A photovoltaic power station wiring method, computing device and storage medium

By determining the main path and routeable location points in the photovoltaic power station, and using the path planning algorithm to optimize the cable routing scheme, the problem of low cable routing design efficiency in the photovoltaic power station is solved, and the cable installation cost is reduced and the design efficiency is improved. promote.

CN113297713BActive Publication Date: 2024-10-18HEFEI SUNGROW RENEWABLE ENERGY SCI & TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110718432.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-28
Publication Date
2024-10-18
Estimated Expiration
2041-06-28

AI Technical Summary

Technical Problem

In photovoltaic power plants, manual design of low-voltage cable routing solutions is inefficient and difficult to obtain optimal results, resulting in high project costs.

Method used

By determining the main path and routeable location points in the photovoltaic array, the path planning algorithm is used to generate the actual wiring topology relationship, and the final wiring path is determined based on the shortest path. The dynamic planning algorithm and grid merging rules are combined to optimize the cable routing. line solutions to reduce costs.

Benefits of technology

It achieves the optimization of cable installation costs, significantly saves construction costs, and improves design efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113297713B_ABST
    Figure CN113297713B_ABST
Patent Text Reader

Abstract

The present invention provides a photovoltaic power station routing method, computing device and storage medium. The photovoltaic power station routing method includes: determining multiple main paths according to the position distribution of multiple first devices and second devices in a photovoltaic array, wherein the main path is a path for directly or indirectly connecting each of the first devices with the second device; determining routing position points in the photovoltaic array; generating actual routing topological relationships of multiple first devices in each of the main paths according to the first devices, the main path and the routing position points, wherein the topological connection nodes of the actual routing topological relationship are the location points used for routing; determining the shortest path between each topological connection node in the actual routing topological relationship according to a path planning algorithm; and determining the final routing path according to the shortest path. Beneficial effects of the present invention: Reasonable wiring to reduce costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic power stations, and in particular to a photovoltaic power station wiring method, a computing device and a storage medium. Background Art

[0002] In a photovoltaic power station, equipment in the photovoltaic plant, such as strings, combiner boxes, and box transformers, need to be connected by cables. For a given equipment location, different cable connections and different routing paths have different corresponding project costs.

[0003] In the related art, the design is based on personal experience to provide a low-voltage cable routing scheme for the photovoltaic area. However, manual design and cost comparison based on experience are inefficient and it is difficult to obtain the optimal result. Summary of the invention

[0004] The problem solved by the present invention is how to perform wiring more reasonably to reduce the cost.

[0005] In order to solve the above problems, the present invention provides a photovoltaic power station wiring method, comprising:

[0006] Determine a plurality of main paths according to the position distribution of the plurality of first devices and the second devices in the photovoltaic array, wherein the main paths are paths for directly or indirectly connecting each of the first devices with the second devices;

[0007] Determining the wiring location points within the photovoltaic array;

[0008] Generate a plurality of actual routing topological relationships of the first device in each of the main paths according to the first device, the main path, and the routing position points, wherein the topological connection nodes of the actual routing topological relationships are the position points used for routing;

[0009] Determine the shortest path between each of the topological connection nodes in the actual routing topological relationship according to a path planning algorithm;

[0010] A final routing path is determined according to the shortest path.

[0011] The photovoltaic power station routing method of the present technical solution takes the main path formed by the position distribution of multiple first devices and second devices as the entry point, and then determines the routing path, which can ensure the designed low-voltage cable routing plan, the cable installation cost is optimal, and the construction cost is greatly saved. When determining the routing plan, the routing position points, the main path and the first device in the photovoltaic array are combined to obtain the actual routing topology relationship, so as to reasonably plan the routing position while reducing the routing cost as much as possible. The routing plan can be determined based on computer calculation and generation, which can improve efficiency and reduce the design cycle.

[0012] Further, the determining of the plurality of main paths according to the position distribution of the plurality of first devices and the second devices in the photovoltaic array includes:

[0013] forming a grid according to the positions of the first device and the second device;

[0014] Determine all routing paths from each grid point of the first device to the grid point of the second device;

[0015] Generate multiple routing schemes according to the routing path, and determine the routing scheme with the lowest cost among the multiple routing schemes;

[0016] A plurality of main paths are obtained according to the minimum cost routing scheme.

[0017] Further, forming a grid according to the positions of the first device and the second device includes:

[0018] Generate a cross grid line with the first device and the second device as the center;

[0019] Merge the grid lines according to a preset merging rule;

[0020] The grid is generated according to the grid lines, wherein a grid point representing the first device is a grid point in the grid that is closest to the first device.

