A southern mountain wind turbine de-icing system and de-icing method

By designing an ice melting system for wind turbines in southern mountainous areas, the system utilizes power grid reverse transmission and wind turbines to predict electric energy, enabling low-temperature operation under freezing conditions, solving the problem of power generation loss caused by freezing wind turbines and reducing ice melting energy consumption. and operation and maintenance costs.

CN113847215BActive Publication Date: 2024-10-18CEEC HUNAN ELECTRIC POWER DESIGN INST +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111193860.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-13
Publication Date
2024-10-18
Estimated Expiration
2041-10-13

Smart Images

  • Figure CN113847215B_ABST
    Figure CN113847215B_ABST
Patent Text Reader

Abstract

The present invention provides a southern mountain wind turbine de-icing system and de-icing method, the de-icing system includes a wind turbine generator set, de-icing electrical equipment, de-icing controller, box transformer, 35kV power distribution device and booster station. The de-icing method, when the system is initially frozen, after judging the predicted power generation of the wind power of the wind turbine generator set and the size of the de-icing electric energy, de-icing is completed by reverse power transmission from the power grid, and after the initial de-icing is completed, a continuous de-icing judgment program is introduced, and if the required de-icing energy is greater than the predicted electric energy, the wind turbine generator set stops the de-icing program; if the required de-icing energy is not greater than the predicted electric energy, de-icing is completed by the electric energy generated by the wind turbine generator set, and no electric energy is required from the power grid. When the required de-icing energy is not greater than the predicted electric energy, the present invention enables the southern mountain wind turbine de-icing system to de-icing without additionally consuming power from the power grid, thereby reducing de-icing energy consumption, saving electric energy, and reducing operation and maintenance costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of wind power generation, and in particular to an ice melting system and an ice melting method for a wind turbine in a southern mountainous area. Background Art

[0002] Wind energy is a pollution-free, inexhaustible and renewable energy source. Therefore, using wind energy to generate electricity is one of the most price-competitive power generation technologies in the world. By the end of 2020, my country's cumulative grid-connected installed capacity of wind power was 281 million kilowatts, ranking first in the world. Since the three northern regions are far away from the load center, wind power construction is restricted by the power grid transmission, and wind power construction has slowed down. Since the central region is close to the load area, it is convenient for nearby consumption, and the installed capacity of wind power in the central region has been growing steadily. In my country, there is a big difference between the development of wind power in the central region and the development of wind power in the three northern regions. The three northern regions have relatively abundant wind resources and good conditions for the construction of wind power plant sites. At the same time, the air humidity in the three northern regions is low, and wind turbines generally do not freeze in low temperature conditions. However, wind resources in the central region are relatively scarce, and wind resource areas with commercial development are generally located in mountains with higher altitudes. Among them, the southern mountains in the central region are located in the central region. Due to the high altitude and high air humidity, wind turbines will freeze in low temperature conditions.

[0003] To ensure the safe operation of the wind turbine blades, the wind turbine needs to be shut down when the blades are frozen. In the mountains, due to the large temperature difference between the mountain and the mountain, the wind speed is generally higher, and the shutdown will cause power generation loss.

[0004] At present, the southern mountain wind power generation system has the following main shortcomings: 1) Wind turbine manufacturers only produce wind turbines from the factory's perspective, such as simply integrating wind turbine blades and wind turbine towers, without considering the operation solutions under various working conditions from a global perspective, so that when freezing occurs, they can only shut down; 2) Wind turbine blade manufacturers only produce blades that can capture wind energy according to the overall requirements of the wind turbine, and do not process the wind turbine blades to cope with the low-temperature operating environment; 3) Because the manufacturers of various wind turbine components have not comprehensively considered the connection between the various components and have not fully utilized the various equipment resources, the freezing of wind power generation in the southern mountains has caused losses.

