Shared battery management system

By deciding priority based on usage status in the shared battery management system and generating scheduling, the problem of unfair use of shared battery in the existing system is solved, and fair shared battery allocation is achieved.

CN113994561BActive Publication Date: 2024-11-12MITSUBISHI ELECTRIC CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201980095453.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-06-03
Publication Date
2024-11-12
Estimated Expiration
2039-06-03

AI Technical Summary

Technical Problem

The existing shared battery management system cannot fairly distribute the use of shared batteries, resulting in unfair use.

Method used

By introducing the use application acceptance, storage, scheduling generation and control commands in the shared battery management system, priority is decided based on the usage status of the shared battery, and scheduling is generated and executed to ensure fair use.

Benefits of technology

The use rights are distributed fairly according to the usage status of the shared battery, ensuring the fair use of the shared battery.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113994561B_ABST
    Figure CN113994561B_ABST
Patent Text Reader

Abstract

A shared battery management system is provided that enables fair use of a shared battery. The shared battery management system comprises: a shared battery use application accepting unit that accepts applications for use of a shared battery from a plurality of tenants, respectively; a storage unit that stores the use status of the shared battery of each of the plurality of tenants; a schedule generating unit that determines a tenant to be given priority based on information on the use status of the shared battery stored in the storage unit when the time of the applications for use of the shared battery of the plurality of tenants accepted by the shared battery use application accepting unit overlaps, and generates a schedule for the shared battery; and a shared battery control instruction unit that controls the shared battery based on the schedule generated by the schedule generating unit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a shared battery management system. Background Art

[0002] Patent Document 1 discloses a shared battery management system. According to this shared battery management system, power loss in a region can be suppressed to the minimum possible.

[0003] Prior art literature

[0004] Patent Literature

[0005] Patent Document 1: Japanese Patent Application Publication No. 2016-40970 Summary of the invention

[0006] Problems to be solved by the invention

[0007] However, the shared storage battery management system described in Patent Document 1 allocates the use of the shared storage battery in the order of the application for use of the shared storage battery from earliest to latest, so the shared storage battery cannot be used fairly.

[0008] The present invention has been made to solve the above-mentioned problems. An object of the present invention is to provide a shared storage battery management system that enables fair use of a shared storage battery.

[0009] Means for solving problems

[0010] The shared battery management system of the present invention comprises: a shared battery use application acceptance unit, which accepts use applications of a shared battery from a plurality of tenants respectively; a storage unit, which stores the use status of the shared battery of each of the plurality of tenants; a schedule generation unit, which determines a tenant to be given priority based on the information on the use status of the shared battery stored in the storage unit when the time of the use applications of the shared battery of the plurality of tenants accepted by the shared battery use application acceptance unit overlaps, and generates a schedule for the shared battery; and a shared battery control instruction unit, which controls the shared battery based on the schedule generated by the schedule generation unit.

[0011] Effects of the Invention

[0012] According to the present invention, the shared battery management system determines a tenant to be given priority based on information on the use status of the shared battery, generates a battery schedule, and controls the shared battery based on the schedule. Therefore, the shared battery can be used fairly. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a diagram showing the configuration of a system to which the shared battery management system in the first embodiment is applied.

[0014] Figure 2 This is a detailed configuration diagram of a system to which the shared battery management system in the first embodiment is applied.

[0015] Figure 3 This is a diagram for explaining a first example of weights in the shared battery management system in the first embodiment.

[0016] Figure 4 This is a diagram for explaining a second example of weights in the shared battery management system in the first embodiment.

[0017] Figure 5 This is a diagram for explaining a first example of weighting results of the shared battery management system in the first embodiment.

[0018] Figure 6 This is a diagram for explaining a second example of the weighting result of the shared battery management system in the first embodiment.

[0019] Figure 7 This is a diagram for explaining an example of using the weighting result of the shared battery management system in the first embodiment.

[0020] Figure 8 This is a flowchart for explaining the outline of the operation of the shared battery management system in the first embodiment.

[0021] Fig. 9 This is a flowchart for explaining the operation of the shared storage battery management system in the first embodiment when generating a schedule.

[0022] Fig.10 This is a hardware configuration diagram of the shared battery management system in the first embodiment. DETAILED DESCRIPTION

[0023] The mode for implementing the present invention will be described with reference to the accompanying drawings. In addition, in each figure, the same or corresponding parts are marked with the same symbols. The repeated description of the part is appropriately simplified or omitted.

[0024] Implementation Method 1

[0025] Figure 1 This is a diagram showing the configuration of a system to which the shared battery management system in the first embodiment is applied.

[0026] exist Figure 1 In the example, building 1 receives power from a power supplier. Tenant 2a, tenant 2b, and tenant 2c move into building 1 as a plurality of tenants.

