Three-dimensional simulation method, device and computer equipment for lifting construction of substation facilities

Through the three-dimensional simulation method, the hoisting equipment parameters and candidate position points are obtained, the force information is calculated, and the three-dimensional simulation animation is generated, which solves the problem of low iteration efficiency of hoisting construction in the existing technology, realizes the rapid generation of suitable hoisting plans and risk prediction, and improves the efficiency of hoisting construction. Construction efficiency and safety.

CN112818519BActive Publication Date: 2024-10-25CHINA SOUTHERN POWER GRID BIG DATA SERVICE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110052569.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-15
Publication Date
2024-10-25
Estimated Expiration
2041-01-15

AI Technical Summary

Technical Problem

In the existing technology, the iterative efficiency of hoisting construction is low, it is difficult to quickly predict and obtain suitable hoisting plans, and it is impossible to quickly and efficiently perform risk prediction and plan optimization.

Method used

Provides a three-dimensional simulation method for hoisting construction of substation facilities. By obtaining the weight of the equipment to be hoisted and the parameters of the hoisting equipment, the candidate hoisting position points are determined, the force information is calculated, the safety of the hoisting is judged, and a three-dimensional simulation animation is generated to realize the hoisting plan. Rapid generation and feasibility estimates.

Benefits of technology

It greatly reduces the data calculation in the hoisting plan formulation process, saves working time, improves work efficiency, can visually display the hoisting process, discovers risks in advance and generates solutions, and improves risk prediction and prevention effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112818519B_ABST
    Figure CN112818519B_ABST
Patent Text Reader

Abstract

The present application relates to a three-dimensional simulation method, device and computer equipment for the lifting construction of substation facilities, including: obtaining the weight corresponding to the substation facilities to be lifted, the lifting equipment parameters corresponding to the lifting equipment and a plurality of candidate lifting position points constituting the lifting path; obtaining a target lifting position point from a plurality of candidate lifting position points according to the lifting equipment parameters and the first position information corresponding to each candidate lifting position point; obtaining the force information corresponding to the lifting equipment according to the weight and the target lifting position point, and judging whether the lifting is safe according to the force information; when the lifting is safe, generating a lifting plan according to the target lifting position point, and generating a three-dimensional simulation animation reflecting the lifting process of the substation facilities according to the lifting plan, thereby realizing the rapid generation of the lifting plan, being able to quickly estimate the feasibility of the lifting position point and the safety of the lifting process during the generation process, saving overall working time and improving work efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of computer technology, and in particular to a three-dimensional simulation method, device, computer equipment and storage medium for the lifting construction of substation facilities. Background Art

[0002] In the process of infrastructure construction, hoisting construction is often involved. For example, when constructing substation facilities, hoisting equipment is used to install and put relevant components in place. As a complex construction method, hoisting construction has diverse and changeable construction methods and organizational procedures.

[0003] In the prior art, for hoisting construction, the hoisting plan is mainly formulated or optimized by operators based on past construction experience. However, this method has low iterative efficiency and is difficult to quickly predict the risks in the hoisting plan and quickly obtain a suitable hoisting plan. Summary of the invention

[0004] Based on this, it is necessary to provide a three-dimensional simulation method, device, computer equipment and storage medium for the lifting construction of substation facilities in response to the above technical problems.

[0005] A three-dimensional simulation method for substation facility hoisting construction, the method comprising:

[0006] Obtaining the weight of the substation facility to be hoisted, the hoisting equipment parameters of the hoisting equipment, and multiple candidate hoisting position points constituting the hoisting path;

[0007] According to the hoisting equipment parameters and the first position information corresponding to each candidate hoisting position point, a target hoisting position point is obtained from a plurality of candidate hoisting position points; the target hoisting position point is a position point to which the hoisting equipment can deliver the substation facility;

[0008] According to the weight and the target hoisting position point, obtaining force information corresponding to the hoisting equipment, and judging whether the hoisting is safe according to the force information;

[0009] When the hoisting is safe, a hoisting plan is generated according to the target hoisting position point, and a three-dimensional simulation animation reflecting the hoisting process of the substation facility is generated according to the hoisting plan.

[0010] Optionally, the first position information is position information in a world coordinate system, and acquiring a target hoisting position point from a plurality of candidate hoisting position points according to the hoisting equipment parameters and the first position information corresponding to each candidate hoisting position point includes:

[0011] For each piece of first position information, coordinate transformation is performed on the first position information to obtain second position information in a relative coordinate system centered on the hoisting device;

[0012] According to the boom parameters and the platform parameters in the lifting equipment parameters, the moving range of the hook of the lifting equipment is obtained;

[0013] According to the moving range and each piece of second position information, a target hoisting position point is acquired from a plurality of candidate hoisting position points.

[0014] Optionally, acquiring force information corresponding to the hoisting equipment according to the weight and the target hoisting position point includes:

[0015] Determine, according to the weight and the second position information corresponding to the target hoisting position point, first force information corresponding to the boom and second force information corresponding to the rope when the substation facility is at the target hoisting position point;

[0016] Based on the first force information and the second force information, force information corresponding to the hoisting equipment is obtained.

[0017] Optionally, judging whether the hoisting is safe according to the force information includes:

[0018] When the first force information is less than the lifting weight, and the second force information is less than the load-bearing capacity of the lifting rope, the lifting is determined to be safe;

[0019] When the first force information exceeds the lifting weight, or the second force information exceeds the bearing capacity of the lifting rope, lifting danger is determined.

