A floating ship lifting structure and method thereof
By designing ballast tanks and negative pressure tubes to allocate ballast water on floating ships, the problem of lifting instability caused by rolling, pitching, and heaving movements is solved, and stable lifting and efficient lifting of floating ships are achieved. construction.
Patent Information
- Application Number
- CN202110780644.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-09
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-07-09
AI Technical Summary
In existing offshore wind power installations, the construction period of self-elevating offshore platforms or bottom-mounted offshore platforms is long and costly, and the crawler crane on the floating ship causes unstable hoisting due to rolling, pitching, and heaving movements, which affects Ship lifting operations.
Design a floating ship lifting structure, including the ship body and the main body of the crane. There are four sets of ballast tanks at both ends of the ship body. The ballast tanks are connected to the ship body. The ballast water is adjusted through the negative pressure tube to control the lateral inclination of the ship. and the center of gravity, using deck winches, positioning anchors and guide mechanisms for positioning and stabilization, combined with pressure gauges and data processors to monitor the force of the negative pressure cylinder, and allocate ballast water to maintain stability.
It improves the stability of floating ship hoisting, ensures the normal lifting operation of the ship, reduces the instability caused by rolling, pitching and heaving movements, and improves construction efficiency.
Smart Images

Figure CN113306677B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ships, and in particular to a floating ship lifting structure and a method thereof. Background Art
[0002] At present, conventional offshore wind power installation uses self-elevating offshore platforms or bottom-mounted offshore platforms for hoisting. Due to the long construction period of offshore platforms, they cannot respond to market needs in a timely manner and have high manufacturing costs. At the same time, there are currently a large number of idle large cranes used for floating ships and land wind turbine installation in China.
[0003] The crawler crane is placed on a floating ship for lifting operations. The crawler crane needs to control the lateral force and inclination angle. Since the ship has rolling, pitching, and heaving movements, and the crawler crane is fixed on the ship, the crane will become unstable with the movement of the ship. Lifting heavy objects will cause the center of gravity of the ship to change and produce a heel angle. Among them, rolling and pitching will generate lateral forces perpendicular to the boom and forces along the boom. The sum of the heaving movement and the vertical components of rolling and pitching will cause the gravity weighting of the ship, which will seriously affect the lifting operation of the ship. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a floating ship lifting structure and method thereof, which improves the stability of floating ship lifting and ensures normal lifting operation of the ship.
[0005] In order to achieve the above object, the technical solution of the present invention is as follows:
[0006] A floating ship lifting structure comprises: a ship body and a crane body, the ship body is connected to the crane body, at least four groups of ballast tanks are arranged at both ends of the ship body, the ballast tanks are connected to the ship body, a negative pressure cylinder is arranged on one side of the ballast tank, the negative pressure cylinder is connected to the ship body, and the ballast water is transferred by the ballast tanks corresponding to each other and cooperating with each other according to the force applied to the negative pressure cylinder.
[0007] The invention provides a floating ship lifting structure and method thereof, which improve the stability of floating ship lifting and ensure the normal lifting operation of the ship.
[0008] As a preferred technical solution, a deck is provided on the ship body, a deck winch is provided on the deck, the deck winch is connected to the deck, and the negative pressure cylinder is connected to the deck winch through a first metal rope.
[0009] As a preferred technical solution, it includes: positioning anchors, which are arranged at the four corners of the ship body and are connected to the deck winch through a second metal rope.
[0010] As a preferred technical solution, a guide mechanism is provided on the side of the deck, the guide mechanism is connected to the deck, and the guide mechanism is used for guiding the negative pressure cylinder when it is raised or lowered.
[0011] As a preferred technical solution, a water pump is provided inside the negative pressure cylinder, and the water pump is used to discharge water in the negative pressure cylinder to form negative pressure.
[0012] As a preferred technical solution, a negative pressure cylinder force measuring device is provided on the negative pressure cylinder, and the negative pressure cylinder force measuring device is used to monitor the magnitude of the force applied to the negative pressure cylinder.
