 310 to the UE 300. The UE 300 may receive PRS based on the updated PRS scheduling resources for one or more gNBs 310 and perform a time difference calculation (such as TDOA). The UE 300 may send a positioning measurement report 375 (such as a received signal time difference (RSTD)) to the SMLC 320.

[0036] Figures 4 to 11 is a flow chart of operations for on-demand location determination of a UE, the operations comprising: Figure 1 UE100, Figure 2 UE 200 and / or Figure 3 Now refer to the operation performed by the UE 300. Figure 4, in block 420, an indication may be sent to the network. The indication may include beam information defining a beam suitable for sending a positioning reference signal PRS to the wireless device. In a cell, a base station may scan various beams over a geographical area served by the base station. The UE may receive signals in one or more beams from the base station. In addition, when located in a specific geographical area, the UE may receive beam scanning from multiple base stations. The UE may receive beam scanning from multiple base stations, but there may be a stronger beam from a serving cell or a cell where the UE resides in idle mode. In terms of beam scanning, these base stations may not be synchronized with each other. The UE may measure beams from various base stations and determine the appropriate one or more beams for communication with one or more base stations based on various factors such as signal strength, signal-to-noise ratio, bit error rate, etc. The UE may share information about the appropriate beam with the network (i.e., one or more elements in the wireless network). The network nodes in the network may include base stations, gNBs, positioning servers, SMLCs, or other network elements. A network including a positioning server and / or one or more gNBs may use information provided by the UE regarding beams from different base stations at the UE to determine scheduling of beams and / or cells for transmitting PRS.

[0037] Still refer to Figure 4 , in block 430, the UE may receive PRS scheduling information for an upcoming transmission of a PRS from the network. The PRS scheduling information may include information indicating a cell and / or beam in which the PRS is transmitted. The PRS scheduling information may indicate a subset of beams in which the PRS is transmitted. The beam may have a direction corresponding to at least a portion of a plurality of configurable beam directions of a base station. Typically, the PRS is scheduled only in a subset of beam directions that can be configured by the base station. For example, the PRS is scheduled only in beams pointing in the direction of the UE. These directions may be determined based on the beam information received from the UE. The PRS scheduling information may include a time and / or frequency at which a beam associated with a beam selection will be used. In some embodiments, the PRS scheduling information may include a time and / or frequency at which the PRS is transmitted. The PRS transmission may be received on a beam associated with a beam selection of the network. The network may perform beam selection taking into account the beam information from the UE. However, the network may not use the beam suggested by the UE in consideration of resources, coordination between base stations, power considerations, and the like. Network-based PRS scheduling can use a subset of available beams in a specific cell to send PRS to UEs as needed, thereby saving resources and improving the efficiency of PRS transmission by using the on-demand positioning techniques described in this article.

[0038] At block 440, measurements may be performed on the PRS based on the received PRS scheduling information. The UE may use the PRS scheduling information to select a beam from a given base station and perform measurements of the PRS in the selected beam. The measurements may include observed time difference of arrival (OTDOA) measurements. At block 450, the measurement results may be provided to the network. In some embodiments, a positioning measurement report may be provided in response to receiving a PRS transmission. The positioning measurement report may include location information of the UE. The location information of the UE may be based on OTDOA or based on reference signal time difference measurement (RSTD) information derived from OTDOA. PRS may be received from one or more base stations at a given time using a given beam suitable for sending PRS in response to a PRS command from a positioning node.

[0039] Now refer to Figure 5 The performing of measurements on the PRS at block 440 may include: performing observed time difference of arrival (OTDOA) measurement based on the PRS at block 510. At block 520, reference signal time difference measurement (RSTD) information based on the OTDOA measurement may be transmitted by the UE.

[0040] In some embodiments, receiving a positioning request by the UE may be in response to a triggering event. An indication of an activity requiring UE location information may be sent. For example, when a user makes an emergency call (such as a 911 call or a 112 call), a positioning request may be triggered based on the emergency call activity. The positioning request may be received in response to an indication of the activity. The triggering of the UE's positioning information may originate from the UE, or may originate from the network (such as at a positioning server or at a base station).

[0041] Now refer to Figure 6 , before sending the indication including the beam information from the UE, a positioning request may be received from the network in response to a triggering event at block 610. The positioning request may be received in response to an agency request. The agency request may be received from a government agency such as a police department, fire department, ambulance, or a medical agency, emergency and / or disaster relief agency. The triggering event may originate from the UE or may originate from the network. For example, if a user of the UE makes an emergency call, the network may process the emergency and subsequently trigger a positioning request to be sent to the UE.