[0005] In summary, there is an urgent need for a wind turbine de-icing system and de-icing method for southern mountain wind power generation to solve the problem that the existing wind power generation can only be shut down when freezing occurs, resulting in power generation loss. Summary of the invention

[0006] The first object of the present invention is to provide a wind turbine de-icing system for mountainous wind power generation in the south. The specific technical scheme is as follows:

[0007] A wind turbine de-icing system for wind power generation in southern mountains, comprising a wind turbine generator set, de-icing electrical equipment and an de-icing controller;

[0008] The wind power generator set comprises a wind power generator and an electric energy conversion device, wherein the wind power generator comprises blades, and a conductive film is arranged on the surface of the blades; the output end of the wind power generator is connected to the electric energy conversion device;

[0009] The ice-melting electrical equipment includes an ice-melting transformer and a remote-controlled circuit breaker QF5; the inlet end of the ice-melting transformer is connected to the output end of the electric energy conversion device, and the outlet end of the ice-melting transformer is connected to the inlet end of the remote-controlled circuit breaker QF5; the outlet end of the remote-controlled circuit breaker QF5 is connected to the conductive film on the blade;

[0010] The ice melting controller is connected to the remote control circuit breaker QF5.

[0011] Preferably, the southern mountain wind turbine de-icing system also includes a box-type transformer, a 35kV power distribution device and a booster station;

[0012] The box-type transformer includes a low-voltage circuit breaker QF1 and a transformer body. The inlet end of the low-voltage circuit breaker QF1 is connected to the output end of the electric energy conversion device through an AC cable; the outlet end of the low-voltage circuit breaker QF1 is connected to the low-voltage side of the transformer body through a copper busbar; the high-voltage side of the transformer body is connected to a 35kV power distribution device;

[0013] The 35kV power distribution device includes an incoming circuit breaker QF2 and an outgoing circuit breaker QF3, wherein the incoming terminal of the incoming circuit breaker QF2 is connected to the high voltage side of the transformer body; the outgoing terminal of the incoming circuit breaker QF2 is connected to the incoming terminal of the outgoing circuit breaker QF3 through an AC bus; and the outgoing terminal of the outgoing circuit breaker QF3 is connected to a booster station;

[0014] The booster station includes a main transformer and an outgoing line circuit breaker QF4. The low voltage side of the main transformer is connected to the outgoing line terminal of the outgoing line circuit breaker QF3, while the high voltage side transmits electric energy to the power grid through the outgoing line circuit breaker QF4.

[0015] Preferably, the number of the wind turbine generator sets is at least two.

[0016] Preferably, the ice melting controller includes a display component, a single-chip microcomputer, a serial communication drive circuit, a wireless communication circuit and an RS485 converter; the wireless communication circuit is respectively connected to the single-chip microcomputer and the terminal device through the serial communication drive circuit; the single-chip microcomputer is connected to the remote control circuit breaker QF5 through the RS485 converter; the display component is connected to the single-chip microcomputer.

[0017] Preferably, the transformer body includes an oil-immersed transformer or a dry-type transformer.

[0018] Preferably, the model of the single chip microcomputer is P89V51RD2FA.

[0019] The second object of the present invention is to provide an ice melting method for a wind turbine ice melting system of a southern mountain wind power generation unit. The specific technical solution is as follows:

[0020] A de-icing method for the de-icing system of a wind turbine in a southern mountainous area wind power generation system comprises the following steps:

[0021] Step S1, numbering all wind turbine generator sets in the selected area one by one;

[0022] Step S2, using the wind power prediction system to respectively set the effective power generation time twg of the wind turbine generator set, the voltage Urb of the output terminal of the de-icing transformer, the conductive film resistance Rrb, the time trb required for de-icing, and the continuous power generation time t after de-icing is started; collecting the power generated by the wind turbine generator set within the effective power generation time twg in the wind power prediction system as Pwg; calculating the predicted electric energy W=Pwgtwg generated by the wind turbine generator set within the effective power generation time twg, and calculating the de-icing energy Q=U2rbtrb / Rrb required for de-icing;

[0023] Compare the predicted power W with the ice-melting energy Q. If W < Q, it means that the energy Q required for ice melting is greater than the predicted power W that can be generated. In this case, ice melting will require additional power from the grid, and the wind farm will not melt ice. If W ≥ Q, it means that the energy Q required for ice melting is not greater than the predicted power W that can be generated. In this case, ice melting does not require additional power from the grid, and the wind farm starts the ice melting procedure.

