A method and system for constructing an intelligent interactive power grid service website
By acquiring and analyzing the historical data and user information of the power grid service website, a customized power grid service website is built, which solves the problem that the existing power grid service website cannot be constructed intelligently, and improves user experience and business processing efficiency.
Patent Information
- Application Number
- CN202111267994.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-29
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2041-10-29
AI Technical Summary
The existing power grid service website cannot be intelligently constructed based on user information, resulting in poor user experience.
By obtaining the historical service database, filtering and analyzing user needs, extracting user characteristics, and building a customized power grid service website based on these characteristics, we can achieve in-depth integration with users.
It provides a more comfortable business processing ecosystem, improves user experience, and meets users' personalized needs.
Smart Images

Figure CN113987399B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field related to the construction of intelligent power grid service websites, and in particular to a method and system for constructing an intelligent interactive power grid service website. Background Art
[0002] Since 2012, State Grid Corporation has been carrying out the construction of an integrated payment access management platform and self-service electricity payment terminals, realizing a unified self-service electricity payment system. However, there are still a large number of non-unified payment terminals in provincial companies, many terminal equipment manufacturers, and various forms of terminal system deployment. There are large differences in terminal interface, system functions, and business processes, and there is a gap between the service interface and function realization and the company's requirements and public expectations.
[0003] However, the inventors of this application found that the above technology has at least the following technical problems in the process of implementing the technical solution of the invention in the embodiment of this application:
[0004] The existing power grid service website has the problem of not being intelligent enough and the technical problem of not being able to construct the website intelligently based on user information. Summary of the invention
[0005] The embodiments of the present application provide a method and system for constructing an intelligent and interactive power grid service website, thereby solving the problem that power grid service websites in the prior art are not intelligent enough and cannot construct the website intelligently based on user information. The embodiment of the present application achieves the technical effect of deeply integrating user information, constructing an intelligent power grid service website, and providing users with a more comfortable business processing ecology.
[0006] In view of the above problems, an embodiment of the present application provides a method and system for constructing an intelligent interactive power grid service website.
[0007] In a first aspect, the present application provides a method for constructing an intelligent interactive power grid service website, the method being applied to a smart grid service system, the system being communicatively connected to a first information acquisition module and a second information acquisition module, the method comprising: obtaining a first historical service database through the first information acquisition module; obtaining a first screening instruction, screening the service content in the first historical service database according to the first screening instruction, and obtaining a first real demand database; obtaining a first analysis instruction, performing a demand frequency analysis on the first real demand database according to the first analysis instruction, and obtaining a first demand frequency list; obtaining a second analysis instruction, performing a demand importance analysis on the first real demand database according to the second analysis instruction, and obtaining a first demand importance list; obtaining information of a first user through the second information acquisition module; obtaining a first feature extraction instruction, performing feature extraction on the information of the first user according to the first feature extraction instruction, and obtaining first user features; performing feature capture on the first demand frequency list and the first demand importance list based on the first user features, and obtaining a first feature capture list; inputting the first feature capture list into the smart grid service system to construct a first customized power grid service website; binding the first customized power grid service website to the first user.
[0008] On the other hand, the present application also provides an intelligent interactive power grid service website construction system, the system comprising: a first acquisition unit, the first acquisition unit is used to obtain a first historical service database through the first information collection module; a second acquisition unit, the second acquisition unit is used to obtain a first screening instruction, and the service content in the first historical service database is screened according to the first screening instruction to obtain a first real demand database; a third acquisition unit, the third acquisition unit is used to obtain a first analysis instruction, and the first real demand database is analyzed for the number of times of demand according to the first analysis instruction to obtain a first demand frequency list; a fourth acquisition unit, the fourth acquisition unit is used to obtain a second analysis instruction, and the first real demand database is analyzed for the importance of demand according to the second analysis instruction to obtain a first demand a fifth obtaining unit, wherein the fifth obtaining unit is used to obtain the information of the first user through the second information acquisition module; a sixth obtaining unit, wherein the sixth obtaining unit is used to obtain a first feature extraction instruction, and extract features from the information of the first user according to the first feature extraction instruction to obtain first user features; a seventh obtaining unit, wherein the seventh obtaining unit is used to capture features of the first demand frequency list and the first demand importance list based on the first user features to obtain a first feature capture list; a first constructing unit, wherein the first constructing unit is used to input the first feature capture list into the smart grid service system to construct a first customized grid service website; a first binding unit, wherein the first binding unit is used to bind the first customized grid service website to the first user.
[0009] In a third aspect, the present invention provides an intelligent interactive power grid service website construction system, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method described in the first aspect when executing the program.
