Systems that control the aircraft's electrical grid
By using universal control electronic boards and fast communication links in the aircraft power grid, the system complexity and security risks caused by decentralized structures are solved, and the quality and safety improvements are achieved, allowing multiple reconstructions and data exchange speeds to be improved. .
Patent Information
- Application Number
- CN202080021377.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-03-15
- Filing Date
- 2020-03-05
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2040-03-05
AI Technical Summary
The existing aircraft electrical systems have increased the number of electronic boards and wiring due to the distributed structure, resulting in system complexity and quality problems. The lack of synchronization devices leads to safety risks in parallel connection of alternators.
Adopt the aircraft grid control system with a universal control electronic board, connect the power electronic box and the distribution box through a fast communication link, reduce special wires, improve data exchange speed, and obtain and control the distribution box status through the local interface electronic board to achieve functions Refactoring and security improvement.
It reduces the quality and wiring costs of the aircraft power grid, improves the safety and availability of the system, allows multiple reconstructions without complicating the control system, and enhances the management capabilities of the power grid.
Smart Images

Figure CN113574761B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of aircraft electrification, and more particularly to a system for controlling an aircraft electrical network. Background Art
[0002] The increasing electrification of commercial aircraft (air conditioning, landing gear, thrust reversers, de-icing, etc.) places increasing demands on electrical systems (increased power, increased availability, multiple operating modes).
[0003] Aircraft manufacturers have therefore developed decentralized structures that optimize the quality of the power cables by placing the distribution boxes as close as possible to the loads.
[0004] However, these architectures have a negative impact on the systems that control power distribution because they lead to an increase in the number of electronic boards and the wiring associated with these boards, such as Figure 4 As shown, Figure 4 A current electrical architecture for a commercial aircraft having two propulsion assemblies is shown schematically.
[0005] In the example shown, which is by no means limiting, the power architecture comprises five starter-generators: two for each propulsion assembly (SG1, SG2, SG3, SG4) and one for the auxiliary power unit APU (SGAPU), a ram air turbine generator (RATG), two ports for the external power unit (ex1, ex2), four electric compressors for the air conditioning system (ECS1, ECS2, ECS3, ECS4), four distribution boxes (LDB1, RDB2, LDB3, RDB4), an emergency box (EDB), and two power electronics boxes (LPEB, RPEB). The letter L indicates the left side of the aircraft and the letter R indicates the right side of the aircraft.
[0006] Each power electronics box (LPEB or RPEB) is associated with two distribution boxes (LDB1 and LDB3 or RDB2 and RDB4) associated with a given propulsion assembly, one of these distribution boxes also being associated with the auxiliary power supply unit.
[0007] The power electronics boxes are each equipped with at least three inverters 10L, 12L, 14L; 10R, 12R, 14R (a greater number may be required if the number of motors is greater or if it is desired to improve the availability of the system), which selectively deliver AC voltage to the starters-generators SG1, SG2, SG3, SG4 of the propulsion components and the SGAPU of the auxiliary power supply unit or other driven motors, such as the driven electric compressors ECS1, ECS2, ECS3, ECS4, based on the DC voltage from the DC busbars 18L, 18R (according to the position of the wiring matrix 16L, 16R) according to the speed and position information delivered by the sensors inside these different driven components. The inverter can drive any motor, whether it is a starter-generator of the propulsion component, an auxiliary power supply unit, an electric compressor, or other motors (not shown) of other systems of the aircraft (electric taxiing, hydraulic system, tank inerting system, etc.).
[0008] The DC busbars 18L and 18R of the two power electronic boxes are interconnected by contact switches (not shown), which can interconnect or isolate them, and are powered by a DC / DC boost converter connected to batteries 20, 22 and three rectifiers LATRU, RATRU and CATRU (the latter operating in the event of a failure of one of the first two), the input of said DC busbars being connected to the distribution box, more precisely to the AC busbars 24, 26, 28, 30 of these four power electronic boxes connected to each other, each of these busbars being further connected to the starter-generator of a given propulsion assembly or auxiliary power supply unit when they are being used in the generator module. Of course, contact switches (not shown) are provided between each busbar, so that when each busbar is powered by its main power source, the contact switches are not closed, then insulating each busbar. When one busbar is not powered and another power source associated with another busbar powers it, the contact switches are closed to connect the busbars.
