Method and apparatus for managing PDCCH processing timeline
By dynamically adapting PDCCH monitoring parameters and scheduling offsets, the power consumption of UEs in NR systems is optimized, which solves the problem of increased power consumption of UEs in NR systems and achieves higher energy efficiency and user experience.
Patent Information
- Application Number
- CN202080010729.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-23
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2040-01-23
AI Technical Summary
The increased power consumption of UEs in NR systems, especially when supporting more frequent control/data monitoring scenarios, leads to equipment energy efficiency issues, affecting user experience and market success.
By dynamically adapting the PDCCH monitoring periodicity and duration, the number of multiple PDCCH candidates, and the minimum scheduling delay offset, combined with the transition between "sleep" and "non-sleep" behaviors, the UE's power consumption management is optimized.
It effectively reduces the power consumption of UE, improves energy efficiency, reduces unnecessary PDCCH monitoring, and improves the overall performance and user experience of the system.
Smart Images

Figure CN113366792B_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to a quasi-5th generation (5G) or 5G communication system provided to support higher data rates beyond 4th generation (4G) communication systems such as long term evolution (LTE). More specifically, the present disclosure relates to managing PDCCH processing timelines. Background Art
[0002] Wireless communication has been one of the most successful innovations in modern history. Recently, the number of subscribers to wireless communication services exceeded 5 billion and continues to grow rapidly. Due to the increasing popularity of smartphones and other mobile data devices (such as tablets, "notepad" computers, netbooks, e-book readers and machine-type devices) among consumers and enterprises, the demand for wireless data services is increasing rapidly. In order to meet the high growth of mobile data services and support new applications and deployments, improvements in radio interface efficiency and coverage are essential.
[0003] In order to meet the growing demand for wireless data services since the deployment of 4G communication systems, efforts have been made to develop improved 5G or quasi-5G communication systems. Therefore, 5G or quasi-5G communication systems are also called 'beyond 4G networks' or 'post-LTE systems'.
[0004] 5G communication systems are considered to be implemented in higher frequency (mmWave) bands (e.g., 60 GHz bands) to achieve higher data rates. In order to reduce the propagation loss of radio waves and increase the transmission distance, beamforming, massive multiple-input multiple-output (MIMO), full-dimensional MIMO (FD-MIMO), array antennas, analog beamforming, and massive antenna technologies are discussed in 5G communication systems.
[0005] In addition, in the 5G communication system, system network improvements are being developed based on advanced small cells, cloud radio access networks (RAN), ultra-dense networks, device-to-device (D2D) communication, wireless backhaul, mobile networks, cooperative communications, coordinated multi-point (CoMP), receiving-end interference cancellation, etc.
[0006] In 5G systems, hybrid FSK and QAM modulation (FQAM) and sliding window superposition coding (SWSC) as advanced coded modulation (ACM) and filter bank multi-carrier (FBMC), non-orthogonal multiple access (NOMA) and sparse code multiple access (SCMA) as advanced access technologies have been developed. Summary of the invention
[0007] Technical issues
[0008] NR supports more frequent control / data monitoring than LTE. For example, when 30kHz subcarrier spacing (SCS) is used in NR, the UE complexity and power consumption for slot-level monitoring of the same / similar number of PDCCH candidates are doubled compared to LTE.
[0009] Solution to the problem
[0010] Embodiments of the present disclosure include user equipment (UE), base stations, and methods for managing scheduling offsets. One embodiment relates to a UE including a transceiver, the transceiver being configured to receive a configuration for one of (i) a first minimum scheduling offset value set (for an active downlink bandwidth part (DL BWP) of a first cell) or (ii) a second minimum scheduling offset value set (for an active uplink bandwidth part (UL BWP) of the first cell). The transceiver is also configured to receive a physical downlink control channel (PDCCH) in a first time slot on an active DL BWP of a second cell that is the same as or different from the first cell. The UE also includes a processor operably connected to the transceiver, the processor being configured to decode a downlink control information (DCI) format provided by the PDCCH. The DCI format includes a field indicating a minimum scheduling offset value. The minimum scheduling offset value may be from a first set and applicable to receiving a physical downlink shared channel (PDSCH) on an active DL BWP of the first cell, or the minimum scheduling offset value may be from a second set and applicable to sending a physical uplink shared channel (PUSCH) on an active UL BWP of the first cell. The processor is also configured to determine a delay based on a current minimum scheduling offset value, a subcarrier spacing (SCS) configuration of an active DL BWP for a first cell, and an SCS configuration of an active DL BWP for a second cell; and apply the minimum scheduling offset value in a second time slot of the second cell that is delayed from the first time slot.
[0011] Another embodiment relates to a base station including a processor, the processor being configured to generate a configuration for one of (i) a first set of minimum scheduling offset values (for an active downlink bandwidth part (DL BWP) of a first cell) or (ii) a second set of minimum scheduling offset values (for an active uplink bandwidth part (UL BWP) of the first cell). The processor is also configured to generate a downlink control information (DCI) format; wherein: (i) the DCI format includes a field indicating a minimum scheduling offset value; (ii) the minimum scheduling offset value is from the first set and is applicable to sending a physical downlink shared channel (PDSCH) on an active DL BWP of the first cell, or the minimum scheduling offset value is from the second set and is applicable to receiving a physical uplink shared channel (PUSCH) on an active UL BWP of the first cell. The base station also includes a transceiver operably connected to the processor, the transmitter being configured to send the configuration and the DCI format in a physical downlink control channel (PDCCH) in a first time slot on an active DL BWP of a second cell, the second cell being the same as or different from the first cell. The minimum scheduling offset value is applied to a second time slot of the second cell that is delayed from the first time slot, and wherein the delay is based on the current minimum scheduling offset value, a subcarrier spacing (SCS) configuration of an active DL BWP for the first cell, and an SCS configuration of an active DL BWP for the second cell.
[0012] Yet another embodiment relates to a method for managing scheduling offsets. The method includes receiving a configuration of one of a first minimum scheduling offset value set for an active downlink bandwidth part (DL BWP) for a first cell or a second minimum scheduling offset value set for an active uplink bandwidth part (UL BWP) for the first cell. The method also includes receiving a physical downlink control channel (PDCCH) in a first time slot on an active DL BWP of a second cell that is the same as or different from the first cell, and decoding a downlink control information (DCI) format provided by the PDCCH. The DCI format includes a field indicating a minimum scheduling offset value. The minimum scheduling offset value may be from a first set and applicable to receiving a physical downlink shared channel (PDSCH) on an active DL BWP of the first cell, or the minimum scheduling offset value may be from a second set and applicable to sending a physical uplink shared channel (PUSCH) on an active UL BWP of the first cell. The method also includes determining a delay based on a current minimum scheduling offset value, a subcarrier spacing (SCS) configuration for an active DL BWP of the first cell, and an SCS configuration for an active DL BWP of a second cell; and applying the minimum scheduling offset value in a second time slot of the second cell that is delayed from the first time slot.
[0013] Other technical features may be apparent to those skilled in the art from the following drawings, descriptions and claims.
[0014] Before carrying out the specific implementation below, it may be advantageous to set forth the definitions of certain words and phrases used throughout this patent document.The term "coupling" and its derivatives refer to any direct or indirect communication between two or more elements, whether or not these elements are in physical contact with each other.The terms "send", "receive" and "communication" and their derivatives cover both direct and indirect communication.The terms "include" and "comprise" and their derivatives mean including but not limited to.The term "or" is inclusive, meaning and / or.The phrase "associated with..." and its derivatives mean including, included in, interconnected with, included in, included in, connected to or connected with, coupled to or coupled with, can communicate with, collaborate with, interlace, juxtapose, approach, be bound to or bound with, have, have the property of, have a relationship with, have a relationship with, etc.The term "controller" means any device, system or part thereof that controls at least one operation.Such a controller can be implemented with hardware or a combination of hardware and software and / or firmware. The functionality associated with any particular controller may be centralized or distributed, whether local or remote. When used with a list of items, the phrase "at least one of" means that different combinations of one or more of the listed items may be used, and only one item in the list may be required. For example, "at least one of: A, B, and C" includes any combination of: A, B, C, A and B, A and C, B and C, and A and B and C. Likewise, the term "set" means one or more. Thus, a set of items may be a single item or a set of two or more items.
[0015] In addition, the various functions described below can be implemented or supported by one or more computer programs, each of which is formed by a computer-readable program code and implemented in a computer-readable medium. The terms "application" and "program" refer to one or more computer programs, software components, instruction sets, processes, functions, objects, classes, instances, related data or a part thereof suitable for implementation in a suitable computer-readable program code. The phrase "computer-readable program code" includes any type of computer code, including source code, object code and executable code. The phrase "computer-readable medium" includes any type of medium that can be accessed by a computer, such as a read-only memory (ROM), a random access memory (RAM), a hard drive, a compact disc (CD), a digital video disc (DVD) or any other type of memory. "Non-transitory" computer-readable medium does not include wired, wireless, optical or other communication links that convey temporary electrical signals or other signals. Non-transitory computer-readable media include media in which data can be permanently stored and media in which data can be stored and rewritten later, such as rewritable optical discs or erasable memory devices.
[0016] Definitions for certain other words and phrases are provided throughout this patent document. Those of ordinary skill in the art should understand that in many, if not most, instances, such definitions apply to prior, as well as future uses of such defined words and phrases.
[0017] Advantageous Effects of the Invention
[0018] Embodiments of the present disclosure include a user equipment (UE), a base station, and a method for managing a scheduling offset. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] For a more complete understanding of the present disclosure and its advantages, reference is now made to the following description taken in conjunction with the accompanying drawings, in which:
[0020] Figure 1 illustrates an exemplary networked computing system according to various embodiments of the present disclosure;
[0021] Figure 2 An exemplary base station (BS) in a networked computing system according to various embodiments of the present disclosure is illustrated;
[0022] Figure 3 illustrates an exemplary user equipment (UE) in a networked computing system according to various embodiments of the present disclosure;
[0023] 4A and 4B illustrate exemplary wireless transmit and receive paths according to various embodiments of the present disclosure;
[0024] Figure 5 illustrates a C-DRX configuration for a UE according to various embodiments of the present disclosure;
[0025] Figure 6 illustrates a flow chart for managing PDCCH monitoring opportunities by increasing search space periodicity according to various embodiments of the present disclosure;
[0026] Figure 7 illustrates a flow chart for managing PDCCH monitoring opportunities by reducing search space periodicity according to various embodiments of the present disclosure;
[0027] Figure 8 illustrates a flow chart for managing PDCCH monitoring opportunities by reducing the duration of a search space set according to various embodiments of the present disclosure;
[0028] Fig. 9 illustrates a flow chart for managing PDCCH monitoring opportunities by increasing the duration of a search space set according to various embodiments of the present disclosure;
[0029] Fig.10illustrates a flow chart for managing PDCCH monitoring opportunities by scaling multiple PDCCH candidates according to various embodiments of the present disclosure;
[0030] Fig.11 illustrates a flow chart for managing PDCCH monitoring opportunities by adapting a minimum scheduling offset according to various embodiments of the present disclosure;
[0031] Fig.12 illustrates a flow chart for transitioning between sleep behavior and non-sleep behavior according to various embodiments of the present disclosure;
[0032] Fig.13 illustrates another flow chart for transitioning between dormant behavior and non-dormant behavior according to various embodiments of the present disclosure; and
[0033] Fig.14 A flow chart for managing scheduling offsets according to various embodiments of the present disclosure is illustrated. DETAILED DESCRIPTION
[0034] The drawings included herein and the various embodiments used to describe the principles of the present disclosure are for illustration only and should not be interpreted in any way as limiting the scope of the present disclosure. In addition, those skilled in the art will appreciate that the principles of the present disclosure can be implemented in any appropriately arranged wireless communication system.