[0013] As a preferred technical solution, the negative pressure cylinder force measuring device includes: a plurality of pressure gauges, a data collector and a data processor. The pressure gauge is arranged in the force monitoring area of the negative pressure cylinder. The pressure gauge is electrically connected to the data collector, the data collector is electrically connected to the data processor, and the data processor is electrically connected to the ballast tank controller for controlling the allocation of ballast water in the ballast tank.
[0014] As a preferred technical solution, it includes: a plurality of impellers, the impellers are assembled into an impeller assembly, and the impeller assembly is connected to the ship body.
[0015] As a preferred technical solution, at least two sets of crane bodies are provided on the deck, and the crane bodies are used to lift the wind turbines. The deck is connected to the crane bodies, and at least two wind ropes are provided opposite to each other on both sides of the crane beam.
[0016] As a preferred technical solution, a hub tooling is provided on the deck, and the hub tooling is connected to the deck.
[0017] The present invention provides a method for lifting a floating vessel, comprising the following steps:
[0018] S1 Control of the transverse inclination angle when the floating vessel enters the construction site for positioning;
[0019] S2 Control of the lateral inclination angle when the crane body is hoisting;
[0020] Control of the lateral inclination angle of the S3 crane's main boom when it rotates.
[0021] As a preferred technical solution, step S1, controlling the transverse inclination angle of the floating vessel when entering the construction site for positioning, comprises the following steps:
[0022] S11 The ship enters the construction site and uses the anchors to position the four corners of the ship;
[0023] S12 lowers the negative pressure cylinder into the seabed soil at the construction site. After the negative pressure cylinder is lowered, the water in the negative pressure cylinder is discharged through the internal water pump to form negative pressure;
[0024] S13 reduces the transverse inclination of the ship by tightening the negative pressure cylinder with the deck winch;
[0025] S14 allocates ballast water according to the force magnitudes of the four negative pressure cylinders, calculates the average force values of each negative pressure cylinder in one cycle as f1, f2, f3 and f4, selects the maximum force value of a negative pressure cylinder as fmax from the average force values f1, f2, f3 and f4, and selects the minimum force value of a negative pressure cylinder as fmin, and pre-sets the threshold value of the allowable force deviation as fdifference. When the maximum force value of the negative pressure cylinder at one end of the ship body is fmax, and the minimum force value of the negative pressure cylinder at the other end of the ship body is fmin, when fmax-fmin>fdifference, ballast water is allocated from the ballast tank at one end of the ship body to the ballast tank at the other end of the ship body; and repeats this process until fmax-fmin≤fdifference;
[0026] S15 continues the subsequent construction.
[0027] As a preferred technical solution, step S2, controlling the lateral inclination angle of the crane body during lifting, comprises the following steps:
[0028] The main body of the S21 crane is slowly lifted by force;
[0029] S22 allocates ballast water according to the force magnitudes of the four negative pressure cylinders, calculates the average force values of each negative pressure cylinder in a cycle as f1, f2, f3 and f4, selects the maximum force value of a negative pressure cylinder as fmax from the average force values f1, f2, f3 and f4, and selects the minimum force value of a negative pressure cylinder as fmin, and pre-sets the threshold value of the allowable force deviation as fdifference. When the maximum force value of the negative pressure cylinder at one end of the ship's body is fmax, and the minimum force value of the negative pressure cylinder at the other end of the ship's body is fmin, when fmax-fmin>fdifference, ballast water is allocated from the ballast tank at one end of the ship's body to the ballast tank at the other end of the ship's body; and repeats this process until fmax-fmin≤fdifference;
[0030] S23 until the crane body completely lifts the load;
[0031] S24 continues the subsequent construction.