[0010] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0011] By obtaining a first historical service database, screening the first historical service database, obtaining a first real demand database, analyzing the first real demand database, obtaining a first demand frequency list and a first demand importance list, obtaining the information of the first user through a second information acquisition module, obtaining the first user characteristics based on the information of the first user, capturing the first demand frequency list and the first demand importance list according to the first user characteristics, obtaining a first feature capture list, inputting the first feature capture list into the smart grid service system, and constructing a first customized grid service website, the technical effect of deeply integrating user information, constructing an intelligent grid service website, and providing users with a more comfortable business processing ecology is achieved.
[0012] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 A flowchart of a method for constructing an intelligent interactive power grid service website according to an embodiment of the present application;
[0014] Figure 2 A schematic diagram of the structure of a method for constructing an intelligent interactive power grid service website according to an embodiment of the present application;
[0015] Figure 3 It is a schematic diagram of the structure of an exemplary electronic device according to an embodiment of the present application.
[0016] Explanation of the figure marks: first obtaining unit 11, second obtaining unit 12, third obtaining unit 13, fourth obtaining unit 14, fifth obtaining unit 15, sixth obtaining unit 16, seventh obtaining unit 17, first constructing unit 18, first binding unit 19, bus 300, receiver 301, processor 302, transmitter 303, memory 304, bus interface 305. DETAILED DESCRIPTION
[0017] The embodiments of the present application provide a method and system for constructing an intelligent and interactive power grid service website, which solves the problem that the power grid service website in the prior art is not intelligent enough and cannot construct the website intelligently according to the user's information, thereby achieving the technical effect of deeply combining user information, constructing an intelligent power grid service website, and providing users with a more comfortable business handling ecology. Below, the example embodiments of the present application will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments of the present application, and it should be understood that the present application is not limited to the example embodiments described here.
[0018] Application Overview
[0019] Since 2012, State Grid Corporation has uniformly carried out the construction of an integrated payment access management platform and self-service electricity payment terminals, realizing a unified self-service electricity payment system. However, there are still a large number of non-unified payment terminals in provincial companies, many terminal equipment manufacturers, and various forms of terminal system deployment. There are large differences in terminal interface, system functions, and business processes. There is a gap between the service interface and function realization and the company's requirements and public expectations. The existing power grid service website has the problem of not being intelligent enough, and the technical problem of not being able to construct the website intelligently based on user information.
[0020] In response to the above technical problems, the overall idea of the technical solution provided by this application is as follows:
[0021] The embodiment of the present application provides a method for constructing an intelligent interactive power grid service website, which is applied to a smart grid service system, and the system is communicatively connected with a first information acquisition module and a second information acquisition module. The method includes: obtaining a first historical service database through the first information acquisition module; obtaining a first screening instruction, filtering the service content in the first historical service database according to the first screening instruction, and obtaining a first real demand database; obtaining a first analysis instruction, analyzing the number of demands on the first real demand database according to the first analysis instruction, and obtaining a first demand frequency list; obtaining a second analysis instruction, analyzing the importance of demands on the first real demand database according to the second analysis instruction, and obtaining a first demand importance list; obtaining information of a first user through the second information acquisition module; obtaining a first feature extraction instruction, extracting features from the information of the first user according to the first feature extraction instruction, and obtaining first user features; performing feature capture on the first demand frequency list and the first demand importance list based on the first user features, and obtaining a first feature capture list; inputting the first feature capture list into the smart grid service system to construct a first customized power grid service website; and binding the first customized power grid service website with the first user.
[0022] After introducing the basic principles of the present application, various non-limiting implementation methods of the present application will be specifically described below in conjunction with the drawings in the specification.
[0023] Embodiment 1
[0024] like Figure 1 As shown, an embodiment of the present application provides a method for constructing an intelligent interactive power grid service website, wherein the method is applied to a smart grid service system, the system is communicatively connected with a first information collection module and a second information collection module, and the method includes:
[0025] Step S100: obtaining a first historical service database through the first information collection module;
[0026] Specifically, the smart grid service system is a system for constructing an intelligent power grid. It collects and analyzes user data to build an intelligent website. The first information collection module is a module for real-time information collection of the power grid service system. It can collect and summarize information on power grid services, and summarize client data of power grid services into a historical service database, namely the first historical service database. The second information collection module is a module for collecting personal user information. Based on the first information collection module and the second information collection module, the historical data of power grid users are collected and analyzed, laying a solid foundation for the subsequent construction of a personalized power grid service website.
[0027] Step S200: obtaining a first screening instruction, screening the service contents in the first historical service database according to the first screening instruction, and obtaining a first real demand database;
[0028] Specifically, the first screening instruction is an instruction for screening the service content in the first historical service database, and the service data in the first historical service database is screened based on the first screening instruction to obtain a first screening result. For example, the screening process is a screening process for erroneous service data and abnormal service data, that is, according to the first screening instruction, the abnormal service data is screened to obtain a set of real needs of users of the power grid service, and a first real demand database is constructed based on the set.