[0021] Furthermore, the grid lines include a first grid line and a second grid line that are adjacent and parallel, and merging the grid lines according to a preset merging rule includes:

[0022] When the distance between the first grid line and the second grid line is less than a preset distance, and the distance between the first grid line and the second device is greater than the distance between the second grid line and the second device, the first grid line is deleted.

[0023] Further, the determining all routing paths from each grid point of the first device to the grid point of the second device includes:

[0024] According to a dynamic programming algorithm, all the routing paths from each grid point of the first device to the grid point of the second device in a Manhattan routing manner are determined.

[0025] Further, obtaining the plurality of main paths according to the minimum cost routing scheme includes:

[0026] Deleting the path in which the number of cables collected is less than a preset number in the minimum cost routing solution to obtain an initial main path;

[0027] Separating the initial main path to obtain a plurality of line segments;

[0028] Performing an offset process on each of the line segments to obtain a plurality of offset line segments, wherein the offset line segments are obtained by offsetting the horizontal line segments up and down and offsetting the vertical line segments left and right;

[0029] A plurality of the line segments and a plurality of the offset line segments are combined to obtain a plurality of the main paths.

[0030] Further, the determining of the routing position points in the photovoltaic array includes:

[0031] Expand the vertices of the bracket of the photovoltaic power station to obtain multiple location points;

[0032] The routable position points are generated according to a plurality of position points.

[0033] Further, generating an actual routing topology relationship according to the first device, the main path and the routing position point includes:

[0034] Generating initial routing topology relationships of a plurality of the first devices in each of the main paths;

[0035] The topological connection nodes of the initial routing topology relationship are replaced according to the routing position points to obtain the actual routing topology relationship.

[0036] Furthermore, the replacing the topological connection nodes of the initial routing topological relationship according to the routing position points to obtain the actual routing topological relationship includes:

[0037] Determine the routable position point closest to the topological connection node of the initial routing topology relationship as the estimated routable position replacement point;

[0038] When the distance between the estimated routeable position replacement point and the topological connection node of the initial routing topological relationship is less than the width of the bracket, the estimated routeable position replacement point is used as the replaced topological connection node.

[0039] The present invention also proposes a computing device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the photovoltaic power station routing method described above is implemented.

[0040] The beneficial effects of the computing device described in the present invention are similar to those of the above-mentioned photovoltaic power station routing method, which will not be described in detail here.

[0041] The present invention further proposes a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the photovoltaic power station routing method as described above is implemented.

[0042] The beneficial effects of the computer-readable storage medium described in the present invention are similar to those of the photovoltaic power station routing method described above, and will not be described in detail here. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 is a flow chart of a photovoltaic power station routing method in an embodiment of the present invention;

[0044] Figure 2 A schematic diagram of a grid generated according to a first device and a second device in an embodiment of the present invention;

[0045] Figure 3 It is a schematic diagram of merging grid lines of a grid in an embodiment of the present invention;

[0046] Figure 4 This is a schematic diagram of a wiring path using a first device D as an example in an embodiment of the present invention;

[0047] Figure 5 A schematic diagram of a wiring scheme of a first device and a second device in an embodiment of the present invention;

[0048] Figure 6 A schematic diagram of multiple main paths in an embodiment of the present invention;

[0049] Figure 7 This is a schematic diagram of equipment distribution of a photovoltaic power station according to an embodiment of the present invention;

[0050] Figure 8 for Figure 7 A schematic diagram of the wiring of the photovoltaic power station;

[0051] Fig. 9 This is a schematic diagram of equipment distribution of another photovoltaic power station according to an embodiment of the present invention;

[0052] Fig.10 for Fig. 9 A schematic diagram of the wiring of the photovoltaic power station. DETAILED DESCRIPTION

[0053] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0054] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein.

[0055] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0056] In the description of this specification, the description with reference to the terms "embodiment", "one embodiment" and "one implementation" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or implementation are included in at least one embodiment or implementation of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or implementation. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or implementations in a suitable manner.

[0057] Reference Figure 1 As shown, an embodiment of the present invention proposes a photovoltaic power station routing method, including:

[0058] S1. Determine a plurality of main paths according to the position distribution of a plurality of first devices and a second device in a photovoltaic array, wherein the main paths are paths for directly or indirectly connecting each of the first devices with the second device;

[0059] S2, determining the routing position points in the photovoltaic array;

[0060] S3, generating a plurality of actual routing topological relationships of the first device in each of the main paths according to the first device, the main path and the routing position points, wherein the topological connection nodes of the actual routing topological relationships are the position points used for routing;

[0061] S4, determining the shortest path between each of the topological connection nodes in the actual routing topological relationship according to a path planning algorithm;

[0062] S5. Determine a final routing path according to the shortest path.