[0032] As a preferred technical solution, step S3, controlling the lateral inclination angle of the boom of the crane body when rotating, comprises the following steps:
[0033] The S31 crane body slowly rotates the boom;
[0034] S32 allocates ballast water according to the force magnitudes of the four negative pressure cylinders, calculates the average force values of each negative pressure cylinder in a cycle as f1, f2, f3 and f4, selects the maximum force value of a negative pressure cylinder as fmax from the average force values f1, f2, f3 and f4, and selects the minimum force value of a negative pressure cylinder as fmin, and pre-sets the threshold value of the allowable force deviation as fdifference. When the maximum force value of the negative pressure cylinder at one end of the ship's body is fmax, and the minimum force value of the negative pressure cylinder at the other end of the ship's body is fmin, when fmax-fmin>fdifference, ballast water is allocated from the ballast tank at one end of the ship's body to the ballast tank at the other end of the ship's body; and repeats this process until fmax-fmin≤fdifference;
[0035] S33 until the crane arm of the crane body has completed the lifting of the object in place;
[0036] S34 continues the subsequent construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 A structural diagram of a floating ship hoisting structure provided by the present invention (ship approaching the site);
[0038] Figure 2 A structural diagram of a floating ship lifting structure provided by the present invention (the negative pressure cylinder is lowered into the seabed soil at the construction site for positioning);
[0039] Figure 3 A structural diagram of a floating ship hoisting structure provided by the present invention (tower transport ship approaching the site);
[0040] Figure 4 A structural diagram of a floating ship lifting structure provided by the present invention (hoisting tower);
[0041] Figure 5 A structural diagram of a floating ship hoisting structure provided by the present invention (impeller transport ship approaching the site);
[0042] Figure 6 A structural diagram of a floating ship lifting structure provided by the present invention (lifting impeller);
[0043] Figure 7 A structural diagram of a floating ship lifting structure provided by the present invention (impeller assembly).
[0044] Among them: 1-ballast tank; 2-negative pressure cylinder; 3-ship body; 4-crane body; 5-deck; 6-deck winch; 7-first metal rope; 8-positioning anchor; 9-second metal rope; 10-guide mechanism; 11-seabed soil at the construction site; 12-tower transport ship; 13-pile foundation; 14-impeller transport ship; 15-impeller assembly. DETAILED DESCRIPTION
[0045] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0046] It can be understood that the present invention is to achieve the purpose of the present invention through some embodiments. The present invention provides a floating ship lifting structure construction method, including the following construction steps:
[0047] S1 Figure 1 As shown, the floating vessel approaches and positions itself;
[0048] The floating vessel needs to enter the site according to the direction of the tide and against the tide. When the floating vessel retreats, it needs to retreat along the tide to prevent the anchor at the stern from losing control and hitting the wind turbine. When the floating vessel enters the site, the staff is arranged to use a laser rangefinder to measure the distance between the bow and the construction site, and the anchor boat is used to throw the anchor 8 to locate the four corners of the floating vessel.
[0049] S2 Figure 2 As shown, the negative pressure cylinder 2 is lowered into the seabed soil 11 at the construction site, and the deck winch 6 is tightened and leveled;
[0050] The negative pressure cylinder 2 is lowered into the seabed soil 11 of the construction site by the deck winch 6. After the negative pressure cylinder 2 is lowered, the water in the negative pressure cylinder 2 is discharged by the water pump inside the negative pressure cylinder 2 to form negative pressure. The negative pressure cylinder 2 is pressed into the seabed soil 11 of the construction site by the pressure difference between the inside and outside of the negative pressure cylinder 2. The negative pressure cylinder 2 is leveled after being tightened by the deck winch 6 to complete the positioning of the floating vessel.
[0051] S3 Figure 3 As shown, the tower transport ship enters the site;
[0052] After the floating vessel has been positioned, the tower transport ship 12 is organized to dock according to the flow direction on site. Before berthing, the anchor cable of the floating vessel's side is appropriately loosened according to the water flow and other conditions to facilitate the berthing of the tower transport ship, and the anchoring boat is assisted. After the tower transport ship 12 docks at the side of the floating vessel, it is tied to the floating vessel with cables, and the tower transport ship 12 is in a position where the crane body 4 of the floating vessel can lift it;
[0053] S4 Figure 4 As shown, the tower is hoisted;
[0054] After the tower transport ship 12 arrives at the site for positioning, it is necessary to check whether the dimensions and number of holes are correct according to the drawings, check whether the flanges and bolt holes are deformed or damaged during transportation and storage, and whether the tower accessories are fully installed;
[0055] The two crane bodies 4 on the ship body 3 simultaneously lift the tower and turn it over. The main crawler crane slowly lifts the hook and slightly turns to one side, and the auxiliary crawler crane slowly turns to the other side. At the same time, the two crane bodies 4 are adjusted to adjust the luffing angle to ensure that the hook is at the center of gravity. After the tower is vertically erected, the auxiliary crawler crane drops the hook and removes the lower flange lifting device.
