An emergency control method for AC / DC hybrid power grid based on static voltage stability domain
Through two-stage clustering and least squares fitting, the hyperplane boundary of the static voltage stability domain is found in the AC-DC hybrid power grid, and the problems of large calculation amount and large error in the existing technology are solved, and the rapid generation of emergency control strategies is realized. Meet the real-time needs of power grid operation.
Patent Information
- Application Number
- CN202210235399.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-10
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-03-10
AI Technical Summary
The prior art studies on the static voltage stability domain in AC-DC hybrid power grids are less studied. The traditional method has a large amount of calculation and strong nonlinearity in the stability domain boundary, resulting in large errors and difficult to effectively carry out emergency control.
A two-stage clustering method is used to find the critical SNB point, and a static voltage stable domain hyperplane boundary is generated through least squares fitting, and a linear optimization model is constructed based on the relative positions of the operating point and the hyperplane to quickly generate an emergency control strategy.
It realizes the rapid generation of emergency control strategies in AC and DC hybrid power grid, reduces computing complexity and error, and can be applied online to meet the real-time needs of power grid operation.
Smart Images

Figure CN114552679B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to an emergency control method for an AC / DC hybrid power grid based on a static voltage stability domain, belonging to the field of power system stability control. An operating point that can be approximately characterized by the same hyperplane is found through two-stage clustering and is fitted as a hyperplane boundary of the static voltage stability domain. A linear optimization model is constructed by utilizing the relative position relationship between the operating point and the hyperplane, and an emergency control strategy for rapidly generating the restoration of static voltage stability is generated. Background Art
[0002] my country's power system has formed an AC / DC hybrid power grid. With the access of the DC system, the coupling characteristics of the power grid have changed fundamentally, and the problem of static voltage stability of the power system has become more complicated. After a power system failure, the balance point may be lost in extreme cases, resulting in major consequences and serious losses. In order to leave a certain margin for the system operation point, or to maintain static voltage stability after a failure, necessary control measures must be adopted. Compared with the traditional point-by-point method, the domain method has received more and more attention in the field of power grid operation and monitoring because it can be calculated offline and applied online, and can provide global information of the system, and its physical meaning is intuitive.
[0003] At present, the research on the prevention and emergency control of power grids by using the static voltage stability domain method mainly focuses on traditional AC power grids, while there is little research on the stability domain of AC / DC hybrid power grids. After the DC system is connected to the power grid, the static voltage stability domain has new characteristics, and the application of the stability domain should also have new considerations. Summary of the invention
[0004] Purpose of the invention: The purpose of the present invention is to overcome the problem of large amount of calculation in traditional methods, strong nonlinearity of the boundary of the stability domain, and large errors in the approximate representation using a hyperplane, and propose an emergency control method for an AC / DC hybrid power grid based on a static voltage stability domain. This method uses the idea of clustering to find critical SNB points that can be approximately represented as a hyperplane, and generates a hyperplane boundary, and finally uses the geometric relationship between the operating point and the hyperplane boundary to quickly generate a stable control strategy.
[0005] Technical solution: To achieve the purpose of the present invention, the technical solution adopted by the present invention is:
[0006] An emergency control method for an AC / DC hybrid power grid based on a static voltage stability domain comprises the following steps:
[0007] Step 1: Generate a large number of initial load points according to the characteristics of the power grid load;
[0008] Step 2: Cluster the generated load points to obtain the cluster center of each type of load;
[0009] Step 3: Perform continuous power flow calculation on the cluster center obtained by clustering to obtain the critical SNB (Saddle Node Bifurcation) point of this load;
[0010] Step 4: Obtain the tangent plane normal vector corresponding to each critical SNB point, and cluster the tangent plane normal vectors again to obtain a sufficient number of critical SNB points belonging to the same category;
[0011] Step 5: Perform least square hyperplane fitting on the critical SNB points belonging to the same category to obtain the hyperplane approximate boundary of the static voltage stability domain of the AC / DC hybrid power grid;
[0012] Step 6: Generate an emergency control strategy based on the relative position of the operating point and the boundary surface of the stable region.
