A BIM-based gravity dam structure design compliance inspection method
By establishing a data access and transmission node package on the Civil3D platform, combined with Dynamo and C# programming, and developing functional plug-ins, the problem of low review efficiency of BIM design models was solved, and automatic compliance checking and dynamic adjustment of the gravity dam structural model were realized. Improved model accuracy and efficiency.
Patent Information
- Application Number
- CN202110356646.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-01
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-04-01
AI Technical Summary
The review work of existing BIM design models is inefficient and has a high error rate. In particular, there are difficulties in the dynamic adjustment and compliance inspection of gravity dam structural models, resulting in low model accuracy and low efficiency.
Using a BIM model creation platform based on Civil3D, by establishing a data access node package and a data transmission node package, the initial BIM model parameter information is exported and stored in the database, a material information base and a rule knowledge base are established, and applications are used for compliance Check, combine Dynamo visual programming and C# code programming to develop functional plug-ins for dynamic adjustment and compliance checking of the model.
The automatic compliance check of the gravity dam structure model is realized, the model accuracy and dynamic correction efficiency are improved, the development difficulty is reduced, and the completeness of the model information and the inspection accuracy are enhanced.
Smart Images

Figure CN112948947B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of hydraulic structure models, and in particular to a BIM-based gravity dam structure design compliance inspection method. Background Art
[0002] Building Information Modeling (BIM) is a digital model based on three-dimensional digital technology that integrates engineering entities and functions. With the rapid promotion of BIM technology in the field of civil engineering, its application in water conservancy project construction is becoming increasingly profound. The delivery of BIM models as design results is the development trend in the future design field. In the process of forward design of hydraulic structures using BIM technology, the accuracy of the BIM model and the information it contains are crucial for the later model structure calculation and operation and maintenance analysis. Therefore, how to effectively implement the compliance check of the gravity dam BIM model is the key to ensuring the normal operation of the final BIM model throughout its life cycle.
[0003] The design of gravity dams is seriously affected by their topographic and geological conditions, so the created structural model should be associated with its geological model to achieve synchronous adjustment to meet the needs of analysis. In gravity dams, corridors are often required to meet the needs of grouting, observation and maintenance, and transportation. The control of the corridor position presents a three-dimensional curve in space. Although Revit has been widely used as the main BIM modeling software, the modeling mechanism of Revit is difficult to meet the creation of the BIM model of the gravity dam mentioned above. Civil 3D can use its own functions to achieve accurate creation of topography and geology, and use the control of target parameters and input / output parameters in its component editor to achieve parametric design of gravity dam models and the combination of structure and terrain. Therefore, Autodesk Civil3D was selected as the BIM model creation platform for gravity dams.
[0004] At present, the review of BIM design models is mainly done manually, which is inefficient and has high error rates. Civil3D itself can realize the standard verification of road design, but it cannot automatically review BIM models in other fields, including water conservancy. In addition, Civil3D itself is suitable for the overall creation of linear structures such as terrain and roads, and it is difficult to dynamically adjust and modify the local gravity dam structure model. The existence of the above problems leads to low model accuracy, low efficiency, and insufficient informatization of the created model. Summary of the invention
[0005] The purpose of the present invention is to provide a BIM-based gravity dam structure design compliance checking method, so that the created initial BIM model of the gravity dam structure can realize automatic compliance checking, thereby improving the model accuracy and the efficiency of model dynamic correction.
[0006] To achieve the above purpose, the technical solution of this application is: a BIM-based gravity dam structure design compliance inspection method, comprising:
[0007] Establish the cross-section components of the gravity dam structure and assemble them along the dam axis to generate the initial BIM model of the gravity dam structure;
[0008] Create a data access node package and a data transmission node package, export the initial BIM model parameter information and store it in a database;
[0009] Establishing a material information base and a rule knowledge base of the gravity dam structure in the database;
[0010] The application connects to the database and interacts with it;
[0011] Perform compliance checks on the initial BIM model parameter information. If there is information that does not comply with relevant specifications, an alarm will be issued and modifications will be made in accordance with relevant specifications.