[0063] In the related art, the design is based on personal experience to provide a low-voltage cable routing scheme for the photovoltaic area. However, manual design and cost comparison based on experience are inefficient and it is difficult to obtain the optimal result.

[0064] The photovoltaic power station routing method in the embodiment of the present invention can be applied to ground photovoltaic power stations, specifically, for cable routing between the first device and the second device in a photovoltaic array. The first device can be a junction box (string inverter), etc., and the second device can be a box transformer. The photovoltaic power station may include mountainous and flat photovoltaic power stations. After the routing path of the photovoltaic power station is confirmed, the cable laying method can be underground (cable trench) and cable bridge, etc.

[0065] It can be understood that in the routing of a photovoltaic power station, multiple junction boxes all need to be connected to the box transformer. If multiple junction boxes are connected to the box transformer respectively, the routing cost is relatively high. In an embodiment of the present invention, based on the position distribution of multiple first devices and second devices in the photovoltaic array, a main path for connecting each first device is determined. The main path is a path for directly or indirectly connecting each first device with the second device. In the main path, the second device can be the starting point or end point of the main path. Based on the determined main path, when the first device is connected to the main path, it can be connected to the second device. When the first device is connected in the form of a T-connection at the closest point to the main path, the routing cost can be well reduced. In addition, in the photovoltaic array, there are certain restrictions on the routing position, such as the routing needs to avoid the photovoltaic panel bracket, etc. Therefore, in an embodiment of the present invention, when designing the routing, it is necessary to determine The routing position points in the photovoltaic array are determined, and the actual routing topological relationship of multiple first devices in each main path is obtained by combining with the first device and the main path, so as to reasonably restrict the routing position while reducing the routing cost as much as possible, so as to perform routing planning. Therefore, for the multiple actual routing topological relationships obtained, the topological connection nodes of the actual routing topological relationship are the location points used for routing of each first device, and the shortest path between each topological connection node in the actual routing topological relationship can be determined according to the path planning algorithm. It can be understood that in the actual routing topological relationship corresponding to each main path, after determining the shortest path of each topological connection node, multiple shortest paths constitute the actual routing path corresponding to the main path, and for the actual routing paths corresponding to multiple main paths, the lowest cost solution can be selected as the final routing path according to the cost of each actual routing path.

[0066] In summary, in this embodiment, the main path formed by the position distribution of multiple first devices and second devices is used as the entry point to determine the routing path, which can ensure that the obtained low-voltage cable routing plan has the best cable installation cost and greatly saves construction costs. The routing plan can be determined based on computer calculations, which can improve efficiency and reduce design cycles.

[0067] In an optional embodiment of the present invention, determining a plurality of main paths according to the position distribution of a plurality of first devices and a second device in the photovoltaic array comprises:

[0068] forming a grid according to the positions of the first device and the second device;

[0069] Determine all routing paths from each grid point of the first device to the grid point of the second device;

[0070] Generate multiple routing schemes according to the routing path, and determine the routing scheme with the lowest cost among the multiple routing schemes;

[0071] A plurality of main paths are obtained according to the minimum cost routing scheme.

[0072] In this embodiment, for a plurality of first devices and second devices, the position points of the first devices and the second devices may be used as grid points to form a grid. Specifically, the following grid may be formed: Figure 2 In the grid coordinate system shown, in the grid, the second device (combiner box) can be made the origin of the grid, and the grid points corresponding to the multiple first devices can be assigned with grid point coordinates representing the position, so as to facilitate the representation of the device position and the planning of the path. Based on the formed grid, all the routing paths from the grid points of each first device to the grid points of the second device can be determined. In this embodiment, all the routing paths from the grid points of each first device to the grid points of the second device in the Manhattan routing method can be determined based on the dynamic programming algorithm. Based on this, for all the routing paths of each first device, multiple routing schemes connecting all the first devices to the second device can be obtained. Furthermore, for multiple routing schemes, the routing scheme with the lowest cost can be determined, and then the required multiple main paths can be obtained based on the routing scheme with the lowest cost. In this way, in the routing design of the photovoltaic power station, the cost consideration can be integrated as much as possible to make the determination of the main path more reasonable, and in the final wiring, the cost can be effectively reduced.