[0029] Step S300: obtaining a first analysis instruction, and performing demand frequency analysis on the first real demand database according to the first analysis instruction to obtain a first demand frequency list;
[0030] Specifically, based on the historical service data of users in the power grid service system, the number of user business transactions in the first real demand database of historical users is summarized, such as: electricity consumption and electricity fee inquiry, payment record inquiry, application for transfer / name change service, application for emergency power supply service, etc. The service types are sorted by frequency according to the number of times users handle the transactions, and the first demand frequency list is obtained.
[0031] Step S400: obtaining a second analysis instruction, and performing a demand importance analysis on the first real demand database according to the second analysis instruction to obtain a first demand importance list;
[0032] Specifically, the second analysis instruction is an instruction for analyzing the importance of the requirements in the first real requirements database, and the requirements data in the first real requirements database are sorted according to the importance according to the second analysis instruction, and the importance refers to the importance evaluation result of the handled business to the user, that is, the importance information evaluated according to the impact of the speed of the business handling on the user's life and work. The first real requirements are sorted according to the importance to obtain a first requirement importance list.
[0033] Step S500: obtaining the information of the first user through the second information collection module;
[0034] Step S600: obtaining a first feature extraction instruction, and performing feature extraction on the information of the first user according to the first feature extraction instruction to obtain first user features;
[0035] Specifically, the first user is a user who needs power grid services. The information of the first user is obtained according to the second information collection module. The information of the first user obtained includes not only the power grid service history information of the first user, but also the basic information of the first user. The information of the first user is collected by the second information collection device, and the features of the first user are extracted according to the collected information. The feature extraction is essentially the extraction of labels for the first user, that is, based on the basic information of the first user, the distinguishing features of the first user are collected and extracted to obtain the features of the first user. For example, when the first user is an elderly person living alone, and the historical power grid service of the first user is a payment service, the features of the first user are payment / elderly features.
[0036] Step S700: performing feature capture on the first demand frequency list and the first demand importance list based on the first user feature to obtain a first feature capture list;
[0037] Step S800: inputting the first feature capture list into the smart grid service system to construct a first customized grid service website;
[0038] Specifically, the feature capture process is a process of performing feature matching on the first demand frequency list and the first demand importance list according to the characteristics of the first user, that is, matching the feature correlations between the first user's characteristics, the first demand frequency list and the first feature capture list, and obtaining the first feature capture list based on the matching results of the correlations. The first feature capture list is a list sorted according to the degree of matching between the service classification and the first user's characteristics. The first feature capture list is input into the smart grid service system, and a first customized grid service website is constructed according to the smart grid service system.
[0039] Step S900: Binding the first customized power grid service website with the first user.
[0040] Specifically, the constructed first power grid service website is bound to the first user, that is, when the system detects that the first user's account is logged in, the constructed first power grid service website is adapted to the first user, and the first customized power grid service website is presented to the first user, so as to achieve the technical effect of deeply integrating user information, constructing an intelligent power grid service website, and providing users with a more comfortable business processing ecology.
[0041] Furthermore, the first demand frequency list and the first demand importance list are feature captured based on the first user feature to obtain a first feature capture list. Step S700 of the embodiment of the present application further includes:
[0042] Step S710: obtaining a first conversion standard, wherein the first conversion standard is a conversion standard for the identity of demand frequency and demand importance;
[0043] Step S720: merging the first demand frequency list and the first demand importance list according to the first conversion standard to obtain a second list;
[0044] Step S730: performing traversal feature capture on the second list based on the first user feature to obtain a first convolution calculation result;
[0045] Step S740: sort the first convolution calculation results by convolution values, and obtain the first feature capture list according to the sorting results.
[0046] Specifically, the first conversion standard is a conversion standard for unifying demand frequency and demand importance. Based on big data, the equivalent conversion information of demand frequency and importance is evaluated to obtain corresponding levels of demand frequency and importance. Based on the corresponding levels, corresponding conversion standards are formulated. Based on the first conversion standard, the first demand frequency list and the first demand importance list are unified, that is, the above two lists are merged into a second list, and the second list is traversed and feature captured according to the characteristics of the first user, that is, the second list is traversed and calculated for the characteristics of the first user. Further, the sorting information of the second list can be assigned, positive values are assigned according to the size of the sorting, and the matching degree of the features is assigned according to the correlation between different categories and the characteristics of the first user. A convolution operation is performed based on the matching degree assignment result and the category assignment result to obtain a first convolution calculation result, and the convolution values are sorted according to the convolution calculation result, and the first feature capture list is obtained according to the sorting result. By traversing the feature values and project types, project features that are more closely matched with the first user are obtained, which lays a solid foundation for subsequently obtaining a more accurate feature capture list and building a power grid service website that is suitable for the first user.