[0013] Furthermore, the specific method of generating a large number of initial operating points according to the characteristics of the power grid load in step 1 is to set the range of the DC system control value and the different load direction vectors (hereinafter represented by variable b), and use the Monte Carlo method to generate 10,000 initial load points to form the original sample space Φ1 = {x1, x2, ..., x N}, where x i (i=1,2,3,…,N) is the initial power injection vector, N is the number of samples in Φ1, which is 10000 in this paper;
[0014] Furthermore, in step 2, the generated load points are clustered to obtain the cluster center of each type of load by using a vector quantization method to cluster the generated load points, cluster the operating points in Φ1 according to the similarity of the load growth direction, and form a new sample space Φ2 = {c1, c2, ..., c M}, where c1, c2, …, c M are the M cluster centers obtained, where M is the number of cluster categories;
[0015] Furthermore, in step 2, the generated load points are clustered, and the angle between vectors is used as the similarity judgment criterion in the process of obtaining the cluster center of each type of load. A sample x1 is randomly selected in the sample space Φ1 as the cluster center c1 of the first cluster category Γ1, and the growth direction b1 of x1 is used as the growth direction vector t1 of the first cluster category Γ1. For the pth (p = 1, 2, 3, ..., N) sample, the growth direction b1 of each sample point is calculated. p (p=1,2,3,…,N) and the growth direction of cluster categories t q The angle between (q=1,2,3,…,M) is given by
[0016]
[0017] Where q = 1, 2, ..., M, M is the number of existing clustering categories, θ pq is the angle between the two vectors, b p ,t q Represent the sample point direction vector and cluster category direction vector respectively;
[0018] Furthermore, in step 2, the generated load points are clustered to obtain the cluster center of each type of load and the corresponding load points are determined. p The cluster category represented by the growth direction with the smallest angle Γ similar and angle θ similar , if the required angle θ similar If the minimum threshold is not met, the direction vector b p As the new cluster center, at this time M=M+1, t M =b p (meaning to change the direction vector b p As the new cluster center), continue clustering; if the angle θ similar If the minimum threshold is met, x p The load Γ that is classified as the cluster center similar , and update the cluster center according to the following formula:
[0019]
[0020] Where N similar To include x p Then the cluster category Γ similar The total number of samples, c similar represents the cluster center of the cluster category, t similar Indicates the growth direction of the cluster category;
[0021] Furthermore, in step 3, the cluster centers obtained by clustering are subjected to continuous power flow calculation to obtain the critical SNB point of the load, and all the obtained cluster centers Φ2={c1,c2,...,c M} Carry out continuous power flow calculation of AC / DC hybrid power grid respectively to obtain the critical SNB point corresponding to the load direction;
[0022] Furthermore, the method for calculating the tangent plane normal vector in step 4 is as follows: assuming that the initial point is A and the load coordinates of this point are (l1, l2, ..., l m )(where m is the number of system load nodes), starting from point A along the load direction [d1, d2,…, d m ] The critical SNB point obtained by continuous power flow calculation is B, λ is the critical load margin of point B, and m perturbation load growth directions [d1+Δd1,d2,…,d m],[d1,d2+Δd2,…,d m ],…,[d1,d2,…,d m +Δd m ], and the critical SNB points are B1, B2, ..., B m , the load margins are λ+Δλ1, λ+Δλ2,..., λ+Δλ m , then the normal vector of the tangent plane in m-dimensional space is
[0023] Furthermore, the tangent plane normal vectors described in step 4 are clustered again to obtain a sufficient number of critical SNB points belonging to the same category, which is to cluster the tangent plane normal vectors at the critical SNB points corresponding to the obtained cluster centers using the vectorized clustering method described above, and the method idea is exactly the same as the clustering of the initial load direction;
[0024] Furthermore, the specific method of performing least squares hyperplane fitting on the critical SNB points belonging to the same category in step 5 to obtain the hyperplane approximate boundary of the static voltage stability domain of the AC / DC hybrid power grid is to assume that there are k categories of critical SNB points clustered in the previous step, L = {L1, L2, ..., L k}, where the elements in L represent a class of critical SNB points, and the wth class is L w ={y1,y2,…y n}, where n is L w The number of critical SNB points in the system, n, is not less than the dimension of the system power space, y r (r=1,2,…,n) are the coordinates of the critical SNB points, then category L w The corresponding hyperplane coefficients can be obtained through the following linear equations:
[0025]
[0026] Where m≤n, each row in the matrix represents the coordinates of a critical SNB point, so there are n critical SNB points in total, m has the same meaning as above, a1, a2, ..., a m is the coefficient of the hyperplane. After performing the least squares fitting on the load points corresponding to each cluster center, several stable domain hyperplane boundaries are obtained, which are:
[0027]
[0028] Among them, a u represents the hyperplane coefficient of the load node, c v represents the hyperplane coefficient of the converter station node, P Lu represents the load node, P dvRepresents the converter station node. Assuming that there are m injection nodes and k DC lines in the system, then u=1,2,3,…,m,v=1,2,3,…,k. The schematic diagram of the hyperplane boundary generation process is as follows Figure 2 shown.