[0012] Furthermore, the cross-sectional components of the gravity dam structure are established and assembled along the dam axis to generate the initial BIM model of the gravity dam structure, specifically:
[0013] Use the component editor to create basic components of hydraulic structures and set the input / output parameters of the components to ensure that the model can be easily viewed and modified later; set the target parameters of the components to ensure that the gravity dam structure can be associated with the terrain in real time; set the code, geometric relationship, and geometric type of each unit in the component to ensure the linkage between the units.
[0014] Furthermore, by using the "Decision" in the workflow to judge the design of the structure, the corresponding component design flow can be selected according to the situation; by using "Switch" to choose from a variety of design flows, the created components can be reasonably selected according to the needs; by using the "Sequence" and "Flowchart" in the workflow, the complex component design flow can be managed according to the function;
[0015] Import the created gravity dam components into the created terrain file for assembly. During the assembly process, debug the target parameters, input / output parameters, and unit linkage of the components. Adjust the unsatisfactory units. Finally, adjust the positions of the various structural parts of the gravity dam to form the initial BIM model of the gravity dam structure.
[0016] Furthermore, a data access node package and a data transmission node package are created to export and store the initial BIM model parameter information into a database, specifically:
[0017] Use Dynamo for Civil3D to write a visual program to access and transmit the initial BIM model data. Because this part of the program is universal, it is packaged into a data access node package and a data transmission node package for easy use in subsequent work;
[0018] By obtaining the Corridor and Baseline in the Civil3D model file, the initial BIM model parameter information is obtained through program access based on the Corridor and Baseline, and the parameter information includes the pile number coordinate value, dam height, dam top / bottom width, upstream / downstream slope ratio, distance between the corridor and the upstream surface, volume and other data;
[0019] Furthermore, the data transmission node package has a bidirectional input and output function. After the model information is obtained, the initial BIM model parameter information is output in the form of an Excel table using the data transmission node package and stored in the database;
[0020] The visualization program is capable of opening a transaction, finding the attribute that the user intends to modify, assigning a new value, and submitting the change information to the database, specifically reading the attribute setting value from the Excel table and updating the value on the corresponding object in the initial BIM model;
[0021] In the process, users can develop without having to have an in-depth understanding of the application API, and can efficiently perform database and transaction processing, serialize data changes, and dynamically update models.
[0022] Furthermore, a material information library and rule knowledge base of the gravity dam structure are established in the database. Specifically, the attributes of the Civil3D model itself are not comprehensive enough, and the software itself is not convenient for adding external attributes. Here, according to GB 50010-2010 "Concrete Structure Design Code", a material information library is created by batch importing in the database. The material information library mainly includes concrete grade, density, elastic modulus, Poisson's ratio, tensile / compressive strength, etc., and the material is ID-coded;
[0023] The SL319-2018 "Concrete Gravity Dam Design Code" involved in the initial BIM model was batch-entered into the database. The entry form was split according to the code catalog, with structure and construction as keywords, followed by the parameter value range and design requirements of the corresponding structure; after the non-regular attributes that could not be directly split were screened, the entire code corresponding to the structure was displayed in text form for manual comparison;
[0024] Primary / foreign key access relationships and geometric calculation relationships are established between the data tables in the database, and the format and constraint relationships of the data are preliminarily verified.
[0025] Furthermore, the application connects to the database and interacts with it, specifically by developing a corresponding functional plug-in based on the Civil3D open API using the C# programming language, and the functional plug-in includes the following four modules:
[0026] A main body design module, used to add or adjust the corresponding model of the cross-section component in the initial BIM model of the gravity dam structure;
[0027] A detailed design module for adding or adjusting non-structural components and construction measures in the initial BIM model of the gravity dam structure;
[0028] An information management module is used to add, delete, modify and query the geometric attribute information, material information, non-structural components and construction measures information of the initial BIM model of the gravity dam structure;
[0029] A rule checking module, used for performing compliance checking on the initial BIM model of the gravity dam structure;
[0030] Furthermore, each module in the functional plug-in is interactively connected with the database through ADO.NET technology, so that the data and model parameters in the database can be changed directly through the user interface corresponding to each functional module.
