A method for determining the construction sequence of autonomous public transportation information system

Through the linear weighted summation and 0-1 planning model, combined with the greedy algorithm, the scientific and accurate problem of determining the construction timing of the autonomous bus information system is solved, achieving high efficiency and optimization of system construction, and ensuring the overall integration of information technology Maximization of importance and efficient use of resources.

CN114462760BActive Publication Date: 2024-10-29SUN YAT SEN UNIV +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111540318.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-16
Publication Date
2024-10-29
Estimated Expiration
2041-12-16

AI Technical Summary

Technical Problem

The existing technology lacks effective quantitative methods to determine the construction timing of autonomous bus information systems. Especially when multiple systems are constructed in parallel, it is difficult to scientifically advance and optimize the construction timing in batches.

Method used

Use the linear weighted summation method combined with the 0-1 planning model to determine the comprehensive importance of each system by obtaining and quantifying business indicators and data indicators, and use the greedy algorithm to optimize the construction timing to meet financial constraints and improve the overall comprehensive importance of informatization. .

Benefits of technology

The scientific and accurate construction timing of the autonomous bus information system has been achieved, the construction efficiency has been improved, the overall comprehensive importance of information has been maximized, and the construction period and funds have been saved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114462760B_ABST
    Figure CN114462760B_ABST
Patent Text Reader

Abstract

This invention discloses a method for determining the construction sequence of autonomous public transport information systems. The method includes: acquiring business indicators and data indicators that affect the construction sequence of autonomous public transport information systems; assigning weights to the business indicators and data indicators; determining the comprehensive importance score of each public transport information system using a linear weighted summation method based on the weight values ​​of each indicator; establishing a 0-1 programming model with the objective of maximizing the overall comprehensive importance of information systems based on the comprehensive importance scores of each public transport information system; solving the 0-1 programming model using a greedy algorithm to obtain the construction batch and construction sequence of each batch for each system; and using the solution results of the 0-1 programming model to propose information construction efficiency as an evaluation indicator for quantitative verification of the method for determining the construction sequence of autonomous public transport information systems. The 0-1 programming model is used to determine the construction sequence of autonomous public transport information systems. This invention improves efficiency and accuracy and can be widely applied in the fields of public transport information technology and computer technology.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of computer technology, and in particular to a method for determining the construction sequence of an autonomous public transportation information system. Background Art

[0002] For a long time, my country has vigorously developed the informatization of public transportation in the Intelligent Transportation System (ITS), which is to integrate and utilize internal and external information resources through information technology, strengthen the exchange and communication of information, and thus improve the management and service level of public transportation. However, with the rapid increase in transportation demand, it is difficult for the ITS system framework to further effectively guide the construction of a new generation of complex transportation systems, and it is urgently needed to develop a more intelligent Autonomous Transportation System (ATS). The autonomous characteristics of ATS are reflected in the business logic based on autonomous perception, learning, decision-making, and response, self-organization operation and autonomous service. Among them, autonomous public transportation is an important module of public transportation operation management services in ATS. Furthermore, autonomous public transportation informatization focuses on the ability of each target subject to self-organization operation and autonomous service in the informatization process.

[0003] The framework of autonomous public transportation informatization usually involves multiple target entities with different characteristics: the informatization system, that is, the coupling of multiple types of informatization systems to form the overall public transportation informatization. However, in actual construction, due to restrictions such as construction funds, it is often impossible to start the construction of all informatization systems in parallel. Therefore, it is necessary to study the construction sequence of the autonomous public transportation informatization system, propose an effective construction sequence determination method, and drive the autonomous process of public transportation informatization.

[0004] At present, most of the research on the construction sequence of public transportation information systems is based on empirical decision-making, but lacks quantitative evaluation. A few scholars have proposed quantitative research methods for determining the construction sequence, but it is difficult to obtain the quantitative values ​​of the indicators proposed in some studies, and how to quantitatively describe the business demand relationship of each system needs further research. In addition, scholars have only studied the sorting method for public transportation information systems. However, with the increase in the number of market information system suppliers, the model of parallel construction of multiple systems as the same batch is becoming more and more widely used. However, there are few studies on the construction sequence determination method of this batch advancement model. Summary of the invention

[0005] In view of this, an embodiment of the present invention provides an efficient and accurate method for determining the construction timing of an autonomous public transportation information system.

[0006] One aspect of the present invention provides a method for determining a construction sequence of an autonomous public transportation information system, comprising:

[0007] Obtain business indicators and data indicators that affect the timing of autonomous public transportation information system construction;

[0008] Assigning weights to the business indicators and the data indicators;

[0009] According to the weight value of each indicator, the linear weighted summation method is used to determine the comprehensive importance score of each public transportation information system;

[0010] According to the comprehensive importance scores of each public transportation information system, a 0-1 planning model is established with the goal of maximizing the overall comprehensive importance of informationization;

[0011] The 0-1 planning model is used to determine the construction sequence of the autonomous public transportation information system.