[0029] Furthermore, in step 6, an emergency control method is generated according to the relative position of the operating point and the boundary surface of the stable region. Specifically, according to the analytical expression of the hyperplane, a minimum power adjustment model can be constructed as follows:
[0030]
[0031] Among them, Δz is the control measure vector, w g is the control cost of each node, d(z-Δz,s,S1) is the distance between the load and the hyperplane S in the specific load direction s after the control measure is applied cr The distance can be expressed using the high-dimensional Euclidean space distance calculation formula, cr represents the hyperplane boundary obtained by all fittings, λ cr represents the load margin threshold (i.e., the minimum distance from the operating point to the boundary hyperplane), z min 、z max Respectively represent the minimum and maximum action amounts of the control measures. The optimization result is the emergency control strategy. The model is a linear programming model, which is very convenient and fast to solve and can achieve the effect of online application.
[0032] Beneficial effects: This paper describes an emergency control method for an AC / DC hybrid power grid based on a static voltage stability domain. Through two-stage clustering, a large number of critical SNB points that can be approximately represented by the same hyperplane are found, and the hyperplane boundary of the stability domain is obtained by fitting using the least squares method. According to the relative position relationship between the operating point and the hyperplane in the power space (Euclidean space), the linear programming model is solved to quickly obtain the system control strategy. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 is a flow chart of the present invention;
[0034] Figure 2 Generate a flow chart for the stability domain hyperplane boundary. DETAILED DESCRIPTION
[0035] The present invention will be further described below in conjunction with the accompanying drawings:
[0036] like Figure 1 As shown, the present invention discloses an emergency control method for an AC / DC hybrid power grid based on a static voltage stability domain, comprising the following steps:
[0037] First, according to the characteristics of the power grid load as described in step 1, a large number of initial operating points are generated, the range of the DC system control value and the different load direction vectors (hereinafter represented by variable b) are set, and 10,000 initial load points are generated using the Monte Carlo method to form the original sample space Φ1 = {x1, x2, ..., x N}, where x i (i=1,2,3,…,N) is the initial power injection vector, N is the number of samples in Φ1, which is 10000 in this paper;
[0038] Then, the generated load points are clustered using the vector quantization method. The operating points in Φ1 are clustered according to the similarity of the load growth direction, and a new sample space Φ2 = {c1, c2, ..., c M}, where c1, c2, …, c M are the M cluster centers obtained, where M is the number of cluster categories;
[0039] Then, using the angle between vectors as the similarity criterion, a sample x1 is randomly selected in the sample space Φ1 as the cluster center c1 of the first cluster category Γ1, and the growth direction b1 of x1 is used as the growth direction vector t1 of the first cluster category Γ1. For the pth (p = 1, 2, 3, ..., N) sample, the growth direction b of each sample point is calculated. p (p=1,2,3,…,N) and the growth direction of cluster categories t q The angle between (q=1,2,3,…,M) is given by
[0040]
[0041] Where q = 1, 2, ..., M, M is the number of existing clustering categories, θ pq is the angle between the two vectors, b p ,t q Represent the sample point direction vector and cluster category direction vector respectively;
[0042] Then, determine the p The cluster category represented by the growth direction with the smallest angle Γ similar and angle θ similar , if the required angle θ similar If the minimum threshold is not met, the direction vector b p As the new cluster center, at this time M=M+1, t M =b p (meaning to change the direction vector b p As the new cluster center), continue clustering; if the angle θ similar If the minimum threshold is met, x pThe load Γ that is classified as the cluster center similar , and update the cluster center according to the following formula:
[0043]
[0044] Where N similar To include x p Then the cluster category Γ similar The total number of samples, c similar represents the cluster center of the cluster category, t similar Indicates the growth direction of the cluster category;
[0045] Then, for all the obtained cluster centers Φ2={c1,c2,...,c M} Carry out continuous power flow calculation of AC / DC hybrid power grid respectively to obtain the critical SNB point corresponding to the load direction;
[0046] Then, the method to calculate the normal vector of the tangent plane is as follows: Assume that the initial point is A and the load coordinates of this point are (l1,l2,…,l m )(where m is the number of system load nodes), starting from point A along the load direction [d1, d2,…, d m ] The critical SNB point obtained by continuous power flow calculation is B, λ is the critical load margin of point B, and m perturbation load growth directions [d1+Δd1,d2,…,d m ],[d1,d2+Δd2,…,d m ],…,[d1,d2,…,d m +Δd m ], and the critical SNB points are B1, B2, ..., B m , the load margins are λ+Δλ1, λ+Δλ2,..., λ+Δλ m , then the normal vector of the tangent plane in m-dimensional space is
[0047] Then, the normal vectors of the tangent plane at the critical SNB points corresponding to each cluster center are clustered using the vectorized clustering method described above. The idea of the method is exactly the same as that of clustering the initial load direction.
[0048] Then, the critical SNB points belonging to the same category are fitted by the least squares hyperplane to obtain the approximate boundary of the static voltage stability domain hyperplane of the AC / DC hybrid power grid. The fitting method is: Assume that there are k categories of critical SNB points obtained by clustering in the previous step, L = {L1, L2, …, L k}, where the elements in L represent a class of critical SNB points, and the wth class is L w ={y1,y2,…y n}, where n is L w The number of critical SNB points in the system, n, is not less than the dimension of the system power space, y r (r=1,2,…,n) are the coordinates of the critical SNB points, then category L w The corresponding hyperplane coefficients can be obtained through the following linear equations:
[0049]
[0050] Where m≤n, each row in the matrix represents the coordinates of a critical SNB point, so there are n critical SNB points in total, m has the same meaning as above, a1, a2, ..., a m is the coefficient of the hyperplane. After performing the least squares fitting on the load points corresponding to each cluster center, several stable domain hyperplane boundaries are obtained, which are:
[0051]
[0052] Among them, a u represents the hyperplane coefficient of the load node, c v represents the hyperplane coefficient of the converter station node, P Lu represents the load node, P dv Represents the converter station node. Assuming that there are m injection nodes and k DC lines in the system, then u=1,2,3,…,m,v=1,2,3,…,k.
[0053] The schematic diagram of the hyperplane boundary generation process is as follows Figure 2 shown.
[0054] Then, according to the relative position of the operating point and the boundary surface of the stable region, the emergency control strategy is generated. According to the analytical expression of the hyperplane, the minimum power adjustment model can be constructed as follows:
[0055]
[0056] Among them, Δz is the control measure vector, w g is the control cost of each node, d(z-Δz,s,S1) is the distance between the load and the hyperplane S in the specific load direction s after the control measure is applied cr The distance can be expressed using the high-dimensional Euclidean space distance calculation formula, cr represents the hyperplane boundary obtained by all fittings, λ cr represents the load margin threshold (i.e., the minimum distance from the operating point to the boundary hyperplane), z min 、z max Respectively represent the minimum and maximum action amounts of the control measures. The optimization result is the emergency control strategy. The model is a linear programming model, which is very convenient and fast to solve and can achieve the effect of online application.
[0057] Taking the modified New England 39-bus system as an example, the method of static voltage stability domain is used to perform emergency control on the AC / DC hybrid power grid. This paper describes the specific implementation method based on this.