[0027] For example, the shared storage battery 4 is installed inside the building 1. The shared storage battery 4 is installed so as to be able to receive power supply from a power supplier.

[0028] For example, the shared battery management system 3 is installed inside the building 1. The shared battery management system 3 is configured to be able to determine whether the tenant 2a, the tenant 2b, and the tenant 2c can use the shared battery 4.

[0029] Next, use Figure 2 The tenant 2a, the tenant 2b, the tenant 2c and the shared battery management system 3 are described in detail.

[0030] Figure 2 This is a detailed configuration diagram of a system to which the shared battery management system in the first embodiment is applied.

[0031] exist Figure 2 In FIG. 1 , the tenant 2 a includes a shared storage battery schedule display unit 311 a and a shared storage battery use application execution unit 312 a .

[0032] The tenant 2b includes a shared storage battery schedule display unit 311b and a shared storage battery use application execution unit 312b.

[0033] The tenant 2c includes a shared storage battery schedule display unit 311c and a shared storage battery use application execution unit 312c.

[0034] The shared battery management system 3 includes a shared battery storage unit 330 , a shared battery use application accepting unit 320 , a shared battery schedule generating unit 340 , a shared battery schedule storing unit 350 , a shared battery control command unit 360 , and an administrator instructing unit 370 .

[0035] The shared battery storage unit 330 includes a shared battery use record storage unit 333 , a shared battery use time period storage unit 332 , and a shared battery use interval storage unit 331 .

[0036] The shared battery usage record storage unit 333 stores information on the usage record of the shared battery 4 . The shared battery usage time period storage unit 332 stores information on the usage time period of the shared battery 4 . The shared battery usage interval storage unit 331 stores information on the usage interval of the shared battery 4 .

[0037] The shared battery use application accepting unit 320 accepts information on the use application of the shared battery 4 from the shared battery use application executing unit 312 a , the shared battery use application executing unit 312 b , and the shared battery use application executing unit 312 c .

[0038] The shared storage battery schedule generation unit 340 generates a schedule for the shared storage battery 4 based on the information from the shared storage battery storage unit 330 and the information from the shared storage battery use application reception unit 320 .

[0039] The shared battery schedule storage unit 350 stores information on the schedule generated by the shared battery schedule generation unit 340. This information is displayed on the shared battery schedule display unit 311a of the tenant 2a, the shared battery schedule display unit 311b of the tenant 2b, and the shared battery schedule display unit 311c of the tenant 2c.

[0040] The shared storage battery control instruction unit 360 controls the shared storage battery 4 based on the information stored in the shared storage battery schedule storage unit 350 .

[0041] The manager instruction unit 370 instructs the shared storage battery schedule generating unit 340 on weight coefficients and the like related to the schedule. For example, the manager instruction unit 370 instructs weight coefficients corresponding to the usage interval, usage time period, and usage performance of the shared storage battery 4 .

[0042] Next, use Figure 3 The first example of weights when generating a schedule will be described.

[0043] Figure 3 This is a diagram for explaining a first example of weights in the shared battery management system in the first embodiment.

[0044] like Figure 3 As shown, the weight coefficient X is set according to the time period of a day. The weight coefficient X is set small in the time period with low demand. As a result, the weight of the tenant who uses the shared storage battery 4 during the time period when the demand is not tight is set smaller than the weight of the tenant who uses the shared storage battery 4 during the time period with high demand from the morning.

[0045] For example, the usage amount of the shared storage battery 4 in consideration of the weight is set by the following formula (1).

[0046] [Mathematical formula 1]

[0047]

[0048] In formula (1), P is the amount of electricity used in one hour and t is the time.

[0049] Next, use Figure 4 The second example of weights when generating a schedule will be described.

[0050] Figure 4 This is a diagram for explaining a second example of weights in the shared battery management system in the first embodiment.

[0051] like Figure 4 As shown, the further away the date is from the date when the shared battery was used, the smaller the weight coefficient Y becomes nonlinearly. As a result, the more empty the usage interval is, the tenant is judged to have a lower usage frequency. The weight is set lower at this time. Alternatively, the weight coefficient Y may also change linearly.

[0052] For example, the amount of electric power used by the shared storage battery 4 in consideration of the weight is set by the following formula (2).

[0053] [Mathematical formula 2]

[0054]

[0055] In formula (2), f1 is the amount of electricity used calculated by formula (1). The period is 5 days.

[0056] Next, use Figure 5 The first example of weighted results is described.

[0057] Figure 5 This is a diagram for explaining a first example of weighting results of the shared battery management system in the first embodiment.

[0058] exist Figure 5 In the total amount of electricity used per hour, the order is "Tenant B>Tenant A>Tenant C".

[0059] However, at the current time, the weight coefficients for 11:00 to 15:00 are set high.