[0042] Now refer to Figure 7 , receiving control signaling including PRS scheduling information at block 430 may include: at block 710, receiving PRS scheduling information from a positioning node using an LTE Positioning Protocol (LPP). In some embodiments, the UE may receive the PRS scheduling information directly from the SMLC. In some embodiments, the UE may receive the PRS scheduling information via a base station that may act as a relay for the PRS scheduling information. Now referring to Figure 8Receiving a PRS transmission on the beam at block 440 may include, at block 810, receiving a PRS transmission from a base station in response to a PRS command from the SMLC.

[0043] Reference Fig. 9 , some embodiments may include: in block 910, in response to determining that the UE location information has changed, providing an update to the positioning node. The update may include: providing an update related to cell information and / or an update related to beam information. Fig.10 , some embodiments may include: at block 1010, receiving updated PRS scheduling information. Additional control signaling including updated PRS scheduling information may be received from the network in response to providing the update. Fig.11 , some embodiments may include: at box 1110, receiving a subsequent PRS transmission on the updated beam, and may include: at box 1120, providing updated measurement results and / or UE location information.

[0044] Figures 12 to 19 is a flow chart of operations for on-demand location determination of a UE, the operations comprising Figure 1 gNB 111, gNB 112 and / or gNB 113, Figure 2 gNB 210, Figure 2 SMLC 220, Figure 3 gNB 310 and / or Figure 3 The SMLC 320 performs the following operations. Fig.12, at block 1210, the network may receive an indication from the UE including beam information defining a beam suitable for use for a PRS for the UE. At block 1220, based on the received beam information, the network may send control signaling to the UE including PRS scheduling information for an upcoming transmission of the PRS. However, the PRS schedule may be adjusted to suit a given UE based on factors such as triggers received by the network or coordination across the network. In some embodiments, once the positioning node or positioning server receives the information from the UE, the positioning node may send a PRS command to one or more gNBs. The UE may also receive on-demand scheduling information. Thus, the UE knows the specific base stations and / or times at which the PRS is transmitted so that the UE can be prepared to receive the PRS. This knowledge of the UE improves the efficiency of the UE because the UE receiver can actively listen to the PRS with a configurable PRS schedule and / or on a specific on-demand beam. For example, the configurable PRS schedule may include an on-demand time to use a specific on-demand beam. In some embodiments, the PRS scheduling information may include cell information such as a cell ID, where a given beam identified by the beam ID associated with the beam selection is to be used. The PRS scheduling information may include the time and / or frequency at which the beam associated with the beam selection is used. The network may perform beam selection for PRS scheduling taking into account the beam information from the UE. However, the network may not use one or more of the beams suggested by the UE in consideration of resources, coordination between base stations, power considerations, etc.

[0045] Still refer to Fig.12 , at block 1230, the network may trigger the sending of the PRS to the UE. For example, the SMLC may send a request to the relevant base station of the relevant cell, such as Figure 3 As described in step 340 in block 1240, the network may receive, from the UE, measurement results related to the PRS that has been sent to the UE. In some embodiments, the network may receive measurement results including the location information of the UE from the UE based on the PRS scheduling information. The operation of the network may include sending the PRS to the UE on a beam indicated by the PRS scheduling information. In response to a PRS command from a positioning node, a base station may send the PRS at a given time using a given beam suitable for sending the PRS. The network may receive a positioning measurement report including the location information of the UE. In some embodiments, the measurement results received by the network may include observed time difference of arrival (OTDOA) measurement results. The location information from the UE may be based on OTDOA or based on reference signal time difference measurement (RSTD) information derived from OTDOA.

[0046] Reference Fig.13At block 1310, the network may receive an indication of an activity requiring UE location information. At block 1320, the network may send a positioning request to the UE in response to the indication of the activity. In some implementations, the positioning request may be sent in response to a triggering event such as an agency request from an agency (such as a police department) or when the UE makes an emergency call.

[0047] Reference Fig.14 At block 1410, the network node may send a positioning request to the UE in response to the mechanism request. Fig.15 , at block 1510, before sending the PRS scheduling information, the network may send a positioning request in response to a triggering event. In some embodiments, the PRS scheduling information may be sent directly from the SMLC to the UE. In some embodiments, the PRS scheduling information may be sent by the network to the UE via a base station that may act as a relay for the PRS scheduling information.