[0031] Furthermore, the initial BIM model parameter information is checked for compliance through the rule checking module. If there is information that does not meet the requirements of relevant specifications, an alarm is issued and modifications are made in accordance with the relevant specifications. Specifically:
[0032] First, corresponding data constraint rules are set in the database, so as to ensure the integrity of the information to be checked and to perform preliminary verification on whether simple design parameters meet the specifications; second, the primary / foreign key relationship is set between the initial BIM model attribute information table extracted from the database and the specification information table to realize the association mapping, and then the attribute information of the structure and construction is traversed and compared, so as to realize the compliance check of the initial BIM model;
[0033] Warnings are given for design parameters that do not meet the requirements of the specifications, and a corresponding report list is generated. Then, according to the relevant specifications, the parameters are modified through the main design module and / or the detailed design module, and the BIM model in the corresponding Civil3D is dynamically updated; the dynamic update is achieved by driving the update of the model after the data is changed based on the Dynamo data transmission node package.
[0034] The present invention adopts the above technical solution, and can achieve the following technical effects:
[0035] (1) By combining Dynamo visual programming with C# code programming, the compliance check of the gravity dam structure design was realized based on Civil3D, which reduced the development difficulty while achieving the development goals;
[0036] (2) Create custom node packages for data extraction and transmission and model modification, which is convenient for later reuse, greatly reduces the workload, and effectively solves the problem of difficulty in Civil3D attribute extraction and detail modification;
[0037] (3) Through interactive association with the SQL Server database, it is convenient to modify the inspection rules and update the database files later, which can effectively improve the efficiency and accuracy of BIM model compliance inspection;
[0038] (4) Through the UI interface corresponding to the gravity dam function plug-in developed based on Civil3D, the dynamic adjustment of the gravity dam model parameters and the improvement of the model information can be realized conveniently and quickly. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a flow chart of the compliance inspection method for gravity dam structure design based on BIM;
[0040] Figure 2 It is the user interface diagram of each module of the functional plug-in developed based on Civil3D; DETAILED DESCRIPTION
[0041] The embodiments of the present invention are implemented on the premise of the technical solution of the present invention, and detailed implementation methods and specific operation processes are given, but the protection scope of the present invention is not limited to the following embodiments.
[0042] Example 1
[0043] This embodiment provides a BIM-based gravity dam structure design compliance inspection method. Figure 1-2 The specific steps include:
[0044] S1, use the component editor of Civil 3D to establish the cross-section components of the gravity dam structure, and assemble them along the dam axis to generate the initial BIM model of the gravity dam structure, specifically:
[0045] Use the component editor to create basic components of hydraulic structures. The basic components created include but are not limited to non-overflow dam sections, overflow dam sections, gate piers, curtain grouting, corridors, traffic bridges, etc. Set the code, geometric relationship, geometric type of each unit in the component, set the input / output parameters of the component, and set the target parameters of the component; use "Decision" in the workflow to judge the design of the component, and use "Switch" to select from a variety of design flows; use "Sequence" and "Flowchart" in the workflow to manage complex component design flows according to function;
[0046] Select the corresponding component design flow according to the situation. For example, when designing overflow components, the overflow top curves commonly used are the Koch-Oberland curve and the WES curve. Both curves are designed separately, and then the required form is selected through "Decision" and "Switch";
[0047] Taking the overflow dam component as an example, the open weir crest curve is determined by using the WES power curve, and the calculation formula is as follows:
[0048]
[0049] Where: H d —Fixed design head; x, y—coordinates with the top of the overflow weir as the origin, x is positive downstream and y is positive downward; n—exponent related to the slope of the upstream weir; k—determined according to the curve parameters of the weir surface.
[0050] The reverse arc section usually adopts an arc curve, and the reverse arc radius is determined in combination with the downstream energy dissipation facilities. According to SL319-2018 "Concrete Gravity Dam Design Code", the reverse arc radius R of the diversion flow energy dissipation is:
[0051] R=(4~10)h
[0052] Where: h is the lowest water depth of the reverse arc when the flood gate is fully opened;
[0053] The overflow component parameters are defined in the component editor according to the design specifications, and the above relationship is input. In the WES power curve calculation, H d As input parameters, combined with the weir surface curve parameters in Table A1.1.1 of SL319-2018 "Concrete Gravity Dam Design Code", the parameters such as R1 and R2 are adjusted in the model; in the calculation of the radius R of the reverse arc section of the diversion energy dissipation, h is set as the input parameter to adjust R in the model. This provides conditions for the subsequent extraction of model attributes and dynamic adjustment of the model. The calculation relationship of other component parameters is similarly determined in the component editor;
[0054] Preferably, in order to facilitate the setting of geometric relationships among various parameters, the parameters are replaced by initial letters. For example, the maximum dam height is zdbg, the downstream slope is xypd, and the C20 concrete partition point is C20. Thus, through the "slope and increment Y" method, the slope point is taken as the starting point, the slope is -xypd, and the increment Y is -(zdbg-C20). In this way, the downstream slope is associated with various parameters, and other parts are also determined by relational formulas to meet the dynamic adjustment of the model.