[0009] One of the two distribution boxes on the left LDB1 may include (as shown, but external connection is also possible) a transformer / rectifier LTRU that delivers a DC voltage from the AC bus 24 to the DC bus 24L. Similarly, one of the two distribution boxes on the right RDB2 may include (as shown, but external connection is also possible) a transformer / rectifier RTRU that delivers a DC voltage from the AC bus 30 to the DC bus 30R. In the event of a transformer / rectifier failure, the two DC busses can be connected to each other through a contact switch (not shown). The other two AC busses 26, 28 of the last two distribution boxes LDB3 and RDB4 supply power to the AC bus 32 of the emergency box EDB, which supplies a DC voltage to the DC bus 32S connected to the DC bus of one of the distribution boxes via the transformer / rectifier TRU. The AC bus 32 of the emergency box is also powered by the ram air turbine generator RAT and by a DC / AC converter connected to the DC bus 32S of the emergency battery 34.
[0010] This standard electrical architecture comprises a substantially identical control system for the left and right sides which are independent and isolated from each other, each side therefore taking measurements independently of each other. On the other hand, the emergency box EDB usually has an independent control system which is not shown.
[0011] Each power electronics box LPEB, RPEB has an integrated supervisor 40L, 40R that structures the contactors of the three inverters 10L, 12L, 14L; 10R, 12R, 14R and the routing matrix 16L, 16R. For each side, left or right, three boards 42L, 44L, 46L; 42R, 44R, 46R are provided in the power electronics box to calculate the instructions applied to each inverter, that is, to control each power supply device associated with and integrated into each inverter 10L, 12L, 14L (depicted as blocks drawn in dashed lines inside each of these inverters) and to perform local control and the measurements required for this control. Each power electronics box further comprises a board 48L, 50L, 51L; 48R, 50R for controlling the starter-generator for regulating the output voltage of the generator in generator mode and for specifically controlling the energization in starter mode.
[0012] In the two distribution boxes LDB1, RDB2, two redundant boards 52L, 54L; 52R, 54R calculate the instructions and protection of the control contact switches and the voting modules 56L, 58L, 56R, 58R arranged in each distribution box and insulated from these calculation boards, so that selection can be made between the commands from the two redundant boards.
[0013] However, if no synchronization device is specified, the parallel connection of AC generators is a catastrophic event in terms of safety. Therefore, power supply anti-parallel protection is usually necessary to achieve functional safety goals. For the same safety reasons, the input of the anti-parallel system must be different from the input of the control system. This is especially true for variable frequency generators currently used in aerospace. Summary of the invention
[0014] The present invention aims to provide a new control system for the aircraft electrical network applied to "more electric" aircraft, i.e. with new electrical functions not available in conventional aircraft, and with reduced mass and increased safety due to a reduced number of components and increased data exchange speed. An object of the invention is also to improve the availability of the aircraft electrical network, which allows multiple reconfigurations without complicating the control system.
[0015] To this end, a control system for an aircraft electrical network is provided, comprising at least one first propulsion assembly having at least one left starter-generator, and a second propulsion assembly having at least one right starter-generator and other electric motors, a system characterized in that it comprises a first and a second power electronics box, each of which comprises at least two so-called universal control electronic boards for controlling the electrical network, each of said at least two universal control electronic boards being connected to separate first and second data switches via a fast communication link, the first and second data switches of the first power electronics box being connected to the first and second data switches of the second power electronics box, respectively, via a first fast communication bus.
[0016] Thus, by using buses and many fast communication links, the speed of data exchange is increased, avoiding communication via dedicated wires, which greatly increases wiring and connectors and suffers in terms of quality and wiring costs, and it becomes possible to move electronic boards from harsh environment areas to protected areas. In addition, by using a universal electronic control board instead of a board dedicated to controlling the inverter, the reconfiguration and merging of functions are facilitated.
[0017] The control system also comprises four distribution boxes, two of which are associated with a given propulsion assembly and each of which comprises at least one so-called local interface electronic board intended firstly to acquire data relating to the status of the distribution boxes and secondly to control contact switches dedicated to each of these distribution boxes and intended to construct the electrical network.