[0035] The following documents are incorporated by reference into the present disclosure as if fully set forth herein: 3GPP TS 38.211 v15.2.0, “NR; Physical Channels and Modulation”, hereinafter “REF 1”; 3GPP TS 38.212 v15.2.0, “NR; Multiplexing and Channel Coding”, hereinafter “REF 2”; 3GPP TS 38.213 v15.2.0, “NR; Physical Layer Procedures for Control”, hereinafter “REF 3”; 3GPP TS 38.214 v15.2.0, “NR; Physical Layer Procedures for Data”, hereinafter “REF 4”; 3GPP TS 38.215 v15.2.0, “NR; Physical Layer Measurements”, hereinafter “REF 5”; 3GPP TS 38.331 v15.2.0, “NR; Physical Layer Procedures for Control”, hereinafter “REF 6”; v15.2.0, “NR; Radio Resource Control (RRC) Protocol Specification”, hereinafter “REF 6”; and 3GPP TS 38.321 v15.2.0, “NR; Medium Access Control (MAC) Protocol Specification”, hereinafter “REF 7”.
[0036] UE power consumption is a critical issue in each generation of wireless communication, and becomes even more important for 5G New Radio (NR). NR supports several new features, including wider bandwidth operation, mandatory use of four receiver antennas in several frequency bands, operation in mmWave bands, shorter transmit time interval (TTI) duration, fewer always-on reference signal (RS) transmissions from the network, and increased connectivity. These features and others lead to increased UE power consumption. In addition, the dynamic traffic characteristics due to the multiple services that may be supported by NR UEs, such as enhanced mobile broadband (eMBB), massive machine type communications (mMTC), and ultra-reliable and low-latency communications (URLLC), also make UE energy saving a challenging but essential goal. Due to the limited progress in battery technology, UE power efficiency has become a key issue for user experience and may even affect the level of success of 5G in the market.
[0037] As will be discussed in more detail below, novel aspects of the present disclosure address the aforementioned issues by dynamic adaptation of one or more configurations associated with a search space set, including an increase / decrease in PDCCH monitoring periodicity and / or duration. Other novel aspects of the present disclosure address UE power consumption by dynamic adaptation of multiple PDCCH candidates, dynamic adaptation of the minimum applicable scheduling delay offset, and by transitioning the UE between "sleeping" behavior and "non-sleeping" behavior.
[0038] Figure 1 An exemplary networked computing system is illustrated in accordance with various embodiments of the present disclosure. Figure 1 The embodiment of the wireless network 100 shown in FIG. 1 is for illustration only. Other embodiments of the wireless network 100 may be used without departing from the scope of the present disclosure.
[0039] like Figure 1 As shown in FIG, wireless network 100 includes gNodeB (gNB) 101, gNB 102, and gNB 103. gNB 101 communicates with gNB 102 and gNB 103. gNB 101 also communicates with at least one Internet Protocol (IP) network 130, such as the Internet, a private IP network, or other data network.
[0040] gNB 102 provides wireless broadband access to network 130 for a first plurality of user equipment (UE) within coverage area 120 of gNB 102. The first plurality of UEs include: UE 111, which may be located in a small business (SB); UE 112, which may be located in an enterprise (E); UE 113, which may be located in a WiFi hotspot (HS); UE 114, which may be located in a first residence (R); UE 115, which may be located in a second residence (R); and UE 116, which may be a mobile device (M) such as a cellular phone, a wireless laptop, a wireless PDA, etc. gNB 103 provides wireless broadband access to network 130 for a second plurality of UEs within coverage area 125 of gNB 103. The second plurality of UEs includes UE 115 and UE 116. In some embodiments, one or more of gNBs 101 to 103 may communicate with each other and with UEs 111-116 using 5G, LTE, LTE-A, WiMAX, WiFi, or other wireless communication technologies.
[0041] Depending on the network type, other well-known terms may be used instead of "gNodeB" or "gNB", such as "base station" or "access point". For convenience, the terms "gNodeB" and "gNB" are used in this patent document to refer to network infrastructure components that provide wireless access to remote terminals. In addition, depending on the network type, other well-known terms may be used instead of "user equipment" or "UE", such as "mobile station", "subscriber station", "remote terminal", "wireless terminal" or "user device". For convenience, the terms "user equipment" and "UE" are used in this patent document to refer to a remote wireless device that wirelessly accesses a gNB, whether the UE is a mobile device (such as a mobile phone or smartphone) or is generally considered a fixed device (such as a desktop computer or vending machine).
[0042] Dashed lines illustrate the approximate extents of coverage areas 120 and 125, which are shown as generally circular for purposes of illustration and explanation only. It should be clearly understood that coverage areas associated with a gNB, such as coverage areas 120 and 125, may have other shapes, including irregular shapes, depending on the configuration of the gNB and variations in the radio environment associated with natural and man-made obstacles.
[0043] As described in more detail below, wireless network 100 may be a 5G communication system in which a UE, such as UE 116, may manage PDCCH monitoring opportunities to improve UE power consumption in accordance with one or more novel embodiments disclosed herein, for example, by dynamic adaptation of one or more configurations related to a search space set, dynamic adaptation of multiple PDCCH candidates, dynamic adaptation of a minimum applicable scheduling delay offset, and by transitioning the UE between "sleeping" behavior and "non-sleeping" behavior. In some embodiments, management of UE power consumption involves communication of adaptation criteria and adaptation rules between a gNB, such as gNB 102, and the UE.
[0044] although Figure 1 One example of a wireless network 100 is shown, but may be used for Figure 1 Various changes may be made. For example, wireless network 100 may include any number of gNBs and any number of UEs in any suitable arrangement. In addition, gNB 101 may communicate directly with any number of UEs and provide those UEs with wireless broadband access to network 130. Similarly, each gNB 102-103 may communicate directly with network 130 and provide the UEs with direct wireless broadband access to network 130. In addition, gNBs 101, 102, and / or 103 may provide access to other or additional external networks, such as an external telephone network or other type of data network.
[0045] Figure 2 An exemplary base station (BS) according to various embodiments of the present disclosure is illustrated. Figure 2 The embodiment of the gNB 102 shown in FIG. 1 is for illustration only, and Figure 1 gNBs 101 and 103 may have the same or similar configurations. However, gNBs may have various configurations, and Figure 2 The scope of the present disclosure is not limited to any particular implementation of the gNB.
[0046] like Figure 2 As shown in FIG. 1 , gNB 102 includes multiple antennas 280a-280n, multiple RF transceivers 282a-282n, transmit (TX) processing circuitry 284, and receive (RX) processing circuitry 286. gNB 102 also includes a controller / processor 288, a memory 290, and a backhaul or network interface 292.
[0047] The RF transceivers 282a-282n receive incoming RF signals from the antennas 280a-280n, such as signals sent by UEs in the network 100. The RF transceivers 282a-282n down-convert the incoming RF signals to generate IF or baseband signals. The IF or baseband signals are sent to the RX processing circuit system 286, which generates processed baseband signals by filtering, decoding and / or digitizing the baseband or IF signals. The RX processing circuit system 286 sends the processed baseband signals to the controller / processor 288 for further processing.
[0048] TX processing circuitry 284 receives analog or digital data (such as voice data, network data, email, or interactive video game data) from controller / processor 288. TX processing circuitry 284 encodes, multiplexes, and / or digitizes the outgoing baseband data to generate processed baseband or IF signals. RF transceivers 282a-282n receive the outgoing processed baseband or IF signals from TX processing circuitry 284 and up-convert the baseband or IF signals to RF signals that are transmitted via antennas 280a-280n.
[0049] The controller / processor 288 may include one or more processors or other processing devices that control the overall operation of the gNB 102. For example, the controller / processor 288 may control the reception of forward channel signals and the transmission of reverse channel signals by the RF transceivers 282a-282n, the RX processing circuitry 286, and the TX processing circuitry 284 in accordance with well-known principles. The controller / processor 288 may also support additional functionality, such as more advanced wireless communication functionality. For example, the controller / processor 288 may support beamforming or directional routing operations, in which outgoing signals from multiple antennas 280a-280n are weighted differently to effectively direct the outgoing signals in a desired direction. Any of a variety of other functions may be supported by the controller / processor 288 in the gNB 102. In some embodiments, the controller / processor 288 includes at least one microprocessor or microcontroller.
[0050] The controller / processor 288 is also capable of executing programs and other processes, such as a basic OS, that reside in the memory 290. The controller / processor 288 may move data into or out of the memory 290 as necessary to execute a process.
[0051] The controller / processor 288 is also coupled to a backhaul or network interface 292. The backhaul or network interface 292 allows the gNB 102 to communicate with other devices or systems via a backhaul connection or via a network. The interface 292 may support communication via any suitable wired or wireless (multiple) connections. For example, when the gNB 102 is implemented as part of a cellular communication system (such as a system supporting 5G, LTE, or LTE-A), the interface 292 may allow the gNB 102 to communicate with other gNBs via a wired or wireless backhaul connection. When the gNB 102 is implemented as an access point, the interface 292 may allow the gNB 102 to communicate via a wired or wireless local area network or via a wired or wireless connection to a larger network (such as the Internet). The interface 292 includes any suitable structure that supports communication via a wired or wireless connection, such as an Ethernet or RF transceiver.
[0052] Memory 290 is coupled to controller / processor 288. A portion of memory 290 may include RAM, and another portion of memory 290 may include flash memory or other ROM.
[0053] As described in more detail below, in some embodiments, management of UE power consumption involves communication of adaptation criteria and adaptation rules between a gNB, such as gNB 102, and the UE. These adaptation criteria and adaptation rules may be configured by the gNB.
[0054] although Figure 2 An example of a gNB 102 is shown, but the Figure 2 For example, gNB 102 may include Figure 2 . As a specific example, an access point can include multiple interfaces 292, and controller / processor 288 can support routing functionality to route data between different network addresses. As another specific example, although shown as including a single instance of TX processing circuitry 284 and a single instance of RX processing circuitry 286, gNB 102 can include multiple instances of each (such as one instance per RF transceiver). In addition, Figure 2 Various components in may be combined, further subdivided, or omitted, and additional components may be added according to specific needs.
[0055] Figure 3 An exemplary user equipment (UE) according to various embodiments of the present disclosure is illustrated. Figure 3 The embodiment of UE 116 shown in FIG. 1 is for illustration only, and Figure 1 UEs 111-115 may have the same or similar configurations. However, UEs may have various configurations, and Figure 3The scope of the present disclosure is not limited to any particular implementation of the UE.
[0056] like Figure 3 As shown in FIG. 1 , UE 116 includes an antenna 305, a radio frequency (RF) transceiver 310, a transmit (TX) processing circuit system 315, a microphone 320, and a receive (RX) processing circuit system 325. UE 116 also includes a speaker 330, a main processor 340, an input / output (I / O) interface (IF) 345, a keyboard 350, a display 355, and a memory 360. The memory 360 includes a basic operating system (OS) program 361 and one or more applications 362.
[0057] RF transceiver 310 receives incoming RF signals from antenna 305 transmitted by a gNB of network 100. RF transceiver 310 downconverts the incoming RF signals to generate an intermediate frequency (IF) or baseband signal. The IF or baseband signal is sent to RX processing circuitry 325, which generates a processed baseband signal by filtering, decoding, and / or digitizing the baseband or IF signal. RX processing circuitry 325 sends the processed baseband signal to speaker 330 (such as for voice data) or to host processor 340 (for further processing (such as for web browsing data)).
[0058] TX processing circuit system 315 receives analog or digital voice data from microphone 320 or other outgoing baseband data (such as network data, email or interactive video game data) from main processor 340. TX processing circuit system 315 encodes, multiplexes and / or digitizes the outgoing baseband data to generate a processed baseband or IF signal. RF transceiver 310 receives the outgoing processed baseband or IF signal from TX processing circuit system 315 and up-converts the baseband or IF signal to an RF signal that is transmitted via antenna 305.