[0058] First, 10,000 initial operating points were generated using the Monte Carlo method;
[0059] Afterwards, the generated load points were clustered, and the minimum clustering angle was set to 5°. A total of 1505 cluster centers were obtained, and continuous flow calculation was performed on the load direction of the cluster center to obtain the critical SNB points; then the tangent plane normal vectors at each critical SNB point were clustered for the second time, and the minimum clustering angle was set to 10°. The number of hyperplanes obtained by fitting was 15. In order to meet the number of fitting points required by the least squares fitting method, 100 initial load points were added, and finally 20 hyperplane boundaries were obtained. The average fitting error was 5.2%. The coefficients of one of the hyperplanes are shown in Table 1, where nodes 14 and 4 are DC converter station nodes, and the other nodes are load nodes. Variable P Lu The coefficient is a in the previous text u , variable P dv The coefficient is c in the previous text v .
[0060] Table 1 Hyperplane coefficients
[0061]
[0062]
[0063] Afterwards, the geometric relationship between the system operating point and the obtained hyperplane boundaries is used to obtain the stable emergency control strategy. The results are shown in Table 2:
[0064] Table 2 Control strategy
[0065]
[0066]
[0067] In the table, the left column indicates the control quantity of the system, and the right column indicates the size of the control quantity that needs to be adjusted. In this article, for the load node, the control quantity is the amount of load shedding, and for the DC system node, the control quantity is the DC power adjustment amount.
[0068] In this example, the load required for emergency control is 0.7421 pu, and the system load margin meets the requirements after emergency control. The strategy generation time is only 1.5 seconds, which can meet the requirements of online applications.
[0069] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. An emergency control method for an AC / DC hybrid power grid based on a static voltage stability domain, characterized in that: The method comprises the following steps: Step 1: Generate initial load points according to grid load characteristics; Step 2: Cluster the generated load points to obtain the cluster center of each type of load; Step 3: Perform continuous power flow calculation on the cluster center obtained by clustering to obtain the critical SNB point of this load; Step 4: Obtain the tangent plane normal vector corresponding to each critical SNB point, and cluster the tangent plane normal vectors again to obtain a sufficient number of critical SNB points belonging to the same category; Step 5: Perform least square hyperplane fitting on the critical SNB points belonging to the same category to obtain the hyperplane approximate boundary of the static voltage stability domain of the AC / DC hybrid power grid; Step 6: Generate an emergency control method based on the relative position of the operating point and the boundary surface of the stable region; The specific method of generating the emergency control method according to the relative position of the operating point and the boundary surface of the stable region described in step 6 is to construct the minimum power adjustment model according to the analytical expression of the hyperplane: Among them, Δz is the control measure vector, w g is the control cost for each load point, d(z-Δz,s,S1) is the distance between the load and the hyperplane S in the specific load direction s after the control measure is applied cr The distance can be expressed using the high-dimensional Euclidean space distance calculation formula, cr represents the hyperplane boundary obtained by all fittings, λ cr represents the load margin threshold, i.e., the minimum distance from the operating point to the boundary hyperplane, z min 、z max They represent the minimum and maximum action amounts of the control measures respectively.
2. The method for emergency control of an AC / DC hybrid power grid based on a static voltage stability domain according to claim 1, characterized in that: The specific method of generating the initial load points according to the characteristics of the power grid load in step 1 is: setting the range of the DC system control value and the different load direction vectors b, using the Monte Carlo method to generate 10,000 initial load points, forming the original sample space Φ1 = {x1, x2, ..., x N }, where xi,i=1,2,3,…,N is the initial power injection vector and N is the number of samples in Φ1.
3. The method for emergency control of an AC / DC hybrid power grid based on a static voltage stability domain according to claim 2, characterized in that: In step 2, the generated load points are clustered to obtain the cluster center of each type of load. Specifically, the generated load points are clustered using the vector quantization method, and the operating points in Φ1 are clustered according to the similarity of the load growth direction. A new sample space Φ2 = {c1, c2, ..., c M }, where c1, c2, …, c M are the M cluster centers obtained, and M is the number of cluster categories.