[0073] Among them, determining the routing scheme with the lowest cost among multiple routing schemes may include converting the coordinates of the grid points in the path of the routing scheme into actual coordinates according to the actual coordinate data of the junction box, transformer box and other equipment obtained in advance, and calculating the bridge laying cost corresponding to each routing scheme. Specifically, the number of times each path appears in the scheme is counted (that is, the number of cables collected), and the corresponding bridge is selected in combination with the bridge selection rules, and the total bridge cost is calculated, so as to obtain the cost of each routing scheme. For multiple routing schemes, the routing scheme with the lowest cost is the routing scheme with the lowest cost.

[0074] In an optional embodiment of the present invention, forming a grid according to the positions of the first device and the second device includes:

[0075] Generate a cross grid line with the first device and the second device as the center;

[0076] Merge the grid lines according to a preset merging rule;

[0077] The grid is generated according to the grid lines, wherein a grid point representing the first device is a grid point in the grid that is closest to the first device.

[0078] Reference Figure 2 and 3 As shown, in this embodiment, when a grid is formed according to the positions of the first device and the second device, a cross grid line is drawn with the first device and the second device as the center, so that a plurality of grid lines form a grid. Since two parallel and adjacent grid lines may exist in the formed grid, two or more adjacent grid lines are merged, and the merged grid is as shown in FIG. Figure 3 As shown, the design process is prevented from being too complicated and the actual wiring is prevented from being too troublesome. Since the grid lines are generated by the positions of the first device and the second device, before merging, each first device is located at the grid line. After merging, some first devices deviate from the grid lines. Therefore, in the grid after merging the grid lines, new grid points are allocated to the deviated first devices. At this time, the grid points representing the first devices are the grid points in the grid closest to these deviated first devices, thereby reducing the complexity of the wiring design as much as possible, and reducing the difficulty and complexity of the actual wiring.

[0079] For the plurality of grid lines forming the grid, there may be a plurality of groups of adjacent and parallel first grid lines and second grid lines. Therefore, merging the grid lines according to a preset merging rule may include:

[0080] When the distance between the first grid line and the second grid line is less than a preset distance, and the distance between the first grid line and the second device is greater than the distance between the second grid line and the second device, the first grid line is deleted.

[0081] In this way, by deleting one of two grid lines that are close to each other, the grid lines in the grid are processed, thereby reducing the complexity of the wiring design and reducing the difficulty and complexity of the actual wiring.

[0082] In other embodiments, merging grid lines according to a preset merging rule may also include deleting the first grid line and the second grid line to generate another third grid line, where the third grid line is parallel to the first grid line and the second grid line and the distance is equal, so that the grid lines in the grid can also be merged.

[0083] In an optional embodiment of the present invention, based on a dynamic programming algorithm, all the routing paths from the grid points of each of the first devices to the grid points of the second device in a Manhattan routing manner are determined. Figure 4 and 5As shown, in the grid of the merged grid lines, the grid point coordinates of the second device (box transformer) are (0, 0), and the grid point coordinates of multiple first devices (combiner boxes) are distributed as follows: A: (0, 2), B: (1, 4), C: (3, 5), D: (2, 2), E: (2, 0), F: (4, 2), G: (5, 3). Taking the first device D as an example, the path from the first device D (2, 2) to the second device (0, 0) is calculated as follows:

[0084] Since the possible path from the grid point (m, n) to the second device (0, 0) must pass through the grid point (m-1, n) and the grid point (m, n-1), the path from (m, n) to (0, 0) can be expressed as F(m, n) = F(m-1, n) + F(m, n-1). By constructing a binary tree structure, the path used can be obtained by using the recursive method. The binary tree structure diagram is shown as follows: Figure 5 Specifically, the six routing paths from the first device D to the second device are obtained as follows:

[0085] 1, (2, 2), (2, 1), (2, 0), (0, 0);

[0086] 2, (2, 2), (2, 1), (1, 1), (1, 0), (0, 0);

[0087] 3. (2, 2), (2, 1), (1, 1), (0, 1), (0, 0);

[0088] 4. (2, 2), (1, 2), (1, 1), (1, 0), (0, 0);

[0089] 5. (2, 2), (1, 2), (1, 1), (0, 1), (0, 0);

[0090] 6. (2, 2), (1, 2), (0, 2), (0, 0).

[0091] In this way, based on all routing paths of each first device, multiple routing schemes for connecting all first devices to second devices can be obtained, and then the routing scheme with the lowest cost among the multiple routing schemes can be determined.