[0024] Step S3: When the initial ice melting is completed, the wind turbine generator set is started to generate electricity, and the power generated by the wind power prediction system during the continuous power generation time t after ice melting is collected as P t , calculate the predicted power W generated by the wind turbine within the continuous power generation time t t =P t t; Calculate the energy Q required for continuous operation of wind turbines to melt ice c =U 2 rb t / R rb ;

[0025] Comparison of predicted power W t The energy required to melt ice Q c The size of W t <Q c , then the energy required to melt the ice is Q c Greater than the predicted power W t, at this time, ice melting requires additional grid power consumption, and the wind turbine generator set stops the ice melting process; if W t ≥Q c , then the energy required to melt the ice is Q c Not more than the predicted power W t At this time, the ice melting is completed by generating electricity through the wind turbine generator set, and the wind turbine generator set continues to run the ice melting program without the need for power grid to provide electricity.

[0026] Preferably, the ice melting of the wind turbine generator set in step S2 and step S3 is controlled by an ice melting controller.

[0027] Preferably, in step S1, all wind turbine generator sets are connected to the terminal device via an ice melting controller.

[0028] Preferably, the voltage of the output terminal voltage Urb of the ice-melting transformer can be 380V or 400V.

[0029] The application of the technical solution of the present invention has the following beneficial effects:

[0030] (1) The Southern Mountain Wind Power Generation Wind Turbine De-icing System described in the present invention fully considers the characteristics of each component of the wind turbine system, does not add energy storage equipment, and uses the original system of the wind farm to achieve initial de-icing through reverse power transmission from the power grid. Specifically, when the Southern Mountain Wind Power Generation Wind Turbine De-icing System starts to operate, the wind turbine generator set freezes and stops operating, and the blades are helped to de-ice by reverse power transmission from the power grid, that is, the power grid transmits electrical energy to the blade conductive film through the booster station, 35kV distribution device, box transformer and de-icing electrical equipment, and the conductive film generates heat to melt the ice.

[0031] (2) The de-icing method of the wind turbine de-icing system for the southern mountain wind power generation described in the present invention, when the system is initially frozen, after judging the predicted power generation of the wind turbine generator set and the amount of de-icing electricity, the de-icing is completed by reverse power transmission from the power grid. After the initial de-icing is completed, a continuous de-icing judgment procedure is introduced. If the required de-icing energy is greater than the predicted electricity, the wind turbine generator set stops the de-icing procedure; if the required de-icing energy is not greater than the predicted electricity, the de-icing is completed by the electricity generated by the wind turbine generator set, and no electricity is required from the power grid. The de-icing method of the wind turbine de-icing system for the southern mountain wind power generation described in the present invention, when the required de-icing energy is not greater than the predicted electricity, enables the wind turbine de-icing system for the southern mountain wind power generation to melt ice without consuming additional power from the power grid, thereby reducing de-icing energy consumption, saving electricity, and reducing operation and maintenance costs.

[0032] (3) The de-icing method of the wind turbine de-icing system for the southern mountain wind power generation described in the present invention adopts a wind power prediction system to introduce a comparison between the predicted electric energy and the de-icing energy. When the required de-icing energy is not greater than the predicted electric energy, the wind turbine generator set can also be enabled to operate at low temperatures, thereby greatly reducing the power generation loss of the wind turbine generator set.