[0056] After slowly rotating the boom to reach the direction of the ship's side base, the tower is slowly lifted. After lifting to the predetermined height, the boom slowly lies over the first section of the tower and slowly falls into place to complete the lifting of the tower.
[0057] S5 Figure 5-7 As shown, the impeller transport ship 14 enters the site, including the following steps:
[0058] S51 After the impeller transport ship 14 docks with the floating ship, the main engine and the hub tooling are first hoisted onto the deck of the installation ship to carry out preparatory work before hoisting, and then the floating ship is turned around and docked to hoist the blades;
[0059] S52 hoisting host;
[0060] Before hoisting the main engine, two wind ropes are installed on both sides of the main engine lifting beam, and wind is pulled by wind winches. Before hoisting and installing the main engine, it is necessary to ensure that the hoisting equipment, especially the sling, is safe and smooth, so that the yaw flange surface (the flange surface connected to the tower) can be easily connected with the tower flange;
[0061] S53 impeller assembly;
[0062] Before assembling the impeller, in order to avoid the impeller from bumping, the floating ship should be anchored horizontally before assembly, and the floating ship should be anchored to one side before assembly;
[0063] After the installation of the engine room is completed, the installation ship is anchored and leaves the pile foundation. The impeller transport ship is docked against the floating ship. The impeller transport ship is docked against the side of the floating ship, with the blade root facing the stern of the floating ship. When the impeller transport ship is docked, the impeller should be in a position that is convenient for the floating ship to lift the impeller;
[0064] After the crane body lifts the impeller, the main and auxiliary crane arms are translated outward to the appropriate position, the main crane slowly rotates inward to one side, and the auxiliary crane slowly rotates to the other side, and continues to rotate after the blade tip enters the deck until the blade is horizontally parallel to the installation ship. The impeller is lifted from one side of the floating ship to the other side of the ship through the two crane bodies, and the main crane rotates until the impeller reaches the predetermined installation position;
[0065] When the blades are rotating, pay attention to the distance between the impeller and the vehicle body, floating ship structure and obstacles, keep the impeller at a safe distance and avoid collision;
[0066] The impeller hoisting is preferably carried out in weather with good weather and sea conditions, and the weather conditions during the entire blade hoisting process should be obtained in advance and planned and prepared in advance.
[0067] S54 completed the installation of the impeller;
[0068] like Figure 6 As shown, the main crane lifts the impeller. When the impeller is lifted steadily to the height of one person, stop it and clean the hub tooling and gearbox mounting flange surface and threaded holes with a clean fiber-free rag and special cleaning agent. Lift the impeller and turn it over. The main crane is hung on the hub tooling hanger. The auxiliary crane uses a special lifting device for turning over to lift the transport tooling position of a single blade on the ship's side. When turning over, the two cranes rise at the same time. The lifting speed of the auxiliary crane is slower than that of the main crane. During the whole process, keep the blade off the ground and the center of gravity of the impeller within the deck. After the impeller is vertical, remove the auxiliary crane's tail lifting device.
[0069] After lifting the impeller system to the height of the main engine, the staff in the main engine keep in touch with the crane through the intercom, command the crane to move slowly, and use the guide rope to cooperate with the crane to make the impeller slowly approach the main engine. At the same time, insert the two wind wheel locating pins into the holes on the gear box wind wheel locking flange.
[0070] S6 lifting is completed and negative pressure cylinder 2 is retracted;
[0071] After the lifting project is completed, water is injected into the negative pressure cylinder 2. After the pressure inside increases, the negative pressure cylinder 2 is lifted and recovered by the deck winch 6;
[0072] S7 moves the floating vessel to the next position for construction.