[0012] Optionally, the method further comprises:

[0013] Solving the 0-1 programming model according to the greedy algorithm to obtain a solution result of the 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization;

[0014] Taking the efficiency of information construction as the evaluation index, the method for determining the construction sequence of autonomous public transportation information system is quantitatively tested.

[0015] Optionally, the obtaining of business indicators and data indicators that affect the construction sequence of the autonomous public transportation information system includes:

[0016] Represent a vertex of the directed graph as a business, and determine the corresponding business directed graph based on the business process diagram;

[0017] Configure the system business in-degree as the sum of the in-degrees of all the businesses in the system, and configure the system business out-degree as the sum of the out-degrees of all the businesses in the system;

[0018] Autonomous availability is configured as information to determine whether the equipment required for collecting data of the system has been purchased and installed, and autonomous supportability is configured as information to determine whether the system is a key system for solving the problem of autonomous data flow;

[0019] The system service in-degree, the system service out-degree, the autonomous availability and the autonomous supportability are quantified to determine the service index and the data index.

[0020] Optionally, the weighting of the business indicator and the data indicator includes:

[0021] Construct the initial decision matrix for each information system;

[0022] The initial decision matrix is ​​subjected to dimensionless processing and trend processing of indicators to obtain a target decision matrix;

[0023] According to the target decision matrix, determining indicator variability and indicator conflict;

[0024] Determining the amount of information contained in each indicator based on the indicator variability and the indicator conflict;

[0025] Determine the objective weight of each indicator according to the amount of information contained in each indicator;

[0026] The calculation formula of the index conflict is:

[0027]

[0028] R j A quantitative indicator representing the conflict between the jth indicator and other indicators; r jk is the correlation coefficient between the jth indicator and the kth indicator.

[0029] Optionally, in the step of determining the comprehensive importance score of each public transportation information system by using a linear weighted summation method according to the weight value of each indicator,

[0030] The calculation formula of the comprehensive importance score is:

[0031] i=1,2,...,I;j=1,2,...,J

[0032] Among them, U i represents the comprehensive importance score of the ith public transportation information system; w j represents the weight of the jth indicator; a ij Represents the corresponding indicator in the target decision matrix.

[0033] Optionally, the 0-1 planning model is established with the goal of maximizing the overall comprehensive importance of informationization according to the comprehensive importance scores of each public transportation informationization system, including:

[0034] Establish the objective function of the 0-1 planning model with the goal of maximizing the overall comprehensive importance of informatization;

[0035] Configure the model constraints of the 0-1 planning model with the goal of maximizing the overall comprehensive importance of informatization;

[0036] According to the objective function and the model constraints, a 0-1 planning model is established with the goal of maximizing the overall comprehensive importance of informatization.

[0037] Optionally, the 0-1 programming model is solved according to the greedy algorithm to obtain a solution result of the 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization, including

[0038] Configure the first greedy strategy, and select the batch with the highest priority in each step to determine the corresponding information system;

[0039] Configure the second greedy strategy, and select the system with the greatest comprehensive importance that meets the capital constraint to join the corresponding batch at each step;

[0040] According to the first greedy strategy and the second greedy strategy, a target process for solving a 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization is determined.

[0041] Optionally, the information construction efficiency is used as an evaluation index to quantitatively test the method for determining the construction sequence of the autonomous public transportation information system, including:

[0042] Calculate the capital utilization rate from the perspective of capital use to determine the proportion of the planned construction costs of multiple batches to the sum of the total system construction costs;

[0043] Calculate the informatization contribution rate from the perspective of informatization contribution to determine the proportion of the sum of the system comprehensive importance in multiple batches to the sum of the comprehensive importance of all systems;

[0044] Calculate the construction period from the perspective of construction period to determine the proportion of the saved construction period to the total construction period of the entire system;

[0045] Determine the efficiency of information construction according to the capital utilization rate, the information contribution rate and the construction period;

[0046] The information construction efficiency is used as an evaluation index to test the method for determining the construction sequence of the autonomous public transportation information system.

