System and method for monitoring residential energy consumption

Data is collected through intelligent power distribution boards and sockets and sent to the main server, the smart plug configuration and network coverage problems are solved, and the monitoring and abnormal detection of residential energy consumption is realized. It supports remote disconnection of electrical appliances, simplifies the installation process, and improves the System integration and user experience.

CN113812061BActive Publication Date: 2024-11-26HOUSING & DEV BOARD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202080034924.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2019-04-01
Filing Date
2020-03-23
Publication Date
2024-11-26
Estimated Expiration
2040-03-23

AI Technical Summary

Technical Problem

Existing smart plugs need to be configured and installed separately, which increases the cost of monitoring energy consumption and may affect the coverage of the home network. External devices are required to ensure the connection between the smart plug and the home network, and will create ugly bumps when installed. Influence furniture layout.

Method used

Using smart distribution boards and smart electrical sockets, the frequency, current, voltage and other data are collected through the distribution boards and sockets, and sent to the main server for analysis and processing, so as to realize the energy consumption monitoring and abnormal detection of multiple residential houses. , supports remote disconnection of electrical appliances, and does not require external equipment. Data is transmitted through power lines, avoiding network coverage problems.

Benefits of technology

It realizes early detection and abnormal monitoring of residential energy consumption, supports demand response and load reduction, integrates energy consumption monitoring and analysis functions, simplifies the installation process, avoids the use of additional equipment, and improves the system integration and user experience. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113812061B_ABST
    Figure CN113812061B_ABST
Patent Text Reader

Abstract

The present invention relates to a residential energy consumption monitoring system and a method for monitoring energy consumption of a residential house. The system includes an intelligent distribution board (DB) and at least one intelligent electrical socket. The intelligent DB includes a metering board having a plurality of metering channels, each metering channel being connected to one of the miniature circuit breakers (MCBs) and being configured to obtain frequency (Hz), current (A) and voltage (V); a DB processing unit configured to receive data from the metering device; and a DC power supply for driving the processing unit. The intelligent electrical socket includes a live inlet connected to one of the MCBs; a neutral inlet; a metering device configured to obtain frequency (Hz), current (A) and voltage (V) from the live inlet and the neutral inlet; and a socket processing unit configured to receive data from the metering device and transmit a data packet including the data from the metering device to the DB processing unit. The socket processing unit is communicatively connected to the DB processing unit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a system and method for remotely monitoring residential energy consumption. In particular, the present invention relates to a system and method for obtaining data associated with energy consumption from a distribution board and one or more outlets in a monitored house, and analyzing the data locally and remotely for visualization by a user. Background Art

[0002] Smart plugs can currently be used to monitor and control the energy consumption of appliances connected to them. In order to monitor all sockets, each socket must have a smart plug attached. Smart plugs must be configured individually so that the user can identify the monitored socket. Therefore, the user must repeat the same setup process multiple times.

[0003] The smart plug must be within the range of the wireless network in order for the smart plug to be communicatively connected to the home network. Therefore, a wireless repeater may be required to extend the range of the wireless network in order for the smart plug to be communicatively connected to the home network. This increases the cost of monitoring energy consumption because an external device is required to ensure that the smart plug is communicatively connected to the home network.

[0004] In order to use a smart plug, it must be plugged directly into an existing outlet. This creates an unsightly protrusion and may require rearranging existing furniture to accommodate the protrusion.

[0005] Therefore, those skilled in the art are striving to provide an improved and integrated energy consumption monitoring system and method. Summary of the invention

[0006] The above and other problems are solved and advances in the art are achieved by the system and method according to the present invention. A first advantage of the system and method according to the present invention is that the system and method enable early detection of anomalies in electrical appliances. A second advantage of the system and method according to the present invention is that the system and method can be used to monitor energy consumption trends of multiple residential houses, allowing additional information (such as energy profiles of household appliances) to be derived for future identification. A third advantage of the system and method according to the present invention is that the system and method will allow household appliances to be turned on or off in any scenario / anomaly, facilitating the possibility of demand response and / or load shedding. A fourth advantage of the system and method according to the present invention is that the form factor of the device associated with the present invention is physically integrated by design, without the need for use as an external plug-in device.

[0007] The first aspect of the present disclosure describes a residential energy consumption monitoring system. The system includes an intelligent distribution board (DB) and at least one intelligent electrical socket. The intelligent DB includes: a metering board having a plurality of metering channels, each metering channel is connected to one of the miniature circuit breakers (MCBs) and is configured to obtain frequency (Hz), current (A) and voltage (V); a DB processing unit configured to receive data from the metering device; and a DC power supply for driving the processing unit. The at least one intelligent electrical socket includes a live inlet connected to one of the MCBs; a neutral inlet; a metering device configured to obtain frequency (Hz), current (A) and voltage (V) from the live inlet and the neutral inlet; and a socket processing unit configured to receive data from the metering device and send a data packet including the data from the metering device to the DB processing unit. The socket processing unit is communicatively connected to the DB processing unit. Those skilled in the art will recognize that the metering board can also be configured to obtain other parameters, such as active power, reactive power, power factor, harmonics, etc., without departing from the present invention.

[0008] According to an embodiment of the first aspect, one of the MCBs connected to the live inlet is also connected to the live inlet of a conventional electrical socket.

[0009] According to an embodiment of the first aspect, the DB processing unit includes a DB processor, a DB memory, and a DB instruction stored on the memory, and the DB instruction can be executed by the DB processor to: receive a signature list containing electrical load signatures of the top N public electrical appliances from a main server; store the signature list in the DB memory; and start collecting data from the metering board and the at least one smart electrical socket.

[0010] According to an embodiment of the first aspect, the DB instructions to start collecting data from the metering board and the at least one smart electrical outlet include DB instructions to: establish a connection with the at least one smart electrical outlet; update details in a configuration file stored on the DB memory, the configuration file containing information about the connected smart electrical outlet, the details being the type of connectivity connected to the at least one smart electrical outlet; obtain data from the metering board, the data including frequency, voltage and current; and receive a data packet from the at least one smart electrical outlet, the data packet including frequency, voltage and current.

[0011] According to an embodiment of the first aspect, the configuration file further comprises a protection threshold AC voltage, a protection threshold current and a protection threshold temperature.

[0012] According to an embodiment of the first aspect, the intelligent DB further comprises an on / off switch for turning each MCB on or off, and the DB instructions for starting to collect data from the metering board and the at least one intelligent electrical socket further comprise DB instructions to: turn off the MCB in response to one of the following rules: AC voltage is higher than a protection threshold AC voltage, current is higher than a protection threshold current, temperature is higher than a protection threshold temperature.

[0013] According to an embodiment of the first aspect, the DB instructions for starting to collect data from the metering board and the at least one smart electrical outlet also include DB instructions to: identify the type of load drawn from the MCB and the smart electrical outlet by matching the electrical load signature in the signature list with the electrical signature generated by the load drawn from the MCB and / or the smart electrical outlet; and send a DB data packet to the main server, the DB data packet including the data obtained from the at least one smart electrical outlet and / or the metering board, wherein the identified load type is indicated to the corresponding MCB and smart electrical outlet.

[0014] According to an embodiment of the first aspect, the system further comprises a main server. The main server comprises a processor, a memory and instructions stored on the memory, and the instructions can be executed by the processor to: receive a DB data packet from the smart DB; determine the type of the load in response to receiving an undetermined load from the DB data packet; and store the DB data packet and update a data structure associated with the smart DB, and wherein the memory further comprises a signature list comprising electrical load signatures of a plurality of electrical appliances.

[0015] According to an embodiment of the first aspect, instructions for determining a load type in response to receiving an undetermined load from a DB data packet include instructions to: compare an electrical load signature of the undetermined load with electrical load signatures in a signature list; in response to a match, identify an electrical appliance associated with the matching electrical load signature and send a notification to a user to confirm the identified electrical appliance; and in response to receiving a confirmation from the user, send an updated signature list to the smart DB, the revised signature list containing electrical load signatures of the top N common electrical appliances and the identified electrical appliance.