[0073] When the floating ship is hoisted, the lateral force of the crane body 4 will cause the floating ship to be hoisted unstably. The lateral force of the crane body 4 is caused by: the rolling, pitching, swaying and swaying movements when the floating ship is hoisted;
[0074] The sway and surge motions of a floating vessel are horizontal linear displacements caused by environmental loads of wind, waves and currents.
[0075] The rolling and pitching of a floating vessel are angular displacement movements around the coordinate axes, which are caused by the environmental loads of wind, waves and currents and the shift of the center of gravity during the lifting process.
[0076] The center of gravity shift during the lifting process of a floating vessel can be calculated, which is specifically divided into the instantaneous torque generated during lifting and the torque change generated by the rotation of the load.
[0077] At this time, if the force generated by the negative pressure cylinder 2 is large enough to completely offset the superposition of the environmental load of the wind and wave flow and the torque caused by the center of gravity shift during the lifting process, there is no need to allocate ballast water for balance. That is, the torque M generated by the negative pressure cylinder 2 is greater than M1+M2 (M1 is the maximum torque generated by the wind and wave flow, and M2 is the maximum torque generated by each operating condition of the hoisted object). However, the capacity of the negative pressure cylinder 2 required at this time is relatively large. It is not economical.
[0078] For this purpose we consider the moment caused by the center of gravity shift during the lifting process which can be calculated through ballast water control.
[0079] (1) For the instantaneous moment generated during lifting, the crane can be slowly subjected to force during lifting, and the ballast water can be adjusted in the reverse direction to balance the force on the four negative pressure cylinders 2 of the floating ship. The force on the four negative pressure cylinders 2 of the floating ship can be monitored during lifting to make the force magnitudes basically consistent.
[0080] (2) For the moment during the rotation of the suspended object, the crane is made to slowly rotate the boom, and at the same time, the ballast water is adjusted in the reverse direction to balance the force on the four negative pressure cylinders 2 of the ship during the rotation of the boom, so that the force magnitudes are basically the same.
[0081] The present invention provides a floating ship lifting structure and method thereof, which can resist the environmental load of the floating ship, improve the stability of the floating ship lifting, and ensure the normal lifting operation of the ship.
[0082] The present invention provides a floating ship lifting structure, comprising: a ship body 3 and a crane body 4, wherein the ship body 3 is connected to the crane body 4, at least four groups of ballast tanks 1 are arranged at both ends of the ship body 3, the ballast tanks 1 are connected to the ship body 3, a negative pressure cylinder 2 is arranged on one side of the ballast tank 1, and the negative pressure cylinder 2 is connected to the ship body 3, and the ballast water is transferred between the ballast tanks 1 in correspondence and in cooperation with each other according to the force of the negative pressure cylinder 2. A deck 5 is arranged on the ship body 3, a deck winch 6 is arranged on the deck 5, and the deck winch 6 is connected to the deck 5, and the negative pressure cylinder 2 is connected to the deck winch 6 through a first metal rope 7. The positioning anchor 8 is arranged at the four corners of the ship body 3, and the positioning anchor 8 is connected to the deck winch 6 through a second metal rope 9, and the positioning anchor 8 is thrown into the seabed mud 11 of the construction site for positioning, which solves the problem of the horizontal and vertical movement of the floating ship when the floating ship is lifted. A guide mechanism 10 is provided on the side of the deck 5, and the guide mechanism 10 is connected to the deck 5. The guide mechanism 10 is used for guiding the negative pressure cylinder 2 when it is raised or lowered. A water pump is provided inside the negative pressure cylinder 2, and the water pump is used to discharge the water in the negative pressure cylinder 2 to form negative pressure. A negative pressure cylinder force measuring device is provided on the negative pressure cylinder 2, and the negative pressure cylinder force measuring device is used to monitor the force magnitude of the negative pressure cylinder. The negative pressure cylinder force measuring device includes: a plurality of pressure gauges, a data collector and a data processor. The pressure gauge is provided in the force monitoring area of the negative pressure cylinder, the pressure gauge is electrically connected to the data collector, the data collector is electrically connected to the data processor, and the data processor is electrically connected to the ballast tank controller, and is used to control the ballast tank to allocate ballast water, so that the force magnitudes of the four negative pressure cylinders 2 are the same, thereby improving the stability of the floating ship hoisting and improving the construction efficiency of the ship hoisting operation.