[0047] Another aspect of the present invention is to provide a device for determining a construction sequence of an autonomous public transportation information system, including:

[0048] The first module is used to obtain business indicators and data indicators that affect the construction timing of the autonomous public transportation information system;

[0049] The second module is used to assign weights to the business indicators and the data indicators;

[0050] The third module is used to determine the comprehensive importance score of each public transportation information system by using the linear weighted summation method according to the weight value of each indicator;

[0051] The fourth module is used to establish a 0-1 planning model with the goal of maximizing the overall comprehensive importance of informationization based on the comprehensive importance scores of each public transportation informationization system;

[0052] The 0-1 planning model is used to determine the construction sequence of the autonomous public transportation information system.

[0053] Another aspect of an embodiment of the present invention further provides an electronic device, including a processor and a memory;

[0054] The memory is used to store programs;

[0055] The processor executes the program to implement the method described above.

[0056] The embodiment of the present invention also discloses a computer program product or a computer program, which includes a computer instruction stored in a computer-readable storage medium. A processor of a computer device can read the computer instruction from the computer-readable storage medium, and the processor executes the computer instruction, so that the computer device executes the above method.

[0057] The embodiment of the present invention obtains business indicators and data indicators that affect the construction sequence of the autonomous public transportation information system; weights the business indicators and the data indicators; according to the weight values ​​of each indicator, a linear weighted summation method is used to determine the comprehensive importance score of each public transportation information system; according to the comprehensive importance score of each public transportation information system, a 0-1 planning model with the maximum overall comprehensive importance of informationization as the goal is established; wherein the 0-1 planning model is used to determine the construction sequence for the autonomous public transportation information system. The present invention improves efficiency and accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0059] Figure 1 An overall step flow chart provided for an embodiment of the present invention;

[0060] Figure 2 A schematic diagram of a business process diagram and a business directed graph provided by an embodiment of the present invention;

[0061] Figure 3 A specific flow chart of solving a 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization based on a greedy algorithm according to an embodiment of the present invention;

[0062] Figure 4 It is a directed graph of main businesses of 10 autonomous public transportation information systems in City A in the embodiment;

[0063] Figure 5 It is a schematic diagram of the comprehensive importance of each information system;

[0064] Figure 6 Build Gantt charts for various information systems. DETAILED DESCRIPTION

[0065] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0066] In view of the problems existing in the prior art, an embodiment of the present invention provides a method for determining the construction timing of an autonomous public transportation information system, comprising:

[0067] Obtain business indicators and data indicators that affect the timing of autonomous public transportation information system construction;

[0068] Assigning weights to the business indicators and the data indicators;

[0069] According to the weight value of each indicator, the linear weighted summation method is used to determine the comprehensive importance score of each public transportation information system;

[0070] According to the comprehensive importance scores of each public transportation information system, a 0-1 planning model is established with the goal of maximizing the overall comprehensive importance of informationization;

[0071] The 0-1 planning model is used to determine the construction sequence of the autonomous public transportation information system.

[0072] Optionally, the method further comprises:

[0073] Solving the 0-1 programming model according to the greedy algorithm to obtain a solution result of the 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization;

[0074] Taking the efficiency of information construction as the evaluation index, the method for determining the construction sequence of autonomous public transportation information system is quantitatively tested.

[0075] Optionally, the obtaining of business indicators and data indicators that affect the construction sequence of the autonomous public transportation information system includes:

[0076] Represent a vertex of the directed graph as a business, and determine the corresponding business directed graph based on the business process diagram;

[0077] Configure the system business in-degree as the sum of the in-degrees of all the businesses in the system, and configure the system business out-degree as the sum of the out-degrees of all the businesses in the system;

[0078] Autonomous availability is configured as information to determine whether the equipment required for collecting data of the system has been purchased and installed, and autonomous supportability is configured as information to determine whether the system is a key system for solving the problem of autonomous data flow;

[0079] The system service in-degree, the system service out-degree, the autonomous availability and the autonomous supportability are quantified to determine the service index and the data index.

[0080] Optionally, the weighting of the business indicator and the data indicator includes:

[0081] Construct the initial decision matrix for each information system;

[0082] The initial decision matrix is ​​subjected to dimensionless processing and trend processing of indicators to obtain a target decision matrix;

[0083] According to the target decision matrix, determining indicator variability and indicator conflict;

[0084] Determining the amount of information contained in each indicator based on the indicator variability and the indicator conflict;

[0085] Determine the objective weight of each indicator according to the amount of information contained in each indicator;

[0086] The calculation formula of the index conflict is:

[0087]

[0088] R j A quantitative indicator representing the conflict between the jth indicator and other indicators; r jk is the correlation coefficient between the jth indicator and the kth indicator.

[0089] Optionally, in the step of determining the comprehensive importance score of each public transportation information system by using a linear weighted summation method according to the weight value of each indicator,

[0090] The calculation formula of the comprehensive importance score is:

[0091] i=1,2,...,I;j=1,2,...,J

[0092] Among them, U i represents the comprehensive importance score of the ith public transportation information system; wj represents the weight of the jth indicator; a ij Represents the corresponding indicator in the target decision matrix.