[0020] Optionally, the target hoisting position points include at least two target hoisting position points, and generating a hoisting plan according to the target hoisting position points includes:

[0021] Obtaining the hoisting construction time and the distance between adjacent target hoisting position points;

[0022] Determine the movement speed corresponding to each hoisting component of the hoisting equipment according to the hoisting construction time and the distance;

[0023] Generate a lifting plan based on the corresponding movement speed of each lifting component and each target lifting position point.

[0024] Optionally, generating a three-dimensional simulation animation reflecting the lifting process of the substation facility according to the lifting scheme includes:

[0025] According to the hoisting scheme, the motion trajectory corresponding to each hoisting component in the hoisting equipment is obtained, and according to the multiple motion trajectories, a three-dimensional simulation animation reflecting the hoisting process of the substation facility is generated;

[0026] The motion trajectory corresponding to the hoisting component includes at least one of the following:

[0027] The crane leg extension and retraction trajectory, boom rotation trajectory, boom extension and retraction trajectory, rope extension and retraction trajectory, hydraulic rod extension and retraction trajectory, and hook movement trajectory.

[0028] Optionally, the step of obtaining the weight of the substation facility to be hoisted and the hoisting equipment parameters of the hoisting equipment includes:

[0029] Obtain the weight of the substation facility to be hoisted, and obtain candidate hoisting equipment whose lifting capacity matches the weight;

[0030] In response to the user operation, the selected lifting equipment is determined from the candidate lifting equipment, and the lifting equipment parameters corresponding to the lifting equipment are obtained.

[0031] A three-dimensional simulation device for lifting construction of substation facilities, the device comprising:

[0032] A parameter acquisition module, used to obtain the weight corresponding to the substation facility to be hoisted, the hoisting equipment parameters corresponding to the hoisting equipment, and a plurality of candidate hoisting position points constituting the hoisting path;

[0033] A target hoisting position point determination module is used to obtain a target hoisting position point from multiple candidate hoisting position points according to the hoisting equipment parameters and the first position information corresponding to each candidate hoisting position point; the target hoisting position point is a position point where the hoisting equipment can deliver the substation facility;

[0034] A hoisting safety acquisition module, used to obtain force information corresponding to the hoisting equipment according to the weight and the target hoisting position point, and determine whether the hoisting is safe according to the force information;

[0035] The three-dimensional simulation animation generation module is used to generate a hoisting plan according to the target hoisting position point when the hoisting is safe, and generate a three-dimensional simulation animation reflecting the hoisting process of the substation facility according to the hoisting plan.

[0036] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of any of the above methods when executing the computer program.

[0037] A computer-readable storage medium stores a computer program, wherein the computer program, when executed by a processor, implements the steps of any of the above methods.

[0038] The above-mentioned three-dimensional simulation method, device, computer equipment and storage medium for the lifting construction of substation facilities obtain the weight corresponding to the substation facilities to be lifted, the lifting equipment parameters corresponding to the lifting equipment and a plurality of candidate lifting position points constituting the lifting path, and obtain the target lifting position point from the plurality of candidate lifting position points according to the lifting equipment parameters and the first position information corresponding to each candidate lifting position point, obtain the force information corresponding to the lifting equipment according to the weight and the target lifting position point, and judge whether the lifting is safe according to the force information. When the lifting is safe, a lifting plan is generated according to the target lifting position point, and a three-dimensional simulation animation reflecting the lifting process of the substation facilities is generated according to the lifting plan, thereby realizing the rapid generation of the lifting plan, being able to quickly estimate the feasibility of the lifting position point and the safety of the lifting process during the generation process, greatly reducing the large amount of data calculation in the process of formulating the lifting plan, saving overall working time and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 A schematic flow chart of a three-dimensional simulation method for substation facility hoisting construction in one embodiment;

[0040] Figure 2 It is a schematic flow chart of a force information acquisition step in one embodiment;

[0041] Figure 3a is a schematic diagram of a three-dimensional simulation operation interface in one embodiment;

[0042] Figure 3b is a schematic diagram of another three-dimensional simulation operation interface in one embodiment;

[0043] Figure 4 A schematic diagram of a simulation process of substation facility hoisting construction in one embodiment;

[0044] Figure 5 It is a structural block diagram of a three-dimensional simulation device for lifting construction of substation facilities in one embodiment;

[0045] Figure 6 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0047] Hoisting construction is a complex task, and its construction methods and organizational procedures are diverse and changeable. In the process of substation hoisting construction, in order to ensure the smooth progress of the substation construction process, it is necessary to standardize the construction process. At the same time, in order to ensure the engineering quality of substation construction, a corresponding construction plan can be generated for substation hoisting construction. In the prior art, the optimization of substation hoisting construction plan and corresponding construction organization method mainly relies on the construction experience of hoisting engineers to control and optimize the construction, and generates the hoisting plan of substation hoisting construction process by drawing two-dimensional drawings.

[0048] In order to reduce risks, save costs and shorten work cycles, hoisting engineers are often required to develop a safe, efficient and economical hoisting plan. However, the above method has low iterative efficiency. In the face of complex and large-scale substation hoisting projects, the amount of data on various equipment performance parameters is huge. Manual verification and calculation and selection of hoisting equipment has become a very tedious task. In addition, the risk prediction ability of the hoisting process is insufficient, and it is impossible to quickly and efficiently obtain a suitable hoisting plan, which has obvious limitations.