[0016] According to an embodiment of the first aspect, the instructions of the main server also include instructions to: receive a request to modify a data structure associated with one of the plurality of smart DBs; modify the data structure according to the request; and store the modified data structure.

[0017] According to an embodiment of the first aspect, the instructions to modify the data structure according to the request also include instructions to: in response to the request to include a new device to the connected load, modify the data structure associated with the smart DB accordingly to include the new appliance for the MCB or smart electrical socket.

[0018] According to an embodiment of the first aspect, the instructions to modify the data structure according to the request further include instructions to: modify the signature list to include an electrical load signature associated with the new appliance.

[0019] According to an embodiment of the first aspect, the instructions to modify the data structure according to the request further include instructions to: update the order of the electrical load signatures in the signature list.

[0020] According to an embodiment of the first aspect, instructions for updating the order of electrical load signatures in a signature list include instructions to: update a score for each electrical load signature, which is the number of data structures containing the same electrical load signature; and arrange the electrical load signatures in ascending order, where the highest score will be arranged at the top of the signature list and the lowest score will be arranged at the bottom of the signature list.

[0021] According to an embodiment of the first aspect, the socket processing unit includes a socket processor, a socket memory, and a socket instruction stored on the socket memory, and the socket instruction can be executed by the socket processor to: establish a connection with a smart DB; obtain data from a metering device, the data including frequency, voltage, current, and temperature; and send a socket data packet to the smart DB, the socket data packet including the data obtained from the metering device.

[0022] According to an embodiment of the first aspect, the smart electrical socket also includes: an on / off button configured to switch the socket processing unit between smart mode and normal mode; a reset button configured to activate a hardware reset of the socket processing unit; a pairing button configured to activate pairing between the socket processing unit and the DB processing unit; a connectivity indicator indicating whether the socket processing unit communicates with the DB processing unit; and an alarm indicator indicating whether there is a problem with the socket processing unit.

[0023] According to an embodiment of the first aspect, the smart electrical socket further comprises a configuration file having a protection threshold AC voltage, a protection threshold current, and a protection threshold temperature.

[0024] According to an embodiment of the first aspect, the socket instructions for obtaining data from the metering device also include socket instructions to: switch the on / off switch to off in response to one of the following rules: AC voltage is higher than a protection threshold AC voltage, current is higher than a protection threshold current, and temperature is higher than a protection threshold temperature.

[0025] According to an embodiment of the first aspect, the metering device is one of a voltmeter, an ammeter, an electric energy meter and a thermistor, or a combination thereof. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The above and other features and advantages of the present invention are described in the following detailed description and are illustrated in the following drawings:

[0027] Figure 1 An overview of the network infrastructure of a system according to an embodiment of the present disclosure is shown;

[0028] Figure 2 A front view of a smart DB according to an embodiment of the present disclosure is shown;

[0029] Figure 3 Shows a side view, a front view, and a rear view of a smart electrical socket according to an embodiment of the present disclosure;

[0030] Figure 4 A block diagram showing components in a smart DB according to an embodiment of the present disclosure is shown;

[0031] Figure 5 A block diagram showing components in a smart electrical socket according to an embodiment of the present disclosure is shown;

[0032] Figure 6 shows a processing unit of a main server according to an embodiment of the present disclosure;

[0033] Figure 7 The process flow for testing the intelligent DB according to the embodiment of the present disclosure is shown;

[0034] Figure 8 The process flow for setting a smart DB according to an embodiment of the present disclosure is shown;

[0035] Fig. 9 The process flow performed by the smart electrical socket according to the embodiment of the present disclosure is shown;

[0036] Fig.10 shows a process flow performed by a smart DB according to an embodiment of the present disclosure;

[0037] Fig.11 A timing diagram showing information flows among a smart DB, a main server, a third-party server, and a mobile device DB according to an embodiment of the present disclosure; and

[0038] Fig.12 The process flow executed by the main server according to an embodiment of the present disclosure is shown. DETAILED DESCRIPTION

[0039] The present invention relates to systems and methods for remotely monitoring and controlling residential energy consumption. In particular, the present invention relates to a system and method for obtaining data associated with energy consumption from a distribution board and one or more outlets in a monitored house, and analyzing the data locally or remotely.

[0040] It is foreseeable that the system and method according to embodiments of the present invention can be used to remotely monitor and obtain information related to the energy consumption of residential premises. The system and method according to the present invention provides the ability to continuously monitor the energy consumption of residential premises so that any anomalies can be easily flagged as soon as possible. The system and method according to the present invention also provides the ability to remotely disconnect an appliance if connected to a smart electrical outlet. The system and method includes two parts: data collection and analysis.

[0041] The data collection part includes smart distribution boards (DB) and smart sockets to obtain information related to energy consumption and other relevant information from the smart DB and smart sockets. Data from other sensors such as smoke detectors and motion sensors can also be collected through the smart DB, which can be used to disconnect the connected (multiple) appliances. All information is sent to the main server for collection, analysis and other processing processes including user visualization / interface.

[0042] The analysis part includes the process of reading the data collected and stored on the main server and providing analysis accordingly. The analysis can also be performed by the intelligent DB. These processes include determining anomalies (such as power trips or surges), energy consumption, appliances in use, etc. The system and / or method according to an embodiment of the present invention will now be described in detail as follows.

[0043] Figure 1 An overview of a system 100 for performing a process according to the present invention is shown. The system 100 includes a smart DB 110, a smart electrical socket 120, a regular electrical socket 150, a main server 160, a third-party server 180, and a mobile device 190.

[0044] Each residential house will be equipped with a smart DB 110, a plurality of smart electrical sockets 120 and a plurality of conventional electrical sockets 150. Figure 1 As shown, the smart electrical socket 120 and the conventional electrical socket 150 are distributed in the bedroom 131, the living room 132 and the kitchen 133. Specifically, the bedroom 131 is provided with one smart electrical socket 120 and one conventional electrical socket 150, which are connected to the first circuit breaker in the smart DB 110; the living room 132 is provided with one smart electrical socket 120 and two conventional electrical sockets 150, which are connected to the second circuit breaker in the smart DB 110; and the kitchen 133 is provided with one smart electrical socket 120 and two conventional electrical sockets 150, which are connected to the third circuit breaker in the smart DB 110. Those skilled in the art will recognize that Figure 1The arrangement of the smart electrical outlets 120 and conventional electrical outlets 150 shown is merely illustrative, and other arrangements may be implemented without departing from the present invention. For example, two circuit breakers may be assigned to the living room 132, where three conventional electrical outlets 150 and one smart electrical outlet 120 may be connected to one of the circuit breakers, while two conventional electrical outlets 150 and one smart electrical outlet 120 may be connected to the other circuit breaker. In addition, typically some circuit breakers are dedicated power lines where only one outlet is connected to one circuit breaker. Such dedicated circuit breakers will not require a smart outlet because the appliances connected to the conventional electrical outlets 150 can be monitored directly from the smart DB. Importantly, each non-dedicated circuit breaker in the smart DB should be connected to at least one smart electrical outlet 120 and at least one conventional electrical outlet 150. Those skilled in the art will also recognize that although Figure 1 One smart DB 110 is shown, but without departing from the present invention, multiple smart DBs 110 may be provided to monitor multiple house residences. For example, a residential complex may include several residential units, and one smart DB may be assigned to each residential unit so that the granular energy consumption of the residential unit can be monitored. In addition, each smart electrical socket 120 may introduce resonance, which may affect the power grid or interfere with the home network. Therefore, the implementation of the smart DB and the smart electrical socket can avoid affecting the power grid or interfering with the home network. Further details related to the smart DB 110 and the smart electrical socket 120 will be further described below.