[0059] The main processor 340 may include one or more processors or other processing devices and execute a basic OS program 361 stored in the memory 360 to control the overall operation of the UE 116. For example, the main processor 340 may control the reception of forward channel signals and the transmission of reverse channel signals by the RF transceiver 310, the RX processing circuit system 325, and the TX processing circuit system 315 according to well-known principles. In some embodiments, the main processor 340 includes at least one microprocessor or microcontroller.
[0060] The main processor 340 is also capable of executing other processes and programs resident in the memory 360. The main processor 340 can move data into or out of the memory 360 as required to perform the processing. In some embodiments, the main processor 340 is configured to execute applications 362 based on the OS program 361 or in response to signals received from the gNB or operator. The main processor 340 is also coupled to the I / O interface 345, which provides the UE 116 with the ability to connect to other devices such as laptops and handheld computers. The I / O interface 345 is the communication path between these accessories and the main processor 340.
[0061] Main processor 340 is also coupled to keyboard 350 and display 355. An operator of UE 116 may enter data into UE 116 using keyboard 350. Display 355 may be a liquid crystal display or other display capable of presenting text and / or at least limited graphics, such as from a website.
[0062] Memory 360 is coupled to main processor 340. A portion of memory 360 may include random access memory (RAM), and another portion of memory 360 may include flash memory or other read-only memory (ROM).
[0063] As described in more detail below, a UE (such as UE 116) can manage PDCCH monitoring opportunities to improve UE power consumption in accordance with one or more novel embodiments disclosed herein, for example, by dynamic adaptation of one or more configurations related to a search space set, dynamic adaptation of multiple PDCCH candidates, dynamic adaptation of a minimum applicable scheduling delay offset, and by transitioning the UE between "sleep" behavior and "non-sleep" behavior.
[0064] although Figure 3 An example of UE 116 is shown, but the Figure 3 Make various changes. For example, Figure 3 The various components in the embodiment may be combined, further subdivided, or omitted, and additional components may be added as required. As a specific example, the main processor 340 may be divided into multiple processors, such as one or more central processing units (CPUs) and one or more graphics processing units (GPUs). In addition, although Figure 3 The UE 116 is illustrated as being configured as a mobile phone or smart phone, but the UE may be configured to operate as other types of mobile or stationary devices.
[0065] 4A and 4B illustrate exemplary wireless transmit and receive paths according to various embodiments of the present disclosure. In the following description, transmit path 400 may be described as being implemented in a gNB (such as gNB 102), and receive path 450 may be described as being implemented in a UE (such as UE 116). However, it should be understood that receive path 450 may be implemented in a gNB and transmit path 400 may be implemented in a UE. In some embodiments, transmit path 400 and receive path 450 are configured to support transmissions between a gNB and a UE in a 5G NR communication system for managing UE power consumption, such as adaptation criteria, adaptation rules, adaptation parameters, CSI, etc.
[0066] The transmit path 400 includes a channel coding and modulation block 405, a serial to parallel (S-to-P) block 410, an inverse fast Fourier transform (IFFT) block of size N 415, a parallel to serial (P-to-S) block 420, an add cyclic prefix block 425, and an upconverter (UC) 430. The receive path 450 includes a downconverter (DC) 455, a remove cyclic prefix block 460, a serial to parallel (S-to-P) block 465, a fast Fourier transform (FFT) block of size N 470, a parallel to serial (P-to-S) block 475, and a channel decoding and demodulation block 480.
[0067] In the transmit path 400, the channel coding and modulation block 405 receives a set of information bits, applies coding (such as low density parity check (LDPC) coding), and modulates the input bits (such as using quadrature phase shift keying (QPSK) or quadrature amplitude modulation (QAM)) to generate a frequency domain modulation symbol sequence. The serial to parallel block 410 converts (such as demultiplexes) the serial modulation symbols into parallel data to generate N parallel symbol streams, where N is the IFFT / FFT size used in the gNB 102 and the UE 116. The size-N IFFT block 415 performs an IFFT operation on the N parallel symbol streams to generate a time domain output signal. The parallel to serial block 420 converts (such as multiplexes) the parallel time domain output symbols from the size-N IFFT block 415 to generate a serial time domain signal. The add cyclic prefix block 425 inserts a cyclic prefix to the time domain signal. The up-converter 430 modulates (such as up-converts) the output of the add cyclic prefix block 425 to an RF frequency for transmission via a wireless channel. The signal may also be filtered at baseband before conversion to RF frequency.
[0068] The RF signal transmitted from gNB 102 arrives at UE 116 after passing through the wireless channel, and operations inverse to those at gNB 102 are performed at UE 116. Downconverter 455 downconverts the received signal to baseband frequency, and remove cyclic prefix block 460 removes the cyclic prefix to generate a serial time-domain baseband signal. Serial to parallel block 465 converts the time-domain baseband signal to parallel time-domain signals. Size N FFT block 470 performs an FFT algorithm to generate N parallel frequency-domain signals. Parallel to serial block 475 converts the parallel frequency-domain signals to a sequence of modulated data symbols. Channel decoding and demodulation block 480 demodulates and decodes the modulation symbols to recover the original input data stream.
[0069] Each of gNBs 101-103 may implement a transmit path similar to 400 for transmitting in the downlink to UEs 111-116 and may implement a receive path similar to 450 for receiving in the uplink from UEs 111-116. Similarly, each of UEs 111-116 may implement a transmit path 400 for transmitting in the uplink to gNBs 101-103 and may implement a receive path 450 for receiving in the downlink from gNBs 101-103.
[0070] Each component in Figures 4A and 4B can be implemented using hardware only or a combination of hardware and software / firmware. As a specific example, at least some of the components in Figures 4A and 4B can be implemented in software, while other components can be implemented by configurable hardware or a mixture of software and configurable hardware. For example, FFT block 470 and IFFT block 415 can be implemented as a configurable software algorithm, wherein the value of size N can be modified according to the implementation.
[0071] In addition, although described as using FFT and IFFT, this is only for illustration and should not be interpreted as limiting the scope of the present disclosure. Other types of transforms can be used, such as discrete Fourier transform (DFT) and inverse discrete Fourier transform (IDFT) functions. It should be understood that for DFT and IDFT functions, the value of variable N can be any integer (such as 1, 2, 3, 4, etc.), while for FFT and IFFT functions, the value of variable N can be any integer of a power of 2 (such as 1, 2, 4, 8, 16, etc.).
[0072] Although Figures 4A and 4B illustrate examples of wireless transmission and reception paths, various changes can be made to Figures 4A and 4B. For example, the various components in Figures 4A and 4B can be combined, further subdivided or omitted, and additional components can be added according to specific needs. In addition, Figures 4A and 4B are intended to illustrate examples of the types of transmission and reception paths that can be used in wireless networks. Any other suitable architecture can be used to support wireless communications in wireless networks.
[0073] In order to better understand the discussion of various embodiments described herein for managing UE power consumption, the following discussion of radio resource control (RRC) is provided. RRC states provide access, energy saving, and mobility optimization for UEs. In addition to the RRC states of RRC_CONNECTED and RRC_IDLE already supported by 4G Long Term Evolution (LTE), NR introduces an additional RRC state RRC_INACTIVE to adjust different service characteristics. The characteristics of the supported RRC states are summarized in Table 1 (see also REF6).
[0074] [Table 1]
[0075] RRC_IDLE -PLMN selection; - Broadcasting of system information; -Cell reselection mobility; -Paging of mobile terminated data is initiated by 5GC; - Paging in the mobile terminated data area is managed by 5GC; -DRX configured by NAS for CN paging. RRC_INACTIVE - Broadcasting of system information; -Cell reselection mobility; - Paging is initiated by NG-RAN (RAN paging); -RAN-based Notification Area (RNA) managed by NG-RAN; -DRX configured by NG-RAN for RAN paging; -5GC to NG-RAN connection (two C / U planes) is established for the UE; -UE AS context is stored in NG-RAN and UE; -NG-RAN knows the RNA to which the UE belongs. RRC_CONNECTED -5GC to NG-RAN connection (two C / U planes) is established for the UE; -UE AS context is stored in NG-RAN and UE; -NG-RAN knows the cell to which the UE belongs; -Transmit unicast data to / from UE; - Network controlled mobility, including measurement.
[0076] The high-level features of the RRC_CONNECTED state in NR Rel-15 are summarized as follows:
[0077] Wide bandwidth
[0078] The system bandwidth (BW) of LTE is up to 20MHz, while the carrier component bandwidth of NR is up to 100MHz (FR1) for carrier frequencies below 6GHz and up to 400MHz (FR2) for carrier frequencies above 6GHz and below 52.6GHz. Operation using bandwidth parts (BWPs) can enable UEs to use BWPs narrower than the system BW when the UE is inactive, thereby achieving UE energy saving. NR supports BWP switching based on RRC reconfiguration or based on indication of the downlink control information (DCI) format, which is conveyed by the physical downlink control channel (PDCCH) as described in REF 3 and REF 6. Cross-BWP scheduling can be applied to PDCCH-based BWP switching.
[0079] Frequent control / data monitoring
[0080] NR supports more frequent control / data monitoring than LTE. For example, when 30kHz subcarrier spacing (SCS) is used in NR, the UE complexity and power consumption for slot-level monitoring of the same / similar number of PDCCH candidates are doubled compared to LTE. The problem becomes more serious when the UE is configured with multiple PDCCH monitoring opportunities within a slot, such as when the UE needs to support low-latency services. The PDCCH monitoring periodicity is configured by RRC together with other PDCCH monitoring parameters. This configuration is not optimal for bursty traffic arrivals, as it is typically the case for mobile broadband or low-latency services. Reducing PDCCH monitoring and enhancing discontinuous reception (DRX) according to instantaneous traffic characteristics are design goals for UE energy saving.
[0081] Cross-slot scheduling or multi-slot scheduling may also be considered to reduce UE power, because a single PDCCH can provide the UE with scheduling information for physical downlink shared channel (PDSCH) reception over multiple slots, without the UE having to perform full PDCCH monitoring during most or all of the multiple slots. The term PDCCH monitoring refers to the UE's reception of potential PDCCHs (PDCCH candidates) and decoding of DCI formats included in the PDCCH candidates, as described in REF 3.
[0082] For some popular services, such as web browsing, the UE typically monitors the PDCCH in the absence of a valid scheduling assignment for PDSCH reception or physical uplink shared channel (PUSCH) transmission. PDCCH-only monitoring without data may consume most of the UE power for digital baseband processing, such as 40% to 60% depending on the service. Baseband operation consumes more power than radio frequency (RF) operation, where the largest component of power consumption is PDCCH monitoring. In order to reduce unnecessary PDCCH monitoring, candidate solutions include increasing the PDCCH monitoring periodicity, adaptive DRX process according to the service mode, wake-up / enter sleep signal / channel for connected mode DRX (C-DRX), etc.
[0083] For each downlink (DL) BWP configured to the UE in the serving cell, the UE may be provided with multiple control resource sets by higher layers. For each control resource set, the UE is provided with the following (see also REF 3 and REF 6): control resource set index p; demodulation reference signal (DM-RS) scrambling sequence initialization value; precoder granularity for multiple resource element groups (REGs) in the frequency for which the UE can assume the use of the same DM-RS precoder; multiple consecutive symbols; resource block set; control channel element to resource element group (CCE-to-REG) mapping parameters; antenna port quasi-co-location (QCL), from the antenna port quasi-co-location set, indicating quasi-co-location information of the DM-RS antenna port for PDCCH reception; and an indication of the presence or absence of the transmission configuration indication (TCI) field of the DCI format 1_1 transmitted by the PDCCH in the control resource set p.
[0084] For each DL BWP configured to the UE in the serving cell, the UE is provided with multiple search space sets by higher layers, wherein for each search space set from the multiple search space sets, the UE is provided with the following (see also REF 3): search space set index s; association between search space set s and control resource set p; k s PDCCH monitoring periodicity and o sPDCCH monitoring offset of a timeslot; PDCCH monitoring mode within a timeslot, indicating the first (multiple) symbols of the control resource set within the timeslot used for PDCCH monitoring; Number of PDCCH candidates per CCE aggregation level L And the search space set s is an indication of a common search space set or a UE-specific search space set.
