Business operation management system and method with autonomous prompting function

The business operation management system with self-prompting function has solved the problem of operational errors in the process of archiving and organizing official documents, improved the efficiency of approval work, and enhanced the standardization and user-friendliness of operations.

CN112785180BActive Publication Date: 2024-10-01贵州惠智电子技术有限责任公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110129391.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-29
Publication Date
2024-10-01
Estimated Expiration
2041-01-29

AI Technical Summary

Technical Problem

Traditional business approval methods are prone to operational errors during the filing and organization of official documents, resulting in low approval efficiency and a lack of effective prompts and guidance.

Method used

Design a business operation management system with autonomous prompting function, including a document storage module, a document access module, a request confirmation prompting module, an abnormal data classification and storage module, a responsibility information push module, and a standardized operation prompting module. The system determines the legality of operation requests by using flow tag information, generates conflict prompt information, and allows users to confirm whether to continue the operation.

Benefits of technology

It effectively avoids errors in the process of approving official documents, improves the efficiency of the approval work, and enhances the standardization and humanization of the operation through the accountability tracking mechanism.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112785180B_ABST
    Figure CN112785180B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of information processing technology, and in particular to a business operation management system and method with an autonomous prompt function, wherein the method is applied to the system, wherein the system includes a user terminal and a server, and the server includes: an official document storage module: used to store official documents, operation flow sequence and flow label information; an official document access module: used to determine whether an operation request complies with the operation flow sequence, and if it does not comply with the operation flow sequence, conflict prompt information is generated; a request confirmation prompt module: used to feedback whether to continue the current operation request based on the conflict prompt information; if the feedback information is yes, the current operation request is continued to be executed, and if the feedback information is no, the current operation request is continued to be terminated. The present invention solves the problem that the archiving and sorting work of official documents in the current approval process is prone to operational errors, resulting in the previously completed approval work being in vain, making the approval work inefficient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of information processing technology, and in particular to a business operation management system and method with an autonomous prompting function. Background Art

[0002] With the rapid development of the information age, the traditional business approval method has long been unable to meet people's needs, especially in the context of deepening administrative reforms and improving work efficiency, government agencies have chosen to conduct online office work through business approval systems. The approval business of government agencies is quite complex and changeable. The approval matters for applicants often involve business collaboration of multiple departments. The business complexity and quantity increase proportionally, and the business approval process and approval form content often change repeatedly, which makes it easy to make mistakes in the approval process and lacks effective prompts and guidance. In particular, the filing and sorting of official documents in the current approval process is all done manually, and the number of official documents is large and the types are complicated. As a result, the filing and sorting of official documents in the approval process is prone to operational errors, which makes the official documents fail to be executed in the order of the operation process, and then the approval work completed previously is in vain, making the approval work inefficient. Summary of the invention

[0003] One of the purposes of the present invention is to provide a business operation management system with an autonomous prompt function to solve the problem that in the current approval process, the filing and sorting of official documents is prone to operational errors, resulting in the previously completed approval work being wasted, resulting in low approval work efficiency.

[0004] In order to achieve the above object, a business operation management system with an autonomous prompting function is provided, including a user terminal and a server, wherein the server includes:

[0005] Official document storage module: used to store official documents, the operation flow sequence stored in association with the official documents, and the flow label information of the stage at which the current official document is in the order of the operation flow sequence;

[0006] Official document file access module: used to receive the operation request of the user end to access the official document file, and judge whether the operation request conforms to the operation process sequence according to the flow tag information. If it does not conform to the operation process sequence, a conflict prompt message is generated;

[0007] Request confirmation prompt module: used to send conflict prompt information to the user end, and receive feedback information from the user end on whether to continue the current operation request based on the conflict prompt information; if the feedback information is yes, continue to execute the current operation request, if the feedback information is no, continue to terminate the current operation request.