[0048] Now refer to Fig.16 At block 1610, the network may send PRS scheduling information from the positioning node to the UE using the LTE positioning protocol LPP. In some embodiments, the PRS transmission on the selected beam may be in response to a PRS command from the SMLC. Referring now to Fig.17 In some embodiments, the operations may include: at block 1710, receiving an update from the UE. In response to determining that the UE location information has changed, the update may provide an update of the cell ID or the beam ID. Now referring to Fig.18 In response to receiving the update, the network may send additional control signaling including updated PRS scheduling information at block 1810. In response to receiving an update of a cell and / or beam for communication with the UE, the updated PRS scheduling information may include updated beam selection and / or updated cell information.

[0049] Now refer to Fig.19 In some embodiments, the network operation may include: at box 1910, sending a subsequent PRS transmission on the updated beam, and at box 1920, receiving an updated positioning measurement report including updated UE location information.

[0050] Fig. 20 is a device 2000 (such as Figure 1 UE100, Figure 2 UE 200 and / or Figure 3 The device 2000 may include a transceiver 2030, one or more antennas 2040, a network interface 2020, a processor circuit 2002, and a memory circuit 2010 containing a computer-readable program code 2012.

[0051] The transceiver 2030 is configured to communicate with a network node (such as Figure 1 gNB 111, gNB 112 and / or gNB 113, Figure 2 gNB 210, Figure 2 SMLC 220, Figure 3 gNB 310 and / or Figure 3 The processor circuit 2002 may include one or more data processing circuits, such as general-purpose processors and / or special-purpose processors (e.g., microprocessors and / or digital signal processors) that may be collocated or distributed across one or more networks. The processor circuit 2002 (also referred to as a processor) is configured to execute computer-readable program code 2012 in the memory 2010 to perform at least some of the operations and methods performed by the device 2000 described herein. For example, the processor 2002 may be configured to perform the above-described Figures 2 to 11 Operations discussed. The network interface 2020 communicates with other devices 2000, base stations, gNBs, positioning servers and / or SMLCs.

[0052] Fig.21 The computer readable program code 2012 is illustrated in more detail. Specifically, the computer readable program code 2012 includes a positioning request module 2112, a beam information module 2116, a PRS scheduling module 2120, a PRS receiving module 2124 and / or a position measurement module 2128.

[0053] Various embodiments described herein provide on-demand positioning information related to the UE. According to various embodiments, the UE may request a specific PRS transmission including a specific antenna beam and / or a base station related to a specific beam. According to various embodiments, signaling of PRS on-demand related information including cell and / or beam information between the UE and the SMLC is provided. PRS scheduling based on UE preferences (in the PRS on-demand information) is provided. PRS transmission commands from the SMLC to the gNB using the LPPa protocol are described. The embodiments described herein provide efficient use of time / frequency / beam resources in a wireless communication network.

[0054] Additional limitations:

[0055] In the above description of various embodiments of the present disclosure, it will be understood that the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention. Unless otherwise defined, all terms (including technical terms and scientific terms) used herein have the same meaning as those commonly understood by those of ordinary skill in the art to which the present disclosure belongs. It will also be understood that terms (such as those defined in commonly used dictionaries) should be interpreted as having a meaning consistent with their meaning in the context of this specification and related art, and will not be interpreted in an idealized or overly formal sense, unless such a definition is explicitly made herein.

[0056] When an element is referred to as being "connected", "coupled", "responded" or a variation thereof to another element, the element may be directly connected, coupled or responded to the other element, or there may be an intermediate element. In contrast, when an element is referred to as being "directly connected", "directly coupled", "directly responded" or a variation thereof to another element, there is no intermediate element. Throughout the text, the same reference numerals represent the same elements. In addition, "coupled", "connected", "responded" or a variation thereof used herein may include being connected, connected or responded to in a wireless manner. As used herein, the singular forms "one", "an" and "the" are also intended to include plural forms unless the context explicitly indicates otherwise. For the sake of brevity and / or clarity, well-known functions or structures may not be described in detail. The term "and / or" includes any and all combinations of one or more of the associated listed items.

[0057] As used herein, the terms "comprise," "comprising," "comprises," "include," "including," "includes," "have," "has," "having" or variations thereof are open ended and include one or more stated features, integers, elements, steps, components or functions, but do not preclude the presence or addition of one or more other features, integers, elements, steps, components, functions or groups thereof.

[0058] This article describes example implementations with reference to the block diagrams and / or flow charts of computer-implemented methods, devices (systems and / or equipment) and / or computer program products. It should be understood that the blocks of the block diagrams and / or flow charts and the combination of the blocks in the block diagrams and / or flow charts can be implemented by computer program instructions executed by one or more computer circuits. These computer program instructions can be provided to the processor circuits of general-purpose computer circuits, special-purpose computer circuits and / or other programmable data processing circuits to produce a machine so that the instructions executed by the processors of the computers and / or other programmable data processing devices transform and control transistors, values ​​stored in storage locations, and other hardware components within such circuits to implement the functions / actions specified in the block diagrams and / or flow charts, thereby creating a device (function) and / or structure for implementing the functions / actions specified in the block diagrams and / or flow charts.