[0060] Therefore, the order of the weighted hourly power usage (f1) is “tenant B′>tenant C′>tenant A′.” In the weighted result of the day, tenant A who uses the shared storage battery 4 at night when demand is low is given the highest priority.

[0061] Next, use Figure 6 The second example of weighted results is described.

[0062] Figure 6 This is a diagram for explaining a second example of the weighting result of the shared battery management system in the first embodiment.

[0063] exist Figure 6 In the 5-day electricity usage, the order is "Tenant B>Tenant A>Tenant C".

[0064] However, tenant C uses 1000 on the day with the largest weight.

[0065] Therefore, the weighted usage amount per day (f2) is in the order of "tenant C'>tenant B'>tenant A'". That is, as a result of weighting, tenant A, who uses the least and less frequently, is given priority.

[0066] Next, use Figure 7 An example of using the weighted results will be described.

[0067] Figure 7This is a diagram for explaining an example of using the weighting result of the shared battery management system in the first embodiment.

[0068] like Figure 7 As shown, tenant A applies for use of the shared storage battery 4 from 4:00 to 16:00. Tenant B applies for use of the shared storage battery 4 from 4:00 to 24:00. Tenant C applies for use of the shared storage battery 4 from 8:00 to 16:00.

[0069] At this time, the priority order is changed every 4 hours by weighting. As a result, the schedule of the shared storage battery 4 is determined.

[0070] Specifically, from 4:00 to 12:00, it is scheduled that tenant A, who has the first priority, uses the shared storage battery 4. At 12:00, tenant A's usage for the day increases, and tenant B's priority becomes 1st. As a result, from 12:00 onwards, it is scheduled that tenant B uses the shared storage battery 4. From 16:00 to 24:00, no tenants other than tenant B apply for use. Therefore, regardless of the priority, tenant B is scheduled to use the shared storage battery 4.

[0071] Next, use Figure 8 The outline of the operation of the shared battery management system 3 will be described.

[0072] Figure 8 This is a flowchart for explaining the outline of the operation of the shared battery management system in the first embodiment.

[0073] In step S1, the shared battery schedule generation unit 340 reads information from the shared battery usage time period storage unit 332. Then, the shared battery schedule generation unit 340 performs the operation of step S2. In step S2, the shared battery schedule generation unit 340 reads information from the shared battery usage interval storage unit 331. Then, the shared battery schedule generation unit 340 performs the operation of step S3. In step S3, the shared battery schedule generation unit 340 reads information from the shared battery usage performance storage unit 333.

[0074] Then, the shared battery schedule generation unit 340 performs the operation of step S4. In step S4, the shared battery schedule generation unit 340 performs weighting according to the read information. Then, the shared battery schedule generation unit 340 performs the operation of step S5. In step S5, the shared battery schedule generation unit 340 generates a schedule according to the weighting result. Then, the shared battery schedule generation unit 340 ends the operation.

[0075] Next, use Fig. 9 The operation of the shared battery management system 3 when generating a schedule will be described.

[0076] Fig. 9This is a flowchart for explaining the operation of the shared storage battery management system in the first embodiment when generating a schedule.

[0077] In step S11 , the shared battery schedule generator 340 reads information on the processing result based on the priority order of the weighting result. Then, the shared battery schedule generator 340 performs the operation of step S12 . In step S12 , the shared battery schedule generator 340 reads information on the use application of the shared battery 4 .

[0078] Then, the shared storage battery schedule generation unit 340 performs the operation of step S13. In step S13, the shared storage battery schedule generation unit 340 determines whether there is a use request from a tenant with a high priority.

[0079] If there is no use request from a tenant with a higher priority in step S13, the shared battery schedule generation unit 340 performs the operation in step S14. In step S14, the shared battery schedule generation unit 340 determines whether the information of all tenants has been read.

[0080] If the information of any tenant is not read in step S14, the shared battery schedule generation unit 340 performs the operation of step S12. If the information of all tenants is read in step S14, the shared battery schedule generation unit 340 performs the operation of step S15. In step S15, the shared battery schedule generation unit 340 does not register the tenant in the schedule. Then, the shared battery schedule generation unit 340 ends the operation.

[0081] If there is a use request from a tenant with a higher priority in step S13, the shared battery schedule generation unit 340 performs the operation of step S16. In step S16, the shared battery schedule generation unit 340 registers the corresponding tenant in the schedule. Then, the shared battery schedule generation unit 340 ends the operation.

[0082] According to the first embodiment described above, the shared battery management system 3 determines the tenant 2a etc. to be given priority according to the usage status of the shared battery 4, and generates a schedule for the shared battery 4. The shared battery management system 3 controls the shared battery 4 according to the schedule. Therefore, the shared battery 4 can be used fairly.