[0047] Furthermore, the first feature capture list is input into the smart grid service system to construct a first customized grid service website. Step S800 of the embodiment of the present application further includes:
[0048] Step S810: obtaining a first location analysis instruction, performing location area analysis on the website page according to the first location analysis instruction, and obtaining a first location analysis result;
[0049] Step S820: adjusting the first location analysis result according to the information of the first user to obtain a second location analysis result;
[0050] Step S830: obtaining a first module size analysis instruction, and performing module feature size allocation on the first feature capture list based on the first module size analysis instruction to obtain a first allocation result;
[0051] Step S840: constructing the first customized power grid service website based on the second location analysis result and the first allocation result.
[0052] Specifically, the first position analysis instruction is an instruction for position analysis of the website page. Based on the first position analysis instruction, the construction page of the first website is divided into regions of importance according to the user attention information, and the first position analysis result is obtained according to the importance / attention of different positions of the page. Further, the first position analysis result is a summary analysis result of the importance of many users obtained based on big data. Based on the information of the first user, the first position analysis result is adjusted to obtain a second position analysis result that is more suitable for the first user. The first module size analysis instruction is an instruction for analyzing the size of each type of module on the service website interface. According to the number of functional modules required to be placed on the home page of the service website, the size of the module features is allocated based on the first feature capture list to obtain a first allocation result. The construction of the first customized power grid service website is completed based on the first allocation result and the second position analysis result. Based on the size and position allocation of the modules of the power grid service website, the function of the initial page of the first customized service website is more suitable for the first user, which can facilitate the first user to handle business in a timely manner.
[0053] Furthermore, the embodiment of the present application also includes:
[0054] Step S841: Obtaining the age information of the first user according to the information of the first user;
[0055] Step S842: obtaining the physical status information of the first user according to the information of the first user;
[0056] Step S843: obtaining a first correction scheme based on the age information and the physical condition information;
[0057] Step S844: amending the first allocation result according to the first amendment scheme to obtain a second allocation result;
[0058] Step S845: constructing the first customized power grid service website according to the second allocation result and the second location analysis result.
[0059] Specifically, based on the basic information of the first user, the age information of the first user is obtained. Age is an important reference standard for the user's recognition of the website interface preference / style. Based on the basic information of the first user, the age information of the first user is obtained. Based on the age information and the age experience of the first user, the preference style of the first user is evaluated. Further, based on the information of the first user, the physical condition information of the first user is obtained. The physical condition includes but is not limited to information such as vision and hearing. Based on the age information and physical condition information, the website information customized for the first user is corrected to obtain a first correction scheme. Based on the first correction scheme, the first allocation result is corrected to obtain a second allocation result. The first customized power grid service website is constructed based on the second allocation result and the second location analysis result. For example, the second allocation result may include information such as the shape, size, color, style, etc. of the module. Based on the information of the first user, the module is adaptively adjusted, and the first customized power grid service website is constructed based on the adjustment result.
[0060] Furthermore, the embodiment of the present application also includes:
[0061] Step S8451: rating the vision information of the first user according to the physical condition information to obtain a first vision rating result;
[0062] Step S8452: Obtaining a first vision analysis preset threshold;
[0063] Step S8453: determining whether the first vision rating result meets the first vision analysis preset threshold;
[0064] Step S8454: when the first vision rating result meets the first vision analysis preset threshold, obtaining a first voice auxiliary instruction;
[0065] Step S8455: generating a first sound assistance module according to the first sound assistance instruction;
[0066] Step S8456: Assessing the hearing status of the first user according to the physical status information to obtain a first hearing level assessment result;
[0067] Step S8457: adjusting the sound of the first sound auxiliary module based on the first hearing level assessment result to obtain a second sound auxiliary module;
[0068] Step S8458: Add the second sound auxiliary module to the first customized power grid service website.
[0069] Specifically, according to the physical state information of the first user, the vision information of the first user is obtained, and based on the obtained vision information of the first user, the vision information of the first user is rated, and the vision rating result of the first user is obtained. A vision analysis preset threshold is set based on big data. When the user's vision cannot meet the first vision analysis preset threshold, the website of the first user is customized with sound assistance, and it is determined whether the first vision rating result of the first user meets the first vision analysis preset threshold. When the first vision rating result meets the first instance analysis preset threshold, it indicates that the vision of the first user is not good, and a first sound auxiliary instruction is obtained. Based on the first sound auxiliary instruction, a first sound auxiliary module is generated. The sound auxiliary module is a module that can provide sound prompts, voice replies, and voice processing to the first user. According to the basic information of the first user, the hearing information of the first user is rated, and according to the hearing rating result, the volume and timbre of the sound auxiliary module are adjusted to obtain a second sound auxiliary module, and the second sound auxiliary module is added to the first customized power grid service website of the first user. By combining more information of the first user, the customized website of the first user is further optimized, so that the customized website of the first user is more in line with the first user, thereby achieving the technical effect of improving the experience of the first user.