[0093] Optionally, the 0-1 planning model is established with the goal of maximizing the overall comprehensive importance of informationization according to the comprehensive importance scores of each public transportation informationization system, including:

[0094] Establish the objective function of the 0-1 planning model with the goal of maximizing the overall comprehensive importance of informatization;

[0095] Configure the model constraints of the 0-1 planning model with the goal of maximizing the overall comprehensive importance of informatization;

[0096] According to the objective function and the model constraints, a 0-1 planning model is established with the goal of maximizing the overall comprehensive importance of informatization.

[0097] Optionally, the 0-1 programming model is solved according to the greedy algorithm to obtain a solution result of the 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization, including

[0098] Configure the first greedy strategy, and select the batch with the highest priority in each step to determine the corresponding information system;

[0099] Configure the second greedy strategy, and select the system with the greatest comprehensive importance that meets the capital constraint to join the corresponding batch at each step;

[0100] According to the first greedy strategy and the second greedy strategy, a target process for solving a 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization is determined.

[0101] Optionally, the information construction efficiency is used as an evaluation index to quantitatively test the method for determining the construction sequence of the autonomous public transportation information system, including:

[0102] Calculate the capital utilization rate from the perspective of capital use to determine the proportion of the planned construction costs of multiple batches to the sum of the total system construction costs;

[0103] Calculate the informatization contribution rate from the perspective of informatization contribution to determine the proportion of the sum of the system comprehensive importance in multiple batches to the sum of the comprehensive importance of all systems;

[0104] Calculate the construction period from the perspective of construction period to determine the proportion of the saved construction period to the total construction period of the entire system;

[0105] Determine the efficiency of information construction according to the capital utilization rate, the information contribution rate and the construction period;

[0106] The information construction efficiency is used as an evaluation index to test the method for determining the construction sequence of the autonomous public transportation information system.

[0107] Another aspect of the present invention is to provide a device for determining a construction sequence of an autonomous public transportation information system, including:

[0108] The first module is used to obtain business indicators and data indicators that affect the construction timing of the autonomous public transportation information system;

[0109] The second module is used to assign weights to the business indicators and the data indicators;

[0110] The third module is used to determine the comprehensive importance score of each public transportation information system by using the linear weighted summation method according to the weight value of each indicator;

[0111] The fourth module is used to establish a 0-1 planning model with the goal of maximizing the overall comprehensive importance of informationization based on the comprehensive importance scores of each public transportation informationization system;

[0112] The 0-1 planning model is used to determine the construction sequence of the autonomous public transportation information system.

[0113] Another aspect of an embodiment of the present invention further provides an electronic device, including a processor and a memory;

[0114] The memory is used to store programs;

[0115] The processor executes the program to implement the method described above.

[0116] The embodiment of the present invention also discloses a computer program product or a computer program, which includes a computer instruction stored in a computer-readable storage medium. A processor of a computer device can read the computer instruction from the computer-readable storage medium, and the processor executes the computer instruction, so that the computer device executes the above method.

[0117] The implementation process of the method of the present invention is described in detail below in conjunction with the accompanying drawings:

[0118] The present invention proposes a method for determining the construction sequence of an autonomous public transportation information system. The method first constructs quantitative indicators that reflect business relationships and data impacts, introduces the concept of directed graphs into the former, and proposes two indicators that quantitatively describe business demand relationships; secondly, the weights of each indicator are determined based on the CRITIC method, and the linear weighted sum method is used to determine the comprehensive importance of each system; then, under the constraint of the available construction funds for each batch, a 0-1 programming model with the maximum overall comprehensive importance of informatization as the goal is established; then, combined with the greedy algorithm for solving, the construction batches to which each system belongs and the construction sequence of each batch are obtained; finally, the efficiency of informatization construction is proposed as an evaluation index, and the method for determining the construction sequence of an autonomous public transportation information system is quantitatively tested. The present invention is applied to the determination of the construction sequence of an autonomous public transportation information system. Compared with the existing model, the advantages of this method are: 1) Four quantifiable indicators "system business in-degree", "system business out-degree", "autonomous availability" and "autonomous support" that reflect business relationships and data impacts are proposed to measure the comprehensive importance of each system. Among them, the concept of directed graph is introduced in the business aspect, and indicators that can quantitatively describe the logical relationships of various businesses are proposed; in terms of data, indicators that couple the characteristics of autonomous public transportation are proposed. 2) In view of the situation that multiple public transportation information systems can be built in parallel, a method based on comprehensive importance and 0-1 planning model is proposed to determine the construction batches and construction sequence of each information system in the batch advancement mode. 3) Comprehensively considering the three aspects of fund utilization, information contribution degree and construction period, the efficiency of information construction is proposed as an evaluation indicator, and the method for determining the construction sequence of autonomous public transportation information systems is quantitatively tested. The present invention can scientifically determine the construction sequence of autonomous public transportation information systems and provide reasonable construction opinions for decision makers.