[0083] The impellers are assembled into an impeller assembly 15, and the impeller assembly 15 is connected to the ship body 3. At least two sets of crane bodies 4 are arranged on the deck 5, and the crane bodies 4 are used to lift the wind turbine. The deck 5 is connected to the crane bodies 4, and at least two wind ropes are arranged opposite to each other on both sides of the lifting beam of the crane body 4. A hub tooling is arranged on the deck 5, and the hub tooling is connected to the deck 5.
[0084] The present invention provides a method for lifting a floating vessel, comprising the following steps:
[0085] S1 Transverse inclination control when the floating vessel enters the construction site for positioning;
[0086] S2 lateral tilt angle control of crane body 4 during lifting;
[0087] S3: Control of the lateral inclination angle of the boom of the crane body 4 when it rotates.
[0088] As a preferred technical solution, step S1, the lateral inclination angle control when the floating vessel enters the construction site for positioning, comprises the following steps:
[0089] S11 The floating vessel enters the construction site and positions the four corners of the floating vessel by means of the positioning anchors 8;
[0090] S12: lowering the negative pressure cylinder 2 into the seabed soil 11 of the construction site. After the negative pressure cylinder 2 is lowered, the water in the negative pressure cylinder 2 is discharged through the internal water pump to form negative pressure;
[0091] S13 tightens the negative pressure cylinder 2 by the deck winch 6 to reduce the transverse inclination of the ship;
[0092] S14 allocates ballast water according to the force magnitudes of the four negative pressure cylinders 2, calculates the average force values of each negative pressure cylinder 2 in one cycle as f1, f2, f3 and f4, selects a negative pressure cylinder 2 with a maximum force value fmax from the average force values f1, f2, f3 and f4, and selects a negative pressure cylinder 2 with a minimum force value fmin, and pre-sets the threshold value of the allowable force deviation as fdifference. When the maximum force value of the negative pressure cylinder 2 at one end of the ship body 3 is fmax, and the minimum force value of the negative pressure cylinder 2 at the other end of the ship body 3 is fmin, when fmax-fmin>fdifference, ballast water is allocated from the ballast tank 1 at one end of the ship body 3 to the ballast tank 1 at the other end of the ship body 3; and repeats this process until fmax-fmin≤fdifference;
[0093] S15 continues the subsequent construction.
[0094] As a preferred technical solution, step S2 adjusts the lateral inclination angle of the crane body 4 during lifting, including the following steps:
[0095] S21 The crane body 4 is slowly lifted by force;
[0096] S22 allocates ballast water according to the force magnitudes of the four negative pressure cylinders 2, calculates the average force values of each negative pressure cylinder 2 in one cycle as f1, f2, f3 and f4, selects a negative pressure cylinder 2 with a maximum force value fmax from the average force values f1, f2, f3 and f4, and selects a negative pressure cylinder 2 with a minimum force value fmin, and pre-sets the threshold value of the allowable force deviation as fdifference. When the maximum force value of the negative pressure cylinder 2 at one end of the ship body 3 is fmax, and the minimum force value of the negative pressure cylinder 2 at the other end of the ship body 3 is fmin, when fmax-fmin>fdifference, ballast water is allocated from the ballast tank 1 at one end of the ship body 3 to the ballast tank 1 at the other end of the ship body 3; and repeats this process until fmax-fmin≤fdifference;
[0097] S23 until the crane body 4 completely lifts the object;
[0098] S24 continues the subsequent construction.