[0092] In an optional embodiment of the present invention, obtaining the plurality of main paths according to the minimum cost routing scheme includes:

[0093] Deleting the path in which the number of cables collected is less than a preset number in the minimum cost routing solution to obtain an initial main path;

[0094] Separating the initial main path to obtain a plurality of line segments;

[0095] Performing an offset process on each of the line segments to obtain a plurality of offset line segments, wherein the offset line segments are obtained by offsetting the horizontal line segments up and down and offsetting the vertical line segments left and right;

[0096] A plurality of the line segments and a plurality of the offset line segments are combined to obtain a plurality of the main paths.

[0097] Reference Figure 5 and 6 In the embodiment of the present invention, for the lowest cost routing solution, the cables constituting the path in the solution include: Figure 5 The main cable path from the box-type transformer to the first device G also includes the branch cable paths of the first devices A, B, C, etc. directly connected to the main cable path. Since these branch cable paths only connect to the main cable path and do not collect other cables, the branch cable paths in the lowest cost solution are deleted in this embodiment. Correspondingly, for the main cable path from the box-type transformer to the first device F, the branch cable paths of the first devices E and D connected to the main cable path are deleted, and the initial main path finally obtained may include the path from the box-type transformer to the first devices G and F. In this embodiment, the preset number is set to 2, and the first devices A, B, etc. have only one cable connected to the main cable path, so these paths are deleted.

[0098] For the obtained initial main path, the initial main path is separated to obtain multiple line segments, such as: line segment 1, line segment 2, ..., line segment m, and the line segments are offset. It can be understood that for multiple line segments, they have the following characteristics: Figure 5 and 6 Therefore, for multiple line segments, the horizontal line segments are offset up and down, and the vertical line segments are offset left and right, such as deriving two line segments from each offset. Specifically, the vertical and horizontal line segments are offset by a preset distance to obtain multiple offset line segments. Based on multiple line segments and multiple offset line segments, multiple main paths are obtained by combination, such as {main path 1: (line segment 1, line segment 2, ..., line segment m), main path 2: (line segment 1, line segment 2', ..., line segment m'), ...}, where line segment m' is an offset line segment derived from the offset of line segment m. Figure 6 In the example, the main path after offsetting the line segments can be reconstructed as follows: Figure 6 The main path scheme 1 and the main path scheme 2 are shown in FIG. 1 . Thus, by offsetting the main path, it is convenient to determine a routing method with lower cost.

[0099] In an optional embodiment of the present invention, the determining of the routable position points in the photovoltaic array includes:

[0100] Expand the vertices of the bracket of the photovoltaic power station to obtain multiple location points;

[0101] The routable position points are generated according to a plurality of position points.

[0102] In an embodiment of the present invention, when routing the photovoltaic power station, the cables are avoided from passing through the brackets of the photovoltaic power station panels as much as possible. Therefore, when determining the routing position points within the photovoltaic array, discretization processing is performed. Specifically, the vertices of the bracket are expanded. For example, the bracket has four vertices, and the four vertices are expanded a certain distance to obtain four position points, and the routing position points are generated based on the position points. Therefore, based on the routing position points finally generated based on the expansion of the bracket vertices, when the actual routing topology relationship is obtained, it is possible to avoid the cables passing through the bracket, thereby making the routing position more reasonable.

[0103] Among them, generating a routable position point according to a plurality of position points may include: merging points whose spacing is smaller than a preset spacing among the plurality of position points, so that the merged position point is the routable position point.

[0104] In an optional embodiment of the present invention, generating an actual routing topology relationship according to the first device, the main path and the routing position point includes:

[0105] Generating initial routing topology relationships of a plurality of the first devices in each of the main paths;

[0106] The topological connection nodes of the initial routing topology relationship are replaced according to the routing position points to obtain the actual routing topology relationship.

[0107] In this embodiment, for the determined multiple main paths, after the multiple first devices are connected in each main path, multiple initial routing topology relationships can be formed. It can be understood that the topological connection nodes in the initial routing topology relationship are the position points that can be used for routing, and then the topological connection nodes of the initial routing topology relationship are replaced according to the routing position points to obtain the above-mentioned actual routing topology relationship.

[0108] The step of replacing the topological connection nodes of the initial routing topology relationship according to the routing position points to obtain the actual routing topology relationship includes:

[0109] Determine the routable position point closest to the topological connection node of the initial routing topology relationship as the estimated routable position replacement point;

[0110] When the distance between the estimated routeable position replacement point and the topological connection node of the initial routing topological relationship is less than the width of the bracket, the estimated routeable position replacement point is used as the replaced topological connection node.