[0119] Specifically, Figure 1 As shown in FIG. 1 , a construction timing determination method for an autonomous public transportation information system is provided. The specific classification process is as follows:

[0120] Step S1: Select indicators that affect the construction sequence of the autonomous public transportation information system from the aspects of business and data.

[0121] Step S2: Using the CRITIC (Criteria Importance Through Intercriteria Correlation) method, weights of the time series indicators that affect the construction of the autonomous public transportation information system are assigned.

[0122] Step S3: Determine the comprehensive importance score of each public transportation information system using the linear weighted sum method.

[0123] Step S4: Based on the comprehensive importance scores of each public transportation information system, a 0-1 planning model is established with the goal of maximizing the overall comprehensive importance of informationization.

[0124] Step S5: using a greedy algorithm, solve a 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization.

[0125] Step S6: Taking into account the use of funds, the degree of informatization contribution and the construction period, the efficiency of informatization construction is proposed as an evaluation indicator, and a quantitative test is conducted on the method for determining the construction sequence of the autonomous public transportation informatization system.

[0126] In step S1, the indicators that affect the construction sequence of the autonomous public transportation information system are selected from the two aspects of business and data, which specifically include the following steps:

[0127] Step 101, the present invention represents a vertex of a directed graph as a business, and the corresponding business directed graph can be determined according to the business process diagram, such as Figure 2 (a) As shown. For any information system, from the business perspective, the indicator "system business in-degree" is defined as the sum of the in-degrees of all businesses of the system. The larger the value, the later the construction sequence; the indicator "system business out-degree" is defined as the sum of the out-degrees of all businesses. The larger the value, the earlier the construction sequence.

[0128] Step 102: Figure 2 As shown in (b), for any information system, from the data aspect, the indicator “autonomous availability” is defined as whether the data collection equipment required by the system, such as surveillance cameras, GPS terminals, etc., has been purchased and installed, and can be seamlessly connected to data-driven self-organized operation and autonomous services after the system is built; the indicator “autonomous support” is defined as whether the information system is a system that collects, stores, processes, shares, and solves the problem of autonomous data flow, such as a data center.

[0129] Step 103: quantify the four indicators defined from the business and data aspects: "system business in-degree", "system business out-degree", "autonomous availability" and "autonomous supportability".

[0130] In step S2, the CRITIC method is used to assign weights to the time series indicators that affect the construction of the autonomous public transportation information system, which specifically includes the following steps:

[0131] Step 201: Index preprocessing. Suppose there are I information systems that need to determine the construction sequence, there are J evaluation indicators, and the corresponding value of the jth (=1, 2, ..., J) decision indicator of the i-th (=1, 2, ..., I) system is x ij , then construct the initial decision matrix X as shown in formula (1).

[0132]

[0133] The minimum and maximum value transformation method is used to transform the indicators into dimensionless and trend-oriented indicators: if the jth indicator is a positive indicator (the larger the value, the better), the processing formula is as shown in formula (2); if it is a reverse indicator (the smaller the value, the better), the processing formula is as shown in formula (3). The reverse indicator is transformed into a positive indicator after the minimum and maximum value method.

[0134]

[0135]

[0136] After the initial decision matrix X undergoes the minima-maxima transformation, the target decision matrix A can be obtained as shown in formula (4).

[0137]

[0138] Step 202: Determine the index variability. The standard deviation of the jth index is S j The calculation formula is as shown in formula (5).

[0139]

[0140] Step 203: Determine the index conflict. The quantitative index R of the conflict between the jth index and other indexes j The calculation formula is as shown in formula (6).

[0141]

[0142] Where: r jk is the correlation coefficient between the jth indicator and the kth indicator.

[0143] Step 204: Determine the amount of information contained in each indicator. The amount of information contained in the jth evaluation indicator D j The calculation is as shown in formula (7).

[0144] D j =S j R j , j = 1, 2, ..., J (7)

[0145] Step 205: Determine the objective weight of each indicator. The weight w of the jth (=1, 2, ..., J) indicator is j The calculation is as shown in formula (8).

[0146]

[0147] In step S3, the linear weighted sum method is used to determine the comprehensive importance score of each public transportation information system, which specifically includes the following steps:

[0148] Step 301: Calculate the comprehensive importance score U of the ith public transportation information system using the linear weighted sum method. i As shown in formula (9).

