A method and device for alarming operation of electric power system
By obtaining and processing the operating status information of power equipment in real time, and combining the probability of lightning activity, the protection alarm information for divided areas is generated, which solves the problem that efficient protection early warning cannot be achieved in lightning-prone areas in the existing technology, and achieves the efficient operation safety guarantee of the power system.
Patent Information
- Application Number
- CN202210199203.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-01
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2042-03-01
AI Technical Summary
Since the operational alarm scheme of existing power systems requires data processing of the operating status of power equipment one by one, it is impossible to achieve efficient protection and early warning in areas with lightning-prone lightning.
By obtaining the operating status information of each power equipment in real time, the normalized proportion of the operating status information is calculated according to the divided area where the power equipment is located, the degree of impact of the operating status is calculated, and the current probability of lightning activity is determined based on the ionic information and historical lightning activity probability, and the protection alarm information for each divided area is generated.
It realizes efficient protection and early warning in areas with lightning-prone lightning, reduces the number of early warnings that need to be processed in the power system, and improves the operational safety of the power system.
Smart Images

Figure CN114578124B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of operation control technology, and in particular to an operation alarm method and device for an electric power system. Background Art
[0002] The power system is an electric energy production and consumption system consisting of power plants, transmission and transformation lines, power supply and distribution stations, and power consumption. It converts natural energy into electric energy, and then supplies the electric energy to various users through transmission, transformation and distribution.
[0003] To achieve this function, the power system also has corresponding information and control systems at all links and levels to measure, regulate, control, protect, communicate and dispatch the production process of electric energy to ensure that users obtain safe and high-quality electricity.
[0004] To this end, an additional system is needed to evaluate and regulate the power system in real time during its operation. However, the existing power system operation alarm scheme cannot achieve efficient protection and early warning in areas prone to lightning because it needs to obtain the operating status of power equipment one by one for data processing. Summary of the invention
[0005] The present invention provides an operation alarm method and device for an electric power system, which solves the technical problem that the existing operation alarm scheme of the electric power system cannot realize efficient protection and early warning in areas prone to lightning because it needs to obtain the operation status of electric power equipment one by one for data processing.
[0006] The present invention provides an operation alarm method for a power system, which is used in a power system, wherein the power system includes power equipment at multiple different levels and a lightning monitor, and the method includes:
[0007] When any of the lightning monitors collects ion information, the operating status information of each of the power equipment is obtained in real time;
[0008] Calculating the normalized ratio of the operation status information respectively according to the divided areas where the electric power equipment is located, to obtain the system operation status information of the electric power system in each of the divided areas;
[0009] Calculating the ratio of each of the system operation status information to the preset conventional system operation status information to obtain the operation status impact degree corresponding to each of the divided areas;
[0010] Based on the ion information and the historical lightning activity probability, determining the current lightning activity probability corresponding to each of the divided areas;
[0011] According to the current lightning activity probability and the impact degree of the operating state, protection alarm information corresponding to each of the divided areas is generated respectively.
[0012] Optionally, the step of determining the current lightning activity probability corresponding to each of the divided areas based on the ion information and the historical lightning activity probability includes:
[0013] Obtaining the ion intensity corresponding to the ion information;
[0014] According to the ion intensity, a preset ion intensity-probability relationship table is retrieved to obtain the probability of detecting lightning activity corresponding to each of the divided areas centered on the lightning monitor;
[0015] The probabilities and values of each of the detected lightning activity probabilities and the historical lightning activity probabilities are calculated respectively to obtain the current lightning activity probabilities corresponding to each of the divided areas.
[0016] Optionally, the step of generating protection warning information corresponding to each of the divided areas according to the current lightning activity probability and the impact degree of the operating state includes:
[0017] According to the probability range corresponding to each of the current lightning activity probabilities, respectively determine the alarm level corresponding to each of the divided areas;
[0018] Selecting a division area whose running state impact degree is less than a preset negative impact threshold as a target division area;
[0019] According to the matching relationship between each of the alarm levels and the target divided areas, corresponding protection alarm information is generated respectively.