[0008] Principles and advantages:

[0009] 1. The setting of the official document storage module can store official documents, the operation process sequence associated with the official document documents, and the associated storage of the flow label information of the stage at which the current official document documents are in the sequence of the operation process. The flow label information can facilitate the user to understand which stage the official document documents are in the operation process sequence, and know the correct flow direction of the official document documents through the operation process sequence, thereby avoiding mistakes in the approval process of the official document documents due to inaccurate approval process direction.

[0010] 2. The setting of the official document access module determines whether the operation request complies with the operation process sequence according to the flow tag information. If it does not comply with the operation process sequence, a conflict prompt message is generated. The conflict prompt message reminds the customer that the current judgment operation does not comply with the operation process sequence, preventing the user from continuing to execute, causing the previously completed approval work to be in vain, making the approval work inefficient.

[0011] 3. Setting of the request confirmation prompt module, by sending the conflict prompt information to the user end, and receiving the feedback information from the user end on whether to continue the current operation request according to the conflict prompt information; if the feedback information is yes, then continue to execute the current operation request, if the feedback information is no, then continue to terminate the current operation request. In principle, this solution does not prevent the user's operation, giving the user the highest degree of freedom, making the approval more humane.

[0012] Furthermore, the server further comprises:

[0013] Abnormal data classification storage module: It is also used to classify the official documents, conflict prompt information and feedback information operated according to the operation request as abnormal data, and associate the abnormal data with the identity information corresponding to the user end for storage.

[0014] The setting of the abnormal data classification storage module collects and stores abnormal data, which makes it easy to trace the responsibility for the problem after it occurs.

[0015] Furthermore, the server further comprises:

[0016] Responsibility information push module: used to push the responsibility information required for not executing in sequence of the operation process to the user end when the feedback information is yes, and receive the received information of the responsibility information received by the user end; it is also used to store the responsibility information and the received information in the exception data.

[0017] The setting of the responsibility information push module sends responsibility information to the user end, so that the user end can understand the corresponding responsibilities arising from erroneous operations and avoid problems caused by users' insistence on operations.

[0018] Furthermore, the server further comprises:

[0019] Standard operation prompt module: after receiving feedback information, it sends prompt information to the user end to ask the user to operate according to the official document specifications.

[0020] The setting of the standardized operation prompt module makes it easy to remind users to perform approval operations in accordance with official document specifications, thereby avoiding problems during the approval process.

[0021] The second object of the present invention is to provide a business operation management method with an autonomous prompting function. The method is applied to the above system and specifically includes the following steps:

[0022] Official document storage step: storing official document files, the operation flow sequence stored in association with the official document files, and associated storage of flow label information of the stage at which the current official document files are in the order of the operation flow sequence;

[0023] Official document file access step: receiving an operation request from a user end to access an official document file, judging whether the operation request complies with the operation process sequence according to the flow tag information, and generating a conflict prompt message if the operation request complies with the operation process sequence;

[0024] Request confirmation prompt step: send the conflict prompt information to the user end, and receive feedback information from the user end on whether to continue the current operation request based on the conflict prompt information; if the feedback information is yes, continue to execute the current operation request, if the feedback information is no, continue to terminate the current operation request.

[0025] Principles and advantages:

[0026] 1. The setting of the official document file storage step can store official document files, the operation process sequence associated with the official document files, and the associated storage of the flow label information of the stage at which the current official document files are in the sequence of the operation process. The flow label information can facilitate the user to understand which stage the official document files are in the operation process sequence, and know the correct flow direction of the official document files through the operation process sequence, thereby avoiding mistakes in the approval process of the official document files due to inaccurate approval process direction.

[0027] 2. The setting of the document access step is to judge whether the operation request conforms to the operation process sequence according to the flow tag information. If it does not conform to the operation process sequence, a conflict prompt message is generated. The conflict prompt message reminds the customer that the current judgment operation does not conform to the operation process sequence, so as to prevent the user from continuing to execute, which will cause the previously completed approval work to be in vain, making the approval work efficiency low.