[0049] Based on this, the present application provides a 3D simulation method for substation installation construction, which can be applied to a terminal or server that can produce and render 3D models, wherein the terminal can be, but is not limited to, various personal computers and laptops, and the server can be implemented as an independent server or a server cluster composed of multiple servers. The terminal or server can be installed with 3D mapping software and / or 3D animation software.

[0050] In one embodiment, Figure 1 As shown, a three-dimensional simulation method for substation facility installation construction is provided. This embodiment uses the method applied to a terminal as an example. It can be understood that the method can also be applied to a server, and can also be applied to a system including a terminal and a server, and is implemented through the interaction between the terminal and the server. In this embodiment, the method can include the following steps:

[0051] Step 101, obtaining the weight corresponding to the substation facility to be hoisted, the hoisting equipment parameters corresponding to the hoisting equipment, and a plurality of candidate hoisting position points constituting the hoisting path.

[0052] As an example, a substation facility may be a component of a substation. In actual applications, a substation may be constructed by assembling and cooperating a plurality of substation facilities.

[0053] The lifting equipment parameters may include parameters reflecting the objective properties and / or lifting capacity of the lifting equipment, such as the weight corresponding to the sling in the lifting equipment, the lifting weight corresponding to the lifting equipment, the lifting amplitude, lifting height, movement speed and other parameters of the lifting equipment. Among them, the lifting weight corresponding to the lifting equipment may refer to the weight that can be lifted by the boom of the lifting equipment, the lifting amplitude may refer to the angular range in which the lifting equipment can rotate, such as the rotation angle range of the boom, the lifting height may refer to the height to which the lifting equipment can lift an object, and the movement speed may include multiple retractable or rotatable components in the lifting equipment, and the corresponding retractable or rotation speeds.

[0054] In this embodiment, the weight corresponding to the substation to be hoisted can be obtained, and the corresponding hoisting equipment can be selected for the substation to be hoisted, and then the hoisting equipment parameters corresponding to the hoisting equipment can be obtained, and multiple candidate hoisting position points corresponding to the substation facility can be obtained. Through multiple candidate hoisting position points, a hoisting path of the substation facility can be formed, wherein the candidate hoisting position points can also be called hoisting key points, and the multiple candidate hoisting position points include at least two candidate hoisting position points.

[0055] For example, if the substation needs to be hoisted from the starting point A to the end point B, it can be hoisted directly from the starting point A to the end point B, and the candidate hoisting position points are the starting point A and the end point B. Alternatively, one or more candidate hoisting position points can be set between the starting point A and the end point B, such as setting point C and point D, and the corresponding candidate hoisting position points include A, B, C, and D.

[0056] Step 102, obtaining a target hoisting location point from multiple candidate hoisting location points according to the hoisting equipment parameters and the first location information corresponding to each candidate hoisting location point; the target hoisting location point is a location point where the hoisting equipment can deliver the substation facility.

[0057] In practical applications, in 3D mapping software and / or 3D animation software, multiple candidate lifting position points can be obtained by setting coordinates or by workers placing points in a virtual 3D scene.

[0058] Since one or more of the multiple candidate lifting position points may have a probability of exceeding the corresponding lifting range of the lifting equipment, after obtaining the multiple candidate lifting position points, the lifting feasibility of each candidate lifting position point can be judged according to the lifting equipment parameters and the first position information corresponding to each candidate lifting position point, and the target lifting position point can be obtained from the multiple candidate lifting position points, wherein the target lifting position point can refer to a position point where the substation facilities can be delivered by the lifting equipment.

[0059] Step 103, obtaining force information corresponding to the hoisting equipment according to the weight and the target hoisting position point, and judging whether the hoisting is safe according to the force information.

[0060] After the target hoisting position is determined, since the stress state of the substation facility at different target hoisting positions may be different, the stress state corresponding to the hoisting equipment used to hoist the substation facility may also be different when the substation facility is hoisted to different positions. For example, if the target hoisting position is located on a platform or the target position is in mid-air, the stress information corresponding to the hoisting equipment will be different.

[0061] In this embodiment, after the target lifting position is determined, the force information corresponding to the lifting equipment can be obtained according to the weight corresponding to the substation facility and the target lifting position, and whether the lifting is safe can be determined based on the force information.

[0062] Step 104, when the hoisting is safe, a hoisting plan is generated according to the target hoisting position point, and a three-dimensional simulation animation reflecting the hoisting process of the substation facility is generated according to the hoisting plan.

[0063] When the lifting is safe, the lifting path of the substation facility can be determined according to the current lifting position point, and a lifting plan can be generated. In addition, a three-dimensional simulation animation reflecting the lifting process of the substation facility can be generated according to the lifting plan.

[0064] In this embodiment, by obtaining the weight corresponding to the substation facility to be hoisted, the hoisting equipment parameters corresponding to the hoisting equipment, and a plurality of candidate hoisting position points constituting the hoisting path, a target hoisting position point is obtained from the plurality of candidate hoisting position points according to the hoisting equipment parameters and the first position information corresponding to each candidate hoisting position point, and the force information corresponding to the hoisting equipment is obtained according to the weight and the target hoisting position point, and whether the hoisting is safe is judged according to the force information. When the hoisting is safe, a hoisting plan is generated according to the target hoisting position point, and a three-dimensional simulation animation reflecting the hoisting process of the substation facility is generated according to the hoisting plan, thereby realizing the rapid generation of the hoisting plan, being able to quickly estimate the feasibility of the hoisting position point and the safety of the hoisting process during the generation process, greatly reducing the large amount of data calculation in the process of formulating the hoisting plan, saving overall working time, and improving work efficiency.