[0045] The main server 160 and the third-party server 180 are typical processing systems, such as desktop computers, laptop computers, or other computer terminals capable of handling large data storage and processing requirements. The main server 160 and the third-party server 180 are communicatively connected to the network 170 via a wired or wireless connection to retrieve data from the smart DB 110 and / or the mobile device 190. Those skilled in the art will recognize that more than one server 110 and more than one third-party server 180 can be used without departing from the present invention. Further details of the server 110 and the third-party server 180 will be described below.

[0046] Smart DB

[0047] The smart DB 110 has a communication interface that allows information to be transmitted and received through a wired or wireless connection to allow the smart DB 110 to be communicatively connected to the main server 160 via the network 170. The smart DB 110 may be connected to the network 170 directly or via a home network. Figure 2 shows a possible arrangement of components in the smart DB 110, and Figure 41 shows a block diagram of the smart DB 110. The smart DB 110 includes a processing unit 210, a DC power source 220, a fuse 230, a module board B 240, a metering board 250, an input miniature circuit breaker (MCB) 260, a residual current device (RCD) 270, and an output MCB 280.

[0048] The smart DB 110 can receive and send data and execute software applications. The processing unit 210 includes a processor 410, a memory 420, a network device 430, and an input / output port 440. The processing unit 210 is powered by a DC power supply 220, which is directly drawn from one of the output MCBs 280. A fuse 230 is connected between the DC power supply 220 and the output MCB 280.

[0049] Processor 410 is a processor, microprocessor, microcontroller, application specific integrated circuit, digital signal processor (DSP), programmable logic circuit or other data processing device that executes instructions to perform the process according to the present invention. Processor 410 has the ability to execute various applications stored in memory 420.

[0050] The memory 420 may include a read-only memory (ROM), a random access memory (RAM), an electrically erasable programmable ROM (EEPROM), a flash memory card, or any memory generally used for a computer.

[0051] The network device 430 connects the processor 310 to the network for transmitting data to and from other processing systems. The network device 330 is communicatively connected to the main server 160 via the network 170. In order to minimize costs, the network device 430 is communicatively connected to the home network, which is in turn connected to the network 170. This means that no additional wiring is required because data can be sent to the network device 430 of the processing unit 210 via the power line. In another embodiment, the network device 430 uses a wired communication means such as a dedicated LAN cable to connect the network device 430 to the home network and / or the network device 530. In another embodiment, the network device 430 uses a wireless communication means such as wireless fidelity (Wi-Fi), ZigBee and Bluetooth to communicate with the home network and / or the network device 530. In another embodiment, the network device 430 includes both wired and wireless communication means to communicate with the home network and / or the network device 530.

[0052] The processing unit 120 is configured to obtain readings from the metering board 250 connected to the MCB and thermistor and send the readings to the main server. The network device 430 is also communicatively connected to the smart electrical outlets 120 to obtain data packets from the corresponding smart electrical outlets 120.

[0053] One or more input / output (I / O) ports 440 can be configured to allow the processor 410 to communicate with and control from various I / O devices. Peripheral devices that can be connected to the smart DB 110 via the I / O port 440 include USB storage devices, SD cards, or other devices for relaying information to or from the smart DB 110. In addition to updating applications stored on the memory 420 or installing new applications to the memory via the network device 430, alternatively, the user can install new applications or update applications on the memory 420 via the I / O port 440 through a user interface such as USB. The I / O port 440 also includes the necessary connectors to connect to multiple devices for monitoring the energy consumption drawn from the output MCB280. This includes an analog-to-digital converter (ADC) 441, a metering device 250, a thermistor 443, and a relay on / off switch 444. Other peripheral devices that can be connected to the smart DB 110 via the I / O port 440 include smoke detectors, door sensors, or other sensors that can be used to monitor housing residences. This allows the owner of a home residence to integrate data collection from various peripheral devices via the smart DB 110.

[0054] Those skilled in the art will recognize that other features may be included in the processing unit 210. In addition, the components in the processing unit 210 may be replaced by other components that perform similar functions. In short, Figure 4 The processing unit 210 shown is to be considered illustrative only and not limiting. In essence, the processing unit 210 is a multi-input data acquisition module configured to obtain measurements from a switchboard.

[0055] In short, the analog signals received from the metering board 250 and the thermistor 443 are converted into digital signals by the ADC 441. Then, the processor 410 receives the digital signals via the I / O port.

[0056] The metering board 250 is connected to the output MCB. Specifically, the metering board 250 includes metering devices, and each metering device is connected to each output MCB. The metering device is configured to obtain frequency, current and voltage and any other relevant information of the load drawn from the smart electrical socket. Examples of metering devices are voltmeters, ammeters, energy meters, etc. This allows the processing unit to obtain frequency, current, voltage, active power, reactive power, apparent power and any other information drawn from each output MCB 280. As described above, each non-dedicated output MCB is connected to the live inlet of one smart electrical socket and at least one conventional electrical socket. In one embodiment, the metering board is a current transformer (CT) board. The thermistor 443 is connected to a temperature sensor, such as a thermometer, to obtain the temperature inside the housing of the smart DB 110.

[0057] Each processing unit 210 is required to send a data packet to the main server 160. The data packet contains frequency, current, voltage, active power, reactive power, temperature and timestamp. Specifically, the data packet can be in the following format: [MF 1...n , M.I. 1...n , MV 1...n , M.P. 1...n , MQ 1...n , MT, SF1, SI1, SV1, SP1, SQ1, ST1, SF2, SI2, SV2, SP2, SQ2, ST2, SF3, SI3, SV3, SP3, SQ3, ST3, XXXXDDDDDD], where MF refers to the frequency from the smart DB, MI refers to the current from the smart DB, MP refers to the active power consumption in the load from the smart DB, MQ refers to the reactive power consumption in the load from the smart DB, MV refers to the voltage from the smart DB, MT refers to the temperature from the smart DB, SF refers to the frequency from the corresponding smart electrical socket 120, SI refers to the current from the corresponding smart electrical socket 120, SV refers to the voltage from the corresponding smart electrical socket 120, SP refers to the active power consumption in the load from the corresponding smart electrical socket 120, SQ refers to the reactive power consumption in the load from the corresponding smart electrical socket 120, ST refers to the temperature of the corresponding smart electrical socket 120, XXXX refers to the time in 24-hour format, DDMMYY refers to day, month and year, and n refers to the number of metering devices 442. Those skilled in the art will recognize that any other information that can be extracted from each output MCB 280 can be sent to the server via a metering board (e.g., a CT board) without departing from the present disclosure. Therefore, the data packet described above is not exhaustive and may include further information.

[0058] Smart electrical socket

[0059] The smart electrical outlet 120 has a communication interface to allow information to be transmitted and received through a wired or wireless connection, thereby allowing the smart electrical outlet 120 to be communicatively connected to the smart DB 110 . Figure 3 A side view 370, a front view 380, and a rear view 390 of the smart electrical outlet 120 and associated components are shown, and Figure 5 A block diagram of the communication interface of the smart electrical outlet 120 is shown. The smart electrical outlet 120 includes a processing unit 310, a conventional ground 320, a live inlet 330 and a neutral inlet 340, an on / off button 311, a reset button 312, a pairing button 313, a connectivity indicator 314, an alarm indicator 315 and an on / off indicator 316. The ground inlet 320, the live inlet 330 and the neutral inlet 340 operate as a conventional 3-pin socket according to Singapore Standard (SS) SS-145. Those skilled in the art will recognize that although the description describes a 3-pin socket, it is reasonable for those skilled in the art to implement the smart electrical outlet 120 based on a 2-pin socket (e.g., a CEE 7 / 3 socket). Importantly, only the live inlet 330 is relevant to the present disclosure because a metering device is connected to the live inlet 330 to obtain the power consumption of the load that draws power from the smart electrical outlet 120.

[0060] The smart electrical outlet 120 can receive and send data and execute software applications. The processing unit 310 includes a processor 510, a memory 520, a network device 530, and an input / output port 540. The processing unit 510 is powered by a DC power supply 550, which draws power directly from the live inlet 330 and the neutral inlet 340. The processing unit 310 acts as a communication interface for the smart electrical outlet 120.