[0070] Furthermore, the embodiment of the present application also includes:
[0071] Step S1010: obtaining first access information of the first customized power grid service website;
[0072] Step S1020: obtaining a first access operation according to the first access information;
[0073] Step S1030: obtaining a first backup instruction, and performing backup processing on the first access operation according to the first backup instruction to obtain a first backup result;
[0074] Step S1040: When the first access operation is abnormal, the operation of the first access information is backtracked according to the first backup result.
[0075] Specifically, the first customized power grid service website is bound to the first user. When the information access of the first user is detected, the website is converted into the first customized power grid service website customized for the first user, and records and backs up the first access information of the first user. Based on the first operation information of the first access information, the operation is backed up in the cloud and locally. When operation abnormalities and network abnormalities occur, the cloud data is restored according to the local backup, and the abnormal operation data is backtracked. Furthermore, the backtracking can be adjusted according to user selection, that is, according to the user's selection information, the amount of backtracked information is adjusted in batches. Time can be used as the backtracking standard, and content can be used as the backtracking standard, so as to achieve the technical effect of ensuring user information security and facilitating user operations.
[0076] Furthermore, the first feature capture list is input into the smart grid service system to construct a first customized grid service website. Step S800 of the embodiment of the present application further includes:
[0077] Step S850: constructing a smart grid service system, wherein the smart grid service system is obtained by training multiple sets of training data, each of the multiple sets of training data includes the first feature capture list and identification information of the distribution position and size of the identification plate;
[0078] Step S860: Obtain a first output result of the smart grid service system, wherein the first output result includes the first customized grid service website.
[0079] Specifically, the smart grid service system is a system including a neural network model in machine learning, which can continuously learn and adjust, and is a highly complex nonlinear dynamic learning system. In simple terms, it is a mathematical model. After the smart grid service system is trained to a convergence state through a large amount of training data, the first customized grid service website can be obtained by analyzing the input data through the smart grid service system.
[0080] Furthermore, the training process also includes a supervised learning process, and each group of supervised data includes the first feature capture list and identification information for identifying the distribution position and size of the plate. The first feature capture list is input into the neural network model, and the smart grid service system is supervised and learned based on the identification information used to identify the distribution position and size of the plate, so that the output data of the smart grid service system is consistent with the supervised data, and the neural network model is continuously self-corrected and adjusted until the output result obtained is consistent with the identification information, then the supervised learning of this group of data is terminated and the supervised learning of the next group of data is carried out; when the neural network model is in a convergence state, the supervised learning process ends. Through supervised learning of the model, the model can process the input information more accurately, thereby obtaining a more accurate and reasonable first customized power grid service website.
[0081] In summary, the method and system for constructing an intelligent interactive power grid service website provided by the embodiments of the present application have the following technical effects:
[0082] 1. By obtaining a first historical service database, screening the first historical service database, obtaining a first real demand database, analyzing the first real demand database, obtaining a first demand frequency list and a first demand importance list, obtaining the information of the first user through a second information acquisition module, obtaining the first user feature based on the information of the first user, capturing the first demand frequency list and the first demand importance list according to the first user feature, obtaining a first feature capture list, inputting the first feature capture list into the smart grid service system, and constructing a first customized grid service website, the technical effect of deeply combining user information, constructing an intelligent grid service website, and providing users with a more comfortable business processing ecology is achieved.
[0083] 2. By adopting the traversal operation through the feature value and the project type, the project features that are more closely matched with the first user are obtained, which lays a solid foundation for obtaining a more accurate feature capture list and building a power grid service website suitable for the first user.
[0084] 3. By further optimizing the customized website of the first user by combining more information of the first user, the customized website of the first user is more compatible with the first user, thereby achieving the technical effect of improving the experience of the first user.
[0085] Embodiment 2
[0086] Based on the same inventive concept as the method for constructing an intelligent interactive power grid service website in the aforementioned embodiment, the present invention also provides a system for constructing an intelligent interactive power grid service website, such as Figure 2 As shown, the system comprises:
[0087] A first obtaining unit 11, the first obtaining unit 11 is used to obtain a first historical service database through the first information collection module;
[0088] A second obtaining unit 12, the second obtaining unit 12 is used to obtain a first screening instruction, and screen the service content in the first historical service database according to the first screening instruction to obtain a first real demand database;
[0089] A third obtaining unit 13, the third obtaining unit 13 is used to obtain a first analysis instruction, and perform a demand frequency analysis on the first real demand database according to the first analysis instruction to obtain a first demand frequency list;
[0090] A fourth obtaining unit 14, the fourth obtaining unit 14 is used to obtain a second analysis instruction, and perform a demand importance analysis on the first real demand database according to the second analysis instruction to obtain a first demand importance list;
[0091] a fifth obtaining unit 15, wherein the fifth obtaining unit 15 is configured to obtain information of the first user through the second information collecting module;
[0092] A sixth obtaining unit 16, the sixth obtaining unit 16 is used to obtain a first feature extraction instruction, and perform feature extraction on the information of the first user according to the first feature extraction instruction to obtain a first user feature;
[0093] a seventh obtaining unit 17, wherein the seventh obtaining unit 17 is configured to perform feature capture on the first demand frequency list and the first demand importance list based on the first user feature to obtain a first feature capture list;
[0094] A first construction unit 18, the first construction unit 18 is used to input the first feature capture list into the smart grid service system to construct a first customized grid service website;
[0095] The first binding unit 19 is used to bind the first customized power grid service website with the first user.
