A portability optimization method for offshore 66kV submarine cable withstand voltage test
By setting up parallel reactor groups and compensation reactor groups in the withstand voltage test of 66kV submarine cables, optimizing equipment parameters solves the problems of poor equipment load capacity and cumbersome calculations, and realizes efficient withstand voltage tests for portable and small-capacity equipment. , which meets the voltage withstand test requirements of 66kV submarine cables in offshore wind farms.
Patent Information
- Application Number
- CN202111459561.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-02
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-12-02
AI Technical Summary
When performing the AC withstand voltage test of 66kV submarine cables, the existing technology has poor equipment load capacity, limited high-voltage loop flow capacity, and cumbersome calculations. It cannot conveniently and effectively solve the problem of large length differences of 66kV submarine cables in offshore wind farms and offshore wind farms. Problems such as lack of test power supply and harsh test environment.
By setting up a parallel reactor group and a compensation reactor group in the loop, optimizing equipment parameters, and using portable, small-capacity test equipment to conduct series resonance AC withstand voltage tests, the quality factor and high-voltage loop current capabilities can be improved, and the calculation model can be simplified.
Portable, small-capacity test equipment has been implemented to carry out 66kV submarine cable series resonance AC withstand voltage tests, which improves the load capacity and calculation efficiency of the equipment, reduces the weight and volume of the equipment, and meets the requirements for voltage withstand tests of longer submarine cables.
Smart Images

Figure CN114397537B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of offshore wind power, and in particular to a method for optimizing the portability of an offshore 66kV submarine cable withstand voltage test. Background Art
[0002] At present, my country's offshore wind power mostly uses 35kV submarine cables to collect electricity, while the 66kV collection system has already occupied the mainstream position in the European offshore wind power market. With the pursuit of reducing the unit cost of offshore wind farms and the development of technology, 66kV submarine cables have great advantages in terms of using fewer cables, lower cable investment and corresponding engineering costs.
[0003] The use of tuned series hybrid resonance is a common method for cable AC withstand voltage test. This method can greatly reduce the volume and weight of the test equipment. With the increase of voltage level and cable length, the volume and weight of the required test equipment are also increasing. Especially for the 66kV submarine cable test for offshore wind power, the AC withstand voltage test after laying needs to be carried out at the offshore booster station. At present, there is no convenient and effective measure to solve the problems of insufficient power capacity and small test space of the offshore booster platform.
[0004] Ginseng Figure 1 As shown, the existing technology uses the working principle and wiring of variable frequency series resonant high voltage test equipment as shown in Figure 1 As shown. The AC 380V power input is converted by the frequency conversion source into a power supply with adjustable frequency and voltage. After being stepped up by the excitation transformer, the output U1 is sent to the high-voltage series resonant circuit composed of the reactor L1 and the test cable C1. The resistance R is not only the resistance of the wire and the reactor, but also the equivalent resistance of the active loss of the circuit, such as corona loss, polarization loss of the test product, etc. The voltage divider is composed of C2 and C3 in series, which is a pure capacitive type and is used to measure the test voltage. The capacitance value of the voltage divider capacitors C2 and C3 is small after being connected in series (generally pF level), while the capacitance of the test cable is large (nF-μF level), so the voltage divider capacitance can be ignored in the calculation. When the output frequency of the inverter is adjusted to the resonant frequency, the circuit reaches the resonant state.
[0005] The resonant frequency is:
[0006]
[0007] The series loop current is:
[0008]
[0009] The quality factor of the test circuit is:
[0010]
[0011] The active power output by the excitation transformer is:
[0012]
[0013] In the formula, f is the resonant frequency; I is the main circuit current flowing through the high-voltage side of the excitation transformer; Q is the quality factor of the series circuit; ω is the angular frequency, and its size is ω=2πf; P is the active power output by the excitation transformer; U2 is the voltage acting on the test product.
[0014] At this time, the voltage on the inductor and the voltage on the capacitor are equal in magnitude and opposite in phase, which is Q times the power supply voltage U1. It can be seen that the use of series resonance can effectively reduce the power supply capacity requirement.