[0055] Import the created gravity dam components into the created terrain file for assembly. During the assembly process, debug the target parameters, input / output parameters, and unit linkage of the components. Adjust the unsatisfactory units and components. Finally, adjust the positions of the various structural parts of the gravity dam to form the initial BIM model of the gravity dam structure.
[0056] S2, using Dynamo for Civil3D to create a data access node package and a data transmission node package, and export the initial BIM model parameter information to the SQL Server database, specifically including the following steps:
[0057] Get objects such as Corridor and Baseline in the Civil3D model file, and access and obtain model information through visualization programs based on them; you can also select the corresponding model entity by selecting the object ID. The information obtained includes pile number coordinates, dam height, dam top / bottom width, upstream / downstream slope ratio, distance between the corridor and the upstream surface, volume and other data.
[0058] Civil3D itself cannot directly create some detailed structures. Here, the design of detailed structures at specific locations is achieved by obtaining the coordinate point (x, y, z) position information of the pile number on the selected control line and changing it by △x, △y, △z.
[0059] It should be noted that when extracting other data such as coordinate points, it may be necessary to perform operations such as transposition and priority setting according to the transmitted data format.
[0060] The nodes are grouped according to their functions and packaged into custom nodes, namely the data access node package and the data transmission node package. A data input interface is set for the node package, and after the input is modified, Dynamo can synchronously change the model and database.
[0061] The data transmission node package has a bidirectional input and output function. After the model information is obtained, the model information is output in the form of an Excel table using the data transmission node package, and is stored in the SQL Server database in a batch import manner.
[0062] Since there is a one-to-one relationship between the Dynamo file and the Civil3D model, the Dynamo file is named in the form of <DWG name><category>_<task>_<version>.dyn when naming it.
[0063] The Dynamo visualization program can directly open a transaction, find the property that the user intends to modify, and after assigning a new value, submit the change to the database. Specifically, it reads the property setting value from an Excel table and updates the value on the corresponding object in the model. In this process, users can develop without having to deeply understand the application API, and can efficiently perform database and transaction processing, making serialized changes to the data and dynamically updating the model.
[0064] S3. Establish a material information database for the gravity dam structure and a rule knowledge database based on the relevant specifications for the design of the gravity dam structure in the SQL Server database. Specifically:
[0065] The properties of the Civil3D model itself are not comprehensive enough, and it is inconvenient to add external properties to the software itself. Here, according to the "Code for Design of Concrete Structures", a material information database is created by batch import in SQL Server, mainly including concrete grade, density, elastic modulus, Poisson's ratio, tensile / compressive strength, etc., and ID coding is performed on the materials.
[0066] The "Code for Design of Concrete Gravity Dams" involved in the model is also batch entered into the SQL Server database. The entry form is split according to the specification catalog, with the structure and structure as keywords, followed by the parameter value range and design requirements of the corresponding structure.
[0067] After screening the non-normalized properties that cannot be directly split, the entire specification corresponding to the structure is displayed in text form for manual verification.
[0068] The implementation of batch importing the above material properties and specifications into the database is mainly achieved by writing a general data access class for reading Excel in C# and methods for importing and querying data. Taking the import of data in the DataGridView control as an example below, the data import process for other controls is the same. Specifically, it includes the following steps:
[0069] First, a general data access class for the SQL Server database needs to be written. Secondly, a general data access class that can read Excel needs to be written. Then, a class for importing data from the Excel data table is written, and a method for querying the Excel data table is added. The UI interface developed in Civil3D displays the encapsulated data list to be imported through the control. Finally, the data to be imported in the control is saved to the database.
[0070] The creation of the database is implemented based on the three-paradigm principle. Primary / foreign key access relationships and geometric calculation relationships are established between the data tables in the database, thereby ensuring the rationality of the structural design of each data table, so that the data tables such as the structure's geometric attribute information, material attribute information, and corresponding specification clauses remain independent yet interconnected.