[0028] 3. Setting of the request confirmation prompt step, by sending the conflict prompt information to the user end, and receiving the feedback information from the user end on whether to continue the current operation request according to the conflict prompt information; if the feedback information is yes, then continue to execute the current operation request, if the feedback information is no, then continue to terminate the current operation request. In principle, this solution does not prevent the user's operation, giving the user the highest degree of freedom, making the approval more humane.

[0029] Further, the method further comprises the following steps:

[0030] Abnormal data classification and storage step: It is also used to classify the official documents, conflict prompt information and feedback information operated according to the operation request as abnormal data, and associate the abnormal data with the identity information corresponding to the user end for storage.

[0031] The setting of abnormal data classification and storage steps collects and stores abnormal data, making it easier to trace the responsibility for problems after they occur.

[0032] Further, the method further comprises the following steps:

[0033] Responsibility information push step: when the feedback information is yes, push the responsibility information required for not executing according to the operation process sequence to the user end, and receive the received information of the responsibility information received by the user end; then store the responsibility information and the received information in the abnormal data.

[0034] The setting of the responsibility information push step sends responsibility information to the user end, so that the user end can understand the corresponding responsibilities arising from erroneous operations and avoid problems caused by users' insistence on operations.

[0035] Further, the method further comprises the following steps:

[0036] Standard operation prompt steps: After receiving the feedback information, a prompt message is sent to the user to ask the user to operate according to the official document specifications.

[0037] Standardize the setting of operation prompt steps to prompt users to perform approval operations in accordance with official document specifications, thereby avoiding problems during the approval process. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 This is a logical block diagram of a business operation management system with an autonomous prompting function in Embodiment 1 of the present invention. DETAILED DESCRIPTION

[0039] The following is further described in detail through specific implementation methods:

[0040] Embodiment 1

[0041] A business operation management system with an autonomous prompt function, basically as shown in the attached Figure 1 As shown: It includes a user terminal and a server. The user terminal is a smart phone or an office computer equipped with an APP or other software for remote communication with the server. The server includes:

[0042] Official document storage module: used to store official documents, the operation process sequence associated with the official document, and the associated storage of the flow label information of the stage at which the current official document is in the order of the operation process; the official document is a Word file, Excel file, etc., and the operation process sequence includes undertaking, review, completion and approval, so the flow label information also includes undertaking, review, completion and approval. The user end can understand the stage of the official document in the operation process sequence through the flow label information, and know the correct flow direction of the official document through the operation process sequence, so as to avoid the error of inaccurate approval process direction during the approval process of the official document.

[0043] Official document file access module: It is used to receive operation requests from the user end to access and operate official document files, and judge whether the operation request complies with the operation process sequence according to the flow tag information. If it does not comply with the operation process sequence, a conflict prompt message is generated; for example, the actual operation that the current official document file should perform is completion. If the user has not completed the archiving operation before completion, it does not comply with the operation process sequence. The official document file access module will generate a conflict prompt message, and through the conflict prompt message, it will remind the customer that the current judgment operation does not comply with the operation process sequence, so as to prevent the user from continuing to execute, resulting in the approval work completed previously being wasted, making the approval work inefficient.

[0044] Request confirmation prompt module: used to send conflict prompt information to the user end, and receive feedback from the user end on whether to continue the current operation request based on the conflict prompt information; if the feedback information is yes, the current operation request will continue to be executed, and if the feedback information is no, the current operation request will continue to be terminated. In principle, this solution does not prevent the user's operation, giving the user the highest degree of freedom, making the approval more humane.

[0045] Abnormal data classification and storage module: It is also used to classify the official documents, conflict prompt information and feedback information operated according to the operation request as abnormal data, and associate the abnormal data with the identity information corresponding to the user end for storage. By collecting and storing abnormal data, it is convenient to trace back the responsibility of the problem after the problem occurs.

[0046] Responsibility information push module: when the feedback information is yes, it pushes the responsibility information required for not following the operation process sequence to the user end, and receives the received information of the responsibility information received by the user end; it is also used to store the responsibility information and the received information into the abnormal data. By sending the responsibility information to the user end, it is convenient for the user end to understand the corresponding responsibility generated after the wrong operation, and avoid problems caused by the user's insistence on operation.