[0099] As a preferred technical solution, step S3, the lateral inclination angle control of the boom of the crane body 4 during rotation, comprises the following steps:
[0100] S31 Crane body 4 slowly rotates the boom;
[0101] S32 allocates ballast water according to the force magnitudes of the four negative pressure cylinders 2, calculates the average force values of each negative pressure cylinder 2 in one cycle as f1, f2, f3 and f4, selects the maximum force value of a negative pressure cylinder 2 as fmax from the average force values f1, f2, f3 and f4, and selects the minimum force value of a negative pressure cylinder 2 as fmin, and pre-sets the threshold value of the allowable force deviation as fdifference. When the maximum force value of the negative pressure cylinder 2 at one end of the ship body 3 is fmax, and the minimum force value of the negative pressure cylinder 2 at the other end of the ship body 3 is fmin, when fmax-fmin>fdifference, ballast water is allocated from the ballast tank 1 at one end of the ship body 3 to the ballast tank 1 at the other end of the ship body 3; and repeats this process until fmax-fmin≤fdifference;
[0102] S33 until the arm of the crane body 4 completes the lifting of the object in place;
[0103] S34 continues the subsequent construction.
[0104] It is to be understood that the present invention is described by some embodiments, and it is known to those skilled in the art that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all various changes or equivalent substitutions falling within the scope of the claims of the present application are included. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of the present application are within the scope protected by the present invention.
Claims
1. A floating vessel lifting structure, characterized in that: include: A ship body (3) and a crane body (4), the ship body (3) being connected to the crane body (4), at least four groups of ballast tanks (1) being arranged at both ends of the ship body (3), the ballast tanks (1) being connected to the ship body (3), a negative pressure cylinder (2) being arranged on one side of the ballast tank (1), the negative pressure cylinder (2) being connected to the ship body (3), and the ballast water being transferred between the ballast tanks (1) correspondingly and mutually cooperating with each other according to the force applied to the negative pressure cylinder (2); a deck (5) being arranged on the ship body (3), a deck winch (6) being arranged on the deck (5), the deck winch (6) being connected to the deck (5), the negative pressure cylinder (2) being connected to the deck via a first metal rope (7). The winch (6) is connected; the negative pressure cylinder (2) is tightened by the deck winch (6) to reduce the transverse inclination of the ship; ballast water is allocated according to the force magnitude of the four negative pressure cylinders (2), and the average force value of each negative pressure cylinder (2) in a cycle is calculated as f1, f2, f3 and f4, and the maximum force value of a negative pressure cylinder (2) is selected as fmax from the average force values f1, f2, f3 and f4, and the minimum force value of a negative pressure cylinder (2) is selected as fmin, and the threshold value of the allowable force deviation is pre-set as fdifference. When the maximum force value of the negative pressure cylinder (2) at one end of the ship body (3) is fmax and the minimum force value of the negative pressure cylinder (2) at the other end of the ship body (3) is fmin, when fmax-fmin>fdifference, ballast water is allocated from the ballast tank (1) at one end of the ship body (3) to the ballast tank (1) at the other end of the ship body (3); and this process is repeated until fmax-fmin≤fdifference.
2. The floating vessel lifting structure according to claim 1, characterized in that: include: Positioning anchors (8), the positioning anchors (8) being arranged at the four corners of the ship body (3), the positioning anchors (8) being connected to the deck winch (6) via a second metal rope (9).
3. The floating vessel lifting structure according to claim 1, characterized in that: A guide mechanism (10) is provided on the side of the deck (5), the guide mechanism (10) being connected to the deck (5), and the guide mechanism (10) being used for guiding the negative pressure cylinder (2) when it is raised or lowered.
4. The floating vessel lifting structure according to claim 3, characterized in that: A water pump is provided inside the negative pressure cylinder (2), and the water pump is used to discharge water in the negative pressure cylinder (2) to form negative pressure.
5. The floating vessel lifting structure according to claim 1 or 4, characterized in that: The negative pressure cylinder (2) is provided with a negative pressure cylinder force measuring device, and the negative pressure cylinder force measuring device is used to monitor the magnitude of the force applied to the negative pressure cylinder.
6. The floating vessel lifting structure according to claim 5, characterized in that: The negative pressure cylinder force measuring device includes: a plurality of pressure gauges, a data collector and a data processor. The pressure gauge is arranged in the force monitoring area of the negative pressure cylinder. The pressure gauge is electrically connected to the data collector, the data collector is electrically connected to the data processor, and the ballast tank controller is electrically connected to the data processor for controlling the allocation of ballast water in the ballast tank.
7. The floating vessel lifting structure according to claim 1, characterized in that: include: A plurality of impellers are assembled into an impeller assembly (15), and the impeller assembly (15) is connected to the ship body (3).