[0065] In addition, by generating a three-dimensional simulation animation of the substation facility hoisting process, the hoisting process can be visualized, ensuring the standardization of construction and discovering risks in the hoisting process in advance. Users can generate solutions in advance based on the discovered risks, thereby achieving the effect of risk prediction and prevention.

[0066] In one embodiment, the first position information may be position information in a world coordinate system, and the world coordinate system may refer to a world coordinate system used in a three-dimensional mapping software or a three-dimensional animation software when constructing a three-dimensional model or a three-dimensional animation, and the position information may be three-dimensional coordinate information. The step of obtaining a target hoisting position point from a plurality of candidate hoisting position points according to the hoisting equipment parameters and the first position information corresponding to each candidate hoisting position point may include the following steps:

[0067] For each first position information, coordinate transformation is performed on the first position information to obtain second position information in a relative coordinate system centered on the lifting equipment; based on the boom parameters and platform parameters in the lifting equipment parameters, the moving range of the hook of the lifting equipment is obtained; based on the moving range and each second position information, a target lifting position point is obtained from multiple candidate lifting position points.

[0068] In a specific implementation, for each candidate lifting position point, the corresponding first position information can be transformed in coordinates, such as performing matrix translation and rotation operations on the first position information to obtain the corresponding second position information of the candidate lifting position point in a relative coordinate system centered on the lifting equipment.

[0069] In addition, the terminal device can determine the moving range of the hook in the lifting equipment based on the boom parameters and platform parameters in the lifting equipment parameters. The moving range can be the moving range of the hook in all directions in the three-dimensional space. The boom parameters may include the lifting amplitude and lifting height, and the platform parameters may include the platform length and platform position information.

[0070] After obtaining the moving range, for each candidate lifting position point, it can be determined whether it is within the moving range based on the position information corresponding to the candidate lifting position point. If so, the candidate lifting position point can be determined as the target lifting position point; if not, the candidate lifting position point is determined to be infeasible, and a prompt message is generated to prompt the user that the candidate lifting position point is infeasible, and the corresponding reason is displayed, for example, the candidate lifting position point exceeds the moving range corresponding to the lifting equipment.

[0071] In this embodiment, by obtaining the target lifting position point from multiple candidate lifting position points based on the moving range and each second position information, the feasibility of each candidate lifting position point of the user facility can be judged in advance, saving overall working time and providing a basis for quickly generating a feasible and suitable lifting plan.

[0072] In one embodiment, Figure 2 As shown, the step of obtaining the force information corresponding to the hoisting equipment according to the weight and the target hoisting position point may include the following steps:

[0073] Step 201, determining, based on the weight and the second position information corresponding to the target lifting position point, first force information corresponding to the boom and second force information corresponding to the rope when the substation facility is at the target lifting position point.

[0074] In practical applications, the lifting equipment can lift the substation facilities through the lifting arm. After determining the target lifting position point, the first force information corresponding to the lifting arm when the substation facilities are lifted to the target lifting position point can be determined according to the weight corresponding to the substation facilities to be lifted and the second position information corresponding to the target lifting position point.

[0075] Specifically, the environmental information within the preset range of the second position information can be obtained based on the second position information corresponding to the target hoisting position point, such as whether the target hoisting position point is in mid-air or on a supporting surface. If it is on a supporting surface, the load-bearing range of the supporting surface can be further obtained. Then, according to the weight corresponding to the substation facility and the environmental information around the second position information, spatial calculation and force analysis can be performed to obtain the force condition corresponding to the substation facility, and the first force information corresponding to the boom can be determined based on the force condition corresponding to the substation facility and the boom length and boom angle information corresponding to the boom. At the same time, the second force information corresponding to the suspension rope can be determined based on the force condition corresponding to the substation facility. When calculating the first force information and the second force information, the force condition can be calculated on the plane formed by the weight of the hoisting object and the boom, that is, the calculation is performed on the plane formed by the vector corresponding to the gravity of the substation facility and the boom.

[0076] Step 202: Obtain force information corresponding to the hoisting equipment based on the first force information and the second force information.

[0077] After obtaining the first force information and the second force information, they can be jointly determined as the force information corresponding to the lifting equipment. When subsequently judging whether the lifting is safe, a judgment can be made simultaneously based on the first force information and the second force information.

[0078] In this embodiment, by acquiring the first force information corresponding to the boom and the second force information corresponding to the lifting rope, and based on the first force information and the second force information, obtaining the force information corresponding to the lifting equipment, and making a judgment based on the first force information and the second force information, it is possible to comprehensively consider the impact of the substation facilities on the boom and the lifting rope during the lifting process, and quickly obtain an assessment of the lifting safety.

[0079] In one embodiment, judging whether the hoisting is safe according to the force information may include the following steps:

[0080] When the first force information is less than the lifting weight and the second force information is less than the bearing capacity of the lifting rope, the lifting is determined to be safe; when the first force information exceeds the lifting weight, or the second force information exceeds the bearing capacity of the lifting rope, the lifting is determined to be dangerous.