[0018] According to the envisaged embodiment, the first and second power electronics boxes may each include a local interface electronic board connected to the first and second data switches of the power electronics box via a fast communication link, and each distribution box includes a single local interface electronic board, and the two local interface electronic boards of the two distribution boxes associated with a given propulsion component are respectively connected to the first and second data switches of the power electronics box associated with the given propulsion component via a fast communication link.
[0019] Advantageously, one of the three universal control electronic boards of each power electronics box also serves as a local interface electronic board, and each distribution box can also comprise a first and a second local interface electronic board, each local interface electronic board of the same distribution box being connected to a different data switch of the same power electronics box.
[0020] Preferably, the first local interface electronic boards of two power distribution boxes associated with a given propulsion assembly are each connected to a different data switch of the same power electronics box, and the first local interface electronic boards of each power distribution box are connected to each other and to the data switch via a second fast communication bus, and the second local interface electronic boards of each power distribution box are connected to each other and to the data switch via a third fast communication bus.
[0021] Advantageously, the first, second and third fast communication buses are 100Mbits / s to 1Gbits / s. type.
[0022] The control system further comprises at least three control units for applying control commands to at least three inverters driving the starter-generators and other motors, each of the at least three control units being connected to the data switch via a fast communication link, a power supply device for each starter-generator and other driven motor for regulating its voltage, each power supply device being connected to the data switch via a fast communication link, a digitizing and communication device corresponding to each starter-generator and other driven motor to elevate the rotor position of each starter-generator and other motor, thereby allowing them to be driven, each of these devices being connected to the data switch via a fast communication link.
[0023] Preferably, at least one common control electronics board of said first and second power electronics box comprises a different failure mode than other common control electronics boards of the same power electronics box.
[0024] Advantageously, each local interface electronic board comprises a voting circuit with three output states, said voting circuit controlling switches connected to the local interface electronic board according to instructions from the universal control electronic board.
[0025] The invention also relates to an electrical network comprising the previously mentioned system, and to an aircraft equipped with such an electrical network. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Other features and advantages of the present invention will become apparent from the detailed description given below, with reference without any limitation to the following drawings, in which:
[0027] Figure 1 is a schematic diagram of a first example of the architecture of a control system of an aircraft electrical network according to the invention,
[0028] Figure 2 is a schematic diagram of a second example of the architecture of a control system of an aircraft electrical network according to the invention,
[0029] Figure 3 is a sequence diagram showing an example of an application program executed on the electronic board of the present invention, and
[0030] Figure 4 It is a schematic diagram of an aircraft power grid and its control system in the prior art. DETAILED DESCRIPTION
[0031] Figure 1 By way of a first example, the application of the previously mentioned Figure 4 The principle of the control system of the invention is described for a known architecture, namely with four distribution boxes LDB1, LDB3, RDB4 and RDB2, and two power electronics boxes LPEB, RPEB.
[0032] This control system, which can control the electrical network and drive the different motors of the aircraft, includes a number of electronic boards, control boards and power supply units. The six electronic boards 60L, 62L, 64L; 60R, 62R, 64R are so-called universal LCMM1, LCMM2, LCMM3; RCMM1, RCMM2, RCMM3, because they are interchangeable (in the event of a failure of an electronic board, the functions supported by them can be disabled or loaded into another board, unlike the prior art, in which each board associated with a given function cannot be reconfigured). The other six electronic boards 66, 68, 70, 72, 74, 76 are called local CIBs and are associated with each of the distribution boxes LDB1, LDB3, RDB2, RDB4 and the power electronics boxes LPEB, RPEB, respectively. At least three power supply devices 78L, 80L, 82L; 78R, 80R, 82R are further provided to apply control commands to each inverter 10L, 12L, 14L; 10R, 12R, 14R that drives the starter, generator and other motors of the aircraft. Finally, there is also provided a number of control boards 48L, 50L, 51L; 48R, 50R, which corresponds to the number of starter-generators of the propulsion assembly and the auxiliary power supply device, and where applicable, their output voltage will be regulated (in generator mode). Finally, there are also provided corresponding digitalization and communication devices sSG1, sSG2, sSG3, sSG4, sSGAPU, sECS1, sECS2, sECS3, sECS4 to improve the rotor position of these starter-generators and other driven motors, allowing them to be driven. Conventionally, such devices are formed by position sensors of resolver or Hall effect type.