[0033] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0035] Figure 1 This is a structural schematic diagram of a southern mountain wind turbine de-icing system in Example 1 of the present invention ( Figure 1 Display means display component);

[0036] Figure 2 is a schematic structural diagram of a wind turbine in Embodiment 1 of the present invention;

[0037] Figure 3 yes Figure 2 Schematic diagram of the structure after the middle blade and the conductive film are installed together;

[0038] Figure 4 This is a flow chart of an ice melting method of a wind turbine ice melting system for a southern mountain wind power generation in Example 1 of the present invention;

[0039] Figure 5 It is a schematic diagram of the communication between the ice melting controller and the monitoring background in Example 1 of the present invention. DETAILED DESCRIPTION

[0040] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0041] Embodiment 1:

[0042] See also Figure 1-3 , a southern mountain wind turbine de-icing system, comprising a wind turbine generator set, de-icing electrical equipment and de-icing controller;

[0043] The wind turbine generator set comprises a wind turbine generator and an electric energy conversion device, wherein the wind turbine generator comprises a tower, a hub, a nacelle and blades, wherein the tower is vertically arranged on the ground, the hub and the nacelle are arranged on the top of the tower, the blades are arranged on the hub, and a conductive film is arranged on the surface of the blades; the output end of the wind turbine generator is connected to the electric energy conversion device;

[0044] The ice-melting electrical equipment includes an ice-melting transformer and a remote-controlled circuit breaker QF5; the inlet end of the ice-melting transformer is connected to the output end of the electric energy conversion device, and the outlet end of the ice-melting transformer is connected to the inlet end of the remote-controlled circuit breaker QF5; the outlet end of the remote-controlled circuit breaker QF5 is connected to the conductive film on the blade;

[0045] The ice melting controller is connected to the remote control circuit breaker QF5.

[0046] See also Figure 1 , the southern mountain wind turbine de-icing system also includes a box-type transformer, a 35kV power distribution device and a booster station;

[0047] The box-type transformer includes a low-voltage circuit breaker QF1 and a transformer body (shown as a transformer in the figure). The inlet end of the low-voltage circuit breaker QF1 is connected to the output end of the electric energy conversion device through an AC cable; the outlet end of the low-voltage circuit breaker QF1 is connected to the low-voltage side of the transformer body through a copper bar; the high-voltage side of the transformer body is connected to a 35kV power distribution device;

[0048] The 35kV power distribution device includes an incoming circuit breaker QF2 and an outgoing circuit breaker QF3, wherein the incoming terminal of the incoming circuit breaker QF2 is connected to the high voltage side of the transformer body; the outgoing terminal of the incoming circuit breaker QF2 is connected to the incoming terminal of the outgoing circuit breaker QF3 through an AC bus; and the outgoing terminal of the outgoing circuit breaker QF3 is connected to a booster station;

[0049] The booster station includes a main transformer and an outgoing line circuit breaker QF4. The low voltage side of the main transformer is connected to the outgoing line terminal of the outgoing line circuit breaker QF3, while the high voltage side transmits electric energy to the power grid through the outgoing line circuit breaker QF4.

[0050] See also Figure 5, the number of wind turbine generator sets is n groups, wherein n is not less than 2, and the specific value of n is determined according to actual needs. The n groups of wind turbine generator sets are connected to the terminal device through an ice melting controller (specifically, a single-chip microcomputer in the ice melting controller), and the connection method is specifically that the ice melting controller in each wind turbine generator set is connected to the wireless communication circuit through a serial communication drive circuit to realize signal transmission to the terminal device. Specifically, the signal is transmitted to the terminal device through the wireless communication circuit and the serial communication drive circuit set at the terminal in turn, and the terminal device is connected to the wireless communication circuit through the serial communication drive circuit;

[0051] The terminal device is a computer (with a host computer, and a printer connected to the host computer can also be set according to actual needs) for displaying and regulating the operating conditions and ice melting conditions of all wind turbine generator sets.

[0052] See also Figure 1 The ice melting controller includes a display component, a single-chip microcomputer, a serial communication drive circuit, a wireless communication circuit and an RS485 converter; the wireless communication circuit is respectively connected to the single-chip microcomputer and the terminal device through the serial communication drive circuit; the single-chip microcomputer is connected to the remote control circuit breaker QF5 (the remote control circuit breaker QF5 has a 485 communication interface) through the RS485 converter; the display component (specifically a display) is connected to the single-chip microcomputer to display the operating status and ice melting status of the wind turbine generator set.