[0047] Standardized operation prompt module: After receiving feedback information, it sends prompt information to the user end to ask the user to operate according to the official document specifications. The setting of the standardized operation prompt module is convenient for prompting users to perform approval operations according to the official document specifications, thereby avoiding problems in the approval process.

[0048] A business operation management method with an autonomous prompting function, which is applied to the above system, specifically comprises the following steps:

[0049] Official document storage step: storing official document files, the operation flow sequence stored in association with the official document files, and associated storage of flow label information of the stage at which the current official document files are in the order of the operation flow sequence;

[0050] Official document file access step: receiving an operation request from a user end to access an official document file, judging whether the operation request complies with the operation process sequence according to the flow tag information, and generating a conflict prompt message if the operation request complies with the operation process sequence;

[0051] Request confirmation prompt step: send the conflict prompt information to the user end, and receive feedback information from the user end on whether to continue the current operation request based on the conflict prompt information; if the feedback information is yes, continue to execute the current operation request, if the feedback information is no, continue to terminate the current operation request.

[0052] Abnormal data classification and storage step: It is also used to classify the official documents, conflict prompt information and feedback information operated according to the operation request as abnormal data, and associate the abnormal data with the identity information corresponding to the user end for storage.

[0053] Responsibility information push step: when the feedback information is yes, push the responsibility information required for not executing according to the operation process sequence to the user end, and receive the received information of the responsibility information received by the user end; then store the responsibility information and the received information in the abnormal data.

[0054] Standard operation prompt steps: After receiving the feedback information, a prompt message is sent to the user to ask the user to operate according to the official document specifications.

[0055] Embodiment 2

[0056] The difference between the second embodiment and the first embodiment is that the server in the business operation management system with the autonomous prompt function further includes the following modules:

[0057] Automatic query module: used to automatically query abnormal data and corresponding user terminals in the abnormal data classification storage module within a set time period; the time period includes working days, working weeks, etc. In this embodiment, working days are used as units.

[0058] Abnormal analysis module: used to obtain the user's operating authority for the official document file, as well as the importance level of the official document file, and determine whether the user terminal performs a bypass operation based on the operating authority and the importance level. If it is a bypass operation, determine whether the impact of the current user's operation request after execution is serious based on the importance level of the official document file. If it is serious, generate an alarm message; if it is not serious, generate a violation message. In this embodiment, determine whether the impact of the current user's operation request after execution is serious through a table lookup method, specifically record the impacts of multiple operation requests after execution into a table, obtain its keywords based on the current user's operation request, and search and match from the table based on the keywords.

[0059] Exception handling module: used to send the alarm information and the responsibility information in the abnormal data to the user end when the alarm information is generated, and match the correction and compensation strategy that the user end needs to take from the preset strategy library, and recommend the correction and compensation strategy to the user end. And when the number of violation information and alarm information exceeds the set threshold, the user end's operation authority is reduced.

[0060] The business operation management method with autonomous prompt function also includes the following steps:

[0061] Automatic query step: automatically query abnormal data and corresponding user terminals in the abnormal data classification storage module within a set time period; the time period includes working days, working weeks, etc. In this embodiment, working days are used as units.

[0062] Abnormal analysis step: obtain the user's operating authority for the official document file, and the importance level of the official document file, and determine whether the user terminal has performed a bypass operation based on the operating authority and the importance level. If it is a bypass operation, determine whether the impact of the current user's operation request after execution is serious based on the importance level of the official document file. If it is serious, generate an alarm message; if it is not serious, generate a violation message. In this embodiment, determine whether the impact of the current user's operation request after execution is serious through a table lookup method, specifically record the impacts of multiple operation requests after execution into a table, obtain its keywords based on the current user's operation request, and search and match from the table based on the keywords.

[0063] Exception handling steps: When an alarm message is generated, the alarm message and the responsibility information in the abnormal data are sent to the user end, and the correction and compensation strategy that the user end needs to take in the future is matched from the preset strategy library, and the correction and compensation strategy is recommended to the user end. When the number of violation information and alarm information exceeds the set threshold, the user end's operation authority is reduced.