[0061] Processor 510 is a processor, microprocessor, microcontroller, application specific integrated circuit, digital signal processor (DSP), programmable logic circuit or other data processing device that executes instructions to perform the process according to the present invention. Processor 510 has the ability to execute various applications stored in memory 520.

[0062] The memory 520 may include a read-only memory (ROM), a random access memory (RAM), an electrically erasable programmable ROM (EEPROM), a flash memory card, or any memory generally used for a computer.

[0063] The network device 530 connects the processor 310 to the network for transmitting data to and from other processing systems. The network device 530 is communicatively connected to the network device 430 of the processing unit 210. In order to minimize costs, the network device 530 uses power line broadband (BPL) communication. This means that no additional wiring is required because data can be sent to the network device 430 of the processing unit 210 via the power line. In another embodiment, a dedicated line such as a LAN cable can be provided to connect the network device 530 and the network device 430. In another embodiment, the network device 530 uses wireless communication means such as wireless fidelity (Wi-Fi), ZigBee and Bluetooth to communicate with the network device 430. In another embodiment, the network device 530 includes both wired and wireless communication means to communicate with the network device 430. The network device 530 allows the transmission of data packets containing relevant information to the network device 430 and receives instructions from the network device 430. This enables users to monitor and control the smart electrical socket 120 locally via a mobile device via a trusted application (or a web-based browser) without Internet connectivity in a residential house. If Internet connectivity is available, a user can remotely monitor and control the smart electrical outlet 120 via a mobile device via a trusted application (or web-based browser).

[0064] The processing unit 310 is configured to obtain the reading of the connected load from the smart electrical socket 120 and send a data packet containing the reading to the smart DB 110. The data packet includes frequency (Hz), current (A), voltage (V), temperature (°C), power (W), and energy consumption (kWh). Those skilled in the art will recognize that the data packet may contain other information, depending on the type of metering device used to obtain information from the live entrance.

[0065] One or more input / output (I / O) ports 540 may be configured to allow the processor 510 to communicate with and be controlled from various I / O devices. Peripheral devices that may be connected to the smart electrical outlet 120 via the I / O port 540 include USB storage devices, SD cards, or other storage devices for sending information to or receiving information from the smart electrical outlet 120. In addition to updating applications stored on the memory 520 or installing new applications to the memory via the network device 530, a user may alternatively install new applications or update applications on the memory 520 via the I / O port 540 through a user interface such as a USB. The I / O port 540 also includes the necessary connectors to connect to a plurality of devices for monitoring the energy consumption drawn from the live 330 and neutral 340 power lines. This includes an analog-to-digital converter (ADC) 541, a metering device 542, a thermistor 543, an on / off button 311, a reset button 312, a pairing button 313, a connectivity indicator 314, an alarm indicator 315, and an on / off indicator 316. The I / O port 540 also includes a relay on / off switch 544 to turn the socket on / off.

[0066] The on / off button 311 allows the user to enable / disable the processing unit 310 between the smart mode and the regular mode. When the regular mode is activated, the smart features of the smart electrical socket will be disabled. The reset button 312 allows the user to activate a hardware reset of the processing unit 310. The pairing button 313 allows the user to activate the pairing between the processing unit 310 and the processing unit 210 of the smart BD 110. The connectivity indicator 314 indicates whether the processing unit 310 is communicating with the processing unit 210 of the smart DB 110. The alarm indicator 315 indicates whether there is a problem with the processing unit 310. The on / off indicator 316 indicates whether the processing unit 310 is in the smart mode or the regular mode.

[0067] Those skilled in the art will recognize that other features may be included in the processing unit 310. In addition, the components in the processing unit 310 may be replaced by other components that perform similar functions. In short, Figure 5 The processing unit 310 shown is to be considered illustrative only and not limiting. In essence, the processing unit 310 is a multi-input data acquisition module configured to obtain measurements from a switchboard.

[0068] In short, analog signals received from the metering device 542 and the thermistor 543 are converted into digital signals by the ADC 541. Then, the processor 510 receives the digital signals through the I / O port.

[0069] A metering device 542 is connected to the live 330 outlet. The metering device is configured to obtain the frequency, current and voltage and any other relevant information of the load drawn from the smart electrical outlet. Some examples of metering devices are voltmeters, ammeters, energy meters, etc. This allows the processing unit to obtain the frequency, current and voltage drawn from the live 330 outlet. The thermistor 543 is connected to a temperature sensor, such as a thermometer, to obtain the temperature inside the housing of the smart electrical outlet 120.

[0070] The processing unit 310 is required to send a data packet to the smart DB 110. The data packet contains frequency, current, voltage, active power, reactive power and temperature. Specifically, the data packet can be in the following format: [SF s , SI s , SV s , S.P. s , SQ s ,ST s ].

[0071] The intelligent electrical socket 120 should also meet the following requirements:

[0072] 1. Rated 13A or 15A, 230VAC@50Hz.

[0073] 2. Includes overload and overheat protection functions.

[0074] 3. A manual switch 351 for connecting and disconnecting the device. The manual switch 351 can be a single-pole or double-pole mechanical switch to achieve the switching of line current.

[0075] 4. British Standard (BS) 1 socket type. The external front plate should be based on SS-145 requirements with an estimated size of 86 x 86 mm.

[0076] 5. Suitable for installation on standard BS 1 socket metal / plastic flush box, estimated size: 70 (length) × 70 (width) × 38 (depth) mm.

[0077] 6. Applicable to existing wiring practices in fixed installations (i.e., ring or radial electrical wiring circuits).

[0078] 7. Each smart electrical socket operates independently.

[0079] Those skilled in the art will recognize that the above requirements are based on standards approved by relevant regulatory agencies. Therefore, the above requirements are not meant to be limiting, but merely illustrative, and other requirements may be implemented without departing from the present invention.

[0080] server

[0081] The process performed by the processing system in the main server 160 or the third party server 180 as instructions stored in the medium provides the method and / or system according to the present invention. The instructions may be stored as firmware, hardware or software. Figure 6 A processing system 600 or a virtual machine running on a processing system 600 in a host server 160 or a third-party server 180 is shown, which executes instructions to perform processes for providing methods and / or systems according to the present invention. Those skilled in the art will recognize that the exact configuration of each processing system may be different, and the exact configuration of the processing system in each device may be different. Therefore, Figure 6 The processing system 600 shown is provided by way of example only.

[0082] The processing system 600 includes a central processing unit (CPU) 605. The CPU 605 is a processor, a microprocessor, or any combination of a processor and a microprocessor that executes instructions to perform the process according to the present invention. The CPU 605 is connected to a memory bus 610 and an input / output (I / O) bus 615. The memory bus 10 connects the CPU 605 to the memory 620 and 625 to send data and instructions between the memory and the CPU 605. The I / O bus 615 connects the CPU 605 to peripheral devices to send data between the CPU 605 and the peripheral devices. Those skilled in the art will recognize that the I / O bus 615 and the memory bus 610 can be combined into one bus, or subdivided into many other buses, and the exact configuration is left to those skilled in the art.

[0083] A non-volatile memory 620, such as a read-only memory (ROM), is connected to the memory bus 610. The non-volatile memory 620 stores instructions and data required to operate the various subsystems of the processing system 600 and to boot the system at startup. Those skilled in the art will recognize that any number of types of memory may be used to perform this function.

[0084] A volatile memory 625, such as a random access memory (RAM), is also connected to the memory bus 610. The volatile memory 625 stores instructions and data required by the CPU 605 to execute software instructions, such as those required to provide the processes required by the system according to the present invention. Those skilled in the art will recognize that any number of types of memory may be used as volatile memory, and the exact type used is left to those skilled in the art as a design choice.