4. The method for emergency control of an AC / DC hybrid power grid based on a static voltage stability domain according to claim 2, characterized in that: In step 2, the generated load points are clustered to obtain the cluster center of each type of load. The angle between vectors is used as the similarity judgment criterion. A sample x1 is randomly selected in the sample space Φ1 as the cluster center c1 of the first cluster category Γ1. The growth direction b1 of x1 is used as the growth direction vector t1 of the first cluster category Γ1. For the pth, p = 1, 2, 3, ..., N samples, the growth direction b of each sample point is calculated. p , p=1,2,3,…,N and the cluster category growth direction t q , q=1,2,3,…,M, the formula is Where q = 1, 2, ..., M, M is the number of existing clustering categories, θ pq is the angle between the two vectors, b p ,t q Represent the sample point direction vector and cluster category direction vector respectively.
5. The method for emergency control of an AC / DC hybrid power grid based on a static voltage stability domain according to claim 4, characterized in that: In step 2, the generated load points are clustered to obtain the cluster center of each type of load, and the load points with the same type as b are determined. p The cluster category represented by the growth direction with the smallest angle Γ similar and angle θ similar , if the required angle θ similar If the minimum threshold is not met, the direction vector b p As the new cluster center, at this time M=M+1, t M =b p The meaning is to change the direction vector b p As the new cluster center, continue clustering; if the angle θ similar If the minimum threshold is met, x p The load Γ that is classified as the cluster center similar , and update the cluster center according to the following formula: Where N similar To include x p Then the cluster category Γ similar The total number of samples, c similar represents the cluster center of the cluster category, t similar Indicates the growth direction of the cluster category.
6. The method for emergency control of an AC / DC hybrid power grid based on a static voltage stability domain according to claim 1, characterized in that: In the process of performing continuous power flow calculation on the cluster centers obtained by clustering in step 3 to obtain the critical SNB point of the load, it is necessary to calculate all the cluster centers Φ2={c1,c2,...,c M }Carry out continuous power flow calculations for the AC / DC hybrid power grid respectively to obtain the critical SNB point corresponding to the load direction of each cluster center in step 2.
7. The method for emergency control of an AC / DC hybrid power grid based on a static voltage stability domain according to claim 1, characterized in that: The method for calculating the normal vector of the tangent plane in step 4 is as follows: assuming that the initial point is A and the load coordinates of this point are l1, l2, …, l m , where m is the number of system load nodes and DC converter stations, starting from point A along the load direction [d1, d2,…, d m ] The critical SNB point obtained by continuous power flow calculation is B, λ is the critical load margin of point B, and m perturbation load growth directions [d1+Δd1,d2,…,d m ],[d1,d2+Δd2,…,d m ],…,[d1,d2,…,d m +Δd m ], and the critical SNB points are B1, B2, ..., B m , the load margins are λ+Δλ1, λ+Δλ2,..., λ+Δλ m , then the normal vector of the tangent plane in m-dimensional space is 8. The method for emergency control of an AC / DC hybrid power grid based on a static voltage stability domain according to claim 7, characterized in that: The clustering again in step 4 is to cluster the tangent plane normal vectors at the critical SNB points corresponding to the obtained cluster centers using the method for calculating the tangent plane normal vectors.
9. The method for emergency control of an AC / DC hybrid power grid based on a static voltage stability domain according to claim 1, characterized in that: The specific method of performing least squares hyperplane fitting on the critical SNB points belonging to the same category in step 5 to obtain the hyperplane approximate boundary of the static voltage stability domain of the AC / DC hybrid power grid is as follows: assuming that there are k categories of critical SNB points clustered in step 4, L = {L1, L2, ..., L k }, where the elements in L represent a class of critical SNB points, and the wth class is L w ={y1,y2,…y n }, where n is L w The number of critical SNB points in the system, n, is not less than the dimension of the system power space, y r (r=1,2,…,n) are the coordinates of the critical SNB points, then category L w The corresponding hyperplane coefficients can be obtained through the following linear equations: Where m≤n, each row in the matrix represents the coordinates of a critical SNB point, so there are n critical SNB points, a1, a2, ..., a m is the coefficient of the hyperplane. After performing the least squares fitting on the load points corresponding to each cluster center, several stable domain hyperplane boundaries are obtained, which are: Among them, a u represents the hyperplane coefficient of the load node, c v represents the hyperplane coefficient of the converter station node, P Lu represents the load node, P dv represents the converter station node. Assuming that there are m injection nodes and k DC lines in the system, then u=1,2,3,…,m and v=1,2,3,…,k.