[0111] In this embodiment, the topological connection nodes in the initial routing topological relationship are replaced to obtain a new routing topological relationship, namely, the actual routing topological relationship. Among the routable position points, the routable position point closest to a topological connection node in the actual routing topological relationship represents an estimated routable position replacement point. If the distance between the estimated routable position replacement point and the above-mentioned nearest topological connection node is less than the width of the bracket, the estimated routable position replacement point replaces the topological connection node, otherwise it is not replaced, thereby obtaining the actual routing topological relationship, filtering out the nodes located between the brackets in the topological connection nodes, thereby avoiding routing through the brackets and reducing costs as much as possible.

[0112] Based on this, for determining the shortest path between each topological connection node in the actual routing topological relationship according to the path planning algorithm, the constraint condition is that the cable is routed along the front, back, left and right gaps of the bracket to avoid the cable passing through the bracket.

[0113] Reference Figure 7 As shown, it is a 3.2MW square array of a centralized flat-ground power station. The cable laying method of the square array is underground. There are 18 DC combiner boxes in total, and the position coordinate data of each bracket, the position coordinate data of the combiner box, and the inverse position coordinate data of the box are obtained in advance for the conversion of grid point coordinates. The selected bracket width is 3.8 meters and the length is 10.22 meters. The minimum distance between the front and rear rows of the bracket is 5.5 meters, and the minimum distance between the left and right gaps of the bracket is 0.6 meters. The routing diagram finally obtained by the photovoltaic power station routing method according to the present invention is Figure 8 The specific photovoltaic power station wiring method in this example is as follows:

[0114] According to the location distribution of combiner boxes and box-type transformers in the photovoltaic array, multiple main paths are determined by optimization;

[0115] Among them, vertical cross lines are drawn with the junction box and the transformer as the center to form a grid; the preset distance for merging grid segments is set to 30 meters, and the horizontal grid segments and vertical grid segments are merged respectively. The transformer location point is taken as the origin of the grid point coordinates, and the grid point coordinates of each junction box location point are associated and bound according to the grid point closest to it;

[0116] For each junction box, a dynamic programming algorithm is used to calculate all routing paths from the junction box grid point to the transformer grid point under the Manhattan routing method, and then n routing schemes are combined. According to the pre-acquired position coordinate data of the junction box, transformer, etc., the grid point coordinates in the routing path are converted into actual coordinates to determine the bridge laying cost of the n routing schemes. The calculation method is: count the number of times each path appears in the routing scheme (that is, the number of cables collected), combine the bridge selection rules, select the corresponding bridge, and calculate the total bridge cost. Finally, determine the routing scheme with the lowest cost among the n routing schemes;

[0117] Based on the lowest cost routing scheme, the paths with less than 2 (preset number) of collected cables are deleted to obtain the initial main path, and then the line segments constituting the initial main path are separated and extracted as (segment 1, segment 2, ..., segment m). The line segments are offset, and each line segment is offset to derive two line segments. The derivation principle is: the horizontal line offset distance is set to the minimum spacing of the front and rear rows of the bracket is 5.5 meters, the vertical line offset distance is set to the bracket length of 10.22 meters, the horizontal line segments are offset up and down, and the vertical line segments are offset left and right. Then, multiple main paths are combined according to the line segments and offset line segments, namely {main path 1: (segment 1, segment 2, ..., segment m), main path 2: (segment 1, segment 2', ..., segment m'), ...}, where segment m' is the offset derived segment of segment m;

[0118] Discretize the wiring positions (gaps between brackets) in the photovoltaic array to obtain the wiring position points:

[0119] The four vertices of each bracket in the photovoltaic array are expanded by 0.3 meters (half of the minimum gap distance between the brackets) to generate four new position points;

[0120] Merge the locations that are close to each other to get the final routable locations;

[0121] Based on each main path, for each combiner box, a T-connection is made to the point of the main path closest to it, and finally an initial routing topology relationship (topological connection structure) including the combiner box and the box-type transformer location point is obtained;

[0122] Based on the routable position point, replace the topological connection node of the initial routing topological relationship. The preset replacement rule is: find the routable position point closest to the topological connection node. If the distance between the routable position point and the topological connection node is less than 3.8 meters (bracket width), replace it, otherwise do not replace it, and obtain the actual routing topological relationship;

[0123] Through the A-star path planning algorithm, the cable is routed along the front, back, left, and right gaps of the bracket as a constraint (i.e., not passing through the bracket), and the shortest path between each topological connection node in the actual routing topology relationship is calculated. Multiple shortest paths constitute the actual routing path corresponding to the main path. For the actual routing paths corresponding to multiple main paths, the length of each path and the corresponding bridge selection are calculated based on the actual routing path, and the length of each cable is counted, and finally the total cost of the cable and bridge is calculated. For the wiring costs corresponding to multiple main paths, the path with the lowest cost is the final routing path taken in this embodiment.