[0085] I / O devices 630, keyboard 635, display 640, memory 645, network device 650, and any number of other peripheral devices are connected to the I / O bus 615 to exchange data with the CPU 605 for applications executed by the CPU 605. The I / O device 630 is any device that sends and / or receives data from the CPU 605. The keyboard 635 is a specific type of I / O that receives user input and sends the input to the CPU 605. The display 640 receives display data from the CPU 605 and displays images on the screen for the user to view. The memory 645 is a device that sends and receives data to and from the CPU 605 for storing data to a medium. The network device 650 connects the CPU 605 to a network for transmitting data to and from other processing systems such as the smart DB 110 and the mobile device 190.

[0086] mobile device

[0087] The mobile device 190 can be a mobile phone, a personal digital assistant (PDA), a portable computer, a tablet or other similar mobile devices without departing from the present invention. The mobile device 190 is equipped with a telecommunications network interface to communicate with the main server 160, the third party service provider 180 and the home network to access the smart DB 110 and the smart electrical socket 120. In essence, the mobile device 190 is a device that allows the user to access data from the main server 160, the third party 180 and the smart DB 110. Therefore, the mobile device 190 may not be limited to a portable device. On the contrary, the mobile device 190 may also include a desktop computer. In essence, the mobile device 190 allows the user to access data in the monitored residential house or from a remote location.

[0088] The mobile device 190 includes a processor, a radio transceiver, an image capture device, a display, a keyboard, a memory, an audio module, a near field communication (NFC) module, and an I / O device. The radio transceiver, the image capture device, the display, the keyboard, the memory, the audio module, the NFC module, the I / O device, and any number of other peripheral devices are connected to the processor to exchange data with the processor for applications executed by the processor.

[0089] The radio transceiver is connected to an antenna configured to transmit outgoing voice and data signals and receive incoming voice and data signals over a radio communication channel. The radio communication channel may be a digital radio communication channel such as a CDMA, GSM, LTE channel or any other subsequent generation telecommunication network channel (e.g., a 5G network) that employs voice and data messages in conventional technology.

[0090] An image capture device is any device capable of capturing still and / or moving images. The display receives display data from the processor and displays the image on the screen for the user to view. The keyboard receives user input and sends the input to the processor. In some embodiments, the display can be a touch-sensitive surface that is used as a keyboard to receive user input.

[0091] The memory is a device that sends data to and receives data from the processor, and is used to store data in the memory. The audio module may include a microphone, an earpiece, and an earphone. A microphone is a device that sends audio data to the processor. An earpiece is a device that receives audio data from the processor. An earpiece is a device that sends audio data to and receives audio data from the processor. An NFC module is a module that allows a device to establish radio communication with another similar device by touching them together or bringing them close together. The NFC module enables the mobile device 190 to communicate contactlessly with another mobile device 190, the smart DB 110, or the smart electrical socket 120.

[0092] Other peripherals that can be connected to the processor include Bluetooth transceivers, Wi-Fi transceivers, and Global Positioning Systems (GPS).

[0093] The processor is a processor, a microprocessor, or any combination of a processor and a microprocessor that executes instructions to perform the process according to the present invention. The processor has the ability to execute various applications stored in the memory. These applications can receive input from the user via a display with a touch-sensitive surface or directly from a keyboard. Some of the applications stored in the memory that can be executed by the processor are applications developed for iPhone, Android, Windows Mobile, Blackberry or other mobile platforms.

[0094] Setting up the program

[0095] Before a smart DB can be used, a testing procedure is performed to ensure that the smart DB meets certain standards. Figure 7 A process 700 is shown for testing a smart DB process flow. The process 700 begins at step 705 by ensuring that the power to the meter board is disconnected. This cuts off the power from the meter board to the smart DB.

[0096] At step 710, ensure that all input and output power supplies are disconnected. Specifically, the input MCB 260, ELCB 270, and output MCB 280 are disconnected.

[0097] In step 715, ensure that the 2A fuse carrier 230 used to isolate the ELV component is opened.

[0098] At step 720, a qualified technician performs the necessary tests on the incoming sub-trunks and the outgoing cables. The tests include a megohmmeter test and a polarity test. Those skilled in the art will recognize that other tests may be required, depending on the requirements of the relevant agencies. It is important to start the test of the smart DB after disconnecting the necessary switches.

[0099] After the test is completed, in step 725, the 2A fuse carrier 230 for isolating the ELV assembly is closed.

[0100] At step 730, all input and output power supplies are turned on. Specifically, the input MCB 260, the RCD 270, and the output MCB 280 are turned on.

[0101] In step 735, power is turned on at the metering board. Certification will then be issued and process 700 ends. Certifications include IEC 61439-3, IEC 60255-1 and IEC 61869-1 & 2.

[0102] After authenticating the smart DB, the user must register and set up the smart DB 110 and the connected smart electrical socket 120 . Figure 8 Process 800 is shown for setting up a processing flow for a smart DB and a smart electrical socket. Process 800 can be executed via a mobile application. Process 800 starts at step 805, where the mobile device is connected to the smart electrical socket. This can be achieved by entering a registration number printed on the smart electrical socket. The registration number can be represented by a QR code. If a QR code is available, the user can simply activate the camera of the mobile device to capture the QR code instead of entering the registration number. The application will perform the necessary processes to connect the mobile phone to the smart electrical socket using the registration number. The registration number is stored in a memory. Repeat this step for all smart electrical sockets connected to the smart DB so that the registration numbers of all smart electrical sockets are stored in a memory.

[0103] At step 810, process 800 connects the mobile device to the smart DB. Similar to connecting to a smart electrical outlet, this can be achieved by entering a registration number printed on the smart DB. The registration number can be represented by a QR code. If a QR code is available, the user can simply activate the camera of the mobile device to capture the QR code instead of entering the registration number. The application will perform the necessary processes to connect the mobile phone to the smart DB using the registration number.

[0104] In step 815, process 800 connects the smart DB and the smart electrical outlet based on the registration number of the smart electrical outlet stored in the memory. The configuration file in the memory of the smart DB will be updated to register the connected smart electrical outlet.

[0105] At step 820, process 800 connects the smart DB to the Internet via the local network. Specifically, the mobile device scans for available local networks and prompts the user to select a local network and enter a password. Once the name and password of the local network are entered, the name and password of the local network will be sent to the smart DB, and the smart DB will attempt to connect to the Internet via the selected local network using the name and password of the local network.

[0106] After the smart DB is connected to the Internet via the local network, the process 800 obtains the setup information at step 825. Specifically, the user will be asked to enter the address and identification number, such as a mobile phone number and a password at step 825. At step 830, the address, identification number, registration number and password will be sent to the main server so that a new data structure can be created.

[0107] In step 835, in response to receiving the address, identification number, registration number and password, the main server creates a new data structure for the smart DB. The new data structure includes the information described in Table 1 below. Thereafter, the main server will send a success message with a signature list containing the electrical load signatures of the top N commonly used electrical appliances. The electrical load signature is based on a combination of voltage, current and frequency readings generated by each electrical appliance. Data collection will begin after the data structure of the smart DB is created. Process 800 ends after step 835. Process 800 can be executed via a mobile application developed by a developer who manages the main server. In order to allow flexibility, the mobile application can include an option for the user to select a third-party server. This allows the user to select a third party instead of the default main server to collect data. For example, the default main server can be a public DB available to the public, while the third-party server can be a secure server that is not available to the public. Therefore, users are allowed to store their data privately.

[0108] Data collection and processes performed by smart electrical outlets

[0109] Fig. 9 Process 900 illustrates a process flow performed by the processing unit 310 when powered on by the on / off button 331. The process 900 begins at step 902 by pairing the smart electrical outlet 120 with the connected smart DB 110.

[0110] After the smart electrical outlet 120 is paired with the smart DB 110 , the process 900 proceeds to step 905 to determine whether a signal is received from the reset button. If a signal is received, the process 900 proceeds to step 910 . Otherwise, the process 900 proceeds to step 915 .