[0149]

[0150] In step S4, according to the comprehensive importance scores of each public transportation information system, a 0-1 planning model with the goal of maximizing the overall comprehensive importance of informationization is established, which specifically includes the following steps:

[0151] Step 401: Establish the objective function of the 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization U. When the construction funds are distributed in G batches, the construction funds available for the gth (=1, 2, ..., G) batch are R g , including the construction funds issued for this batch and the remaining construction funds for the batch that has been determined to include the system. Let the construction cost of the i-th autonomous public transportation information system be C i , determine the model objective function as shown in formula (10).

[0152]

[0153] In formula (10), k g,i is a 0-1 decision variable: k g,i =1 means that the i-th information system is constructed in the g-th batch; k g,i =0 means no.

[0154] Step 402: Set the model constraints of the 0-1 planning model with the goal of maximizing the overall comprehensive importance of informatization U. The sum of the construction costs of the systems included in the g-th batch should not be greater than the available construction funds R for the batch. g , as shown in formula (11); the i-th system can only belong to one construction batch, as shown in formula (12); the value constraints of each variable are shown in formula (13).

[0155]

[0156]

[0157] k g,i ∈{0, 1}, i=1, 2,...,I; g=1, 2,...,G (13)

[0158] In step S5, a greedy algorithm is used to solve a 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization, which specifically includes the following steps:

[0159] Step 501, in the greedy algorithm, solve the first greedy strategy of the 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization: at each step, the highest priority is selected, that is, the informatization system included in the construction batch with the smallest value g is determined.

[0160] Step 502, in the greedy algorithm, solve the second greedy strategy of the 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization: at each step, select the system with the largest comprehensive importance that meets the capital constraint to join the corresponding batch.

[0161] Step 503: Combining the first and second greedy strategies, the specific process of solving the 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization is determined as follows: Figure 3 shown.

[0162] In step S6, the three aspects of fund use, information technology contribution and construction period are comprehensively considered, and the information technology construction efficiency is proposed as an evaluation index. The method for determining the construction sequence of the autonomous public transportation information system is quantitatively tested, which specifically includes the following steps:

[0163] Step 601: Calculate the capital utilization rate α from the perspective of capital usage. g The calculation is the ratio of the planned construction cost of the g-th batch to the sum of the total system construction costs. The larger the value, the better.

[0164] Step 602: From the perspective of the degree of informatization contribution, the informatization contribution rate β g The calculation of is the ratio of the sum of the comprehensive importance of the systems in the g-th batch to the sum of the comprehensive importance of all systems. The larger the value, the better.

[0165] Step 603: From the aspect of construction period, calculate the ratio γ as the ratio of the planned construction period to the sum of the total system construction period, then 1-γ is the ratio of the saved construction period to the sum of the total system construction period, and the larger the value of 1-γ, the better.

[0166] Step 604: Use the information construction efficiency η as an evaluation index to test the method for determining the construction timing of the autonomous public transportation information system. The larger the value, the better. The calculation formula is shown in formula (14).

[0167]

[0168] This example takes the 10 autonomous public transportation information systems in City A as an example. For the 9 business systems and 1 data center that have been planned, it is necessary to determine the construction batches to which each system belongs and the construction sequence of each batch. After investigating the internal bus company and the market software suppliers, the construction cost of each system is determined as shown in Table 1. Table 1 introduces the main contents of the 10 autonomous public transportation information systems in City A, and clarifies the main business directed diagram of each system. Figure 4 shown.

[0169] Table 1

[0170]

[0171]

[0172] From Table 1, it can be seen that the construction of 10 systems requires a total of 10.15 million yuan. At this time, the construction funds are divided into G = 3 batches, and the amounts issued from the first to the third batch are 3 million yuan, 4 million yuan, and 3.15 million yuan respectively, and the interval between the release of funds in two adjacent batches is 12 months.

[0173] according to Figure 4 Based on the settings in Table 2 and Table 1, the indicators are quantified and the initial decision matrix X can be constructed as shown in formula (15). Among them, Table 2 is used to describe the evaluation indicators of the comprehensive importance of the information system.

[0174]

[0175] Table 2

[0176]

[0177]

[0178] Based on the decision matrix after the change of the minimum and maximum values, the CRITIC weight method is used to determine the weight of each indicator as shown in Table 3. Table 3 is used to describe the indicator weight assignment results based on the CRITIC method.

[0179] Table 3

[0180]

[0181] According to the calculated weights of each indicator and the decision matrix, determine the comprehensive importance of each information system. Figure 5 shown.