[0064] The above is only an embodiment of the present invention. The common sense such as the known specific structure and characteristics in the scheme is described too much here. The ordinary technicians in the relevant field know all the common technical knowledge in the technical field of the invention before the application date or priority date, can know all the existing technologies in the field, and have the ability to apply the conventional experimental means before that date. The ordinary technicians in the relevant field can improve and implement this scheme in combination with their own abilities under the enlightenment given by this application. Some typical known structures or known methods should not become obstacles for ordinary technicians in the relevant field to implement this application. It should be pointed out that for those skilled in the art, without departing from the structure of the present invention, several deformations and improvements can be made, which should also be regarded as the protection scope of the present invention, which will not affect the effect of the implementation of the present invention and the practicality of the patent. The protection scope required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A business operation management system with autonomous reminder function, Features: It includes a user terminal and a server, wherein the server includes: Official document storage module: used to store official documents, the operation flow sequence stored in association with the official documents, and the flow label information of the stage at which the current official document is in the order of the operation flow sequence; Official document file access module: used to receive the operation request of the user end to access the official document file, and judge whether the operation request conforms to the operation process sequence according to the flow tag information. If it does not conform to the operation process sequence, a conflict prompt message is generated; Request confirmation prompt module: used to send conflict prompt information to the user end, and receive feedback information from the user end on whether to continue the current operation request based on the conflict prompt information; if the feedback information is yes, continue to execute the current operation request, if the feedback information is no, continue to terminate the current operation request; The server also includes: Abnormal data classification storage module: also used to classify the official documents, conflict prompt information and feedback information operated according to the operation request as abnormal data, and associate the abnormal data with the identity information corresponding to the user end for storage; The server also includes: Responsibility information push module: used to push the responsibility information required for not following the operation flow sequence to the user end when the feedback information is yes, and receive the received information of the responsibility information received by the user end; and also used to store the responsibility information and the received information into the abnormal data; Abnormal analysis module: used to obtain the user's operation authority for the official document and the importance level of the official document, and judge whether the user has performed a bypass operation based on the operation authority and the importance level. If it is a bypass operation, judge whether the impact of the current user's operation request after execution is serious based on the importance level of the official document. If it is serious, generate an alarm message; if it is not serious, generate a violation message; Exception handling module: used to send the alarm information and the responsibility information in the exception data to the user end when the alarm information is generated, and match the correction and compensation strategy that the user end needs to take from the preset strategy library, and recommend the correction and compensation strategy to the user end; Standard operation prompt module: after receiving feedback information, it sends prompt information to the user end to ask the user to operate according to the official document specifications.

2. A business operation management method with autonomous reminder function, Features: The following steps are involved: Official document storage steps: the operation process sequence of storing official document files and associating them with official document files. And associated storage of the flow label information of the stage at which the current official document is in the sequence of flow according to the operation process sequence; Official document file access step: receiving an operation request from a user end to access an official document file, judging whether the operation request complies with the operation process sequence according to the flow tag information, and generating a conflict prompt message if the operation request complies with the operation process sequence; Request confirmation prompt step: sending the conflict prompt information to the user end, and receiving the feedback information of whether to continue the current operation request according to the conflict prompt information from the user end; if the feedback information is yes, continue to execute the current operation request, if the feedback information is no, continue to terminate the current operation request; The following steps are also included: Abnormal data classification storage module: also used to classify the official documents, conflict prompt information and feedback information operated according to the operation request as abnormal data, and associate the abnormal data with the identity information corresponding to the user end for storage; Responsibility information push step: when the feedback information is yes, push the responsibility information required for not executing in the order of the operation process to the user end, and receive the received information of the responsibility information received by the user end; then store the responsibility information and the received information into the abnormal data; Standard operation prompt steps: After receiving the feedback information, a prompt message is sent to the user to ask the user to operate according to the official document specifications.