[0111] At step 910, process 900 resets the configuration file to default data. The default configuration file is as follows:

[0112] Name: Smart socket 1

[0113] Rated voltage: 195VAC~265VAC

[0114] Rated frequency: 50Hz

[0115] Rated current: 13A

[0116] Protection threshold voltage: 274VAC

[0117] Protection threshold current: 14A

[0118] Protection threshold temperature: 85℃

[0119] Password: 123456

[0120] The configuration file contains information required to execute the processes that can be executed by the processing unit 310. Those skilled in the art will recognize that the above parameters (except the name and password) are based on standards approved by relevant regulatory agencies. Therefore, the parameters (except the name and password) as described above are not meant to be limiting, but are merely meant to be illustrative, and other parameters may be implemented without departing from the present invention.

[0121] At step 915, process 900 determines whether instructions are received from an external device such as mobile device 190 or a mobile device to configure smart electrical outlet 120. If instructions are received from an external device, process 900 proceeds to step 920. Otherwise, process 900 proceeds to step 930.

[0122] In step 920, after the external device provides a password corresponding to the password in the configuration file, the process 900 will act according to the instructions received from the external device. The instructions may include changing parameters in the configuration file, receiving data from a metering device and a thermistor, or turning the socket on or off by triggering the on / off switch 544. If the instruction is to change a parameter in the configuration file, the process will receive the change from the external device and modify the configuration file according to the received change. For example, if the received change includes a change in the name, the process will modify the configuration file to include the new name received from the external device. The rated values ​​of voltage, frequency, and current; the protection threshold voltage, current, and temperature; and the password can be modified by the user via the external device. Turning the socket on or off by triggering the on / off switch 544 allows the user to flexibly turn the appliance on or off remotely. Steps 905 and 915 are essentially interruptions that pause the data collection of the smart electrical socket to reconfigure the configuration file and operate according to the instructions received from the user, respectively. It should be noted that steps 905 and 915 are instructions received from an external device such as a mobile device 190 via a local network or a short-range network. If the mobile device 190 is located at a remote location, the mobile device 190 must send instructions to the smart electrical socket via the smart DB. For example, if the mobile device 190 wants to disconnect the smart electrical socket, the mobile device 190 must send instructions to the smart DB, which in turn relays the instructions to the smart electrical socket by triggering the on / off switch 544 to disconnect the socket.

[0123] At step 930, the process 900 obtains data from the metering device and the thermistor. After obtaining data from the metering device and the thermistor, the process 900 determines whether the current, voltage, and temperature are above the protection threshold current, voltage, and temperature. If any of the current, voltage, and temperature is above the protection threshold current, voltage, and temperature, the process 900 will activate the alarm indicator and open the switch by triggering the on / off switch 544.

[0124] At step 935, process 900 generates a data packet and sends it to smart DB 110. The data packet includes frequency, current, voltage, and temperature.

[0125] Process 900 repeats from step 905 after step 935. However, if the connection between the intelligent DB and the intelligent electrical outlet is disconnected and process 900 cannot send a data packet to intelligent DB 110, process 900 repeats from step 902 to reestablish a connection with the intelligent DB.

[0126] Although process 900 describes a process that can be performed by the smart electrical socket 120 and communicate with the smart DB 110, those skilled in the art will recognize that it is possible to configure the smart electrical socket 120 to communicate directly with the mobile device 190 so that the user can modify the configuration file or read the current data obtained from the metering device and thermistor. However, such connectivity between the smart electrical socket 120 and the mobile device 190 can be obtained via a short-range network such as WiFi, Bluetooth, etc.

[0127] Data collection and processing performed by SmartDB

[0128] Fig.10 Process 1000 shows a process flow executed by the processing unit 210 at power-on to start data collection or action according to instructions received from the user. It should be noted that after the smart DB and smart electrical outlets are set up as described in process 800, the configuration file of the smart DB will be stored in the memory of the smart DB. In addition, a signature list containing the electrical load signatures of the top N public electrical appliances received from the main server will be stored on the memory of the smart DB. It should be noted that the smart DB does not mean only collecting data and sending the data to the main server. Instead, the function of the smart DB is to act as an edge computer to collate data from residential premises; and perform certain analyses, such as identifying electrical appliances based on the electrical load signatures obtained from the MCB and the smart electrical outlets, and determining abnormalities in the power drawn by the same load within a predetermined time period.

[0129] Process 1000 begins at step 1002, pairing the smart DB 110 with the connected smart electrical socket 120, which is listed in the profile under the connected smart electrical socket. It should be noted that in the case where the smart electrical socket only implements wireless connectivity, a smart electrical socket that may be outside the wireless communication range can be connected to the smart DB via relaying from the smart electrical socket outside the range and the smart electrical socket within the wireless communication range of the smart DB. In another embodiment where the smart electrical socket includes both wireless and wired communication protocols, the smart DB can automatically select wired communication with a smart electrical socket that is outside the wireless communication range or has a poor wireless signal. After the smart DB 110 is paired with the smart electrical socket 120, the process 1000 updates the details related to the connected smart electrical socket in the profile and begins to receive data packets from the connected smart electrical socket. For example, the details to be updated in the profile can be the connectivity type.

[0130] At step 1005, process 1000 determines whether an instruction is received from an external device such as mobile device 190 or a mobile device to configure smart DB 110. If an instruction is received from an external device, process 1000 proceeds to step 1010. Otherwise, process 1000 proceeds to step 1020. Step 1005 is essentially an interruption that pauses data collection by the smart DB to act according to an instruction received from a user.

[0131] In step 1010, after the external device provides a password corresponding to the password in the configuration file stored on the memory 420, the process 1000 will act according to the instructions received from the external device. In short, some form of authentication is required before the user can access or modify the data associated with the smart DB. These instructions may include changing parameters in the configuration file, receiving data from the metering device and receiving data from the thermistor directly from the smart DB 110 and the connected smart electrical outlet 120, or disconnecting one or more MCBs by triggering the on / off switch 444. If the instruction is to receive data from the metering device and thermistor, step 1025 is required to send a data packet to the main server and the external device. If the instruction is to change a parameter in the configuration file, the process will receive the change from the external device and modify the configuration file according to the received change. The details in the configuration file stored on the memory 420 are as follows:

[0132] Name: Smart DB 1

[0133] Password: 123456

[0134] Connected smart electrical sockets: Smart socket 1, Smart socket 2, Smart socket 3

[0135] Circuit Breakers: 16

[0136] Rated voltage: 230VAC

[0137] Voltage range: 46VAC~250VAC

[0138] Circuit breaker rated current: 6A / 20A / 32A / 40A

[0139] Power consumption: <1w / 2VAC

[0140] Rated frequency: 50Hz

[0141] Those skilled in the art will recognize that the above parameters (except name, password, connected smart electrical outlet) are based on standards approved by relevant regulatory agencies. Therefore, the parameters described above (except name, password, connected smart electrical outlet) are not meant to be limiting, but are merely meant to be illustrative, and other parameters may be implemented without departing from the present invention.

[0142] The configuration file will be used to prepare the data structure shown in Table 1 below. If the instruction is to turn on or off one of the MCBs, the smart DB will trigger the relevant on / off switch 444 to turn off the relevant MCB. This allows the user to flexibly turn on or off the sockets drawn from the relevant MCB remotely.

[0143] In step 1020 of process 1000, process 1000 updates details in the configuration file related to the connected smart electrical outlet and begins receiving data packets from the connected smart electrical outlet. For example, the details to be updated in the configuration file may be the type of connectivity. Thereafter, process 1000 proceeds to step 1020 to obtain data from the metering device and the thermistor.

[0144] In step 1020, after obtaining data from the metering device and thermistor, the process 1000 determines whether the AC voltage, pulsed AC voltage, current, and temperature are above the protection threshold AC voltage, threshold pulsed AC voltage, threshold current, and threshold temperature. If any of the AC voltage, pulsed AC voltage, current, and temperature are above the protection threshold AC voltage, pulsed AC voltage, current, and temperature, the process 1000 will disconnect the DB by triggering the on / off switch 444. In this step, the smart DB will also identify the type of load by comparing the signature list containing the electrical load signature with the electrical signature generated by the connected load.