[0081] In practical applications, when the first force information is less than the lifting capacity of the lifting arm of the lifting facility, and the second force information is less than the load-bearing beam of the lifting rope, it can be determined that the lifting arm and the lifting rope are in a safe state during the lifting process, and the lifting is safe. When the first force information exceeds the lifting capacity or the second force information exceeds the load-bearing capacity of the lifting rope, the lifting arm or the lifting rope is overloaded during the lifting process, and the probability of abnormal conditions occurring during the lifting process is high, and the lifting is dangerous.

[0082] In this embodiment, the first force information can be compared with the lifting weight, and the second force information can be compared with the load-bearing capacity of the lifting rope to determine whether the lifting is safe and quickly obtain an assessment of the lifting safety.

[0083] In one embodiment, the target hoisting position points include at least two target hoisting position points, and generating a hoisting plan according to the target hoisting position points may include the following steps:

[0084] Obtain the hoisting construction time and the distance between adjacent target hoisting position points; determine the movement speed corresponding to each hoisting component of the hoisting equipment according to the hoisting construction time and the distance; generate a hoisting plan according to the movement speed corresponding to each hoisting component and each target hoisting position point.

[0085] As an example, the hoisting construction time may be the time taken to complete a hoisting construction of a substation facility, that is, the time taken to hoist the substation facility from a target hoisting position point as a starting point to a target hoisting position point as a focus point.

[0086] The various lifting components corresponding to the lifting equipment may include crane legs, crane arms, lifting ropes, and hydraulic rods.

[0087] In actual applications, users can obtain the hoisting construction time of the terminal facilities. After obtaining the hoisting construction time, the terminal can determine the moving speed of the substation facilities between adjacent hoisting positions according to the distance between adjacent target hoisting positions and the hoisting construction time, and determine the corresponding movement speed of each component in the hoisting equipment according to the moving speed, such as calculating the rotation or extension speed of the boom between two adjacent target hoisting positions. Then, a hoisting plan can be generated according to the movement speed and target hoisting position corresponding to each hoisting component.

[0088] In one example, after calculating the movement speeds corresponding to multiple lifting components, the lifting safety can be judged again, for example, whether the calculated movement speed exceeds the safe movement speed of the corresponding lifting component. If not, the lifting case can be determined. Otherwise, the lifting is determined to be dangerous and a prompt message is generated to remind the user that there are operational risks in lifting at the current movement speed. When calculating the movement speed of the lifting components and making safety judgments, a variety of mathematical calculations can be designed, such as angle calculations, radian calculations, trigonometric function operations, spatial matrix calculations, etc.

[0089] In this embodiment, a lifting plan can be generated according to the movement speeds corresponding to each lifting component and each target lifting position point, providing an accurate data basis for the subsequent generation of a three-dimensional simulation animation reflecting the lifting process of the substation facility.

[0090] In one embodiment, generating a three-dimensional simulation animation reflecting the lifting process of the substation facility according to the lifting plan may include the following steps:

[0091] According to the hoisting plan, the motion trajectory corresponding to each hoisting component in the hoisting equipment is obtained, and based on multiple motion trajectories, a three-dimensional simulation animation reflecting the hoisting process of the substation facility is generated.

[0092] As an example, the motion trajectory corresponding to the lifting component may include at least one of the following: a crane leg extension and retraction trajectory, a boom rotation trajectory, a boom extension and retraction trajectory, a rope extension and retraction trajectory, a hydraulic rod extension and retraction trajectory, and a hook motion trajectory.

[0093] In practical applications, since the lifting scheme may include the movement speed of each lifting component in the lifting equipment when the substation facility is lifted between two adjacent target lifting positions, the movement trajectory of each lifting component can be generated in combination with the movement speed and each target lifting position, and a three-dimensional simulation animation reflecting the lifting process of the substation facility is generated based on multiple movement trajectories, a three-dimensional model corresponding to the substation facility, and a three-dimensional model corresponding to the lifting equipment. The animation can simulate the lifting process, for example, simulating the extension and retraction of the crane legs, the rotation / extension of the crane boom, the extension and retraction of the lifting rope, the extension and retraction of the hydraulic rod, and the lifting of the hook during the lifting process. Through the animation, the user can observe the overall process of the substation lifting construction and obtain the lifting results.

[0094] In this embodiment, according to the lifting plan, the motion trajectory corresponding to each lifting component in the lifting equipment is obtained, and a three-dimensional simulation animation reflecting the lifting process of the substation facility is generated according to multiple motion trajectories, which can visualize the entire lifting process and the lifting results. Compared with traditional two-dimensional drawings, it is impossible to observe the lifting process and the actual effect after the lifting is completed, resulting in discrepancies between the actual lifting results and the expected effects. This embodiment allows users to intuitively discover the risks in the lifting process and improve the risk prevention effect.

[0095] In one embodiment, the step of obtaining the weight of the substation facility to be hoisted and the hoisting equipment parameters of the hoisting equipment includes:

[0096] Obtain the weight corresponding to the substation facility to be hoisted, and obtain candidate hoisting equipment whose lifting capacity matches the weight; in response to user operation, determine the selected hoisting equipment from the candidate hoisting equipment, and obtain the hoisting equipment parameters corresponding to the hoisting equipment.

[0097] In a specific implementation, the lifting equipment parameters corresponding to the candidate lifting equipment can be pre-stored in the terminal, and the lifting equipment parameters can include the lifting weight of the lifting equipment. The user can set the lifting object parameters corresponding to the substation facilities to be lifted in the terminal, and the lifting object parameters can include the weight of the substation facilities. When the terminal obtains the weight, the candidate lifting equipment whose lifting weight matches the weight can be obtained. In an example, the user can also set the size corresponding to the substation facilities to be lifted, and when obtaining matching candidate lifting equipment, the terminal can screen them in combination with the weight and size of the substation facilities.