[0053] The transformer body includes an oil-immersed transformer or a dry-type transformer, and the specific transformer to be selected is determined according to actual needs.

[0054] The model of the single chip microcomputer is P89V51RD2FA.

[0055] See also Figure 4 A de-icing method using the southern mountain wind turbine de-icing system comprises the following steps:

[0056] Step S1, numbering all wind turbines in the selected area of ​​the southern mountainous area one by one; the numbering principle is to number the wind turbines in order from far to near from the booster station;

[0057] Step S2: Use a wind power prediction system (an existing prediction method) to set the effective power generation time t of the wind turbine generator set. wg (t wg It refers to the time that the wind turbine generator set can generate electricity in the wind power prediction system after the de-icing program is started), the voltage U at the outlet of the de-icing transformer rb , Conductive film resistance R rb (R rb refers to the total resistance of the conductive film on the blades of the wind turbine generator set), the time required for ice melting t rb(t rb According to the specific setting of the site conditions) and the continuous power generation time t after the ice melting starts; the effective power generation time t of the wind turbine generator set in the wind power prediction system is collected wg The power generated inside is P wg ; Calculate the effective power generation time t of the wind turbine wg The predicted electrical energy generated within wg t wg , calculate the ice melting energy Q = U 2 rb t rb / R rb ;

[0058] Compare the predicted power W with the ice-melting energy Q. If W < Q, it means that the energy Q required for ice melting is greater than the predicted power W that can be generated. In this case, ice melting will require additional power from the grid, and the wind farm will not melt ice. If W ≥ Q, it means that the energy Q required for ice melting is not greater than the predicted power W that can be generated. In this case, ice melting does not require additional power from the grid, and the wind farm starts the ice melting procedure.

[0059] Step S3: When the de-icing is completed, the wind turbine is started to generate electricity. Since the surrounding environment of the wind turbine has not changed, the blades may be frozen again. Simple one-time de-icing cannot eliminate the risk of icing in the future. Therefore, a continuous de-icing judgment procedure for the wind turbine is introduced (see Figure 4 ), which is used to determine whether the wind turbine generator set will continue to melt ice in the future. Specifically, the power generated by the wind power prediction system after ice melting within the continuous power generation time t is P t , calculate the predicted power W generated by the wind turbine within the continuous power generation time t t =P t t; Calculate the energy Q required for continuous operation of wind turbines to melt ice c =U 2 rb t / R rb ;

[0060] Compare the predicted power W t The energy required to melt ice Q c The size of W t <Q c , then the energy required to melt the ice is Q c Greater than the predicted power W t , at this time, ice melting requires additional grid power consumption, and the wind turbine generator set stops the ice melting process; if W t ≥Q c , then the energy required to melt the ice is Q c Not more than the predicted power W tAt this time, the ice melting is completed by generating electricity through the wind turbine generator set, and the wind turbine generator set continues to run the ice melting program without the need for power grid to provide electricity.

[0061] All wind turbines are connected to the terminal equipment through ice melting controllers.

[0062] The ice melting of the wind turbine generator set in step S2 and step S3 is controlled by an ice melting controller, that is, the ice melting program is set in the ice melting controller, and the ice melting process corresponding to the ice melting program is that the wind turbine generator set generates electricity through a wind turbine generator, converts the generated electric energy through an electric energy conversion device, and transmits it to the conductive film on the blade through an ice melting electrical device, and melts the ice by generating heat through the conductive film.

[0063] The voltage U of the ice melting transformer outlet rb The voltage can be 380V or 400V, and the specific voltage is determined according to actual needs.

[0064] The wind power prediction system described in Example 1 refers to a system that must be installed during the construction of a wind farm and is used to predict the output power of the wind farm within a certain period of time in the future.