[0059] These computer program instructions may also be stored in a tangible computer-readable medium, which may direct a computer or other programmable data processing device to operate in a specific manner so that the instructions stored in the computer-readable medium produce an article of manufacture including the following instructions, which implement the functions / actions specified in the block diagram and / or flowchart block.

[0060] Tangible non-transitory computer readable media may include electronic, magnetic, optical, electromagnetic or semiconductor data storage systems, devices or apparatuses. More specific examples of computer readable media would include the following: portable computer diskettes, random access memory (RAM) circuits, read-only memory (ROM) circuits, erasable programmable read-only memory (EPROM or flash memory) circuits, portable compact disk read-only memory (CD-ROM) and portable digital video disk read-only memory (DVD / BlueRay).

[0061] Computer program instructions may also be loaded into a computer and / or other programmable data processing device to cause a series of operational steps to be performed on the computer and / or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide steps for implementing the functions / actions specified in the block diagram and / or flowchart block. Thus, embodiments of the present disclosure may be embodied in hardware and / or software (including firmware, resident software, microcode, etc.) running on a processor such as a digital signal processor, which may be collectively referred to as "circuits," "modules," or variations thereof.

[0062] Various aspects of the present disclosure are described herein with reference to the flowcharts and / or block diagrams of the methods, devices (systems) and computer program products according to the embodiments of the present disclosure. It will be understood that the individual frames of the flowcharts and / or block diagrams and the combination of the frames in the flowcharts and / or block diagrams can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer or other programmable data processing device to produce a machine so that the instructions executed by the processor of the computer or other programmable instruction execution device create a mechanism for implementing the function / action specified in the flowchart and / or block diagram frame.

[0063] These computer program instructions may also be stored in a computer-readable medium, which when executed may direct a computer, other programmable data processing apparatus, or other device to operate in a particular manner, such that the instructions, when stored in the computer-readable medium, produce an article of manufacture comprising instructions, which when executed cause the computer to perform the functions / actions specified in the flowchart and / or block diagram blocks. The computer program instructions may also be loaded into a computer, other programmable instruction execution apparatus, or other device to perform a series of operational steps on the computer, other programmable apparatus, or other device to produce a computer-implemented process, such that the instructions executed on the computer or other programmable apparatus provide a process for implementing the functions / actions specified in the flowchart and / or block diagram blocks.

[0064] The flowcharts and block diagrams in the accompanying drawings illustrate the architecture, functions and operations of possible implementations of systems, methods and computer program products according to various aspects of the present disclosure. In this regard, each frame in a flowchart or a block diagram may represent a code module, a code segment or a code portion including one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions indicated in the frame may not occur in the order indicated in the accompanying drawings. For example, depending on the functions involved, the two frames shown in succession may actually be executed substantially simultaneously, or the frames may sometimes be executed in reverse order. It will also be noted that the combination of each frame of the block diagram and / or the flowchart and the frames in the block diagram and / or the flowchart can be implemented by a combination of a dedicated hardware-based system or dedicated hardware and computer instructions that performs a specified function or action.

[0065] It should also be noted that in some alternative implementations, the function / action indicated in the frame may not occur in the order indicated in the flow chart. For example, depending on the function / action involved, two frames shown in succession may actually be performed substantially simultaneously, or the frames may be performed in reverse order sometimes. In addition, the function of a given frame of a flow chart and / or block diagram may be divided into a plurality of frames, and / or the function of two or more frames of a flow chart and / or block diagram may be integrated at least in part. Finally, other frames may be added / inserted between the frames shown. In addition, although some figures include arrows on the communication path to illustrate the main communication direction, it will be understood that communication may occur in the direction opposite to the arrows depicted.

[0066] In conjunction with the above description and the accompanying drawings, many different embodiments have been disclosed herein. It will be understood that it would be inappropriately repetitive and confusing to describe and illustrate each combination and sub-combination of these embodiments verbatim. Therefore, this specification (including the accompanying drawings) should be interpreted as a complete written description of various example combinations and sub-combinations of embodiments and the manner and processing of making and using them, and should support claims regarding any such combination or sub-combination. Many variations and modifications may be made to the embodiments without substantially departing from the principles described herein. All of these variations and modifications are intended to be included within this scope.