[0085] DC / CA Operations
[0086] From the UE's perspective, any dual connectivity / carrier aggregation (DC / CA) operation consumes more power than non-DC / non-CA operation. In CA, the traffic pattern on the secondary cell (SCell) is sparser than that on the primary cell (PCell) where the UE maintains an RRC connection with the base station (gNB) because the SCell is mainly used when there are a large number of data packets for the UE to exchange with the gNB. Since the SCell takes a few milliseconds to be activated by higher layers, the SCell is usually kept activated even when there is no data to be sent to the UE so that the gNB can quickly access the UE on the SCell when data arrives. Therefore, although the gNB has no benefit in deactivating the SCell for the UE, the UE will perform redundant PDCCH monitoring for the SCell and consume power unnecessarily. Solutions to enhance the power efficiency of DC / CA operation need to be considered, such as dynamic carrier management in DC / CA, DRX enhancement in DC / CA, etc.
[0087] Increased number of receiving and transmitting antennas
[0088] In NR, for some frequency bands, the UE must be equipped with 4 receiver antenna ports. The power consumption of receiving using 4 receiver antenna ports is greater than that of receiving using 2 receiver antenna ports. In several operating scenarios, such as when the UE has very favorable link conditions and a certain performance reliability target (such as block error rate (BLER)) can be achieved using both 2 and 4 receiver antenna ports, the UE prefers to use 2 receiver antenna ports to reduce power consumption. Similar behavior also applies to transmissions from UEs with 2 or 4 transmitter antenna ports. Dynamic UE transmitter / receiver antenna port adaptation can be considered to reduce UE power consumption.
[0089] NR employs different antenna solutions and technologies depending on the part of the spectrum used for operation. For lower carrier frequencies, such as below 6 GHz, a small to moderate number of active antennas (up to about 32 transmitter chains) are typically used by the gNB transmitters. Acquisition of channel state information (CSI) by the gNB requires transmission of a channel state information reference signal (CSI-RS) by the gNB and CSI reporting by the UE. The limited bandwidth available for operation in this frequency region requires high spectral efficiency, which can be achieved through multi-user MIMO (MU-MIMO) and higher order spatial multiplexing compared to LTE as described in REF 4, which is achieved via higher resolution CSI reporting.
[0090] C-DRX
[0091] The UE can perform DRX in the RRC_CONNECTED state (C-DRX) instead of always monitoring the PDCCH. The configuration of C-DRX and the associated UE processing are illustrated in the following Figure 5 and as described in REF 7.
[0092] Figure 5 A C-DRX configuration for a UE according to various embodiments of the present disclosure is illustrated. In order to reduce power consumption, when the onDurationTimer or the inactivityTimer is not expired, the UE monitors a paging message in a common search space (CSS) set during the active time.
[0093] There is a trade-off between latency and UE power consumption overhead on C-DRX configuration. For example, for longer DRX cycles or inactivity timers, the UE consumes less power but also experiences longer latency. NR Rel-15 supports reconfiguration of all associated DRX parameters from a predefined set of values using higher layer signaling. However, for network flexibility, UE-specific configurations tend to remain unchanged for a long time regardless of the overall UE power consumption state, such as BWP bandwidth and number of component carriers (CCs) / cells activated. The associated configuration parameters are as follows:
[0094] drx-onDurationTimer: duration when the DRX cycle starts;
[0095] drx-SlotOffset: the time slot delay before starting drx-onDurationTimer;
[0096] drx-InactivityTimer: duration after a PDCCH opportunity indicating the initial UL or DL user data transmission by the medium access control (MAC) entity;
[0097] drx-RetransmissionTimerDL (per DL Hybrid Automatic Repeat Request (HARQ) process): maximum duration until a DL retransmission is received;
[0098] drx-RetransmissionTimerUL (per UL HARQ process): maximum duration until a grant for UL retransmission is received;
[0099] drx-LongCycle: long DRX cycle;
[0100] drx-ShortCycle (optional): short DRX cycle;
[0101] drx-ShortCycleTimer (optional): duration of the short DRX cycle that the UE should follow;
[0102] drx-HARQ-RTT-TimerDL (per DL HARQ process): the minimum duration before a DL allocation that the MAC entity expects for a HARQ retransmission; and
[0103] drx-HARQ-RTT-TimerUL (per UL HARQ process): Minimum duration before a UL HARQ retransmission grant is expected by the MAC entity.
[0104] NR supports flexible timing of time domain resource allocation. The associated processing timing is defined according to REF 4 as follows:
[0105] K0: The timing between PDCCH reception and corresponding PDSCH reception is indicated by a field in the DCI format scheduling PDSCH reception from a set of values. The set of values is provided by higher layers;
[0106] K2: The timing between PDCCH reception and corresponding PUSCH transmission is indicated by a field in the DCI format scheduling the PUSCH transmission from a set of values. The set of values is provided by higher layers; and
[0107] K1: The timing between PDSCH reception and the transmission of the corresponding HARQ-ACK information is indicated by a field in the DCI format scheduling PDSCH reception from a set of values. The set of values is provided by higher layers.
[0108] The UE supports a set of minimum values for the HARQ processing time. The HARQ processing time includes the delay between the PDSCH reception timing and the corresponding HARQ-ACK information transmission timing and the delay between the PDCCH reception timing and the corresponding PUSCH transmission timing. The UE indicates its capability for the shortest HARQ processing time to the serving gNB.
[0109] Unlike LTE where the UE has fixed PDCCH monitoring opportunities, NR supports duty cycle based PDCCH monitoring with configurable PDCCH candidates and configurable monitoring periodicity and duration for each search space set. However, the reconfiguration of the parameters of the search space sets is performed through RRC signaling and is therefore of limited applicability for adapting to dynamic traffic patterns. When the buffer status or channel conditions of the UE change, it may be beneficial to increase or decrease the PDCCH monitoring frequency (including skipping PDCCH monitoring). The same considerations apply when SCells are activated or deactivated, as such activity is related to the data buffer size and the likelihood of PDCCH transmissions to the UE for scheduling PDSCH reception or PUSCH transmissions from the UE. Both can have an impact on UE power consumption by increasing PDCCH monitoring to reduce the time required to complete a session (e.g., buffer increases or channel conditions improve) or by reducing (including skipping) PDCCH monitoring (e.g., buffer is empty or channel conditions deteriorate, and the UE may not be scheduled in at least some search space sets).
[0110] Therefore, it is beneficial to develop mechanisms and associated signaling support for dynamic adaptation of search space set configuration while considering the tradeoff between potential UE energy saving gains and scheduling delay.There is also a need to support relaxation of PDCCH processing timeline by dynamic adaptation of the minimum applicable scheduling delay offset.
[0111] Figure 6 A flowchart for managing PDCCH monitoring opportunities by increasing search space periodicity according to various embodiments of the present disclosure is illustrated. The operations of flowchart 600 may be performed in a UE (such as Figure 2 is implemented in the UE 116).
[0112] The PDCCH monitoring periodicity associated with the search space set s is denoted as k_{s} and is in units of one time slot. In one embodiment, k_{s} may be adjusted to achieve UE energy saving according to an adaptation criterion associated with the real-time decoding result of the PDCCH monitoring occasion of the DCI format scheduling PDSCH reception or PUSCH transmission. Figure 6 The associated adaptation criterion of this embodiment described in is referred to as adaptation criterion (1) to distinguish it from the adaptation criteria of other embodiments disclosed herein.
[0113] According to the adaptation criterion (1), over Y1>=1 consecutive PDCCH monitoring periods k_{s}, the UE does not detect any DCI format for scheduling PDSCH / PUSCH in at least X1*100% of (multiple) PDCCH monitoring opportunities, where 0<=X1<=1 and Y1 are predetermined in system operation or configured to the UE by a higher layer. In a non-limiting example, X1=0.5 and Y1=2. In another non-limiting example, X1=1 and Y1=1.
[0114] When the adaptation criterion (1) is met, the UE may increase k_{s} according to one of the following adaptation rules:
[0115] Adaptation rule 1.1: k_{s}=min(c1*k_{s}, k^max_{s}), where c1 is a positive integer, for example, c1=2, and k^max_{s} is the maximum value of the PDCCH monitoring periodicity;
[0116] Adaptation rule 1.2: k_{s}=k^PS_{s}, where k^PS_{s} is the reference PDCCH monitoring periodicity configured to the UE by higher layers, such as as part of the configuration associated with UE operation in energy saving mode; or
[0117] Adaptation rule 1.3: k_{s}=min(k_{s}+k^delta_{s},k^max_{s}), where k^delta_{s}>=1 is a positive constant, for example, k^delta_{s}=1, and k^max_{s} is the maximum value of the PDCCH monitoring periodicity k_{s}.
[0118] The parameters X1, Y1, k^max_{s}, c1, and k^PS_{s} may be determined by the UE in a number of different ways. In one non-limiting example, these parameters are fixed and defined in the specification of the system operation. In another non-limiting example, these parameters are provided to the UE via higher layer signaling. In yet another non-limiting example, these parameters are reported by the UE to the serving gNB, and the gNB may provide the corresponding values to the UE via physical layer signaling or via higher layer signaling.
[0119] In some embodiments, a reset scheme may be employed to avoid error situations involving k_{s}, such as a DCI format being sent and the UE failing to detect it. In one example, the associated higher layer configuration is reset at a subframe so that (SFN mod Z1)=o1, where o1 and Z1 are predetermined in system operation or configured to the UE by a higher layer, e.g., o1=0 and Z1=10 or 20.
[0120] Flowchart 600 begins at operation 602 by configuring adaptation criteria (1) and one or more associated adaptation rules for dynamic increase of PDCCH monitoring periodicity.
[0121] In operation 604, it is determined whether SFN mod z1 is equal to o1. As previously described, operation 604 is a reset scheme that helps avoid certain error situations involving k_{s}. If SFN mod z1 is equal to o1, then in operation 606, the gNB and the UE reset higher layer configurations associated with the adaptation criterion (1) and one or more adaptation rules. In operation 608, it is determined whether the adaptation criterion (1) is met. If the adaptation criterion (1) is met, then flowchart 600 proceeds to operation 610, where the UE increases the PDCCH opportunity monitoring periodicity search space according to one or more adaptation rules.
[0122] Returning to operation 604, if it is determined that SFN mod Z1 is not equal to o1, then flowchart 600 proceeds to operation 612, where the UE maintains the same PDCCH opportunity monitoring periodicity.
[0123] Returning to operation 608, if it is determined that the adaptation criterion (1) is not satisfied, then the flowchart 600 proceeds to operation 612, where the UE maintains the same PDCCH opportunity monitoring periodicity.
[0124] Figure 7 A flowchart for managing PDCCH monitoring opportunities by reducing search space periodicity according to various embodiments of the present disclosure is illustrated. The operations of flowchart 700 may be performed in a UE (such as Figure 2 is implemented in the UE 116 in order to achieve lower latency.
[0125] In this illustrative embodiment, the PDCCH monitoring periodicity is reduced based on an adaptation criterion associated with real-time decoding results on PDCCH monitoring occasions of DCI formats that schedule PDSCH reception or PUSCH transmission. Figure 7 The associated adaptation criterion of this embodiment described in is referred to as adaptation criterion (2) to distinguish it from the adaptation criteria of other embodiments disclosed herein.
[0126] According to adaptation criterion (2), the UE detects the DCI format for scheduling PDSCH reception or PUSCH transmission in at least X2*100% of (multiple) PDCCH monitoring opportunities and over Y2>=1 consecutive PDCCH monitoring periods, where 0<=X2<=1 and Y2 are predetermined in system operation or configured to the UE by a higher layer. In a non-limiting example, X2=0.5 and Y2=2. In another non-limiting example, X2=1 and Y2=1.