[0096] Furthermore, the system also includes:
[0097] An eighth obtaining unit, the eighth obtaining unit is used to obtain a first conversion standard, wherein the first conversion standard is a conversion standard of the identity of the demand frequency and the demand importance;
[0098] a ninth obtaining unit, configured to merge the first demand frequency list and the first demand importance list according to the first conversion standard to obtain a second list;
[0099] a tenth obtaining unit, configured to perform traversal feature capture on the second list based on the first user feature to obtain a first convolution calculation result;
[0100] An eleventh obtaining unit, the eleventh obtaining unit is used to sort the convolution values of the first convolution calculation results, and obtain the first feature capture list according to the sorting results.
[0101] Furthermore, the system also includes:
[0102] a twelfth obtaining unit, the twelfth obtaining unit being used to obtain a first location analysis instruction, and to perform location area analysis on the website page according to the first location analysis instruction to obtain a first location analysis result;
[0103] a thirteenth obtaining unit, the thirteenth obtaining unit being configured to adjust the first location analysis result according to the information of the first user to obtain a second location analysis result;
[0104] a fourteenth obtaining unit, the fourteenth obtaining unit being used to obtain a first module size analysis instruction, and to perform module feature size allocation on the first feature capture list based on the first module size analysis instruction to obtain a first allocation result;
[0105] A second construction unit is used to construct the first customized power grid service website based on the second location analysis result and the first allocation result.
[0106] Furthermore, the system also includes:
[0107] a fifteenth obtaining unit, the fifteenth obtaining unit being configured to obtain age information of the first user according to the information of the first user;
[0108] a sixteenth obtaining unit, the sixteenth obtaining unit being configured to obtain the physical state information of the first user according to the information of the first user;
[0109] a seventeenth obtaining unit, the seventeenth obtaining unit being configured to obtain a first correction scheme based on the age information and the physical condition information;
[0110] an eighteenth obtaining unit, the eighteenth obtaining unit being used to correct the first allocation result according to the first correction scheme to obtain a second allocation result;
[0111] A third construction unit is used to construct the first customized power grid service website according to the second allocation result and the second location analysis result.
[0112] Furthermore, the system also includes:
[0113] a nineteenth obtaining unit, the nineteenth obtaining unit being configured to rate the vision information of the first user according to the physical state information, and obtain a first vision rating result;
[0114] a twentieth obtaining unit, the twentieth obtaining unit being used to obtain a first vision analysis preset threshold;
[0115] A first judgment unit, the first judgment unit is used to judge whether the first vision rating result meets the first vision analysis preset threshold;
[0116] A twenty-first obtaining unit, the twenty-first obtaining unit being configured to obtain a first voice auxiliary instruction when the first vision rating result meets a preset threshold of the first vision analysis;
[0117] A first generating unit, the first generating unit is used to generate a first sound auxiliary module according to the first sound auxiliary instruction;
[0118] a twenty-second obtaining unit, the twenty-second obtaining unit being configured to perform a grade assessment on the hearing status of the first user according to the physical status information, and obtain a first hearing grade assessment result;
[0119] a twenty-third obtaining unit, the twenty-third obtaining unit being configured to perform sound adjustment on the first sound auxiliary module based on the first hearing level assessment result to obtain a second sound auxiliary module;
[0120] A first adding unit, wherein the first adding unit is used to add the second sound auxiliary module to the first customized power grid service website.
[0121] Furthermore, the system also includes:
[0122] a twenty-fourth obtaining unit, the twenty-fourth obtaining unit being configured to obtain first access information of the first customized power grid service website;
[0123] a twenty-fifth obtaining unit, the twenty-fifth obtaining unit being configured to obtain a first access operation according to the first access information;
[0124] a twenty-sixth obtaining unit, the twenty-sixth obtaining unit being configured to obtain a first backup instruction, and perform backup processing on the first access operation according to the first backup instruction to obtain a first backup result;
[0125] The first backtracking unit is used to backtrack the operation of the first access information according to the first backup result when the first access operation is abnormal.
[0126] Furthermore, the system also includes:
[0127] A third construction unit, the third construction unit is used to construct a smart grid service system, wherein the smart grid service system is obtained by training with multiple sets of training data, each of the multiple sets of training data includes the first feature capture list and identification information of the distribution position and size of the identification plate;
[0128] The twenty-seventh obtaining unit is used to obtain a first output result of the smart grid service system, wherein the first output result includes the first customized grid service website.