[0033] The universal electronic boards carry most of the control functions of the power grid and the drive functions of the motors. They have no direct connection with the interfaces to be controlled and monitored, which can be independent of the number and type of interfaces (logic, analog, digital). This guarantees the universal performance of the board and allows it to support different functions and, in particular, allows the functionality of each board to be easily reconstructed when one of them is lost. The local interface electronic boards are responsible for locally collecting the data related to each box (state of the contact switch, voltage, current, temperature, etc.) and for making it available to the other parts of the system. They also apply the control commands received from the universal electronic boards to construct the power grid, and when these instructions are multiple, they decide between the different commands according to a predetermined priority.
[0034] The control board and power supply means already present in the prior art control system operate in the same way as the position measuring device, however within the scope of the present invention, have a different interaction with the other boards, as described below.
[0035] The information exchange and transmission between these different electronic boards and devices is accomplished in particular via four data switches 90-1, 91-1, 90-2, 91-2, to which these boards, power supply devices and digitization and communication devices are connected, which are connected via The electronic boards are interconnected by a fast communication bus 92 of the same type (preferably 1 Gbit / s) or other communication buses of the same priority and performance, on which all data are exchanged, unless functional safety restrictions require dedicated wires, for example for reasons of independence or dissimilarity. Therefore, the motor drive functions (propulsion components, auxiliary power units and starters-generators of other driven motors), including the paralleling of inverters driving the same motor, as well as the generation, distribution and protection functions of the power grid, impose performance restrictions on the fast communication bus, which requires setting control loops in the range of tens of microseconds to a few milliseconds, with local clocks and information available from the fast communication bus being applicable, and the different electronic boards being synchronized with each other with an accuracy suitable for the desired control period. For example, it will be noted that some functions, such as the paralleling of inverters, require synchronization performance in the range of 50 nanoseconds, while other functions have less stringent requirements.
[0036] Specifically, each power electronic box LPEB (or RPEB) includes two data switches 90-1, 90-2 (or 91-1, 91-2, respectively), one connected to each input / output of the electronic board 60L, 62L, 64L (respectively 60R, 62R, 64R), the power supply device 78L, 80L, 82L (respectively 78R, 80R, 82R) and the control board 48L, 50L, 51L (respectively 48R, 50R), and the other connected to each other input / output, the data switches arranged at one input / output 90-2, 91-2 are connected to each other, and the data switches arranged at the other input / output 90-1, 91-1 are also connected to each other. All of the above links are preferably made through a fast communication bus 92 (however, links with the power supply device and the control board can be made at a lower bit rate). At the same time, the distribution box is connected to each other through a few fast communication links (usually The data switches are connected to the distribution boxes LDB1 and LDB3 by a link 93 and by a link 94 to the first data switch 90-1 of the power electronics box LPEB. Similarly, the distribution boxes RDB2 and RDB4 are connected to the third data switch 91-1 of the power electronics box RPEB by a link 95 and to the fourth data switch 91-2 of the power electronics box RPEB by a link 96.
[0037] Similarly, different digitizing and communication devices are connected to the two data switches via fast communication links 99 .
[0038] Figure 2 A second example of an architecture according to the invention is shown, but in which the structure of the local interface boards is different (other boards or units equivalent to the previous architecture will not be described). Specifically, in this structure, each distribution box LDB1, LDB3; RDB2, RDB4 no longer has a single local interface electronic board, but has a first local interface electronic board 100A, 102A, 104A, 106A and a second local interface electronic board 100B, 102B, 104B, 106B, each local interface electronic board of the same distribution box being connected to a different data switch of the same power electronic box LPEB, RPEB. The first local interface electronic boards of each distribution box are interconnected and connected to the data switches to which they are connected via a fast communication bus 108, and in the same way, the second local interface electronic boards of each distribution box are interconnected and also connected to the data switches to which they are connected via a fast communication bus 110. These two fast communication buses, which are independent (i.e. isolated from each other) and allow simple management of redundancy at the level of contact switches dedicated to the distribution boxes, are typically The bus 108 is dedicated, for example, to controlling contact switches and the bus 110 is dedicated to protection and acquiring data related to the state of the switchboard (in particular acquiring measurement data).