[0015] The prior art has the following technical defects:
[0016] 1. Fixed reactor equipment has poor load capacity. From the resonant frequency formula, we know that the resonant frequency is related to the inductance of the reactor and the equivalent capacitance of the test object. As the length of the submarine cable continues to increase, the equivalent capacitance continues to increase, causing the resonant frequency to continue to decrease. Eventually, the test cannot be carried out because the resonant frequency is too low.
[0017] 2. The flow capacity of the equipment’s high-voltage circuit is limited.
[0018] From the series loop current formula, we know that the high-voltage loop current is related to the test voltage and the equivalent capacitance of the submarine cable. As the length of the submarine cable increases, this current also increases. When the rated current of the high-voltage side of the excitation transformer and the current-carrying capacity of the reactor are lower than this current, the test cannot be carried out.
[0019] 3. The calculations when formulating the test plan are rather complicated.
[0020] For submarine cables of different lengths, a series of mathematical calculations are required when formulating test plans. The process is cumbersome, time-consuming and laborious. Summary of the invention
[0021] The purpose of the present invention is to provide a method for optimizing the portability of an offshore 66kV submarine cable withstand voltage test. Aiming at practical problems such as large differences in the lengths of 66kV submarine cables in offshore wind farms, lack of offshore test power supply, and harsh test environment, the equipment parameters in the series resonant withstand voltage test scheme are optimized to achieve the use of portable, small-capacity test equipment to perform a 66kV submarine cable series resonant AC withstand voltage test.
[0022] The present invention provides a method for optimizing the portability of an offshore 66 kV submarine cable withstand voltage test, comprising the following steps:
[0023] Step 1: Set m parallel reactor groups and n compensating reactor groups in the circuit, obtain the parameters of the equipment and the test product, and set the initial values m=1, n=0; wherein the parameters include the number of reactors x, the rated voltage U e , rated current I e ; Number of excitation transformers y, maximum output voltage U on high voltage side max , the maximum output current on the high-voltage side I max , rated power P max ; Test voltage of the tested submarine cable U2; Among them, the rated voltage of the reactor group U e Higher than the test voltage U2;
[0024] Step 2: Each reactor group is composed of z reactors connected in series, and the value of z is [U2 / U e ], that is, the smallest integer not less than this ratio, traverse all combinations of reactors, calculate the resonant frequency f, main circuit current I, active power P, quality factor Q, and determine whether the calculation results meet the following constraints:
[0025]
[0026] In the constraint conditions, the method of selecting the value of y is to try from small to large until it is satisfied;
[0027] Step 3: If the constraints are met, calculate min(m+n), minI according to the following objective function;
[0028] The objective function is:
[0029]
[0030] The two conditions in the objective function meet the constraints of the minimum number of reactors used and the minimum current on the high-voltage side of the excitation transformer step by step from top to bottom;
[0031] Step 4, judge the inequalities in the constraints from top to bottom, screen all the solutions that meet the constraints, screen out the solution with the least number of reactors, the least number of excitation transformers, and the least number of compensation reactor groups, and output m, n, y, f, Q, I, P corresponding to the solution.
[0032] Furthermore, the calculation formula of the resonant frequency f in step 2 is:
[0033]
[0034] Where, L1 is the inductance of the reactor, C1 is the equivalent capacitance of the tested submarine cable, and ω is the angular frequency.
[0035] Furthermore, the calculation formula of the main circuit current I in step 2 is:
[0036]
[0037] Furthermore, the calculation formula of active power P in step 2 is:
[0038]
[0039] Where R is the resistance component in the circuit excluding the reactor.
[0040] Furthermore, the calculation formula of the quality factor Q in step 2 is:
[0041]
[0042] Through the above scheme, through the portability optimization method of the offshore 66kV submarine cable withstand voltage test, it is possible to use portable, small-capacity test equipment to carry out the 66kV submarine cable series resonant AC withstand voltage test, which has the following technical effects:
[0043] 1) The scheme optimization based on quality factor takes into account the impact of corona on the quality factor, and the requirement for the quality factor is increased by 1.5 times.
[0044] 2) The optimization of the scheme based on the high-voltage loop current reduces the number of excitation transformers used and reduces the weight and volume of the required equipment.