[0129] The foregoing Figure 1 The various variations and specific examples of the method for constructing a smart interactive power grid service website in Example 1 are also applicable to the system for constructing a smart interactive power grid service website in this embodiment. Through the above detailed description of the method for constructing a smart interactive power grid service website, those skilled in the art can clearly understand the implementation method of the system for constructing a smart interactive power grid service website in this embodiment. Therefore, for the sake of brevity of the specification, it will not be described in detail here.
[0130] Exemplary Electronic Devices
[0131] Reference below Figure 3 To describe the electronic device of the embodiment of the present application.
[0132] Figure 3 The figure shows a schematic structural diagram of an electronic device according to an embodiment of the present application.
[0133] Based on the inventive concept of a method for building a smart interactive power grid service website in the aforementioned embodiment, the present invention also provides a system for building a smart interactive power grid service website, on which a computer program is stored, and when the program is executed by a processor, the steps of any method of the method for building a smart interactive power grid service website described above are implemented.
[0134] Among them, Figure 3In the embodiment of the present invention, a bus architecture (represented by bus 300) is shown, which may include any number of interconnected buses and bridges, and bus 300 links together various circuits including one or more processors represented by processor 302 and memory represented by memory 304. Bus 300 may also link together various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. Bus interface 305 provides an interface between bus 300 and receiver 301 and transmitter 303. Receiver 301 and transmitter 303 may be the same element, namely a transceiver, which provides a unit for communicating with various other systems over a transmission medium.
[0135] The processor 302 is responsible for managing the bus 300 and general processing, while the memory 304 may be used to store data used by the processor 302 when performing operations.
[0136] An embodiment of the present invention provides a method for constructing an intelligent interactive power grid service website. The method is applied to a smart grid service system. The system is communicatively connected with a first information acquisition module and a second information acquisition module. The method includes: obtaining a first historical service database through the first information acquisition module; obtaining a first screening instruction, screening the service content in the first historical service database according to the first screening instruction, and obtaining a first real demand database; obtaining a first analysis instruction, analyzing the number of demands on the first real demand database according to the first analysis instruction, and obtaining a first demand frequency list; obtaining a second analysis instruction, analyzing the importance of demands on the first real demand database according to the second analysis instruction, and obtaining a first demand importance list; obtaining information of a first user through the second information acquisition module; obtaining a first feature extraction instruction, extracting features from the information of the first user according to the first feature extraction instruction, and obtaining first user features; performing feature capture on the first demand frequency list and the first demand importance list based on the first user features, and obtaining a first feature capture list; inputting the first feature capture list into the smart grid service system to construct a first customized power grid service website; and binding the first customized power grid service website with the first user. The invention solves the problem that the power grid service website in the prior art is not intelligent enough and cannot construct the website intelligently according to the user's information. It achieves the technical effect of deeply combining user information, constructing an intelligent power grid service website, and providing users with a more comfortable business management ecology.
[0137] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0138] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A system that specifies the functions of a box or multiple boxes.
[0139] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to work in a specific manner, so that the instructions stored in the computer-readable memory produce a product including an instruction system, which is implemented in the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0140] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps of the functions specified in a box or multiple boxes. Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they know the basic creative concept. Therefore, the attached claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0141] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for constructing an intelligent interactive power grid service website, wherein: The method is applied to a smart grid service system, the system is in communication connection with a first information acquisition module and a second information acquisition module, and the method includes: Obtaining a first historical service database through the first information collection module; Obtaining a first screening instruction, and screening the service content in the first historical service database according to the first screening instruction to obtain a first real demand database; Obtain a first analysis instruction, and perform a demand frequency analysis on the first real demand database according to the first analysis instruction to obtain a first demand frequency list, where the first demand frequency list is a list constructed according to the number of times a user handles a business; Obtain a second analysis instruction, and perform a demand importance analysis on the first real demand database according to the second analysis instruction to obtain a first demand importance list, wherein the demand importance analysis refers to an evaluation result of the importance of the handled business to the user, including importance information evaluated according to the impact of the speed of business handling on the user's life and work; Obtaining the information of the first user through the second information collection module; Obtaining a first feature extraction instruction, and performing feature extraction on the information of the first user according to the first feature extraction instruction to obtain a first user feature; Based on the first user feature, feature capture is performed on the first demand frequency list and the first demand importance list to obtain a first feature capture list; inputting the first feature capture list into the smart grid service system to construct a first customized grid service website; Binding the first customized power grid service website with the first user; The method of performing feature capture on the first demand frequency list and the first demand importance list based on the first user feature to obtain a first feature capture list further includes: Obtaining a first conversion standard, wherein the first conversion standard is a conversion standard for identity between demand frequency and demand importance; Merge the first demand frequency list and the first demand importance list according to the first conversion standard to obtain a second list; Based on the first user feature, traverse the second list to capture features to obtain a first convolution calculation result; The first convolution calculation results are sorted by convolution values, and the first feature capture list is obtained according to the sorting results.