[0145] In step 1025, process 1000 generates a data packet and sends it to main server 160 via the home network. The data packet includes data obtained from the smart electrical outlet and the meter board. In addition, the identified load is indicated to the corresponding MCB and smart electrical outlet. Process 1000 repeats from step 1005 after step 1025.

[0146] Smart DB also performs certain analyses after collecting data from smart electrical outlets and meter boards for a predetermined period of time. For the analysis to be meaningful, at least one week of data is required. The analysis performed by Smart DB includes monitoring of anomalies in identified loads over a period of time. Electrical appliances typically draw power in a consistent manner. Therefore, the electrical load signature of the identified load should not deviate by more than a predetermined percentage. Therefore, Smart DB analyzes the electrical load signature of each identified load over a period of time. If any electrical load signature deviates from the electrical load signature by more than a predetermined percentage, Smart DB will send a notification directly to the user's mobile device. Alternatively, the notification will be sent to the user indirectly via the main server.

[0147] Data analysis and processes performed by the master server

[0148] Fig.11A timing diagram 1100 showing the flow of information between the smart DB 110 , the main server 160 , the third party server 180 , and the mobile device 190 .

[0149] At step 1105, the signature list is sent to the smart DB.

[0150] In step 1110, the smart DB 110 sends the data packet to the main server 160. In response to receiving the data packet, the main server 160 stores the data packet on a memory in a data structure according to the identity of the smart DB 110. Table 1 below shows an example of a data structure according to an embodiment of the present disclosure.

[0151]

[0152] Table 1

[0153] The user can register with the main server 160 via his mobile device 190 or computer through the application. For the sake of brevity, the details of registering via the application are omitted because the registration process is a well-known process. In essence, after the user completes the registration, the user can modify the details of the location in the data structure. This allows the user to identify which (which) smart electrical socket is in use. Table 1 above shows a data structure containing the details of two connected smart DBs 110 (DB1 and DB2). DB1 includes 3 smart electrical sockets (S1-S3) and 3 circuit breakers (B1-B3). DB2 includes 2 smart electrical sockets (S1-S2) and 3 circuit breakers (B1-B3). The second column on the far right indicates the location of the smart socket provided by the user. For DB1, the residential unit has at least a bedroom, a living room and a kitchen. DB1 has at least three circuit breakers, each of which is connected to a smart electrical socket. Similarly, for DB2, the residential unit has at least a bedroom, a living room and a kitchen. However, DB2 has at least three circuit breakers, two of which are connected to a smart electrical socket respectively. This is because circuit breaker 3 (B3) can be a dedicated circuit breaker for air conditioning. Therefore, B3 does not require a smart electrical socket. The rightmost column indicates the type of load that draws power from the socket. Information about the load can be indicated by the user or via data analysis by comparing known electrical load signatures. Those skilled in the art will recognize that the data structure presented in Table 1 above is for illustrative purposes only. Other information, such as rule-based notifications, may be included without departing from the present disclosure. For example, the data structure may include rule-based notifications to trigger a warning to the user when the energy consumption of a particular circuit breaker or smart electrical socket exceeds a certain limit. In another example, the data structure may include rule-based notifications to trigger an alarm to the user when the total energy consumption exceeds a certain limit. In essence, steps 1105 and 1110 involve starting to collect and store data on the main server.

[0154] The user can monitor the energy consumption in real time or the energy consumption over a period of time. In addition, the user can also modify the location of the socket. In addition, the user may want to remotely turn on or off the appliance. This is achieved by communicating directly with the main server 160 or the smart DB 110 according to the type of user request. Specifically, in step 1120, the mobile device 190 can request information or modify the location of the socket. Such a request is sent to the main server 160. In step 1125, in response to the request, the main server 160 retrieves and sends the requested information to the mobile device 190. The requested information can be real-time energy consumption or energy consumption over a period of time. In step 1125, if the request is a modification of the location of the socket, the main server 160 will modify the data structure accordingly and send an acknowledgment to confirm the change. In another type of request, in step 1120, the mobile device 190 can request to disconnect the appliance. Such a request is sent to the smart DB 110. In response to the request, the smart DB 110 disconnects the relevant MCB to cut off the power supply to the appliance. If an appliance is connected to the smart electrical socket, the smart DB 110 will instruct the smart electrical socket to cut off the power to the appliance. In step 1125, a confirmation about disconnecting the appliance will be sent back to the mobile device 190. In short, steps 1120 and 1125 show that the mobile device 190 can access and modify the data structure from the main server 160, or remotely turn on or off the appliance via the smart DB.

[0155] The user can monitor energy consumption based on actual pricing. In this case, the user requests the pricing rate from the relevant third-party server 180 in step 1130. In step 1135, in response to the request, the third-party server 180 sends the pricing rate to the mobile device 190.

[0156] Fig.12 Process 1200 of the process flow performed by the host server is shown. Process 1200 begins by identifying the source of the received data. If the data is received from the smart DB, process 1200 proceeds to step 1210. If the data is received from the mobile device 190, process 1200 proceeds to step 1215.

[0157] In step 1210, process 1200 stores the data received from the smart DB in a memory and updates the data structure associated with the smart DB. Specifically, the data structure associated with the smart DB is retrieved and the data structure is appended to include the data received from the smart DB. Before appending the data structure, process 1200 can determine the type of the connected undetermined load by comparing the received data with the electric load signature stored on the signature list. More specifically, the electric load signature of the undetermined load from the data packet is compared with the electric load signature in the signature list. If there is a match, the main server appends the rightmost column to indicate the electrical appliance associated with the matching electric load signature and waits for the user to confirm the load. If the user confirms the electrical appliance, the main server will send an updated signature list. If the identified electrical appliance is not among the top N public electrical appliances, the updated signature list contains the electric load signatures of the top N public electrical appliances and the electric load signature of the new electrical appliance.

[0158] At step 1215, process 1200 determines the type of data received from the mobile device. If the data received from the mobile device is a request to modify a data structure, process 1200 proceeds to step 1220. If the data received from the mobile device is a request to retrieve information, process 1200 proceeds to step 1225.

[0159] In step 1220, process 1200 retrieves a data structure associated with the mobile device, which is associated with the smart DB, and modifies the data structure accordingly. In this step, if the request from the user is to add a new appliance to the connected but undetermined load, process 1200 modifies the data structure accordingly to include the new appliance for the MCB or smart electrical outlet. The electrical load signature of the new appliance will also be added to the signature list. Each appliance has some kind of energy consumption signature. Therefore, storing electrical load signatures of appliances from multiple users allows the server to establish an electrical load signature list so that the main server can identify unknown appliances that draw energy from the power grid. The main server can also prompt the user to confirm unverified appliances based on the match of the electrical load signature of the connected appliance with the electrical load signature in the electrical load signature data structure.

[0160] At step 1225, process 1200 retrieves a data structure associated with the mobile device and sends the data structure to the mobile device.

[0161] The master server also periodically updates the signature list to better reflect the top N public appliances. For example, at a predetermined time interval, the master server will update the score of each electric load signature. The score is the number of data structures, each corresponding to a smart DB, containing the same electric load signature. The electric load signatures will then be sorted in ascending order, with the highest score at the top of the signature list and the lowest score at the bottom of the signature list.

[0162] Similar to the analysis performed by the smart DBs, the master server also performs certain analysis after collating the data from various smart DBs for a predetermined time period. In order for the analysis to be meaningful, at least one week of data from each smart DB is required. The analysis performed by the master server includes monitoring the identified loads for anomalies over a period of time. Electrical appliances usually draw power in a consistent manner. Therefore, the electrical load signature of the identified load should not deviate by more than a predetermined percentage. Therefore, the master server analyzes the electrical load signature of each identified load over a period of time. If any electrical load signature deviates from the electrical load signature by more than a predetermined percentage, the master server will send a notification directly to the user's mobile device.