[0045] 3) The calculation model of the optimization method is used to improve the efficiency and accuracy of the solution calculation.
[0046] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 This is the principle diagram of variable frequency series resonance;
[0048] Figure 2 It is a wiring diagram of the optimization method of the present invention;
[0049] Figure 3 It is a flow chart of the portability optimization method of the offshore 66kV submarine cable withstand voltage test of the present invention. DETAILED DESCRIPTION
[0050] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0051] Ginseng Figure 2As shown, m parallel reactor groups and n compensating reactor groups are set in the circuit, L1 is the inductance value of the reactor, R1 is the resistance value of the reactor, R is the resistance component in the circuit except the reactor, and the equivalent capacitance of the voltage divider has been ignored.
[0052] The sum of the impedance values of the entire loop is:
[0053]
[0054] When calculating the resonant frequency, because the imaginary part of the reactance is much larger than the real part, the influence of the resistor R1 can be ignored. Let R1 = 0 and let the imaginary part of equation (1) be 0, we can get:
[0055]
[0056] According to the circuit principle, the quality factor is:
[0057]
[0058] in:
[0059]
[0060] Combining equation (3) and equation (4) and setting R1 = 0, we can obtain:
[0061]
[0062] The main circuit current is:
[0063]
[0064] The active power is:
[0065]
[0066] It can be seen from formula (2) that when C1 and L1 are determined, the resonant frequency depends on the sum of the number of parallel reactor groups m and the number of compensating reactor groups n, has nothing to do with the installation position of the reactor group, and increases with the increase of the sum of m and n. Therefore, increasing the number of parallel reactor groups and compensating reactor groups can improve the load capacity of the test equipment and realize the withstand voltage test of longer submarine cables.
[0067] It can be seen from equations (6) and (7) that increasing the number of compensation branches n can reduce the main circuit current and the active power required for the excitation transformer, which is conducive to the use of small and portable variable frequency power supplies and excitation transformers.
[0068] Ginseng Figure 3As shown, this embodiment proposes an optimization algorithm based on quality factor and high-voltage loop current. Only by inputting the basic parameters of the test equipment and the test product, the optimal matching solution of the test equipment can be automatically calculated, which can greatly improve the efficiency of solution selection.
[0069] The original input parameters of the optimization algorithm include: reactor (number x, rated voltage U e , rated current I e , internal resistance R0, inductance L0); excitation transformer (number of units y, maximum output voltage U on the high voltage side max , the maximum output current on the high-voltage side I max , rated power P max , internal resistance R); tested submarine cable (test voltage U2 and equivalent capacitance C1).
[0070] The initial variables include: the number of parallel reactor groups m, the number of compensation reactor groups n. It should be noted that the rated voltage of each reactor group must be higher than the test voltage U2, so each reactor group is composed of z reactors connected in series, and the value of z is [U2 / U e ], that is, the smallest integer not less than this ratio.
[0071] The intermediate variables include: the results (f, Q, I, P) of the functions in equations (2) to (7).
[0072] The constraints are:
[0073]
[0074] In the constraint conditions, y represents the number of excitation transformers used, and its value is selected by trying from small to large until it is satisfied. The Q value is greatly affected by the resistance estimation accuracy and corona, and there may be a certain error between the calculated value and the actual value, so a coefficient of 1.5 is introduced in the constraint conditions to ensure that the optimization results meet the actual needs.
[0075] The objective function is:
[0076]
[0077] The two conditions in formula (9) are constrained to meet the constraints step by step from top to bottom. The actual meanings of the two formulas are respectively the minimum number of reactors used and the minimum current on the high-voltage side of the excitation transformer (the minimum number of excitation transformers).
[0078] The inequalities in equation (8) are judged step by step from top to bottom. All solutions that meet the constraints are screened to select the solution with the least number of reactors, the least number of excitation transformers, and the least number of compensation reactor groups. Finally, m, n, y, f, Q, I, and P corresponding to the solution are output.
[0079] The following calculation is carried out on the technical solution of variable frequency series resonant AC withstand voltage for submarine cables of different voltage levels and lengths in a certain offshore wind farm.