[0124] Reference Fig. 9 As shown, it is a 4MW square array of a centralized flat-ground power station. The cable laying method of the square array is underground. There are 15 DC combiner boxes in total, and the position coordinate data of each bracket, the combiner box position coordinate data, and the box inverse position coordinate data are obtained in advance for the conversion of grid point coordinates. The selected bracket width is 2.88 meters and the length is 27.48 meters. The minimum distance between the front and rear rows of the bracket is 10.5 meters, and the minimum distance between the left and right gaps of the bracket is 0.8 meters. The routing diagram finally obtained by the photovoltaic power station routing method described in the present invention is Fig.10 The specific photovoltaic power station wiring method in this example is as follows:

[0125] According to the location distribution of combiner boxes and box-type transformers in the photovoltaic array, multiple main paths are calculated and optimized:

[0126] Draw vertical cross lines with the combiner box and transformer as the center to form a grid; the preset distance for merging grid segments is set to 30 meters, and the horizontal grid segments and vertical grid segments are merged respectively. The transformer location point is taken as the origin of the grid point coordinates. For the grid point coordinates of each combiner box location point, the grid point closest to it is associated and bound;

[0127] For each junction box, a dynamic programming algorithm is used to calculate all routing paths from the junction box grid point to the transformer grid point under the Manhattan routing method, and then n routing schemes are combined. According to the pre-acquired position coordinate data of the junction box, transformer, etc., the grid point coordinates in the routing path are converted into actual coordinates to determine the bridge laying cost of the n routing schemes. The calculation method is: count the number of times each path appears in the routing scheme (that is, the number of cables collected), combine the bridge selection rules, select the corresponding bridge, and calculate the total bridge cost. Finally, determine the routing scheme with the lowest cost among the n routing schemes;

[0128] Based on the lowest cost routing scheme, the paths with less than 2 (preset number) of collected cables are deleted to obtain the initial main path, and then the line segments constituting the initial main path are separated and extracted as (line segment 1, line segment 2, ..., line segment m), and the line segments are offset. Each line segment is further offset to derive two line segments. The derivation principle is: the horizontal line offset distance is set to the minimum spacing between the front and rear rows of the bracket of 10.5 meters, the vertical line offset distance is set to the bracket length of 27.48 meters, the horizontal line segments are offset up and down, and the vertical line segments are offset left and right. Then, multiple main paths are combined according to the line segments and offset line segments, namely {main path 1: (line segment 1, line segment 2, ..., line segment m), main path 2: (line segment 1, line segment 2', ..., line segment m'), ...}, where line segment m' is the offset derived line segment of line segment m;

[0129] Discretize the wiring positions (gaps between brackets) in the photovoltaic array to obtain the wiring position points:

[0130] The four vertices of each bracket in the photovoltaic array are expanded by 0.3 meters (half of the minimum gap distance between the brackets) to generate four new position points;

[0131] Merge the locations that are close to each other to get the final routable locations;

[0132] Based on each main path, for each combiner box, a T-connection is made to the point of the main path closest to it, and finally an initial routing topology relationship (topological connection structure) including the combiner box and the box-type transformer location point is obtained;

[0133] Based on the routable position point, replace the topological connection node of the initial routing topological relationship. The preset replacement rule is: find the routable position point closest to the topological connection node. If the distance between the routable position point and the topological connection node is less than 2.8 meters (bracket width), replace it, otherwise do not replace it, and obtain the actual routing topological relationship;

[0134] Through the path planning algorithm, the cable is routed along the front, back, left and right gaps of the bracket as a constraint (i.e., not passing through the bracket), and the shortest path between each topological connection node in the actual routing topology relationship is calculated. Multiple shortest paths constitute the actual routing path corresponding to the main path. For the actual routing paths corresponding to multiple main paths, the length of each path and the corresponding bridge selection are calculated based on the actual routing path, and the length of each cable is counted, and finally the total cost of the cable and bridge is calculated. For the wiring costs corresponding to multiple main paths, the path with the lowest cost is the final routing path taken in this embodiment.

[0135] A computing device according to another embodiment of the present invention includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the photovoltaic power station routing method described above is implemented.

[0136] The beneficial effects of the computing device described in the present invention are similar to those of the above-mentioned photovoltaic power station routing method, which will not be described in detail here.

[0137] A computer-readable storage medium according to another embodiment of the present invention stores a computer program, and when the computer program is executed by a processor, the photovoltaic power station routing method described above is implemented.