[0071] S4, using C# programming language to develop functional plug-ins based on Civil3D's open API, and realize the connection and interaction between the application and SQL Server database, specifically:
[0072] like Figure 2 As shown in the figure, the corresponding functional plug-in is developed based on the Civil3D open API using the C# programming language, and finally loaded into Civil3D in the form of a .dll file. The functional plug-in includes the following four modules:
[0073] A main body design module, used to add or adjust the corresponding model of the cross-section component in the initial BIM model of the gravity dam structure;
[0074] A detailed design module for adding or adjusting non-structural components and construction measures in the initial BIM model of the gravity dam structure;
[0075] An information management module is used to add, delete, modify and check the geometric attribute information, material information, non-structural components and construction measures of the initial BIM model of the gravity dam structure;
[0076] A rule checking module, used for checking the compliance of the initial BIM model parameters and structural form of the gravity dam structure;
[0077] Preferably, each module in the above-mentioned plug-in is interactively connected with the SQL Server database through ADO.NET technology, so as to realize the modification of the data and model parameters in the database directly through the user interface corresponding to each functional module. The specific steps include:
[0078] First, to connect to the database, you need to import the two namespaces System.Data and System.Data.SqlClient corresponding to SQL Server, then create objects, encapsulate the connection string, and then open the connection. Issue instructions through the user interface, the Command object is responsible for executing instructions on the data source, and the Connection object is responsible for connecting to the data source, thus realizing dynamic interactive updates; DataReader reads objects from the database and views them in the user interface; DataAdapter fills DataSet from the database and parses and updates.
[0079] S5, conduct compliance check on the gravity dam structure model information. If there is information that does not meet the requirements of relevant specifications, an alarm will be issued and modifications will be made in accordance with relevant specifications. The specific steps are as follows:
[0080] The implementation of rule checking mainly consists of two parts:
[0081] First, the corresponding data constraint rules are set in the SQL Server database to ensure the integrity of the information to be checked, mainly including entity integrity, domain integrity, and reference integrity, and can also achieve preliminary verification of whether some design parameters meet the specifications;
[0082] Secondly, based on the rule knowledge base created by S3, the model attribute information table extracted from the database and the specification information table are set with a primary / foreign key relationship to realize association mapping, and the building components to be inspected are taken as the objects, and the attributes contained therein and the corresponding specification clauses are queried and extracted into two sets, and then the attribute information of the structure and construction is traversed and compared, so as to realize the compliance inspection of the model;
[0083] When the overflow weir adopts the method of diverting flow to dissipate energy, the radius R of the downstream anti-arc section is set in the overflow dam design window in the main design module. Based on the above rule check, when the value of R is not within the range of (4 to 10) h, a warning is issued. After the value of R is adjusted, the model is updated based on the Dynamo data transmission node package after the data is changed.
[0084] Similarly, warnings are given for other design parameters that do not meet the requirements of the specifications, and a corresponding inspection report list is generated. Then, according to the relevant specifications, the parameters are modified through the main / detailed design module, and the gravity dam structure BIM model in Civil3D is dynamically updated.
[0085] The embodiments of the present invention have better practicability and are not intended to limit the present invention in any form. The technical features or combinations of technical features described in the embodiments of the present invention should not be considered isolated, and they can be combined with each other to achieve better technical effects. The scope of the preferred embodiments of the present invention may also include other implementations, and this should be understood by those skilled in the art of the invention embodiments.