[0163] The above is a description of an exemplary embodiment of a system and method for monitoring energy consumption in a residential building according to the present disclosure. It is anticipated that those skilled in the art can and will design alternative systems and methods based on the present disclosure.

Claims

1. A residential energy consumption monitoring system for monitoring energy consumption in a residential house, the residential energy consumption monitoring system comprising: An intelligent distribution board DB, wherein the intelligent distribution board DB comprises: Multiple miniature circuit breakers MCB; a metering board having a plurality of metering devices, each metering device configured to obtain data associated with energy consumption drawn from one of the MCBs; A DB processing unit configured to receive data from the metering board; and a DC power supply for the DB processing unit; and at least one intelligent electrical outlet communicatively connected to the intelligent distribution board DB, the at least one intelligent electrical outlet comprising: a live inlet connected to one of the MCBs; neutral entrance; a metering device configured to obtain data associated with energy consumption drawn from the live inlet and the neutral inlet; and a socket processing unit configured to receive the data from the metering device of the at least one smart electrical socket and send a data packet including the data from the metering device of the at least one smart electrical socket to the DB processing unit, At least one of the MCBs is connected to a live inlet of at least one conventional electrical outlet and the at least one intelligent electrical outlet.

2. The residential energy consumption monitoring system according to claim 1, wherein: The at least one conventional electrical outlet and the at least one intelligent electrical outlet connected to the at least one of the MCBs are located in a location within the residential premises.

3. The residential energy consumption monitoring system according to claim 1 or claim 2, wherein: The DB processing unit includes a DB processor, a DB memory, and a DB instruction stored on the DB memory, and the DB instruction can be executed by the DB processor to: receiving a signature list including electric load signatures of the first N public electric appliances from a main server; storing the signature list in the DB memory; and Data collection from the meter board and the at least one smart electrical outlet is initiated.

4. The residential energy consumption monitoring system according to claim 3, wherein: The DB instructions to initiate data collection from the meter board and the at least one intelligent electrical outlet include instructions to: establishing a connection with the at least one smart electrical socket; updating details in a configuration file stored on the DB memory, the configuration file containing information about the at least one intelligent electrical socket connected, the details being a type of connectivity connected to the at least one intelligent electrical socket; obtaining data from the metering board, the data including frequency, voltage and current; as well as A data packet is received from the at least one intelligent electrical outlet, the data packet including frequency, voltage, and current.

5. The residential energy consumption monitoring system according to claim 4, wherein: The configuration file also includes a protection threshold AC voltage, a protection threshold current, and a protection threshold temperature.

6. The residential energy consumption monitoring system according to claim 5, wherein: The intelligent distribution board DB further comprises an on / off switch for turning on or off each of the MCBs, and the DB instructions for starting to collect data from the meter board and the at least one intelligent electrical outlet further comprise instructions to: The MCB is disconnected in response to one of the following rules: AC voltage is higher than the protection threshold AC voltage, current is higher than the protection threshold current, temperature is higher than the protection threshold temperature.

7. The residential energy consumption monitoring system according to claim 4, wherein: The DB instructions to initiate data collection from the meter board and the at least one intelligent electrical outlet also include instructions to: identifying the type of load drawn from the MCB and the smart electrical outlet by matching the electrical load signature in the signature list with an electrical signature generated by the load drawn from the MCB and the smart electrical outlet; as well as A DB data packet is sent to the main server, the DB data packet including data obtained from the at least one smart electrical outlet and the meter board, wherein the identified load type is indicated to the corresponding MCB and smart electrical outlet.

8. The residential energy consumption monitoring system according to claim 7, further comprising the main server, the main server having a processor, a memory and instructions stored on the memory, and the instructions can be executed by the processor to: Receiving the DB data packet from the smart switchboard DB; determining a type of the payload in response to receiving an undetermined payload from the DB packet; as well as The DB data packet is stored and a data structure associated with the intelligent switchboard DB is updated, and wherein the memory further includes a signature list including electrical load signatures of a plurality of electrical appliances.

9. The residential energy consumption monitoring system according to claim 8, wherein: In response to receiving the undetermined payload from the DB packet, the instructions to determine a payload type include instructions to: comparing the electrical load signature of the undetermined load with the electrical load signatures in the signature list; In response to the match, identifying an electrical appliance associated with the matched electrical load signature and sending a notification to a user to confirm the identified electrical appliance; as well as In response to receiving the confirmation from the user, a revised signature list is sent to the intelligent switchboard DB, the revised signature list containing the electrical load signatures of the top N common electrical appliances and the identified electrical appliance.

10. The residential energy consumption monitoring system according to claim 8, wherein: The instructions of the master server also include instructions to: receiving a request to modify a data structure associated with one of a plurality of intelligent switchboard DBs; modifying the data structure according to the request; as well as Store the modified data structure.

11. The residential energy consumption monitoring system according to claim 10, wherein: The instructions to modify the data structure according to the request also include instructions to: In response to a request to include a new appliance to the connected loads, a data structure associated with the intelligent distribution board DB is modified accordingly to include the new appliance for the MCB or the at least one intelligent electrical outlet.

12. The residential energy consumption monitoring system according to claim 11, wherein: The instructions to modify the data structure according to the request also include instructions to: The signature list is modified to include an electrical load signature associated with the new appliance.

13. The residential energy consumption monitoring system according to claim 12, wherein: The instructions to modify the data structure according to the request also include instructions to: The order of the electrical load signatures in the signature list is updated.

14. The residential energy consumption monitoring system according to claim 13, wherein: The instructions for updating the order of the electrical load signatures in the signature list include instructions to: updating a score for each electrical load signature, the score being the number of data structures containing the same electrical load signature; and The electrical load signatures are arranged in ascending order, with the highest scores being arranged at the top of the signature list and the lowest scores being arranged at the bottom of the signature list.

15. The residential energy consumption monitoring system according to any one of claims 1-2, wherein: The socket processing unit of the at least one intelligent electrical socket includes a socket processor, a socket memory, and socket instructions stored on the socket memory, and the socket instructions are executable by the socket processor to: Establishing a connection with the intelligent distribution board DB; obtaining data from the metering device of the at least one smart electrical outlet, the data comprising frequency, voltage, current, and temperature; as well as A socket data packet is sent to the smart distribution board DB, wherein the socket data packet includes data obtained from the metering device of the at least one smart electrical socket, wherein the metering device of the at least one smart electrical socket is further configured to obtain a temperature.

16. The residential energy consumption monitoring system according to claim 15, wherein: The at least one intelligent electrical socket further comprises: an on / off button configured to switch the socket processing unit between a smart mode and a regular mode; a reset button configured to activate a hardware reset of the socket processing unit; a pairing button configured to activate pairing between the socket processing unit and the DB processing unit; a connectivity indicator indicating whether the socket processing unit is in communication with the DB processing unit; an alarm indicator to indicate if there is a problem with the socket processing unit; and The on / off switch is configured to turn the smart electrical socket on or off.

17. The residential energy consumption monitoring system according to claim 16, wherein: The at least one intelligent electrical outlet also includes a configuration file having a protection threshold AC voltage, a protection threshold current, and a protection threshold temperature.

18. The residential energy consumption monitoring system of claim 17, wherein the socket instructions for obtaining data from the metering device of the at least one smart electrical socket further include socket instructions to: The on / off switch is switched to off in response to one of the following rules: AC voltage is higher than the protection threshold AC voltage, current is higher than the protection threshold current, temperature is higher than the protection threshold temperature.

19. The residential energy consumption monitoring system according to claim 6, wherein: The on / off switch of the smart distribution board DB or the on / off switch of the at least one smart electrical socket is configured to be remotely turned on or off by a user.

20. The residential energy consumption monitoring system according to any one of claims 1-2, wherein: The metering device is one of a voltmeter, an ammeter, an electric energy meter and a thermistor, or a combination thereof.