[0182] After determining the comprehensive importance of each information system, the model was constructed and solved, and the overall comprehensive importance of informationization was obtained as U = 3.368. Combined with the interval of 12 months between the release of two adjacent batches of funds, the Gantt charts of 10 autonomous bus information systems were obtained as follows: Figure 6 At this time, it would take 38 months to actually complete the construction of the entire information system.

[0183] The quantitative test results based on the method implemented in this paper are shown in Table 4. The information construction efficiency of the proposed method is 59.98%, which shows that the proposed method is effective.

[0184] Table 4 Quantitative test results based on the method of this implementation

[0185]

[0186] In summary, compared with the prior art, the present invention has the following advantages:

[0187] 1) Four quantifiable indicators, namely "system business in-degree", "system business out-degree", "autonomous availability" and "autonomous support", are proposed to reflect the business relationship and data impact, to measure the comprehensive importance of each system. In terms of business, the concept of directed graph is introduced, and indicators that can quantitatively describe the logical relationship of each business are proposed; in terms of data, indicators that couple the characteristics of autonomous public transportation are proposed.

[0188] 2) In view of the fact that multiple public transportation information systems can be constructed in parallel, a method based on comprehensive importance and 0-1 planning model is proposed to determine the construction batches and construction sequence of each information system in the batch advancement mode.

[0189] 3) Taking into account the use of funds, the degree of contribution of informatization and the construction period, the efficiency of informatization construction is proposed as an evaluation indicator, and a quantitative test is conducted on the method for determining the construction sequence of the autonomous public transportation informatization system.

[0190] In some selectable embodiments, the function / operation mentioned in the block diagram may not occur in the order mentioned in the operation diagram. For example, depending on the function / operation involved, the two boxes shown in succession can actually be executed substantially simultaneously or the boxes can sometimes be executed in reverse order. In addition, the embodiment presented and described in the flow chart of the present invention is provided by way of example, for the purpose of providing a more comprehensive understanding of technology. The disclosed method is not limited to the operation and logic flow presented herein. Selectable embodiments are expected, wherein the order of various operations is changed and the sub-operation of a part for which is described as a larger operation is performed independently.

[0191] In addition, although the present invention is described in the context of functional modules, it should be understood that, unless otherwise specified, one or more of the functions and / or features described may be integrated into a single physical device and / or software module, or one or more functions and / or features may be implemented in separate physical devices or software modules. It is also understood that a detailed discussion of the actual implementation of each module is unnecessary for understanding the present invention. More specifically, in view of the properties, functions, and internal relationships of the various functional modules in the device disclosed herein, the actual implementation of the module will be understood within the conventional skills of the engineer. Therefore, those skilled in the art can implement the present invention set forth in the claims without excessive experimentation using ordinary techniques. It is also understood that the specific concepts disclosed are merely illustrative and are not intended to limit the scope of the present invention, which is determined by the full scope of the appended claims and their equivalents.

[0192] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.

[0193] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0194] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0195] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0196] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0197] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

[0198] The above is a specific description of the preferred implementation of the present invention, but the present invention is not limited to the described embodiments. Those skilled in the art may make various equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.