[0039] More precisely, the first local interface electronic boards 100A, 102A (104A, 106A) of the two distribution boxes LDB1, LDB3 (respectively RDB4, RDB2) associated with a given propulsion assembly are each connected to a different data switch 90-1, 90-2 (respectively 91-1, 91-2) of the same power electronics box LPEB (respectively RPEB). It should be noted that in this configuration, at the level of the power electronics box LPEB, RPEB, it may be advantageous to incorporate the local interface functionality originally present in the local interface electronic boards 74, 76 into one of the universal control electronic boards 60L, 62L, 64L; 60R, 62R, 64R, thus providing a more universal monitoring functionality for the universal control electronic board selected. Therefore, each power electronic box will include two universal boards dedicated to driving motors (SG1, SG2, SG3, SG4, SGAPU and ECS1, ECS2, ECS3, ECS4) and the monitoring board, which constructs the universal board of the power electronic box in question and controls the operation of the contact switches of the power electronic box.
[0040] In the two structures previously shown, the purpose of the control system is to implement different functions, namely the so-called "left and right side engine control" function, the so-called "main and redundant left and right side power distribution control", the so-called "LPEB monitor" function, the so-called "RPEB monitor" function, the so-called "left and right side power distribution protection" isolation function, and the so-called "main and redundant left and right side system monitoring" isolation function, by means of associated application software executed with a period T (typically between 50 microseconds for fast functions and 2 milliseconds for slow functions).
[0041] The "left and right motor control" function calculates the cyclic ratio applied to each arm of the inverter bridge. This cyclic ratio is recalculated and transmitted at the chopping frequency, and each board 60L, 62L, 64L on the left side (LCMM1, 2 and 3) and each board 60R, 62R, 64R on the right side (RCMM1, 2 and 3) can drive the three inverters on its corresponding side individually or in parallel.
[0042] The "main and redundant left and right side distribution control" function controls different contact switches (not shown in the figure for convenience), such as the connection contact switch between different generating channels, the line contact switch authorizing the closing of the generator, and the control of the grounding power supply device contact switch. These two functions perform the same calculations based on the same information (the main channel and the redundant channel have the same network status view) and transmit the control commands to the local interface electronic board 66-76 for application. The resolution between these two controls is performed in the local interface electronic board by a voting circuit as will be described in detail below.
[0043] The “LPEB Monitor” function constructs a common electronic board 60L, 62L, 64L and three corresponding inverters 10L, 12L, 14L to allocate computing and power electronics resources to load drive requirements (motor starting and ECS), and constructs a contactor switch network of a routing matrix 16L to route the inverters to the associated starters - generators SG1, SG3, APU and compressors ECS1 and ECS3.
[0044] The “RPEB Monitor” function constructs a common electronic board 60R, 62R, 64R and three corresponding inverters 10R, 12R, 14R to allocate computing and power electronics resources to load drive requirements (motor starting and ECS), and constructs a contactor switch network of a routing matrix 16R to route the inverters to the associated starters - generators SG2 and SG4 and compressors ECS2 and ECS4.
[0045] The "left and right side distribution protection" isolation function concentrates all protectors within the distribution system range on the corresponding left and right sides, especially the anti-parallel connection between generators (VFSG and external devices), the anti-parallel connection between the loads of the centralized left power electronic box LPEB or the corresponding right power electronic box RPEB, the leakage current protection on the power cables between the distribution devices LDB1 and LDB3, LDB3 and RDB4, and between LDB1 and RDB2, and the protection of the two external devices ex1 and ex2.
[0046] The "Primary and Redundant Left and Right System Monitoring" separate functions, one for the left side and one for the right side, collect information from the power distribution system and transmit it for cockpit displays, as well as monitor and troubleshoot the power distribution system. The following correspondence table summarizes these different functions of each electronic board. The left side is written in the table "Side 1" and the right side is written in the table "Side 2".