[0080] 1. Basic parameters of submarine cables and test equipment
[0081] The length and equivalent capacitance of the 66kV submarine cable of an offshore wind farm are shown in Table 1. The parameters of the existing test instruments and equipment are shown in Table 2. Because the space on the offshore platform is small and the power capacity is small, the instruments and equipment used are all portable devices that can be manually carried.
[0082] Table 1 Length and equivalent capacitance of 66kV submarine cable in a wind farm
[0083]
[0084] The withstand voltage of a 66kV submarine cable is 2U0=72kV (U0 is generally 36kV), which has nothing to do with the cross-sectional area of the submarine cable. Therefore, when performing optimization calculations, you only need to enter the capacitance of the submarine cable. Figure 3 The optimization algorithm can get the best solution. To verify the effectiveness of the optimal algorithm, this paper takes each integer value from 100-800nF and inputs it into the program for calculation. Combined with the parameters of the test equipment, the original input parameters are listed in Table 2.
[0085] Table 2 Test equipment parameters
[0086]
[0087]
[0088] Substituting the above parameters into the optimization algorithm, the optimization results obtained by computer calculation are shown in Table 3.
[0089] It can be seen from Table 3 that as the capacitance of the test sample increases, the number of reactor groups required also increases, gradually increasing from 1 to 6, and the number of excitation transformers increases from 1 to 2. To verify the correctness of the optimization algorithm calculation.
[0090] Table 3 Case optimization calculation results
[0091]
[0092] Through the portability optimization method of the offshore 66kV submarine cable withstand voltage test, it is possible to use portable, small-capacity test equipment to carry out the 66kV submarine cable series resonant AC withstand voltage test, which has the following technical effects:
[0093] 1) The scheme optimization based on quality factor takes into account the impact of corona on the quality factor, and the requirement for the quality factor is increased by 1.5 times.
[0094] 2) The optimization of the scheme based on the high-voltage loop current reduces the number of excitation transformers used and reduces the weight and volume of the required equipment.
[0095] 3) The calculation model of the optimization method is used to improve the efficiency and accuracy of the solution calculation.
[0096] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the technical principles of the present invention, and these improvements and modifications should also be regarded as within the scope of protection of the present invention.
Claims
1. A portability optimization method for offshore 66kV submarine cable withstand voltage test, characterized in that: The steps include: Step 1: Set m parallel reactor groups and n compensating reactor groups in the circuit, obtain the parameters of the equipment and the test product, and set the initial values m=1, n=0; wherein the parameters include the number of reactors x, the rated voltage U e , rated current I e ; Number of excitation transformers y, maximum output voltage U on high voltage side max , the maximum output current on the high-voltage side I max , rated power P max ; Test voltage of the tested submarine cable U2; Among them, the rated voltage of the reactor group U e Higher than the test voltage U2; Step 2: Each reactor group is composed of z reactors connected in series, and the value of z is [U2 / U e ], that is, the smallest integer not less than this ratio, traverse all combinations of reactors, calculate the resonant frequency f, main circuit current I, active power P, quality factor Q, and determine whether the calculation results meet the following constraints: In the constraint conditions, the value of y is tried from small to large until it is satisfied; Step 3: If the constraints are met, calculate min(m+n), minI according to the following objective function; The objective function is: The two conditions in the objective function meet the constraints of the minimum number of reactors used and the minimum current on the high-voltage side of the excitation transformer step by step from top to bottom; Step 4, determine the inequalities in the constraints from top to bottom, screen all solutions that meet the constraints, screen out the solution with the least number of reactors, the least number of excitation transformers, and the least number of compensation reactor groups, and output m, n, y, f, Q, I, P corresponding to the solution; In step 2, the formula for calculating the resonant frequency f is: Where, L1 is the inductance of the reactor, C1 is the equivalent capacitance of the tested submarine cable, and ω is the angular frequency; The calculation formula of the main circuit current I is: The calculation formula of active power P is: In the formula, R is the resistance component in the circuit excluding the reactor; The quality factor Q is calculated as:
Citation Information
Patent Citations
Long-cable withstand voltage test equipment parameter optimization method
CN108445357A