[0127] When the adaptation criterion (2) is satisfied, the UE may reduce ks according to one of the following adaptation rules:
[0128] Adaptation rule 2.1: ks = max(c2 * ks, kmins), where 0 < c2 < 1 is a fraction, e.g., c2 = 0.5, and kmins is the minimum value of the PDCCH monitoring periodicity ks, e.g., kminp,s = 1;
[0129] Adaptation rule 2.2: ks = k0s, where k0s is the PDCCH monitoring periodicity configured when the UE operation is configured to operate in the power saving mode, e.g., k0s = 1; or
[0130] Adaptation rule 2.3: ks = max(ks - kdeltas, kmins), where kdeltas >= 1 is a positive constant, e.g., kdeltas = 1, and kmins is the minimum value of the PDCCH monitoring periodicity. For example, kdeltas may be provided to the UE by a higher layer.
[0131] The parameters X2, Y2, kmins, c2, and k0s may be determined by the UE in a variety of different ways. In one non - limiting example, these parameters are fixed and defined in the specification of the system operation. In another non - limiting example, these parameters are provided to the UE by a higher layer. In yet another non - limiting example, these parameters are reported by the UE to the serving gNB, and the gNB may configure the corresponding values for the UE in response via physical layer signaling or via higher layer signaling.
[0132] In some embodiments, a reset scheme may be adopted to avoid error situations involving ks, e.g., a DCI format is sent and the UE fails to detect it. In one example, the associated higher layer configuration is reset at a sub - frame such that (SFN mod Z2) = o2, where o2 and Z2 are predetermined in the system operation or configured for the UE by a higher layer, e.g., o2 = 0 and Z2 = 10 or 20.
[0133] Flowchart 700 begins at operation 702 with an adaptation criterion (2) configured for dynamic reduction of the PDCCH monitoring periodicity and one or more associated adaptation rules.
[0134] In operation 704, it is determined whether SFN mod Z2 is equal to o2. As previously mentioned, operation 704 is a reset scheme to help avoid certain error situations involving k_s. If SFN mod z2 is equal to o2, then in operation 706, the gNB and the UE reset the higher layer configuration related to adaptation criterion (2) and one or more adaptation rules. In operation 708, it is determined whether adaptation criterion (2) is satisfied. If adaptation criterion (2) is satisfied, then flowchart 700 proceeds to operation 710, where the UE reduces the PDCCH occasion monitoring periodic search space according to one or more adaptation rules.
[0135] Returning to operation 704, if it is determined that SFN mod Z2 is not equal to o2, then flowchart 700 proceeds to operation 712, where the UE maintains the same PDCCH occasion monitoring periodicity.
[0136] Returning to operation 708, if it is determined that adaptation criterion (2) is not satisfied, then flowchart 700 proceeds to operation 712, where the UE maintains the same PDCCH occasion monitoring periodicity.
[0137] Figure 8 A flowchart for managing PDCCH monitoring occasions by reducing the duration of a set of search spaces is illustrated according to various embodiments of the present disclosure. The operations of flowchart 800 may be implemented in a UE (such as Figure 2 UE 116 in
[0138] The PDCCH monitoring duration of the PDCCH monitoring periodicity k_s associated with the set of search spaces s is denoted as d_s, 1 <= d_s < k_s, and is in units of one time slot. In one embodiment, the UE may reduce d_s according to an adaptation criterion associated with the real-time decoding result of the DCI format for scheduling PDSCH reception or PUSCH transmission. Figure 8 The associated adaptation criterion of this embodiment described in
[0139] is referred to as adaptation criterion (3) to distinguish it from the adaptation criteria of other embodiments disclosed herein. According to adaptation criterion (3), the UE does not detect the DCI format for scheduling PDSCH reception or PUSCH transmission in at least X3 * 100% of the (multiple) PDCCH monitoring occasions or in Y3 >= 1 consecutive PDCCH monitoring periods, where 0 <= X3 <= 1 and Y3 is a constant. In a non-limiting example, X3 = 0.5 and Y3 = 2. In another non-limiting example, X3 = 1 and Y3 = 1.
[0140] When adaptation criterion (3) is satisfied, the UE may increase d_s according to one of the following adaptation rules:
[0141] Adaptation rule 3.1: \(d_s=\max(c3\times d_s, d^min_s)\), where \(0 < c3 < 1\) is a fraction, for example \(c3 = 0.5\), and \(d^min_s\) is the minimum duration of the search space set \(s\), for example \(d^min_s = 1\);
[0142] Adaptation rule 3.2: \(d_s = d^PS_s\), where \(d^PS_s\) is the search space set duration configured by a higher layer for the UE operation in the power saving mode, for example \(d^PS_s = 1\); or
[0143] Adaptation rule 3.3: \(d_s=\max(d_s - d^delta_s, d^min_s)\), where \(d^delta_s\) controls the reduction of the search space \(s\) duration, for example \(d^delta_s = 1\), and \(d^min_s\) is the minimum duration of the search space set \(s\).
[0144] The associated parameters X3, Y3, \(d^min_s\), c3, and \(d^PS_s\) can be determined by the UE in a variety of different ways. In one non - limiting example, these parameters are fixed and defined in the specification of the system operation. In another non - limiting example, these parameters are signaled by a higher layer to the UE. In yet another non - limiting example, these parameters are reported by the UE to the serving gNB, and the gNB can configure the corresponding values for the UE in response via physical layer signaling or via higher layer signaling.
[0145] In some embodiments, a reset scheme can be adopted to avoid error situations involving \(k_s\), for example, a DCI format is sent but the UE fails to detect it. In one example, the associated higher layer configuration is reset at a sub - frame such that \((SFN\ mod\ Z3)=o3\), where \(o3\) and \(Z3\) are predetermined in the system operation or configured by a higher layer for the UE, for example, \(o3 = 0\) and \(Z3 = 10\) or 20.
[0146] Flowchart 800 starts at operation 802 with an adaptation criterion (3) configured for dynamic reduction of the search space duration and one or more associated adaptation rules.
[0147] In operation 804, it is determined whether SFN mod Z3 is equal to o3. As previously described, operation 804 is a reset scheme that helps avoid certain error situations involving k_{s}. If SFN mod z3 is equal to o3, then in operation 806, the gNB and the UE reset the higher layer configuration associated with the adaptation criterion (3) and one or more adaptation rules. In operation 808, it is determined whether the adaptation criterion (3) is met. If the adaptation criterion (3) is met, then the flowchart 800 proceeds to operation 810, where the UE reduces the duration of the associated search space according to one or more configured adaptation rules.
[0148] Returning to operation 804, if it is determined that SFN mod Z3 is not equal to o3, then flow diagram 800 proceeds to operation 812, where the UE maintains the same search space duration.
[0149] Returning to operation 808, if it is determined that the adaptation criterion (3) is not satisfied, then the flowchart 800 proceeds to operation 812, where the UE maintains the same search space duration.
[0150] Fig. 9 A flowchart for managing PDCCH monitoring opportunities by increasing the duration of a search space set according to various embodiments of the present disclosure is illustrated. The operations of flowchart 900 may be performed in a UE (such as Figure 2 is implemented in the UE 116 in order to achieve lower latency.
[0151] In one embodiment, the UE may increase d_{s} according to an adaptation criterion associated with a real-time decoding result of a DCI format scheduling PDSCH reception or PUSCH transmission. Fig. 9 The associated adaptation criterion of this embodiment described in is referred to as adaptation criterion (4) to distinguish it from the adaptation criteria of other embodiments disclosed herein.
[0152] According to the adaptation criterion (4), the UE detects the DCI format for scheduling PDSCH reception or PUSCH transmission in at least X4*100% of (multiple) PDCCH monitoring opportunities within a PDCCH monitoring period or within Y4>=1 consecutive PDCCH monitoring periods, where 0<=X4<=1 and Y4 are defined in the system operation specification or provided to the UE by a higher layer. In a non-limiting example, X4=0.5 and Y4=2. In another non-limiting example, X4=1 and Y4=1.
[0153] When the adaptation criterion (4) is met, the UE may increase d_{s} according to one of the following adaptation rules:
[0154] Adaptation rule 4.1: d_{s}=min(c4*d_{s},d^max_{s}), where c3 is a constant, c4>1, for example, c4=2, and d^max_{s} is the maximum PDCCH monitoring duration of the search space set s, for example, d^max_{s}=k_{s};
[0155] Adaptation rule 4.2: d_{s}=d^0_{s}, where d^0_{s} is the PDCCH monitoring duration of the search space set s provided by the higher layer to the UE, e.g., d^PS_{s}=1; or
[0156] Adaptation rule 4.3: d_{s}=min(d_{s}+d^delta_{s},d^max_{s}), where d^delta_{s}>0 is provided to the UE by higher layers, for example d^delta_{s}=1, and d^ax_{s} is the maximum PDCCH monitoring duration of the search space set s.
[0157] The associated parameters X4, Y4, d^max_{s}, c4, and d^0_{s} may be provided by the UE in a number of different ways. In one non-limiting example, these parameters are fixed and defined in the specification of the system operation. In another non-limiting embodiment, these parameters are signaled to the UE by higher layers. In yet another non-limiting embodiment, these parameters are reported by the UE to the serving gNB, and the gNB may in response configure the corresponding values to the UE via physical layer signaling or via higher layer signaling.
[0158] In some embodiments, a reset scheme may be employed to avoid error situations involving k_{s}, such as a DCI format being sent and the UE failing to detect it. In one example, the associated higher layer configuration is reset at a subframe so that (SFN mod Z4)=o4, where o4 and Z4 are predetermined in system operation or configured to the UE by a higher layer, e.g., o4=0 and Z4=10 or 20.
[0159] Flowchart 900 begins at operation 902 by configuring the adaptation criteria (4) and one or more associated adaptation rules for dynamic increase of search space duration.
[0160] In operation 904, it is determined whether SFN mod z4 is equal to o4. As previously described, operation 904 is a reset scheme that helps avoid certain error situations involving k_{s}. If SFN mod z4 is equal to o4, then in operation 906, the gNB and the UE reset the higher layer configuration associated with the adaptation criterion (4) and one or more adaptation rules. In operation 908, it is determined whether the adaptation criterion (4) is met. If the adaptation criterion (4) is met, then the flowchart 900 proceeds to operation 910, where the UE increases the duration of the associated search space according to one or more configured adaptation rules.
[0161] Returning to operation 904, if it is determined that SFN mod z4 is not equal to o4, then flow chart 900 proceeds to operation 912, where the UE maintains the same search space duration.
[0162] Returning to operation 908, if it is determined that the adaptation criterion (4) is not satisfied, then the flowchart 900 proceeds to operation 912, where the UE maintains the same search space duration.
[0163] Fig.10 A flowchart for managing PDCCH monitoring opportunities by scaling multiple PDCCH candidates according to various embodiments of the present disclosure is illustrated. The operations of flowchart 1000 may be performed in a UE (such as Figure 2 is implemented in the UE 116).
[0164] This embodiment involves dynamic adaptation of multiple PDCCH candidates of a search space set s, denoted as M^L_{s}, for each CCE aggregation level (AL), L. The UE may adapt M^L_{s} based on the latest reported channel state information (CSI). Let X^CSI denote the selected CSI metric used to trigger the adaptation of the multiple PDCCH candidates. X^CSI may be L1-RSRP or CQI.
[0165] In addition to the CSI reporting scheme supported in NR REL-15, CORSET based CSI reporting may also be supported and may be advantageous in supporting adaptation on search space configurations, such as PDCCH candidates per AL. In one example of this embodiment, CORSET-RSRP may be defined as the linear average of the power contributions (in [W]) of the resource elements carrying the PDCCH DMRS in the associated CORSET.