[0083] Alternatively, the tenant 2a or the like to be given priority may be determined based on the weighted cumulative values ​​corresponding to the usage interval, usage time period, and usage performance of the shared storage battery 4, and a schedule for the shared storage battery 4 may be generated. In this case, the shared storage battery 4 can be used fairly.

[0084] Furthermore, the shared storage battery management system 3 sets a higher weight for a time period with a higher frequency of use, so that the shared storage battery 4 can be used more fairly.

[0085] Furthermore, the shared storage battery management system 3 sets a higher weight as the time when the use application is accepted is shorter than the elapsed time of the actual use record. Therefore, the shared storage battery 4 can be used more fairly.

[0086] Next, use Fig.10 An example of the shared battery management system 3 will be described.

[0087] Fig.10 This is a hardware configuration diagram of the shared battery management system in the first embodiment.

[0088] Each function of the shared battery management system 3 can be implemented by a processing circuit. For example, the processing circuit has at least one processor 100 a and at least one memory 100 b. For example, the processing circuit has at least one dedicated hardware 200 .

[0089] In the case where the processing circuit has at least one processor 100a and at least one memory 100b, each function of the shared battery management system 3 is implemented by software, firmware, or a combination of software and firmware. At least one of the software and firmware is recorded as a program. At least one of the software and firmware is stored in at least one memory 100b. The functions of the shared battery management system 3 are implemented by reading out and executing the program stored in at least one memory 100b by at least one processor 100a. At least one processor 100a is also called a central processing unit, a processing unit, an arithmetic unit, a microprocessor, a microcomputer, or a DSP. For example, at least one memory 100b is a non-volatile or volatile semiconductor memory such as RAM, ROM, flash memory, EPROM, EEPROM, a magnetic disk, a floppy disk, an optical disk, a high-density disk, a mini disk, a DVD, etc.

[0090] In the case where the processing circuit has at least one dedicated hardware 200, the processing circuit is implemented by, for example, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC, an FPGA, or a combination thereof. For example, each function of the shared battery management system 3 is implemented by the processing circuit respectively. For example, each function of the shared battery management system 3 is uniformly implemented by the processing circuit.

[0091] The functions of the shared battery management system 3 may be partially implemented by dedicated hardware 200, and the other parts may be implemented by software or firmware. For example, the functions of the control unit 9b may be implemented by a processing circuit as dedicated hardware 200, and functions other than the functions of the control unit 9b may be implemented by at least one processor 100a reading and executing a program stored in at least one memory 100b.

[0092] In this way, the processing circuit implements the functions of the shared battery management system 3 through hardware 200, software, firmware or a combination thereof.

[0093] Industrial Applicability

[0094] As described above, the shared storage battery management system of the present invention can be used in a system for supplying electric power.

[0095] Explanation of symbols

[0096] 1: building; 2a: tenant; 2b: tenant; 2c: tenant; 3: shared battery management system; 4: shared battery; 311a: shared battery scheduling display unit; 311b: shared battery scheduling display unit; 311c: shared battery scheduling display unit; 312a: shared battery use application execution unit; 312b: shared battery use application execution unit; 312c: shared battery use application execution unit; 320: shared battery use application acceptance unit; 330: shared battery storage unit; 331: shared battery use interval storage unit; 332: shared battery use time period storage unit; 333: shared battery use performance storage unit; 340: shared battery scheduling generation unit; 350: shared battery scheduling storage unit; 360: shared battery control instruction unit.

Claims

1. A shared battery management system, the shared battery management system having: A shared battery use application acceptance department, which accepts applications for use of shared batteries from multiple tenants; a storage unit configured to store usage status of the shared battery of each of the plurality of tenants; a schedule generating unit for determining a tenant to be given priority based on the information on the use status of the shared battery stored in the storage unit, and generating a schedule for the shared battery, when the time of the use applications of the shared battery accepted by the shared battery use application accepting unit overlaps with that of the multiple tenants; and a shared storage battery control instruction unit configured to control the shared storage battery according to the schedule generated by the schedule generation unit, The storage unit stores information on usage intervals, usage time periods, and usage performance of the shared storage battery for each of the plurality of tenants. When the times of the shared battery use applications received by the shared battery use application receiving unit overlap, the schedule generating unit determines the tenant to be given priority based on the weighted cumulative values ​​corresponding to the information on the use interval, use time period and use performance of the shared battery stored in the storage unit, and generates a schedule for the shared battery.

2. The shared battery management system according to claim 1, wherein: The schedule generating unit sets a higher weight for a time period with a higher frequency of use among the use time periods for which the shared storage battery use application accepting unit has accepted a use application.

3. The shared battery management system according to claim 1, wherein: The schedule generating unit sets a higher weight as the time at which the shared storage battery use application accepting unit accepts the use application is shorter than the elapsed time of the actual use performance.