[0098] After the terminal obtains the candidate lifting equipment, it can be displayed in the terminal interface, and the user can select it. In response to the user operation, the terminal can determine the selected lifting equipment from the candidate lifting equipment and obtain the lifting equipment parameters corresponding to the lifting equipment.

[0099] In this embodiment, by obtaining the weight corresponding to the substation facility to be hoisted, and obtaining candidate hoisting equipment whose lifting capacity matches the weight, in response to user operations, the selected hoisting equipment is determined from the candidate hoisting equipment, and the hoisting equipment parameters corresponding to the hoisting equipment are obtained. This provides feasible hoisting equipment for users to choose based on the weight corresponding to the substation facility, thereby saving overall working time and improving work efficiency.

[0100] In order to enable those skilled in the art to better understand the above steps, the embodiment of the present application is illustrated below by using an example, but it should be understood that the embodiment of the present application is not limited to this.

[0101] In actual applications, users can select the 3D model corresponding to the appropriate lifting equipment from the 3D model library in which the terminal pre-stores the 3D models corresponding to various types of machines, such as selecting a crane from earth moving trucks, cranes, purifiers, pressure test equipment, leveling instruments, micro-water testers, liquefied sulfur hexafluoride tanks, pressure oil filters, liquid recovery inflators and vacuum pumps.

[0102] After selecting the lifting equipment, the lifting equipment parameters corresponding to the lifting equipment can be loaded into the terminal memory, where the lifting equipment can be multiple lifting equipment with different lifting equipment parameters. The lifting equipment parameters may include the weight of the lifting equipment itself, the lifting weight, the lifting amplitude, the lifting height, the movement speed, the joint structure of the lifting equipment, etc. The joint structure is used to constrain the movement relationship of each lifting component in the lifting equipment.

[0103] Furthermore, the user can set the parameters of the hoisting object corresponding to the substation to be hoisted, and configure the hoisting action, wherein the hoisting object parameters may include the weight and size of the hoisting object, and the configuration of the hoisting object parameters and hoisting action can be set in Figure 3a The configuration area on the right side of the interface (such as Figure 3b Parameter configuration is performed in the configuration area (as shown), and specific lifting action parameters that can be set include: the name of the lifting object, the lifting target position (corresponding to the candidate lifting position point in this application), the lifting rope binding height, the number of lifting points, the lifting point position, and the lifting time (corresponding to the lifting construction time in this application). In one example, prompt information can be displayed in the configuration area.

[0104] The terminal can provide the user with one or more optional lifting equipment according to the parameters of the lifting object. After the user selects the lifting equipment, the lifting equipment parameters corresponding to the lifting equipment can be obtained, and the feasibility and safety analysis can be performed in combination with the lifting object parameters and the lifting action parameters. After the feasibility and safety analysis are passed, the movement speed of each lifting component can be determined in combination with the lifting time, and then the lifting plan can be obtained. In the process summary of generating the lifting plan, the lifting target position, lifting time or movement speed can be optimized and adjusted according to the calculated movement speed. If an infeasible situation occurs, a corresponding prompt message is generated to prompt the user the reason why the current lifting plan is not feasible.

[0105] After the hoisting scheme is generated, a 3D simulation animation can be generated based on the hoisting scheme. Figure 4 A simulation of the lifting process is shown.

[0106] It should be understood that although Figure 1 , Figure 2The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 1-2 At least part of the steps may include multiple steps or multiple stages. These steps or stages are not necessarily performed at the same time, but can be performed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed in turn or alternately with other steps or at least part of the steps or stages in other steps.

[0107] In one embodiment, Figure 5 As shown, a three-dimensional simulation device for the lifting construction of substation facilities is provided, and the device comprises:

[0108] The parameter acquisition module 501 is used to obtain the weight corresponding to the substation facility to be hoisted, the hoisting equipment parameters corresponding to the hoisting equipment, and a plurality of candidate hoisting position points constituting the hoisting path;

[0109] The target hoisting position point determination module 502 is used to obtain a target hoisting position point from multiple candidate hoisting position points according to the hoisting equipment parameters and the first position information corresponding to each candidate hoisting position point; the target hoisting position point is a position point where the hoisting equipment can deliver the substation facility;

[0110] A hoisting safety acquisition module 503 is used to acquire force information corresponding to the hoisting equipment according to the weight and the target hoisting position point, and determine whether the hoisting is safe according to the force information;

[0111] The three-dimensional simulation animation generation module 504 is used to generate a hoisting plan according to the target hoisting position point when the hoisting is safe, and generate a three-dimensional simulation animation reflecting the hoisting process of the substation facility according to the hoisting plan.

[0112] In one embodiment, the first position information is position information in a world coordinate system, and the target hoisting position point determination module 502 includes:

[0113] A conversion submodule, for performing coordinate conversion on each piece of first position information to obtain second position information in a relative coordinate system centered on the hoisting device;

[0114] A moving range determination submodule, used for obtaining the moving range of the hook of the lifting equipment according to the arm parameters and the platform parameters in the lifting equipment parameters;

[0115] The target hoisting position point acquisition submodule is used to acquire the target hoisting position point from multiple candidate hoisting position points according to the moving range and each second position information.