[0166] In another example of this embodiment, CORSET-RSRQ can be defined as the ratio of N×SS-RSRP / NR carrier RSSI, where N is the number of resource blocks in the NR carrier RSSI measurement bandwidth. The measurements of the numerator and denominator should be performed on the same set of resource blocks. The NR carrier received signal strength indicator (NR carrier RSSI) is the linear average of the total received power (in [W]) observed in only some OFDM symbols of the (multiple) measurement time resources, in the measurement bandwidth, on more than N resource blocks from all sources (including co-channel serving and non-serving cells, adjacent channel interference, thermal noise, etc.). The measurement time resources of the NR carrier RSSI are constrained to be within the configured OFDM symbols of the search space associated with the associated CORSET.
[0167] In yet another example of this embodiment, the CORSET-SINR may be defined as the linear average of the power contribution (in [W]) of the resource elements carrying the DMRS of the PDCCH divided by the linear average of the noise and interference power contributions (in [W]) on the resource elements carrying the DMRS of the PDCCH within the same frequency bandwidth. The measurement time resource(s) of the CORSET-SINR is constrained within the configured OFDM symbols of the search space associated with the associated CORSET.
[0168] CORSET-based CSI can report the latest measurement results periodically through pre-configured PUCCH resources or in PUSCH triggered by scheduling DCI.
[0169] In another example of this embodiment, the UE may adapt M^L_{s} according to adaptation criterion 5a (i.e., when the UE reports X^CSI>T1 to the serving gNB), where T1 is a threshold provided to the UE by higher layers. For example, when X^CSI is L1-RSRP, T1=-90dBm, or when X^CSI is CQI, T1=15. When the report from the UE indicates good channel / link quality and the UE receives HARQ-ACK feedback from the gNB in response to its CSI report (if configured), the UE may reduce the number of PDCCH candidates for (multiple) larger CCE aggregation levels and increase the number of PDCCH candidates for (multiple) smaller CCE aggregation levels. The associated adaptation rules may be defined as follows:
[0170] Adaptation rule 5.1: M^L_{s}=floor(max(M^L_{s}*s1,M_min)), for N1>=1 highest AL(s), ...; and
[0171] Adaptation Rule 5.2: \(M^L_{s}=\lfloor\min(M^L_{-s}*s2,M_{max})\rfloor\), for N2 >= 1 of the lowest AL(s),...
[0172] where s1 and s2 are scalars such that 0 < s1 < 1, s2 > 1, e.g., s1 = 0.5, s2 = 2, and M_max and M_min are the maximum and minimum numbers of PDCCH candidates for each CCE aggregation level, e.g., M_max = 8 and M_min = 0.
[0173] In another example of this embodiment, the UE may adapt \(M^L_{s}\) according to adaptation criterion 5b (i.e., when the UE reports \(X^{CSI}<T2\) to the serving gNB), where T2 is a threshold provided to the UE by a higher layer. For example, when \(X^{CSI}\) is L1-RSRP, T2 = -100 dBm, or when \(X^{CSI}\) is CQI, T2 = 10. When the report from the UE indicates poor channel / link quality and the UE receives HARQ-ACK feedback from the gNB in response to its CSI report (if configured), the UE may increase the number of candidates for larger CCE aggregation levels and decrease the number of candidates for smaller CCE aggregation levels. The associated adaptation rules may be defined as follows:
[0174] Adaptation Rule 5.3: \(M^L_{s}=\lfloor\min(M^L_{s}*s3,M_{max})\rfloor\), for N3 >= 1 of the highest AL(s),...; and
[0175] Adaptation Rule 5.4: \(M^L_{s}=\lfloor\max(M^L_{s}*s4,M_{min})\rfloor\), for N4 >= 1 of the lowest AL(s),...
[0176] where s3 and s4 are scalars such that s3 > 1, 0 < s4 < 1, e.g., s3 = 2, s4 = 0.5, and M_max and M_min are the maximum and minimum numbers of PDCCH candidates for each CCE aggregation level, e.g., M_max = 8 and M_min = 1.
[0177] Fig.10 Flowchart 1000 has, at operation 1002: the gNB configures UE adaptation criteria 5a and 5b and the associated adaptation rules for dynamically scaling the number of PDCCH candidates of an associated search space. Non-limiting examples of these adaptation rules may include adaptation rules 5.1, 5.2, 5.3, and 5.4.
[0178] 1004, the UE reports CSI to the gNB. The CSI includes an adaptive metric X^CSI. In operation 1006, it is determined whether T1 is configured and whether X^CSI is greater than T1. In other words, it is determined whether the adaptation criterion (5a) is met. If the adaptation criterion (5a) is not met, then the flowchart 1000 proceeds to operation 1008 to make another determination as to whether T2 is configured and whether X^CSI is less than T2. In other words, it is determined whether the adaptation criterion (5b) is met. If the adaptation criterion (5b) is not met, then the flowchart 1000 proceeds to operation 1010 and the UE maintains the same number of PDCCH candidates.
[0179] Returning to operation 1006, if it is determined that the adaptation criterion (5a) is satisfied, flowchart 1000 proceeds to operation 1012, where the UE reduces the number of candidates for the high CCE aggregation level according to adaptation rule 5.1 and increases the number of candidates for the low CCE aggregation level according to adaptation rule 5.2.
[0180] Returning to operation 1008, if it is determined that the adaptation criterion (5b) is satisfied, flowchart 1000 proceeds to operation 1014, where the UE increases the number of candidates for the high CCE aggregation level according to adaptation rule 5.3 and decreases the number of candidates for the low CCE aggregation level according to adaptation rule 5.4.
[0181] According to another embodiment, UE power management can be achieved by UE adaptation of a minimum scheduling offset Kmin, which can be received in units of time slots via a physical layer signal / channel. Kmin is used to determine an applicable value of a scheduling offset for data reception or transmission scheduled by a PDCCH. For any associated scheduling offset parameter X, the UE expects X>=Kmin+C_X, where C_X>=0 and is an integer, such as C_X=0. The associated scheduling offset parameter X can be any of the following:
[0182] The timing offset between the last received symbol of the DCI format scheduling PDSCH reception is denoted as K0;
[0183] The timing offset between the last symbol received of the DCI format scheduling PUSCH reception is denoted as K2;
[0184] Aperiodic CSI-RS triggering offset; or
[0185] SRS trigger offset.
[0186] When an applicable value of the minimum scheduling offset is configured or indicated separately for an associated scheduling offset parameter, X, Kmin in the present disclosure corresponds to the minimum value among all applicable values of the minimum scheduling offset for the associated scheduling offset parameter. For example, when the UE is indicated or configured with K^DL_min as the minimum applicable value of K0 for the active DL BWP and is indicated or configured with L^UL as the minimum applicable value of K2 for the active UL BWP, the UE assumes Kmin=min(K^DL_min,K^UL_min) for the active BWP of the carrier in which the UE monitors PDCCH.
[0187] To avoid negative impact on URLLC services, the UE may assume that the indicated Kmin is not applicable for PDCCH monitoring associated with the URLLC service. For example, the UE assumes that the indicated Kmin is not applicable for search space sets of more than one first symbol of a CORESET within a slot configured with mini-slot scheduling or for PDCCH monitoring via monitoringSymbolsWithinSlot as defined in REF 3. The UE assumes that there are no constraints on any scheduling offset parameters for PDCCH reception in the search space sets for which Kmin is not applicable.
[0188] C_X may be determined according to the associated scheduling offset parameter X. For example, for X=K0 or X=aperiodic CSI-RS trigger offset, C_X=0. In another example, for X=K2 or X=SRS trigger offset, C_X=1. In this case, the applicable value of Kmin indicated by the physical layer signal / channel may be shared by multiple associated scheduling offset parameters, while the actual minimum applicable value may be different for the associated scheduling offset parameters due to different values of C_X. The adaptation of the minimum applicable values of multiple scheduling offset parameters may be jointly indicated by the indication of a uniform value of Kmin.
[0189] The UE may determine the value of C_X by any of the following methods: In one example, one C_X may be configured by RRC signaling per cell or per BWP or per UE.
[0190] In another example, one or two candidate values for C_X may be configured by RRC signaling for each BWP. When only one candidate value for C_X is configured, the value should be greater than zero. For a joint indication based on a 1-bit indication in DCI format 0_1 / 1_1, the 1-bit indication indicates the values of Kmin and C_X. When only one candidate value is provided for the associated scheduling offset X (e.g., K2), the 1-bit indication in DCI format 0_1 / 1_1 indicates a zero or non-zero candidate value for C_X. When two candidate values are provided for the associated scheduling offset X (e.g., K2), the 1-bit indication in DCI format 0_1 / 1_1 indicates the first or second candidate value for C_X.
[0191] In another example, C_X can be reported from the UE to the gNB as UE capability information. If the UE reports the value of C_X in ms, it is represented as C'_X. In this case, the UE needs to convert it to C_X in slots so that or Where u is the subcarrier spacing configuration for the active BWP of the physical layer signal / channel to be monitored by the UE for an indication of Kmin. For example, the UE may report two values, denoted as C_UL and C_DL, respectively, where C_UL and C_DL are applicable to UL-related scheduling offsets, such as K2 or SRS trigger offset, and C_DL is applicable to DL-related scheduling offsets, such as K0 or aperiodic CSI-RS trigger offset.
[0192] When the UE is configured with candidate minimum applicable value(s) for K0 in the DL BWP and candidate minimum applicable value(s) K2 in the UL BWP, respectively, the UE does not expect to be indicated with a minimum applicable value for K0 that is greater than the minimum applicable value for K2.
[0193] In one example of configuration of candidate values of Kmin, N>=1 candidate values of Kmin may be configured per BWP via RRC signaling. For frequency division duplex (FDD) with paired spectrum, the same set of Kmin candidate values may be shared between paired DL BWP and UL BWP, and the candidate value of Kmin may be configured in DL BWP or UL BWP. For time division duplex (TDD), the same set of Kmin candidate values may be shared between DL BWP and UL BWP with the same center frequency, and the candidate value of Kmin may be configured in DL BWP or UL BWP.
[0194] The list of candidate values for Kmin may be predetermined or preconfigured per cell or per configured BWP.
[0195] In one example of the candidate value list for determining Kmin, the candidate value list of Kmin can be determined based on UE assistance information regarding its preferred value. For example, in order to reduce signaling overhead without sacrificing the energy-saving gain, two candidates can be considered, namely the default candidate and the non-zero candidate. The UE can report at least its preferred value for the non-zero candidate based on UE capabilities or its energy-saving requirements. In this case, the binary bits sent from the gNB through the physical layer signal / channel are sufficient to deliver the new Kmin to the UE. As another example, the UE can report more than one preferred candidate value of Kmin, and the indicated Kmin from the gNB is selected from one of the preferred candidate values. When the UE is configured with more than one serving cell in CA mode, the UE can report one or more preferred applicable values of Kmin for all serving cells, or the UE can report one or more preferred applicable values for each serving cell.
[0196] In another example, the UE is provided with a default value of Kmin, denoted as Kmin_0. In one sub-example, the default value can be zero. In another sub-example, the default value can be the minimum applicable value in the configured time domain resource allocation (TDRA) table for PDSCH or PUSCH. In yet another sub-example, the default value can be the minimum value among the configured candidate value list of Kmin. In yet another sub-example, the default value can be the maximum candidate value of Kmin.
[0197] In one embodiment, Kmin_0 can be applied before any dynamic indication of Kmin is received through the physical layer signal / channel. In another embodiment, when the UE receives any invalid configuration parameter X such that X < Kmin, Kmin_0 is applied. In yet another embodiment, Kmin_0 is applied when the UE is switched to another BWP. In another embodiment, when the UE receives any invalid configuration parameter X such that X is less than the current valid Kmin through the physical layer signal / channel (such as fallback DCI or DCI format 0_0 or DCI format 1_0), and there is no indication of the applicable value of Kmin in the physical layer signal / channel, Kmin_0 is applied.