[0047] [Table 1]
[0048]
[0049]
[0050] It is important to note that in this architecture, the difference between electronic boards LCMM1 / LCMM2 / RCMM1 and LCMM3 / RCMM2 / RCMM3 is that their electronic technology, design and code are different enough that there are no common failure modes. Specifically, the "catastrophic" classification of two variable frequency generators (VFSG) in parallel requires that anti-parallel protection and control be supported by different electronic boards.
[0051] At the level of the local interface electronic boards 66–76, a voting circuit with three output states provides control commands (up to two inputs CTRL1 and CTRL2) and protection instructions (one input PROT) from the general electronic board 60L-64R and following the following logic for the interface with each contact switch (not shown) controlled by the electronic board, according to the following selection table: X: any state; 0: state 0; 1: state 1; No data: for the input, valid data is not available, and 0: the contact switch is commanded to open; 1: the contact switch is commanded to close; No change: for the output of the voting circuit (output), the instruction of the contact switch remains in the previous valid state.
[0052] [Table 2]
[0053]
[0054] The following table shows the connection between system functions and voting circuit inputs (N / A means not applicable).
[0055] [Table 3]
[0056]
[0057] Therefore, by means of the present invention, when the local interface electronic board receives an erroneous result on CTRL1 or CTRL2, a better tolerance to erroneous results on this CTRL1 or CTRL2 can be obtained (these two functions must be coherent in order for the voting circuit to apply modifications), a better tolerance to the loss of CTRL1 or CTRL2 can be obtained, because the remaining functions maintain control of the contact switches, a better limitation of the impact of the erroneous results on PROT can be obtained, because the range of the protection function is limited to a single side (left or right side), and a better tolerance to the loss of PROT can be obtained, because CTRL1 and CTRL2 maintain control of the contact switches.
[0058] For certain network protection functions that are subsequently used to correct errors in the control functions (e.g. anti-parallel connection), the embodiment of the voting circuit must ensure that there are no common points between CTRL1 / CTRL2 on the one hand and PROT on the other hand. This can be achieved, for example, by having different logic components on the same local board supporting the functions CTRL1 / 2 and PROT.
[0059] Figure 3 In the form of a time-based diagram, a sequential representation of an application program executed, for example by software, on appropriate processors of the different electronic boards CIB and CMM is shown (of course, execution on programmable logic components, for example of FPGA type, could be envisaged).
[0060] At t0 (reference numeral 200) at the beginning of cycle N, the local interface electronic board (CIB) sends the acquisitions made in cycle N-1 to the six common control electronic boards (CMM). Then, by voting (202) on the control and protection instructions received in cycle N-1, the CIB calculates the control commands for the contact switches. In cycle N, based on the acquisitions transmitted by the local board CIB (cycle N-1), the main and redundant left and right distribution control functions (204) and the LPEB and RPEB monitor (206) control functions are continuously executed and the results are transmitted to these same local board CIBs (208, 210) and to the left and right distribution protection functions (212, 214). Then, the left and right distribution protection functions (216) execute their results and transmit them to the local board CIB (218) to be applied to cycle N+1. Therefore, the reaction to an event on the power grid will occur at the earliest 2 cycles after the event.
[0061] It should be noted that the left and right side power distribution protection functions may intercept the results of the left and right side power distribution control functions before the local electronic board CIB operates on them.
[0062] It is also noted that, while in the illustrated example the power distribution and monitoring functions have been executed serially, parallel execution is of course also possible, also with the sending of messages in sequential mode at the end of each task.
[0063] Thus, through the invention, data transmission between devices is maximized thanks to the presence of a fast communication bus, with the aim of reducing the number of wires (saving quality and wiring costs), allowing easy reconfiguration and reducing their number by aggregating certain equipment items in the network for multiple functions, in particular in power electronics boxes and distribution boxes.
[0064] It will also be noted, therefore, that if different universal control electronic boards and data switches have been described as power electronics boxes LPEB and RPEB, this does not mean that they must be included in these power electronics boxes, and it must be understood that these power electronics boxes can also be physically arranged in control modules independent of these power electronics boxes, which has the advantage of locating the computing board in a protected environment.