[0138] The beneficial effects of the computer-readable storage medium described in the present invention are similar to those of the photovoltaic power station routing method described above, and will not be described in detail here.

[0139] Generally speaking, the computer instructions for implementing the method of the present invention can be carried by any combination of one or more computer-readable storage media. Non-transitory computer-readable storage media can include any computer-readable media except for the signal itself that is temporarily propagating.

[0140] Computer-readable storage media can be, for example, but not limited to, electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or devices, or any combination thereof. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection with one or more conductors, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer-readable storage medium can be any tangible medium that contains or stores a program that can be used by or in conjunction with an instruction execution system, device, or device.

[0141] Program code for performing the operation of the present invention can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" or similar programming languages, in particular, Python suitable for neural network computing and platform frameworks based on TensorFlow, PyTorch, etc. can be used. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).

[0142] Although the present invention is disclosed as above, the present invention is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the scope defined by the claims.

Claims

1. A photovoltaic power station routing method, characterized in that: include: forming a grid according to the positions of the plurality of first devices and second devices in the photovoltaic array; Determine, according to a dynamic programming algorithm, all routing paths from each grid point of the first device to the grid point of the second device in a Manhattan routing manner; Generate multiple routing schemes according to the routing path, and determine the routing scheme with the lowest cost among the multiple routing schemes; Obtaining a plurality of main paths according to the minimum cost routing scheme, wherein the main paths are paths for directly or indirectly connecting each of the first devices with the second device; Determining the wiring location points within the photovoltaic array; Generate a plurality of actual routing topological relationships of the first device in each of the main paths according to the first device, the main path, and the routing position points, wherein the topological connection nodes of the actual routing topological relationships are the position points used for routing; Determine the shortest path between each of the topological connection nodes in the actual routing topological relationship according to a path planning algorithm; A final routing path is determined according to the shortest path.

2. The photovoltaic power station routing method according to claim 1, characterized in that: The forming a grid according to the positions of the first device and the second device comprises: Generate a cross grid line with the first device and the second device as the center; Merge the grid lines according to a preset merging rule; The grid is generated according to the grid lines, wherein a grid point representing the first device is a grid point in the grid that is closest to the first device.

3. The photovoltaic power station routing method according to claim 2, characterized in that: The grid lines include a first grid line and a second grid line that are adjacent and parallel, and merging the grid lines according to a preset merging rule includes: When the distance between the first grid line and the second grid line is less than a preset distance, and the distance between the first grid line and the second device is greater than the distance between the second grid line and the second device, the first grid line is deleted.

4. The photovoltaic power station routing method according to claim 1, characterized in that: The obtaining of the plurality of main paths according to the minimum cost routing scheme comprises: Deleting the path in which the number of cables collected is less than a preset number in the minimum cost routing scheme to obtain an initial main path; Separating the initial main path to obtain a plurality of line segments; Performing an offset process on each of the line segments to obtain a plurality of offset line segments, wherein the offset line segments are obtained by offsetting the horizontal line segments up and down and offsetting the vertical line segments left and right; A plurality of the line segments and a plurality of the offset line segments are combined to obtain a plurality of the main paths.

5. The photovoltaic power station routing method according to claim 1, characterized in that: Determining the routing position points in the photovoltaic array includes: Expand the vertices of the bracket of the photovoltaic power station to obtain multiple location points; The routable position points are generated according to a plurality of position points.

6. The photovoltaic power station routing method according to any one of claims 1 to 5, characterized in that: The generating an actual routing topology relationship according to the first device, the main path and the routing position point includes: Generating initial routing topology relationships of a plurality of the first devices in each of the main paths; The topological connection nodes of the initial routing topology relationship are replaced according to the routing position points to obtain the actual routing topology relationship.

7. The photovoltaic power station routing method according to claim 6, characterized in that: The replacing the topological connection nodes of the initial routing topological relationship according to the routing position points to obtain the actual routing topological relationship includes: Determine the routable position point closest to the topological connection node of the initial routing topology relationship as the estimated routable position replacement point; When the distance between the estimated routeable position replacement point and the topological connection node of the initial route topological relationship is less than the width of the bracket, the estimated routeable position replacement point is used as the replaced topological connection node.

8. A computing device, characterized in that The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the photovoltaic power station routing method according to any one of claims 1 to 7 is implemented.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the photovoltaic power station routing method according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Method for automatically generating multi-device power path schematic diagram

    CN105302965A

  • Photovoltaic power station wiring method and device

    CN112487626A