Prestressed full-dry type connection assembly type concrete frame beam-column joint
A technology of beam-column joints and prefabricated concrete, which is applied in the direction of architecture and building construction, can solve the problems of high cost of energy-consuming devices and inconvenient construction, etc., achieve strong energy-dissipating capacity, reduce the reinforcement ratio of stirrups, reduce stretching effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2021-07-13
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
Technical field
[0001] The present invention relates to the field of construction engineering assembly, which specifically involves a prestressed full dry connection to assembled concrete frame beam column node. Background technique
[0002] The prefabrication rate of assembled frame structures is high, production, and efficiency of production and construction are more suitable for structural industrialization. Currently, a well-known prefabricated assembly framework structure mainly has conventional prefabricated beam column nodes wet connection assembly framework structures and node dry connection prestressed assembly frame structures. Wet connections are connected by steel lap and a small amount of cast-in-situ concrete. The dry connection does not use the current pouring concrete, only by welding, bolt, post-prestressed ribs or trenches. Currently, in the seismic assembled concrete frame structure, the dry connection application of the wet connection and the post-standing pre...
Examples
Embodiment 1
[0045] A prestressed full-handed connection assembled concrete frame beam column node, such as Figure 1 ~ 5 As shown, including prefabricated concrete columns 1, prefabricated concrete beams 2, prestressed ribs 3, plus axis 4, gap 5, and energy consumption 6.
[0046] The pre-concrete column 1 and the preform beam 2 thereof are passed through the pre-stress hole 7 provided in the inner interior of the three, forming a full drying connecting beam node. The prefabricated concrete beam 2 is perfused between the high-strength mortar 9 between the prefabricated concrete beam 2 and the prefabricated concrete column 1. The pre-concrete beam 2 is longitudinally run through a plurality of conventional steel bars 6, and the energy consuming ordinary steel bib 6 does not directly anchor in the beam end by bending form. Prefabricated concrete beam 2 is provided with a plus 4 in the end edge of the prefabricated concrete column 1, the plus 4 length is 0.8 to 1.2 times the prefabricated concret...
Embodiment 2
[0048] A prestressed full-handed connection assembled concrete frame beam column node, such as Figure 6 ~ 10 As shown, including prefabricated concrete columns 1, prefabricated concrete beams 2, prestressed thumbers 3, plus 4, and energy consumption ordinary steel bars 6.
[0049] The pre-concrete column 1 and the preform beam 2 thereof are passed through the pre-stress hole 7 provided in the inner interior of the three, forming a full drying connecting beam node. The prefabricated concrete beam 2 is perfused between the high-strength mortar 9 between the prefabricated concrete beam 2 and the prefabricated concrete column 1. The pre-concrete beam 2 is longitudinally run through a plurality of conventional steel bars 6, and the energy consuming ordinary steel bib 6 does not directly anchor in the beam end by bending form. The prefabricated concrete beam 2 is provided with a plus 4, and the plus 4 length is 0.8 to 1.2 times the prefabricated concrete beam 2 beam. The pre-stretcular ...
Embodiment 3
[0051] A prestressed full-handed connection assembled concrete frame beam column node, such as Figures 11-15 As shown, including prefabricated concrete column 1, prefabricated concrete beam 2, prestressed rib 3, gap 5, and energy consumption ordinary steel 6.
[0052] The pre-concrete column 1 and the preform beam 2 thereof are passed through the pre-stress hole 7 provided in the inner interior of the three, forming a full drying connecting beam node. The prefabricated concrete beam 2 is perfused between the high-strength mortar 9 between the prefabricated concrete beam 2 and the prefabricated concrete column 1. The pre-concrete beam 2 is longitudinally run through a plurality of conventional steel bars 6, and the energy consuming ordinary steel bib 6 does not directly anchor in the beam end by bending form. Prefabricated concrete beam 2 top surface top surface 5, the distance of the gap 5 to the prefabricated concrete beam 2 beam is 0.8 to 1.2 times the preform of the prefabricat...