Claims
1. A BIM-based gravity dam structure design compliance inspection method, characterized in that: include: Establish the various cross-section components of the gravity dam structure, and assemble them along the dam axis to generate the initial BIM model of the gravity dam structure. Specifically: use the component editor to create basic components of the hydraulic structure, set the input / output parameters of the components, so as to ensure that the model is easy to view and modify later; set the target parameters of the components to ensure that the gravity dam structure can be associated with the terrain in real time; set the code, geometric relationship, and geometric type of each unit in the component to ensure the linkage between the units; use the "Decision" in the workflow to judge the design of the structure and select the corresponding component design flow according to the situation; use "Switch" to choose from a variety of design flows, so that the created components can be reasonably selected according to needs; use "Sequence" and "Flowchart" in the workflow to manage complex component design flows according to functions; Import the created gravity dam components into the created terrain file for assembly. During the assembly process, debug the target parameters, input / output parameters, and unit linkage of the components. Adjust the unsatisfactory units. Finally, adjust the locations of the various structural parts of the gravity dam to form the initial BIM model of the gravity dam structure. Create a data access node package and a data transmission node package, and export and store the initial BIM model parameter information in a database, specifically: use Dynamo for Civil3D to write a visualization program to access and transmit the initial BIM model data, and package it into a data access node package and a data transmission node package; obtain the Corridor and Baseline in the Civil3D model file, and obtain the initial BIM model parameter information through program access based on them, and the parameter information includes the pile number coordinate value, dam height, dam top / bottom width, upstream / downstream slope ratio, corridor distance from upstream surface, and volume; the data transmission node package has a bidirectional input and output function, and the initial BIM model parameter information is output in the form of an Excel table using the data transmission node package and stored in the database; the visualization program can open the transaction, find the attribute that the user intends to modify, assign a new value, and submit the change information to the database, specifically, read the attribute setting value from the Excel table, and update the value on the corresponding object in the initial BIM model; Establishing a material information base and a rule knowledge base of the gravity dam structure in the database; The application connects to the database and interacts with it; Perform compliance checks on the initial BIM model parameter information. If there is information that does not comply with relevant specifications, an alarm will be issued and modifications will be made in accordance with relevant specifications.
2. According to claim 1, a BIM-based gravity dam structure design compliance inspection method is characterized in that: A material information base and a rule knowledge base of the gravity dam structure are established in the database, specifically: According to GB 50010-2010 "Specification for Design of Concrete Structures", a material information library is created by batch importing in the database, wherein the material information library includes concrete grade, density, elastic modulus, Poisson's ratio, tensile / compressive strength, and ID codes are performed on the materials; The SL319-2018 "Concrete Gravity Dam Design Code" involved in the initial BIM model was batch-entered into the SQL database. The entry form was split according to the code catalog, with structure and construction as keywords, followed by the parameter value range and design requirements of the corresponding structure; after filtering the non-regular attributes that could not be directly split, the entire code corresponding to the structure was displayed in text form for manual comparison; Primary / foreign key access relationships and geometric calculation relationships are established between the data tables in the database, and the format and constraint relationships of the data are preliminarily verified.
3. According to the BIM-based gravity dam structure design compliance inspection method of claim 1, it is characterized in that: The application connects to the database and interacts with it, specifically by developing corresponding functional plug-ins based on Civil3D open API using C# programming language, and the functional plug-ins include the following four modules: A main body design module, used to add or adjust the corresponding model of the cross-section component in the initial BIM model of the gravity dam structure; A detail design module for adding or adjusting non-structural components and construction measures in the initial BIM model of the gravity dam structure; An information management module is used to add, delete, modify and query the geometric attribute information, material information, non-structural components and construction measures information of the initial BIM model of the gravity dam structure; A rule checking module is used to perform compliance checking on the initial BIM model of the gravity dam structure.
4. According to claim 3, a BIM-based gravity dam structure design compliance inspection method is characterized in that: Each module in the functional plug-in is interactively connected with the database through the ADO.NET technology, so that the data and model parameters in the database can be changed directly through the user interface corresponding to each functional module.
5. According to claim 3, a BIM-based gravity dam structure design compliance inspection method is characterized in that: The rule checking module is used to check the compliance of the initial BIM model parameter information. If there is information that does not meet the requirements of the relevant specifications, an alarm will be issued and modifications will be made in accordance with the relevant specifications. Specifically: First, corresponding data constraint rules are set in the database, so as to ensure the integrity of the information to be checked and to perform preliminary verification on whether the design parameters meet the specifications; Secondly, the primary / foreign key relationship between the initial BIM model attribute information table extracted from the database and the specification information table is set to realize the association mapping, and then the attribute information of the structure and construction is traversed and compared, so as to realize the compliance check of the initial BIM model; Warnings are given for design parameters that do not meet the requirements of the specifications, and a corresponding report list is generated. Then, the parameters are modified through the main design module and / or detailed design module according to the relevant specifications, and the BIM model in Civil3D is dynamically updated; The dynamic update is achieved by driving the model update based on the Dynamo data transmission node package after the data is changed.