8. The floating vessel lifting structure according to claim 1, characterized in that: At least two sets of crane bodies (4) are provided on the deck (5), the crane bodies (4) are used to lift the wind turbine, the deck (5) is connected to the crane bodies (4), and at least two wind ropes are provided on opposite sides of the crane beam of the crane body (4).
9. A method for lifting a floating vessel, characterized in that: The following steps are involved: The control of the transverse inclination angle of the S1 floating vessel when entering the construction site for positioning includes the following steps: S11 The vessel enters the construction site and positions the four corners of the floating vessel using the positioning anchors (8); S12: lowering the negative pressure cylinder (2) into the seabed soil (11) at the construction site. After the negative pressure cylinder (2) is lowered, water in the negative pressure cylinder (2) is discharged through an internal water pump to form a negative pressure. S13 tightens the negative pressure cylinder (2) through the deck winch (6) to reduce the transverse inclination angle of the ship; S14 allocates ballast water according to the force magnitudes of the four negative pressure cylinders (2), calculates the average force value of each negative pressure cylinder (2) in a cycle as f1, f2, f3 and f4, selects the maximum force value of a negative pressure cylinder (2) from the average force values f1, f2, f3 and f4 as fmax, and simultaneously selects the minimum force value of a negative pressure cylinder (2) as fmin, and pre-sets the threshold value of the allowable force deviation as fdifference. When the maximum force value of the negative pressure cylinder (2) at one end of the ship body (3) is fmax and the minimum force value of the negative pressure cylinder (2) at the other end of the ship body (3) is fmin, when fmax-fmin>fdifference, ballast water is allocated from the ballast tank (1) at one end of the ship body (3) to the ballast tank (1) at the other end of the ship body (3); and repeats this process until fmax-fmin≤fdifference; S15 continues the subsequent construction; The control of the lateral inclination angle of the S2 crane body (4) during lifting comprises the following steps: The main body of the S21 crane (4) is slowly lifted by force; S22 allocates ballast water according to the force magnitudes of the four negative pressure cylinders (2), calculates the average force value of each negative pressure cylinder (2) in a cycle as f1, f2, f3 and f4, selects the maximum force value of a negative pressure cylinder (2) from the average force values f1, f2, f3 and f4 as fmax, and simultaneously selects the minimum force value of a negative pressure cylinder (2) as fmin, and pre-sets the threshold value of the allowable force deviation as fdifference. When the maximum force value of the negative pressure cylinder (2) at one end of the ship body (3) is fmax and the minimum force value of the negative pressure cylinder (2) at the other end of the ship body (3) is fmin, when fmax-fmin>fdifference, ballast water is allocated from the ballast tank (1) at one end of the ship body (3) to the ballast tank (1) at the other end of the ship body (3); and repeats this process until fmax-fmin≤fdifference; S23 until the crane body (4) completely lifts the object; S24 continues the subsequent construction; The control of the lateral inclination angle of the boom of the S3 crane body (4) during rotation comprises the following steps: S31 Crane body (4) slowly rotates the boom; S32 allocates ballast water according to the force magnitudes of the four negative pressure cylinders, calculates the average force value of each negative pressure cylinder (2) in a cycle as f1, f2, f3 and f4, selects the maximum force value of a negative pressure cylinder (2) from the average force values f1, f2, f3 and f4 as fmax, and simultaneously selects the minimum force value of a negative pressure cylinder (2) as fmin, and pre-sets the threshold value of the allowable force deviation as fdifference. When the maximum force value of the negative pressure cylinder (2) at one end of the ship body (3) is fmax, and the minimum force value of the negative pressure cylinder (2) at the other end of the ship body (3) is fmin, when fmax-fmin>fdifference, ballast water is allocated from the ballast tank (1) at one end of the ship body (3) to the ballast tank (1) at the other end of the ship body (3); and repeats this process until fmax-fmin≤fdifference; S33 until the arm of the crane body (4) has completed the lifting of the object; S34 continues the subsequent construction.
Citation Information
Patent Citations
Floating ship hoisting structure
CN215884017U