[0198] In yet another example, the UE can report its ability regarding the applicable value of Kmin based on its implementation of PDCCH processing relaxation. The applicable value of Kmin can be reported per serving cell.
[0199] For the indication method of Kmin, an additional field with a size of N_bits may be included in an existing DCI format (e.g., DCI format 0_1 or DCI format 0_1) in the active BWP of the scheduling cell in which the UE monitors the PDCCH. The size of the DCI field indicating Kmin in the DCI format may be determined, such as N_bits=ceil(log2(N_Kmin)) bits, where N_Kmin is the number of candidate applicable values for Kmin to select. When N_Kmin is less than 1, the DCI field for indicating Kmin may not exist. When the field exists, it indicates the index of a predetermined / preconfigured candidate value of Kmin. The indicated Kmin is applied to the active BWP of the carrier in which the scheduled PDSCH / PUSCH is transmitted.
[0200] The UE may be provided with an application delay for applying the new indication applicable value of Kmin, ie, T1 in units of one time slot.
[0201] When a UE receives an applicable value of Kmin in slot n in a scheduling cell by means of a scheduling DCI format to schedule PDSCH / PUSCH in a target BWP of a scheduled cell, if the indicated Kmin is different from the default Kmin or the currently applied value of Kmin in the target BWP of the scheduled cell, then the UE does not expect to apply the newly indicated Kmin before slot n' in the target BWP of the scheduled cell, where or u data and u PDCCH They are the subcarrier spacing configurations of PDSCH / PUSCH and PDCCH respectively.
[0202] When the UE operates in CA mode and is configured with cross-carrier scheduling, the application delay T1 may be determined in a number of different ways.
[0203] In one embodiment, T1 is associated with min(Y0, Ymin), where Y0 is the current Kmin of the active BWP of the scheduling cell where the UE receives the scheduling DCI, or And Yi is the current effective Kmin or default Kmin of the active BWP in any associated scheduled cell with carrier indicator i. For example, Y = max(min(Y0, Ymin), Z), where Z is a predefined constant for each SCS, e.g., Z = (1, 1, 2, 2) for SCSs of (15, 30, 60, 120) KHz respectively. When the UE detects an invalid indication of any associated parameter X in the physical layer signal / channel such that X < Kmin + C_X and the physical layer signal / channel also indicates the applicable value of Kmin, the UE may apply the indicated Kmin immediately after decoding the physical layer signal / channel.
[0204] In another embodiment, T1 is associated with and Yi is the current effective Kmin or default Kmin of the active BWP in any associated scheduled cell with carrier indicator i. For example, T1 = max(Ymin, Z), where Z is a predefined constant for each SCS, e.g., Z = (1, 1, 2, 2) for SCSs of (15, 30, 60, 120) KHz respectively. When the UE detects an invalid indication of any associated parameter X in the physical layer signal / channel such that X < Kmin + C_X and the physical layer signal / channel also indicates the applicable value of Kmin, the UE may apply the indicated Kmin immediately after decoding the physical layer signal / channel.
[0205] In yet another embodiment, T1 = (Y0, Z), where, respectively, Z is a predefined constant for each SCS, e.g., Z = (1, 1, 2, 2) for SCSs of (15, 30, 60, 120) KHz, and Y0 is the Kmin of the active BWP of the scheduled cell. In this case, the UE assumes where Yi is the current effective Kmin or default Kmin of the active BWP in any associated scheduled cell with carrier indicator i.
[0206] In yet another embodiment, when the UE is operating in CA mode and is configured with both same carrier scheduling and cross-carrier scheduling in the case of the same scheduled cell, T1 may be associated with the current effective Kmin or default Kmin (denoted as Yi) of the active BWP of any associated scheduled cell with carrier indicator i and the current Kmin (denoted as Y0) of the active BWP of the scheduled cell in which the UE receives the scheduling DCI. For example, T1 = max(min(Ymin, Y0), Z), where, and Z is a predefined constant for each SCS, e.g., Z = (1, 1, 2, 2) for SCSs of (15, 30, 60, 120) KHz respectively.
[0207] For UEs configured with same-carrier scheduling and cross-carrier scheduling in CA mode, the application delay of the new Kmin received on the scheduling cell is associated with the applicable value of Kmin among all scheduled cells with SCS normalization such that or where Kmin,i is the currently applicable value of Kmin for the active BWP on the scheduled cell with carrier indication i; u i and u PDCCH are the subcarrier spacing configurations of the active BWP on the scheduled cell i and the scheduling cell respectively. T1 should not be less than Tmin.
[0208] Since there is no HARQ-ACK feedback for PDCCH reception, if the UE fails to receive DCI indicating a new Kmin, the gNB and the UE may apply different applicable values of Kmin. In this case, when the Kmin assumed by the UE is larger than the Kmin assumed by the gNB, the UE may miss buffering PDSCH / PUSCH / aperiodic CSI-RS. As a result, the UE ends up wasting unnecessary energy on retransmitting PDSCH / PUSCH / aperiodic CSI-RS, and the gNB may trigger unnecessary link adaptation to improve PDSCH reception when the channel conditions are still good. To avoid this problem, the gNB may have an applicable delay for applying a new Kmin that is relatively larger than the Kmin used by the UE, such that T2=N*T1, where T2 is the applicable delay used by the gNB and N is a positive integer, such as N=2. The longer applicable delay of the new Kmin at the gNB makes the UE robust to missed detection of DCI. When the gNB sends a new Kmin in time slot n via a physical layer signal / channel, the gNB is not expected to apply the newly indicated minimum applicable value(s) before time slot n' in the target BWP of the scheduled cell, where For flexible configuration and efficient adaptation, N>=1 can be determined based on auxiliary information sent from the UE. The UE can send auxiliary information to the gNB through a higher layer (e.g., MAC CE via PUSCH) to indicate its preferred value for N, such as N=2. The gNB can configure the value of T2 until it is implemented. In one example, after receiving feedback on N from the UE, the gNB can determine the value of T2, such as T2=N*T1.
[0209] Fig.11 A flowchart for managing PDCCH monitoring opportunities by adapting the minimum scheduling offset according to various embodiments of the present disclosure is illustrated. The operations of flowchart 1100 may be performed in a UE (such as Figure 2 is implemented in the UE 116).
[0210] Flowchart 1100 begins at operation 1102 by reporting to the gNB its preferred candidate values of Kmin and / or C_X for any associated parameters.
[0211] As Fig.11 illustrated, the UE may report to the gNB its (multiple) preferred candidate values of Kmin or C_X for any associated scheduling offset parameter X, or the application delay spread factor N used at the gNB.
[0212] At operation 1104, a list of candidate values for Kmin or C_X is received for any associated scheduling offset parameter X.
[0213] At operation 1106, a default value Kmin (Kmin_0) and an application delay T1 are determined. The default value of Kmin_0 is determined before any indicated value of Kmin is received via a physical layer signal / channel.
[0214] At operation 1108, it is determined whether a new Kmin is received from the gNB via a physical layer signal / channel. If the new Kmin is not received from the gNB via a physical layer signal / channel, then flowchart 1100 proceeds to operation 1110, and the UE determines the minimum applicable value of any associated scheduling offset parameter X based on the default value Kmin_0 that satisfies the relation X >= Kmin_0 + C_X. However, if the new Kmin is received from the gNB via a physical layer signal / channel at operation 1108, then flowchart 1100 proceeds to operation 1112, and the UE applies the newly received Kmin after the application delay T1.
[0215] At operation 1104, it is determined whether the UE receives an invalid scheduling offset parameter X that satisfies the relation X < Kmin + C_X. If the UE does not receive an invalid scheduling offset parameter X, then flowchart 1100 proceeds to operation 1116, and the UE assumes that any associated scheduling offset parameter X satisfies the relation X >= Kmin + C_X, i.e., the UE assumes that any associated scheduling offset parameter X is not less than the most recently indicated Kmin such that X >= Kmin + C_X. However, if the UE receives an invalid scheduling offset parameter X at operation 1114, then flowchart 1100 proceeds to operation 1118, where the UE reverts to the default value Kmin_0.
[0216] Another embodiment relates to UE adaptation for PDCCH monitoring on SCell. The UE may be configured for 'sleeping' and 'non-sleeping' behavior on an active SCell, which is associated with different PDCCH monitoring configurations for the active SCell, wherein, for example, when the SCell is in 'sleeping' state, the UE does not monitor the PDCCH at least for DCI formats scheduled for PDSCH receptions to the UE or PUSCH transmissions from the UE (the opposite applies when the cell is 'non-sleeping'). The UE may be triggered by a physical layer signal / channel on the PCell / PSCell to switch between 'sleeping' and 'non-sleeping' behavior for the active SCell.
[0217] For UEs in RRC_CONNECTED state configured with discontinuous reception (C-DRX), the PDCCH may provide a DCI format that includes a field indicating to the UE whether to "wake up" for PDCCH monitoring in the next one or more DRX ON durations. For example, the UE may be configured by the gNB to receive PDCCH outside of the UE's DRX active time, and the PDCCH provides a DCI format with a 1-bit per UE indication to indicate to the UE whether to monitor PDCCH candidates in one or more intrinsically associated search space sets in subsequent (multiple) DRX ON durations for the PCell or PSCell. The indication may also be extended to transitions between 'sleeping' and 'non-sleeping' behavior applicable to the active SCell. When the UE is instructed by a field in the DCI format to monitor PDCCH during the next (multiple) DRX ON durations of the PCell or PSCell, the UE is also instructed by the same field to switch to the 'non-sleep' behavior of the active SCell; otherwise, when the UE is instructed to skip PDCCH monitoring for the next (multiple) DRX ON durations of the PCell or PSCell, the UE is also instructed to switch to the 'sleep' behavior of the active SCell.
[0218] When the UE is instructed to skip PDCCH monitoring, the UE may still perform certain functionality on the PCell that the UE does not perform on the SCell. For example, the UE may still send PRACH or PUCCH with a positive SR or even monitor PDCCH in the common search space on the PCell without the UE performing any of these functionalities on the SCell. When the UE starts monitoring PDCCH in response to a PRACH transmission or a PUCCH transmission with a positive SR, the UE may start PDCCH monitoring only on the PCell, while the SCell may remain 'dormant' without PDCCH monitoring. In addition, the UE may perform measurements of CSI-RS to obtain CSI reports for any cell.
[0219] Fig.12 A flowchart for transitioning between dormant behavior and non-dormant behavior according to various embodiments of the present disclosure is illustrated. The operations of flowchart 1200 may be performed in a UE (such as Figure 2 is implemented in the UE 116).
[0220] The UE is configured to monitor the PDCCH outside of the C-DRX active time in the PCell / PSCell, and the PDCCH is configured to provide a DCI format that includes an indication of whether the UE is expected to monitor the PDCCH for multiple next DRX cycles. The PDCCH provides a DCI format with a PDCCH monitoring indication and can be monitored both outside and inside C-DRX in the PCell (or PSCell). When the UE detects the DCI format, the UE can interpret the field (e.g., 1 bit) in the DCI format as also indicating a transition between the 'sleeping' behavior and the 'non-sleeping' behavior of the active SCell.
[0221] When the UE receives a PDCCH-based PoSS outside of the C-DRX active time in the PCell / PSCell, the flowchart 1200 starts at operation 1202. In operation 1204, it is determined whether the UE receives an indication to wake up and monitor the PDCCH within the next DRX ON duration. If the UE receives an indication to wake up and monitor the PDCCH within the next DRX ON duration, the UE monitors the PDCCH within the next DRX On duration in the PCell or PSCell and switches to the "non-sleep" behavior of the active SCell. However, if the UE does not receive an indication to wake up and monitor the PDCCH within the next DRX ON duration, the UE skips the PDCCH monitoring within the next DRX ON duration in the Pcell / PSCell and switches to the "sleep" behavior of the active SCell.