Claims
1. A system for controlling an aircraft electrical network, comprising at least one first propulsion assembly having at least one left starter-generator (SG1, SG3), and a second propulsion assembly having at least one right starter-generator (SG2, SG4) and other electric machines (ECS1, ECS2, ECS3, ECS4), a system characterized in that, It comprises a first and a second power electronic box (LPEB, RPEB), each of which comprises at least two so-called universal control boards (60L, 62L, 64L; 60R, 62R, 64R) for controlling a power grid, each of which is connected to separate first and second data switches (90-1, 90-2; 91-1, 91-2) via a fast communication link, the first and second data switches (90-1, 90-2) of the first power electronic box (LPEB) being connected to the first and second data switches of the second power electronic box (RPEB) via a first fast communication bus (92), respectively. and a second data switch (91-1, 91-2), the system also comprising four distribution boxes (LDB1, LDB3; RDB2, RDB4), two distribution boxes being associated with a given propulsion assembly, each distribution box comprising at least one so-called local interface electronic board (66, 68; 70, 72; 100A, 100B; 102A, 102B; 104A, 104B; 106A, 106B), the local interface electronic board being used, firstly, to obtain data relating to the state of the distribution box and, secondly, to control contact switches dedicated to each of these distribution boxes and which will provide the configuration of the electrical grid.
2. The control system according to claim 1, characterized in that: Furthermore, each of the first and second power electronics boxes comprises a local interface electronic board (74; 76) connected to the first and second data switches of the power electronics box via a fast communication link (97, 98), each distribution box comprising a separate local interface electronic board (66, 68; 70, 72), and the two local interface electronic boards of the two power distribution boxes associated with a given propulsion assembly are connected to the first and second data switches of the power electronics box associated with the given propulsion assembly via fast communication links (93, 94; 95, 96), respectively.
3. The control system according to claim 1, characterized in that: One of the three universal control electronic boards of each power electronic box is also used as a local interface electronic board, and each distribution box may also include a first and a second local interface electronic board (100A, 100B; 102A, 102B; 104A, 104B; 106A, 106B), and each local interface electronic board of the same distribution box is connected to a different data switch of the same power electronic box.
4. The control system according to claim 3, characterized in that: The first local interface electronics boards of the two power distribution boxes associated with a given propulsion assembly are each connected to a different data switch of the same power electronics box.
5. The control system according to claim 3 or 4, characterized in that: The first local interface electronic boards of each distribution box are connected to each other and connected to the data switch via a second fast communication bus (108); the second local interface electronic boards of each distribution box are connected to each other and connected to the data switch via a third fast communication bus (110).
6. The control system according to claim 1, characterized in that: The first, second and third fast communication buses are 100Mbits / s to 1Gbits / s. type.
7. The control system according to claim 1, characterized in that: It also includes at least three control units (78L, 80L, 82L; 78R, 80R, 82R) for applying control commands to at least three inverters (10L, 12L, 14L; 10R, 12R, 14R) that drive starters, generators and other motors, each of which is connected to the data switch via a fast communication link.
8. The control system according to claim 1, characterized in that: It also comprises an electronic board (48L, 50L, 51L; 48R, 50R) for each starter-generator or other driven electric machine to regulate its voltage, each power unit being connected to the data switch via a fast communication link.
9. The control system according to claim 1, characterized in that: It also includes digitalization and communication units (sSG1, sSG2, sSG3, sSG4, sSGAPU, sECS1, sECS2, sECS3, sECS4) corresponding to each starter-generator and other driven motor to improve the position of the rotor of each starter-generator and other motor so that they can be driven, each of these units being connected to the data switch via a fast communication link (99).
10. The control system according to claim 1, characterized in that: At least one common control electronics board of the first and second power electronics box comprises a different failure mode than other common control electronics boards of the same power electronics box.
11. The control system according to claim 1, characterized in that: Each of the local interface electronic boards includes a voting circuit with three output states, and the voting circuit controls a switch connected to the local interface electronic board according to instructions from the universal control electronic board.
12. An aircraft electrical network comprising a control system according to any one of claims 1 to 11.
13. An aircraft comprising the electrical network according to claim 12.