Claims

1. A method for determining the construction sequence of an autonomous public transportation information system, characterized in that: include: Obtain business indicators and data indicators that affect the timing of autonomous public transportation information system construction; Assigning weights to the business indicators and the data indicators; According to the weight value of each indicator, the linear weighted summation method is used to determine the comprehensive importance score of each public transportation information system; According to the comprehensive importance scores of each public transportation information system, a 0-1 planning model is established with the goal of maximizing the overall comprehensive importance of informationization; Solving the 0-1 programming model according to the greedy algorithm to obtain a solution result of the 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization; Taking the efficiency of information construction as the evaluation index, the method of determining the construction sequence of autonomous public transportation information system is quantitatively tested; The 0-1 planning model is used to determine the construction sequence of the autonomous public transportation information system; The business indicators and data indicators that affect the construction sequence of the autonomous public transportation information system include: Represent a vertex of the directed graph as a business, and determine the corresponding business directed graph based on the business process diagram; Configure the system business in-degree as the sum of the in-degrees of all the businesses in the system, and configure the system business out-degree as the sum of the out-degrees of all the businesses in the system; Autonomous availability is configured as information to determine whether the equipment required for collecting data of the system has been purchased and installed, and autonomous supportability is configured as information to determine whether the system is a key system for solving the problem of autonomous data flow; Quantifying the system service in-degree, the system service out-degree, the autonomous availability and the autonomous supportability to determine the service index and the data index; The weighting of the business indicator and the data indicator includes: Construct the initial decision matrix for each information system; The expression of the initial decision matrix X is: In the initial decision matrix, there are I information systems that need to determine the construction sequence, J evaluation indicators, and the corresponding value of the jth decision indicator of the i-th system is x ij ; The initial decision matrix is ​​subjected to dimensionless processing and trend processing of indicators to obtain a target decision matrix; Among them, the expression of the target decision matrix A is: Among them, a ij Represents the indicator x ij The result of dimensionless and trend-based processing; According to the target decision matrix, determining indicator variability and indicator conflict; Among them, the index conflict R j The calculation formula is: Among them, R j A quantitative indicator representing the conflict between the jth indicator and other indicators; r jk is the correlation coefficient between the jth indicator and the kth indicator; According to the indicator variability and the indicator conflict, the amount of information contained in each indicator is determined; wherein the amount of information D j The calculation formula is: D j =S j R j ,j=1,2,...,J Among them, S j represents the variability of the indicator; Determine the objective weight of each indicator according to the amount of information contained in each indicator; Wherein, the expression of the objective weight is: Among them, w j represents said objective weight; In the step of establishing a 0-1 planning model with the goal of maximizing the overall comprehensive importance of informatization according to the comprehensive importance scores of each public transportation informatization system, the expression of the objective function corresponding to the goal of maximizing the overall comprehensive importance of informatization is: Among them, U represents the overall comprehensive importance of informatization; when the construction funds are distributed in G batches, the construction funds available for the gth batch are R g , including the construction funds issued for this batch and the remaining construction funds for the batch that has been determined to include the system; k g,i is a 0-1 decision variable; The 0-1 programming model is solved according to the greedy algorithm to obtain the solution result of the 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization, including: Configure the first greedy strategy, and select the batch with the highest priority in each step to determine the corresponding information system; Configure the second greedy strategy, and select the system with the greatest comprehensive importance that meets the capital constraint to join the corresponding batch at each step: According to the first greedy strategy and the second greedy strategy, a target process for solving a 0-1 programming model with the goal of maximizing the overall comprehensive importance of informatization is determined.

2. The method for determining the construction sequence of an autonomous public transportation information system according to claim 1, characterized in that: In the step of determining the comprehensive importance score of each public transportation information system by using a linear weighted summation method according to the weight value of each indicator, The calculation formula for the comprehensive importance score is: Among them, U i represents the comprehensive importance score of the ith public transportation information system; w j represents the weight of the jth indicator; a ij Represents the corresponding indicator in the target decision matrix.

3. The method for determining the construction sequence of an autonomous public transportation information system according to claim 1, characterized in that: According to the comprehensive importance scores of each public transportation information system, a 0-1 planning model is established with the goal of maximizing the overall comprehensive importance of informationization, including: Establish the objective function of the 0-1 planning model with the goal of maximizing the overall comprehensive importance of informatization; Configure the model constraints of the 0-1 planning model with the goal of maximizing the overall comprehensive importance of informatization: According to the objective function and the model constraints, a 0-1 planning model is established with the goal of maximizing the overall comprehensive importance of informatization.

4. The method for determining the construction sequence of an autonomous public transportation information system according to claim 1, characterized in that: Taking the efficiency of information construction as the evaluation index, the method of determining the construction sequence of autonomous public transportation information system is quantitatively tested, including: Calculate the capital utilization rate from the perspective of capital use to determine the proportion of the planned construction costs of multiple batches to the sum of the total system construction costs; Calculate the informatization contribution rate from the perspective of informatization contribution to determine the proportion of the sum of the system comprehensive importance in multiple batches to the sum of the comprehensive importance of all systems; Calculate the construction period from the perspective of construction period to determine the proportion of the saved construction period to the total construction period of the entire system; Determine the efficiency of information construction according to the capital utilization rate, the information contribution rate and the construction period; The information construction efficiency is used as an evaluation index to test the method for determining the construction sequence of the autonomous public transportation information system.

5. A device using the method for determining the construction sequence of an autonomous public transportation information system as described in any one of claims 1 to 4, characterized in that: include: The first module is used to obtain business indicators and data indicators that affect the construction timing of the autonomous public transportation information system; The second module is used to assign weights to the business indicators and the data indicators; The third module is used to determine the comprehensive importance score of each public transportation information system by using the linear weighted summation method according to the weight value of each indicator; The fourth module is used to establish a 0-1 planning model with the goal of maximizing the overall comprehensive importance of informationization according to the comprehensive importance scores of each public transportation informationization system; The 0-1 planning model is used to determine the construction sequence of the autonomous public transportation information system.

6. An electronic device, characterized in that: including a processor and a memory; The memory is used to store programs; The processor executes the program to implement the method according to any one of claims 1 to 4.