[0116] In one embodiment, the hoisting safety acquisition module 503 includes:

[0117] A force analysis submodule, for determining, according to the weight and the second position information corresponding to the target lifting position point, first force information corresponding to the boom and second force information corresponding to the lifting rope when the substation facility is at the target lifting position point;

[0118] The force information acquisition submodule is used to obtain the force information corresponding to the lifting equipment based on the first force information and the second force information.

[0119] In one embodiment, the hoisting safety acquisition module 503 includes:

[0120] A first comparison submodule, used for determining hoisting safety when the first force information is less than the lifting weight and the second force information is less than the load-bearing capacity of the lifting rope;

[0121] The second comparison submodule is used to determine the hoisting danger when the first force information exceeds the lifting weight, or the second force information exceeds the bearing capacity of the lifting rope.

[0122] In one embodiment, the target hoisting position points include at least two target hoisting position points, and the three-dimensional simulation animation generation module 504 includes:

[0123] A distance acquisition submodule is used to acquire the hoisting construction time and the distance between adjacent target hoisting position points;

[0124] A motion speed acquisition submodule, used to determine the motion speed corresponding to each hoisting component of the hoisting equipment according to the hoisting construction time and the distance;

[0125] The lifting plan generation submodule is used to generate a lifting plan according to the movement speed corresponding to each lifting component and each target lifting position point.

[0126] In one embodiment, the 3D simulation animation generation module 504 includes:

[0127] A motion trajectory acquisition submodule, used to acquire the motion trajectory corresponding to each hoisting component in the hoisting equipment according to the hoisting plan, and generate a three-dimensional simulation animation reflecting the hoisting process of the substation facility according to multiple motion trajectories;

[0128] The motion trajectory corresponding to the hoisting component includes at least one of the following:

[0129] The crane leg extension and retraction trajectory, boom rotation trajectory, boom extension and retraction trajectory, rope extension and retraction trajectory, hydraulic rod extension and retraction trajectory, and hook movement trajectory.

[0130] In one embodiment, the parameter acquisition module 501 includes:

[0131] A candidate lifting equipment determination submodule is used to obtain the weight corresponding to the substation facility to be lifted, and obtain a candidate lifting equipment whose lifting capacity matches the weight;

[0132] The lifting equipment parameter acquisition submodule is used to determine the selected lifting equipment from the candidate lifting equipment in response to user operations, and to acquire the lifting equipment parameters corresponding to the lifting equipment.

[0133] For the specific definition of a three-dimensional simulation device for the lifting and construction of substation facilities, please refer to the definition of a three-dimensional simulation method for the lifting and construction of substation facilities mentioned above, which will not be repeated here. Each module in the above-mentioned three-dimensional simulation device for the lifting and construction of substation facilities can be implemented in whole or in part through software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0134] In one embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as follows: Figure 6 As shown. The computer device includes a processor, a memory, a communication interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, an operator network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, a three-dimensional simulation method for the lifting construction of a substation facility is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a key, trackball or touchpad set on the computer device housing, or an external keyboard, touchpad or mouse, etc.

[0135] Those skilled in the art will understand that Figure 6The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0136] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:

[0137] Obtaining the weight of the substation facility to be hoisted, the hoisting equipment parameters of the hoisting equipment, and multiple candidate hoisting position points constituting the hoisting path;

[0138] According to the hoisting equipment parameters and the first position information corresponding to each candidate hoisting position point, a target hoisting position point is obtained from a plurality of candidate hoisting position points; the target hoisting position point is a position point to which the hoisting equipment can deliver the substation facility;

[0139] According to the weight and the target hoisting position point, obtaining force information corresponding to the hoisting equipment, and judging whether the hoisting is safe according to the force information;

[0140] When the hoisting is safe, a hoisting plan is generated according to the target hoisting position point, and a three-dimensional simulation animation reflecting the hoisting process of the substation facility is generated according to the hoisting plan.

[0141] In one embodiment, when the processor executes the computer program, the steps in other embodiments described above are also implemented.

[0142] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0143] Obtaining the weight of the substation facility to be hoisted, the hoisting equipment parameters of the hoisting equipment, and multiple candidate hoisting position points constituting the hoisting path;

[0144] According to the hoisting equipment parameters and the first position information corresponding to each candidate hoisting position point, a target hoisting position point is obtained from a plurality of candidate hoisting position points; the target hoisting position point is a position point to which the hoisting equipment can deliver the substation facility;

[0145] According to the weight and the target hoisting position point, obtaining force information corresponding to the hoisting equipment, and judging whether the hoisting is safe according to the force information;

[0146] When the hoisting is safe, a hoisting plan is generated according to the target hoisting position point, and a three-dimensional simulation animation reflecting the hoisting process of the substation facility is generated according to the hoisting plan.

[0147] In one embodiment, when the computer program is executed by a processor, the steps in other embodiments described above are also implemented.

[0148] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory or optical memory, etc. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).