Claims

1. A method for obtaining location information of a user equipment in a wireless communication system, the method comprising: sending an indication including beam information to a location server, the beam information defining a beam suitable for: sending a positioning reference signal to the wireless device, and determining, by the location server, positioning reference signal scheduling information based on the beam information from the wireless device; receiving, from the location server, the positioning reference signal scheduling information for an upcoming transmission of the positioning reference signal from a base station; Based on the received positioning reference signal scheduling information, performing measurement on the positioning reference signal; as well as The measurement results are provided to the location server.

2. The method according to claim 1, wherein: The positioning reference signal scheduling information includes information indicating a cell and a beam that transmits the positioning reference signal.

3. The method according to claim 1 or 2, wherein: The positioning reference signal scheduling information also includes the time and / or frequency of sending the positioning reference signal.

4. The method according to claim 1, wherein: In response to a positioning reference signal command from a positioning node, the positioning reference signal is received from one or more base stations at a given time using a given beam suitable for transmitting the positioning reference signal.

5. The method according to claim 1, wherein: Performing measurement on the positioning reference signal includes: performing observed time difference of arrival measurements based on the positioning reference signal; and Based on the observed time difference of arrival measurements, reference signal time difference measurement information is transmitted.

6. The method according to claim 1, further comprising: Prior to sending the indication, a positioning request is received from the base station in response to a triggering event.

7. The method according to claim 1, wherein: Receiving the positioning reference signal scheduling information includes: The positioning reference signal scheduling information is received from a positioning node using an LTE positioning protocol.

8. The method according to claim 1, further comprising: In response to determining that the location information of the user equipment has changed, providing an update to a positioning node, wherein the update includes an update to a cell and / or a beam.

9. The method according to claim 8, further comprising: In response to providing the update, additional control signaling including updated positioning reference signal scheduling information is received from the base station.

10. The method according to claim 9, further comprising: receiving a subsequent positioning reference signal on an updated beam associated with the updated positioning reference signal scheduling information; as well as In response to receiving the subsequent positioning reference signal, providing updated measurement results including updated user equipment location information.

11. A method for obtaining location information of a user equipment in a wireless communication system, performed in a location server, the method comprising: receiving, from the user equipment, an indication including beam information defining a beam suitable for use for a positioning reference signal for the user equipment; determining, by the location server, positioning reference signal scheduling information for an upcoming transmission of the positioning reference signal based on the received beam information; Based on the received beam information, send the positioning reference signal scheduling information for the upcoming transmission of the positioning reference signal to the user equipment via the base station; triggering sending the positioning reference signal to the user equipment; as well as A measurement result of the positioning reference signal sent to the user equipment is received from the user equipment.

12. The method according to claim 11, wherein: The positioning reference signal scheduling information includes information indicating one or more cells and one or more beams that transmit the positioning reference signal.

13. The method according to claim 11, wherein: In response to the positioning reference signal command from the positioning node, the base station transmits the positioning reference signal using a given beam suitable for transmitting the positioning reference signal at a given time.

14. The method according to claim 11, wherein: The sending of the positioning reference signal scheduling information includes: In response to the mechanism request, a positioning request is sent to the user equipment.

15. The method according to claim 11, further comprising: Before sending the positioning reference signal scheduling information, a positioning request is sent in response to a triggering event.

16. The method according to claim 11, wherein: The sending of the positioning reference signal scheduling information includes: The positioning reference signal scheduling information is sent from a positioning node to the user equipment using an LTE positioning protocol.

17. The method according to claim 11, further comprising: An update is received from a user equipment, the update comprising updated information associated with a cell and / or a beam.

18. The method according to claim 17, further comprising: In response to receiving the update, additional control signaling including updated positioning reference signal scheduling information is sent.

19. The method according to claim 18, further comprising: sending a subsequent positioning reference signal on an updated beam associated with the updated positioning reference signal scheduling information; as well as In response to sending the subsequent positioning reference signal, an updated measurement result including updated user equipment location information is received.

20. A wireless electronic device used in a wireless communication system, the wireless electronic device comprising: processor; as well as a memory coupled to the processor, the memory comprising computer readable program code embodied in the memory, the computer readable program code, when executed by the processor, causing the processor to perform operations comprising: sending an indication including beam information to a location server, the beam information defining a beam suitable for: sending a positioning reference signal to the wireless electronic device, and determining, by the location server, positioning reference signal scheduling information based on the beam information from the wireless electronic device; receiving, from the location server, the positioning reference signal scheduling information for an upcoming transmission of the positioning reference signal from a base station; Based on the received positioning reference signal scheduling information, performing measurement on the positioning reference signal; as well as The measurement results are provided to the location server.