2. The method of claim 1, wherein: The step of inputting the first feature capture list into the smart grid service system to construct a first customized grid service website further includes: Obtaining a first location analysis instruction, and performing location area analysis on the website page according to the first location analysis instruction to obtain a first location analysis result; Adjust the first location analysis result according to the information of the first user to obtain a second location analysis result; Obtaining a first module size analysis instruction, and allocating module feature sizes to the first feature capture list based on the first module size analysis instruction to obtain a first allocation result; The first customized grid service website is constructed based on the second location analysis result and the first allocation result.
3. The method of claim 2, wherein: The method further comprises: obtaining age information of the first user according to the information of the first user; Obtaining physical status information of the first user according to the information of the first user; obtaining a first correction scheme based on the age information and the physical condition information; Correct the first allocation result according to the first correction scheme to obtain a second allocation result; The first customized power grid service website is constructed according to the second allocation result and the second location analysis result.
4. The method of claim 3, wherein: The method further comprises: Rating the vision information of the first user according to the physical condition information to obtain a first vision rating result; Obtaining a first vision analysis preset threshold; Determining whether the first vision rating result meets the first vision analysis preset threshold; When the first vision rating result meets the first vision analysis preset threshold, obtaining a first voice auxiliary instruction; generating a first sound assistance module according to the first sound assistance instruction; Rating the hearing status of the first user according to the physical status information to obtain a first hearing level rating result; Performing sound adjustment on the first sound auxiliary module based on the first hearing level assessment result to obtain a second sound auxiliary module; Adding the second voice assistance module to the first customized grid service website.
5. The method of claim 1, wherein: The method further comprises: Obtaining first access information of the first customized power grid service website; Obtaining a first access operation according to the first access information; Obtaining a first backup instruction, and performing backup processing on the first access operation according to the first backup instruction to obtain a first backup result; When the first access operation is abnormal, the operation of the first access information is backtracked according to the first backup result.
6. The method of claim 1, wherein: The step of inputting the first feature capture list into the smart grid service system to construct a first customized grid service website further includes: Constructing a smart grid service system, wherein the smart grid service system is obtained by training multiple sets of training data, each of the multiple sets of training data includes the first feature capture list and identification information of the distribution position and size of the identification plate; A first output result of the smart grid service system is obtained, wherein the first output result includes the first customized grid service website.
7. An intelligent interactive power grid service website construction system, wherein: The system comprises: A first obtaining unit, the first obtaining unit is used to obtain a first historical service database through a first information collection module; a second obtaining unit, the second obtaining unit being used to obtain a first screening instruction, and to screen the service contents in the first historical service database according to the first screening instruction to obtain a first real demand database; a third obtaining unit, the third obtaining unit being used to obtain a first analysis instruction, and to perform a demand frequency analysis on the first real demand database according to the first analysis instruction to obtain a first demand frequency list, wherein the first demand frequency list is a list constructed according to the number of times a user handles a business; a fourth obtaining unit, the fourth obtaining unit being used to obtain a second analysis instruction, and to perform a demand importance analysis on the first real demand database according to the second analysis instruction to obtain a first demand importance list, wherein the demand importance analysis refers to an analysis of an importance evaluation result of the handled business to the user, including importance information evaluated according to the impact of the speed of the business handling on the user's life and work; a fifth obtaining unit, the fifth obtaining unit being configured to obtain information of the first user through the second information collecting module; a sixth obtaining unit, the sixth obtaining unit being configured to obtain a first feature extraction instruction, and to perform feature extraction on the information of the first user according to the first feature extraction instruction to obtain a first user feature; a seventh obtaining unit, the seventh obtaining unit being configured to perform feature capture on the first demand frequency list and the first demand importance list based on the first user feature to obtain a first feature capture list; a first construction unit, the first construction unit being used to input the first feature capture list into a smart grid service system to construct a first customized grid service website; A first binding unit, the first binding unit is used to bind the first customized power grid service website with the first user; An eighth obtaining unit, the eighth obtaining unit is used to obtain a first conversion standard, wherein the first conversion standard is a conversion standard of the identity of the demand frequency and the demand importance; a ninth obtaining unit, configured to merge the first demand frequency list and the first demand importance list according to the first conversion standard to obtain a second list; a tenth obtaining unit, configured to perform traversal feature capture on the second list based on the first user feature to obtain a first convolution calculation result; An eleventh obtaining unit, the eleventh obtaining unit is used to sort the convolution values of the first convolution calculation results, and obtain the first feature capture list according to the sorting results.
8. An intelligent interactive power grid service website construction system, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the steps of the method according to any one of claims 1 to 6 are implemented.