[0222] Fig.13 Another flowchart for transitioning between dormant behavior and non-dormant behavior of an active SCell according to various embodiments of the present disclosure is illustrated. The operations of flowchart 1300 may be performed in a UE such as Figure 2 is implemented in the UE 116).
[0223] The UE is configured to monitor PDCCH(s) providing a DCI format with an indication of whether the UE monitors the PDCCH until the next monitoring opportunity of the PDCCH(s). The UE monitors the PDCCH(s) within the C-DRX active time or when no C-DRX is configured for the UE.
[0224] Flowchart 1300 begins at operation 1302 by receiving a PDCCH-based PoSS within the C-DRX active time of the PCell / PSCell. The UE may detect a DCI format and a corresponding indication for transitioning between the "sleep" behavior and the "non-sleep" behavior of the active SCell from the (multiple) PDCCHs. In operation 1304, the UE interrupts the indication of the PDCCH monitoring adaptation for the active SCell. Hereinafter, in operation 1306, it is determined whether the UE receives an indication of the assumed "sleep" behavior. If the UE receives an indication of the assumed "sleep" behavior, then flowchart 1300 proceeds to operation 1308, where the UE switches to the "sleep" behavior of the active SCell. However, if the UE does not receive an indication of the assumed "sleep" behavior in operation 1306, then flowchart 1300 proceeds to operation 1310, where the UE switches to the "quasi-sleep" behavior of the active SCell.
[0225] Fig.14 A flowchart for managing scheduling offset according to various embodiments of the present disclosure is illustrated. The operations of flowchart 1400 may be performed at a UE (such as Figure 2 is implemented in the UE 116).
[0226] Flowchart 1400 begins at operation 1402 by receiving an indication field indicating a change to one or more minimum values for receiving a configuration of one of (i) a first minimum set of scheduling offset values for an active downlink bandwidth part (DL BWP) for a first cell or (ii) a second minimum set of scheduling offset values for an active uplink bandwidth part (UL BWP) for the first cell.
[0227] In operation 1404, a physical downlink control channel (PDCCH) is received in a first time slot on an active DL BWP of a second cell that is the same as or different from the first cell.
[0228] In operation 1406, a downlink control information (DCI) format provided by the PDCCH is decoded. The DCI format includes a field indicating a minimum scheduling offset value. In one embodiment, the minimum scheduling offset value is from a first set and is applicable to receiving a physical downlink shared channel (PDSCH) on an active DL BWP of the first cell. In another embodiment, the minimum scheduling offset value is from a second set and is applicable to sending a physical uplink shared channel (PUSCH) on an active UL BWP of the first cell.
[0229] In operation 1408, the delay is determined based on the current minimum scheduling offset value, the subcarrier spacing (SCS) configuration of the active DL BWP for the first cell, and the SCS configuration of the active DL BWP for the second cell. In a non-limiting embodiment, the delay is determined by the following equation:
[0230]
[0231] Among them, Y i is the current minimum scheduling offset of the active DL BWP in the first cell, μ first is the SCS configuration for the active DL BWP of the first cell, and μ second is the SCS configuration for the active DL BWP of the second cell.
[0232] In operation 1406, the minimum scheduling offset value is applied to a second time slot of the second cell that is delayed from the first time slot.
[0233] In some embodiments, flowchart 1400 may also include the additional steps of receiving a configuration of a serving cell set and sending information including one or more values for a minimum scheduling offset to the gNB. In a non-limiting embodiment, each of the one or more values is non-zero, the one or more values correspond to corresponding one or more SCS configurations, and the one or more values are applicable to each cell from the serving cell set.
[0234] In some embodiments, flowchart 1400 may further include, in operation 1406, an optional step of applying a minimum scheduling offset value (i.e., a default minimum scheduling offset value) before receiving the field indicating the minimum scheduling offset from the decoded DCI format. The indication field in operation 1402. For example, the UE may apply the lowest minimum scheduling offset value from the first minimum scheduling offset value set, and / or when the field has a value of "0", the second minimum scheduling offset value set is applied, or the PDSCH receives a DCI format scheduling without the field included, or the PUSCH sends a DCI format scheduling without the field included.
[0235] In one embodiment, Fig.14 The one or more minimum scheduling offsets described in are the minimum number of time slots on the active DL BWP of the first cell between the time slot of PDCCH reception and the time slot of PDSCH reception, the PDSCH reception being scheduled by the DCI format provided by the PDCCH reception.
[0236] In another embodiment, Fig.14The one or more minimum scheduling offsets described in are the minimum number of time slots on the active DL BWP of the first cell between the time slot of PDCCH reception and the time slot of CSI RS reception, and the CSI RS reception is scheduled by the DCI format provided by the PDCCH reception.
[0237] In yet another embodiment, Fig.14 The one or more minimum scheduling offsets described in are the minimum number of time slots on the active UL BWP of the first cell between the time slot of PDCCH reception and the time slot of PUSCH transmission, and the PUSCH transmission is scheduled by the DCI format provided by PDCCH reception.
[0238] Although the present disclosure has been described with exemplary embodiments, various changes and modifications may be suggested to those skilled in the art. The present disclosure is intended to encompass such changes and modifications as fall within the scope of the appended claims.
Claims
1. A method performed by a terminal in a communication system, the method include: receiving, from a base station, configuration information including a list of minimum scheduling offset values for a downlink bandwidth part DL BWP or an uplink bandwidth part UL BWP; receiving downlink control information DCI from the base station in a scheduling cell, the DCI including a field indicating a minimum scheduling offset value for the DL BWP or the UL BWP among the minimum scheduling offset value list; and applying the minimum scheduling offset value indicated by the field included in the DCI after applying a delay from a time slot in which the DCI is received in the scheduling cell, The application delay is determined based on the following: The currently applied minimum scheduling offset value of the active DL BWP in the scheduled cell, the subcarrier spacing (SCS) configuration of the physical downlink control channel (PDCCH) of the active DL BWP in the scheduling cell, and The SCS configuration of the physical downlink shared channel PDSCH of the active DL BWP in the scheduled cell.
2. The method of claim 1, wherein the application delay is based on a The value of Where Y is the currently applied minimum scheduling offset value of the active DL BWP in the scheduled cell, μ PDCCH is the SCS configuration of the PDCCH of the active DL BWP in the scheduling cell, and μ PDSCH is the SCS configuration of the PDSCH of the active DL BWP in the scheduled cell.
3. The method of claim 2, wherein the application delay is determined as: in: In the case where the SCS configuration of the active DL BWP in the scheduling cell corresponds to 15 KHz or 30 KHz, Z is 1, and In the case where the SCS configuration of the active DL BWP in the scheduling cell corresponds to 60 KHz or 120 KHz, Z is 2.
4. The method according to claim 1, further comprising sending one or more preferred minimum scheduling offset values of the terminal to the base station.
5. The method according to claim 1, wherein a default value is applied before applying the minimum scheduling offset value based on the DCI including the field, and the default value is a minimum scheduling offset value in the minimum scheduling offset value list included in the configuration information.
6. A method performed by a base station in a communication system, the method include: Sending configuration information including a list of minimum scheduling offset values for a downlink bandwidth part DL BWP or an uplink bandwidth part UL BWP to the terminal; Sending downlink control information DCI to the terminal in a scheduling cell, wherein the DCI includes a field indicating a minimum scheduling offset value for the DL BWP or the UL BWP in the minimum scheduling offset value list; and applying the minimum scheduling offset value indicated by the field included in the DCI after applying a delay from the time slot in which the DCI is transmitted in the scheduling cell, The application delay is determined based on the following: The currently applied minimum scheduling offset value of the active DL BWP in the scheduled cell, the subcarrier spacing (SCS) configuration of the physical downlink control channel (PDCCH) of the active DL BWP in the scheduling cell, and The SCS configuration of the physical downlink shared channel PDSCH of the active DL BWP in the scheduled cell.
7. The method of claim 6, wherein the application delay is based on a The value of Where Y is the currently applied minimum scheduling offset value of the active DL BWP in the scheduled cell, μ PDCCH is the SCS configuration of the PDCCH of the active DL BWP in the scheduling cell, and μ PDSCH is the SCS configuration of the PDSCH of the active DL BWP in the scheduled cell.
8. The method of claim 7, wherein the application delay is determined as: in: In the case where the SCS configuration of the active DL BWP in the scheduling cell corresponds to 15 KHz or 30 KHz, Z is 1, and In the case where the SCS configuration of the active DL BWP in the scheduling cell corresponds to 60 KHz or 120 KHz, Z is 2.
9. The method of claim 6, further comprising receiving, from the terminal, one or more preferred minimum scheduling offset values for the terminal.
10. The method according to claim 6, wherein a default value is applied before applying the minimum scheduling offset value based on the DCI including the field, and the default value is one minimum scheduling offset value in the minimum scheduling offset value list included in the configuration information.
11. A terminal in a communication system, the terminal include: Transceiver; as well as The controller is configured as: receiving, from a base station, configuration information including a list of minimum scheduling offset values for a downlink bandwidth part DL BWP or an uplink bandwidth part UL BWP; receiving downlink control information DCI from the base station in a scheduling cell, the DCI including a field indicating a minimum scheduling offset value for the DL BWP or the UL BWP among the minimum scheduling offset value list; and applying the minimum scheduling offset value indicated by the field included in the DCI after applying a delay from a time slot in which the DCI is received in the scheduling cell, The application delay is determined based on the following: The currently applied minimum scheduling offset value of the active DL BWP in the scheduled cell, the subcarrier spacing (SCS) configuration of the physical downlink control channel (PDCCH) of the active DL BWP in the scheduling cell, and The SCS configuration of the physical downlink shared channel PDSCH of the active DL BWP in the scheduled cell.
12. The terminal according to claim 11, wherein the application delay is based on a The value of Where Y is the currently applied minimum scheduling offset value of the active DL BWP in the scheduled cell, μ PDCCH is the SCS configuration of the PDCCH of the active DL BWP in the scheduling cell, and μ PDSCH is the SCS configuration of the PDSCH of the active DL BWP in the scheduled cell.
13. The terminal according to claim 12, wherein the application delay is determined as: in: In the case where the SCS configuration of the active DL BWP in the scheduling cell corresponds to 15 KHz or 30 KHz, Z is 1, and In the case where the SCS configuration of the active DL BWP in the scheduling cell corresponds to 60 KHz or 120 KHz, Z is 2.
14. A base station in a communication system, the base station include: Transceiver; as well as The controller is configured as: Sending configuration information including a list of minimum scheduling offset values for a downlink bandwidth part DL BWP or an uplink bandwidth part UL BWP to the terminal; Sending downlink control information DCI to the terminal in a scheduling cell, wherein the DCI includes a field indicating a minimum scheduling offset value for the DL BWP or the UL BWP in the minimum scheduling offset value list; and applying the minimum scheduling offset value indicated by the field included in the DCI after applying a delay from the time slot in which the DCI is transmitted in the scheduling cell, The application delay is determined based on the following: The currently applied minimum scheduling offset value of the active DL BWP in the scheduled cell, the subcarrier spacing (SCS) configuration of the physical downlink control channel (PDCCH) of the active DL BWP in the scheduling cell, and The SCS configuration of the physical downlink shared channel PDSCH of the active DL BWP in the scheduled cell.
15. The base station of claim 14, wherein the application delay is based on a The value of Where Y is the currently applied minimum scheduling offset value of the active DL BWP in the scheduled cell, μ PDCCH is the SCS configuration of the PDCCH of the active DL BWP in the scheduling cell, and μ PDSCH is the SCS configuration of the PDSCH of the active DL BWP in the scheduled cell, and Wherein the application delay is determined as: in: In the case where the SCS configuration of the active DL BWP in the scheduling cell corresponds to 15 KHz or 30 KHz, Z is 1, and In the case where the SCS configuration of the active DL BWP in the scheduling cell corresponds to 60 KHz or 120 KHz, Z is 2.