[0149] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0150] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A three-dimensional simulation method for substation installation construction, characterized in that: The method comprises: Obtain the weight of the substation facilities to be hoisted and the hoisting equipment parameters of the hoisting equipment; The points placed by the user in the virtual three-dimensional scene corresponding to the three-dimensional animation software are used as a plurality of candidate hoisting position points; the candidate hoisting position points include other hoisting position points between the hoisting start point and the hoisting end point; each of the candidate hoisting position points has first position information in the world coordinate system of the three-dimensional animation software; For each piece of the first position information, coordinate transformation is performed on the first position information to obtain second position information in a relative coordinate system centered on the hoisting device; According to the boom parameters and the platform parameters in the lifting equipment parameters, the moving range of the hook of the lifting equipment is obtained; Determine the lifting feasibility corresponding to each candidate lifting position point according to the moving range and each second position information, and obtain a target lifting position point from multiple candidate lifting position points according to the lifting feasibility; the target lifting position point is a position point where the lifting equipment can deliver the substation facility; Determine, according to the weight and the target hoisting position, force information corresponding to the hoisting equipment when the substation facility is hoisted to the target hoisting position, and judge whether the hoisting is safe according to the force information; When the lifting is safe, the lifting path of the substation facility is determined according to the target lifting position point to obtain a lifting plan, and according to the lifting plan, the motion trajectory corresponding to each lifting component in the lifting equipment is obtained, and according to the multiple motion trajectories, a three-dimensional simulation animation reflecting the lifting process of the substation facility is generated; Among them, the motion trajectory corresponding to the hoisting component includes: The crane leg extension and retraction trajectory, boom rotation trajectory, boom extension and retraction trajectory, rope extension and retraction trajectory, hydraulic rod extension and retraction trajectory, and hook movement trajectory.

2. The method according to claim 1, characterized in that The various lifting components corresponding to the lifting equipment include crane legs, crane booms, lifting ropes, and hydraulic rods.

3. The method according to claim 1, characterized in that The determining, based on the weight and the target hoisting position, force information corresponding to the hoisting equipment when the substation facility is hoisted to the target hoisting position includes: Determine, according to the weight and the second position information corresponding to the target hoisting position point, first force information corresponding to the boom and second force information corresponding to the rope when the substation facility is at the target hoisting position point; Based on the first force information and the second force information, force information corresponding to the hoisting equipment is obtained.

4. The method according to claim 3, characterized in that The determining whether the hoisting is safe according to the force information includes: When the first force information is less than the lifting weight, and the second force information is less than the load-bearing capacity of the lifting rope, the lifting is determined to be safe; When the first force information exceeds the lifting weight, or the second force information exceeds the bearing capacity of the lifting rope, lifting danger is determined.

5. The method according to claim 1, characterized in that The target hoisting position points include at least two target hoisting position points, and determining the hoisting path of the substation facility according to the target hoisting position points to obtain a hoisting plan includes: Obtaining the hoisting construction time and the distance between adjacent target hoisting position points; Determine the movement speed corresponding to each hoisting component of the hoisting equipment according to the hoisting construction time and the distance; Generate a lifting plan based on the corresponding movement speed of each lifting component and each target lifting position point.

6. The method according to claim 1, characterized in that The step of obtaining the weight of the substation facility to be hoisted and the hoisting equipment parameters of the hoisting equipment includes: Obtain the weight of the substation facility to be hoisted, and obtain candidate hoisting equipment whose lifting capacity matches the weight; In response to the user operation, the selected lifting equipment is determined from the candidate lifting equipment, and the lifting equipment parameters corresponding to the lifting equipment are obtained.

7. A three-dimensional simulation device for substation installation construction, characterized in that: The device comprises: A parameter acquisition module is used to obtain the weight corresponding to the substation facility to be hoisted and the hoisting equipment parameters corresponding to the hoisting equipment; the points placed by the user in the virtual three-dimensional scene corresponding to the three-dimensional animation software are used as multiple candidate hoisting position points; the candidate hoisting position points include other hoisting position points between the hoisting start point and the hoisting end point; each of the candidate hoisting position points has the first position information in the world coordinate system of the three-dimensional animation software; A target hoisting position point determination module is used to perform coordinate conversion on each of the first position information to obtain second position information in a relative coordinate system centered on the hoisting equipment; obtain the moving range of the hook of the hoisting equipment according to the boom parameters and the platform parameters in the hoisting equipment parameters; determine the hoisting feasibility corresponding to each candidate hoisting position point according to the moving range and each second position information, and obtain a target hoisting position point from multiple candidate hoisting position points according to the hoisting feasibility; the target hoisting position point is a position point at which the hoisting equipment can deliver the substation facility; A hoisting safety acquisition module, used to determine the force information corresponding to the hoisting equipment when the substation facility is hoisted to the target hoisting position point according to the weight and the target hoisting position point, and judge whether the hoisting is safe according to the force information; A three-dimensional simulation animation generation module is used to determine the lifting path of the substation facility according to the target lifting position point when the lifting is safe, obtain a lifting plan, obtain the motion trajectory corresponding to each lifting component in the lifting equipment according to the lifting plan, and generate a three-dimensional simulation animation reflecting the lifting process of the substation facility according to multiple motion trajectories; Among them, the motion trajectory corresponding to the hoisting component includes: The crane leg extension and retraction trajectory, boom rotation trajectory, boom extension and retraction trajectory, rope extension and retraction trajectory, hydraulic rod extension and retraction trajectory, and hook movement trajectory.

8. The device according to claim 7, characterized in that The hoisting safety acquisition module includes: A force analysis submodule, for determining, according to the weight and the second position information corresponding to the target lifting position point, first force information corresponding to the boom and second force information corresponding to the lifting rope when the substation facility is at the target lifting position point; The force information acquisition submodule is used to obtain the force information corresponding to the lifting equipment based on the first force information and the second force information.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.