Construction method of inverse construction of connecting channel structure in open-cut section of subway
A communication channel and construction method technology, applied in the direction of basic structure engineering, excavation, underwater structures, etc., can solve the problems of high safety risks, difficulty in securing construction nodes, and high cost of groundwater, so as to ensure safety, reduce construction risks, The effect of construction cost control
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2022-08-05
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of urban rail transit, and in particular relates to a construction method for inverse construction of a connecting channel structure in an open-cut section of a subway. Background technique
[0002] With the rapid development of urban rail transit, open-cut construction has been increasingly used in many suburban areas. When excavating sand and gravel layers, the foundation pit cannot be formed due to the influence of groundwater, and the construction efficiency is low. When excavating near the protective structure, the back of the pile body is hollowed out due to groundwater scouring, which will cause great safety hazards. When the entrance and exit lines of the cut-and-cover section (including the entry and exit lines) are located in the middle and upper span of the main line section for transition, an isolated island is formed at the position of the communication channel, and the structure is located in t...
Examples
Embodiment Construction
[0045] like Figure 1~Figure 6 , an inverse construction method for a connecting channel structure in an open-cut section of a subway, which includes the following steps:
[0046] S1, excavate the foundation pit. After the excavation reaches the bottom, carry out the construction of the main line bottom plate in the small foundation pit; then construct the main line side wall and the side wall of the contact channel, and set the horizontal floor on the main line bottom plate and the side wall of the contact channel respectively. construction joints;
[0047] S2, carry out the construction of the access line bottom plate above the side wall of the main line and the side wall of the communication channel, and carry out the construction of the top plate of the access line above the bottom plate of the access line;
[0048] S3, set up multiple grouting flower pipes around the predetermined planned catchment area for grouting reinforcement; then excavate the catchment pool earthwo...