[0065] The southern mountain wind turbine de-icing system described in Example 1 is combined with the de-icing method. When the system is initially frozen, after the predicted power generation of the wind turbine generator set and the size of the de-icing electricity are judged, the de-icing is completed by reverse power transmission from the power grid. After the initial de-icing is completed, a continuous de-icing judgment procedure is introduced. If the required de-icing energy is greater than the predicted electricity, the wind turbine generator set stops the de-icing procedure; if the required de-icing energy is not greater than the predicted electricity, the de-icing is completed by the electricity generated by the wind turbine generator set, and no electricity is required from the power grid. The de-icing method for the southern mountain wind turbine de-icing system described in the present invention enables the southern mountain wind turbine de-icing system to melt ice without consuming additional power from the power grid when the required de-icing energy is not greater than the predicted electricity, thereby reducing de-icing energy consumption and operation and maintenance costs.

[0066] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A de-icing method for a wind turbine de-icing system in a southern mountainous area. It is characterized in that The southern mountain wind turbine de-icing system comprises a wind turbine generator set, de-icing electrical equipment and an de-icing controller; The wind power generator set comprises a wind power generator and an electric energy conversion device, wherein the wind power generator comprises blades, and a conductive film is arranged on the surface of the blades; The output end of the wind turbine generator is connected to the electric energy conversion device; The ice-melting electrical equipment includes an ice-melting transformer and a remote-controlled circuit breaker QF5; The inlet of the ice-melting transformer is connected to the output of the electric energy conversion device, and the outlet of the ice-melting transformer is connected to the inlet of the remote control circuit breaker QF5; the outlet of the remote control circuit breaker QF5 is connected to the conductive film on the blade; The ice melting controller is connected to the remote control circuit breaker QF5; The ice melting method comprises the following steps: Step S1, numbering all wind turbine generator sets in the selected area one by one; Step S2: Use the wind power prediction system to set the effective power generation time t of the wind turbine generator set wg , Ice-melting transformer output terminal voltage U rb , Conductive film resistance R rb , time required for ice melting t rb And the continuous power generation time t after ice melting starts; the effective power generation time t of the wind turbine wg It refers to the time that the wind turbine generator set can generate electricity in the wind power prediction system after the de-icing program is started; the effective power generation time t of the wind turbine generator set in the wind power prediction system is collected. wg The power generated inside is P wg ; Calculate the effective power generation time t of the wind turbine wg The predicted electrical energy generated within W = P wg t wg , calculate the ice melting energy Q = U 2 rb t rb / R rb ; Compare the predicted power W with the ice-melting energy Q. If W < Q, it means that the energy Q required for ice melting is greater than the predicted power W that can be generated. In this case, ice melting will require additional power from the grid, and the wind farm will not melt ice. If W ≥ Q, it means that the energy Q required for ice melting is not greater than the predicted power W that can be generated. In this case, ice melting does not require additional power from the grid, and the wind farm starts the ice melting procedure. Step S3: When the initial ice melting is completed, the wind turbine generator set is started to generate electricity, and the power generated by the wind power prediction system during the continuous power generation time t after ice melting is collected as P t , calculate the predicted power W generated by the wind turbine within the continuous power generation time t t =P t t; Calculate the energy Q required for continuous operation of wind turbines to melt ice c =U 2 rb t / R rb ; Comparison of predicted power W t The energy required to melt ice Q c The size of W t <Q c , then the energy required to melt the ice is Q c Greater than the predicted power W t , at this time, ice melting requires additional grid power consumption, and the wind turbine generator set stops the ice melting process; if W t ≥Q c , then the energy required to melt the ice is Q c Not more than the predicted power W t At this time, the ice melting is completed by generating electricity through the wind turbine generator set, and the wind turbine generator set continues to run the ice melting program without the need for power grid to provide electricity.

2. The ice melting method according to claim 1, It is characterized in that The de-icing of the wind turbine generator set in step S2 and step S3 is controlled by an de-icing controller.

3. The ice melting method according to claim 1, It is characterized in that In step S1, all wind turbine generator sets are connected to the terminal device via an ice melting controller.

4. The ice melting method according to claim 1, It is characterized in that The voltage U of the ice melting transformer outlet rb The voltage is 380V or 400V.

Citation Information

Patent Citations

  • Southern mountain wind power generation fan ice melting system