[0020] Optionally, the method further comprises:
[0021] If the operating status impact degree is less than the negative impact threshold, the transmission voltage corresponding to the power equipment in the divided area is increased according to a preset voltage amplitude until the operating status impact degree is greater than or equal to the negative impact threshold;
[0022] If the impact degree of the operating state is greater than or equal to the negative impact threshold and less than the damage threshold, maintaining the transmission voltage of the power equipment in the divided area at the current moment;
[0023] If the impact degree of the operating status is equal to or greater than the damage threshold, the power device is determined to be damaged, and the current connection with the power devices in the divided area is disconnected.
[0024] Optionally, the method further comprises:
[0025] When a lightning strike occurs, obtaining updated operating status information of each of the power devices at the current moment;
[0026] The updated operating status information is used as new operating status information, and the step of calculating the normalized ratio of the operating status information according to the divided areas where the power equipment is located is jumped to obtain the system operating status information of the power system in each of the divided areas.
[0027] The present invention also provides an operation alarm device for an electric power system, which is used in an electric power system, wherein the electric power system includes electric power equipment at multiple different levels and a lightning monitor, and the device includes:
[0028] An operation status information acquisition module, used to acquire the operation status information of each of the power equipment in real time when any of the lightning monitors collects ion information;
[0029] A system operation status determination module, used to calculate the normalized ratio of the operation status information according to the divided areas where the power equipment is located, and obtain the system operation status information of the power system in each of the divided areas;
[0030] An operation status impact degree calculation module, used to calculate the ratio of each of the system operation status information and the preset conventional system operation status information, and obtain the operation status impact degree corresponding to each of the divided areas;
[0031] A lightning activity probability calculation module, used to determine the current lightning activity probability corresponding to each of the divided areas based on the ion information and the historical lightning activity probability;
[0032] The protection alarm information generation module is used to generate protection alarm information corresponding to each of the divided areas according to the current lightning activity probability and the impact degree of the operating state.
[0033] Optionally, the lightning activity probability calculation module is specifically used to:
[0034] Obtaining the ion intensity corresponding to the ion information;
[0035] According to the ion intensity, a preset ion intensity-probability relationship table is retrieved to obtain the probability of detecting lightning activity corresponding to each of the divided areas centered on the lightning monitor;
[0036] The probabilities and values of each of the detected lightning activity probabilities and the historical lightning activity probabilities are calculated respectively to obtain the current lightning activity probabilities corresponding to each of the divided areas.
[0037] Optionally, the protection alarm information generating module is specifically used to:
[0038] According to the probability range corresponding to each of the current lightning activity probabilities, respectively determine the alarm level corresponding to each of the divided areas;
[0039] Selecting a division area whose running state impact degree is less than a preset negative impact threshold as a target division area;
[0040] According to the matching relationship between each of the alarm levels and the target divided areas, corresponding protection alarm information is generated respectively.
[0041] Optionally, the device further comprises:
[0042] A voltage adjustment module, configured to increase the transmission voltage corresponding to the power equipment in the divided area according to a preset voltage amplitude if the operating state impact degree is less than the negative impact threshold, until the operating state impact degree is greater than or equal to the negative impact threshold;
[0043] A voltage maintenance module, configured to maintain the transmission voltage of the power equipment in the divided area at the current moment if the impact degree of the operating state is greater than or equal to the negative impact threshold and less than the damage threshold;
[0044] The connection and disconnection module is used to determine that the power equipment is damaged and disconnect the current connection between the power equipment in the divided area if the impact degree of the operating status is equal to or greater than the damage threshold.
[0045] Optionally, the device further comprises:
[0046] An updated information acquisition module, used to acquire updated operating status information of each of the electric power devices at the current moment when a lightning strike occurs;
[0047] A loop module is used to use the updated operating status information as new operating status information, jump to execute the step of calculating the normalized ratio of the operating status information according to the divided areas where the power equipment is located, and obtain the system operating status information of the power system in each of the divided areas.
[0048] It can be seen from the above technical solutions that the present invention has the following advantages:
[0049] When any lightning monitor collects ion information, the operating status information of each power equipment is obtained in real time; the normalized ratio of the operating status information is calculated according to the divided area where the power equipment is located, and the system operating status information of the power system in each divided area is obtained; the ratio of each system operating status information and the preset conventional system operating status information is calculated to obtain the operating status impact degree corresponding to each divided area; based on the ion information and the historical lightning activity probability, the current lightning activity probability corresponding to each divided area is determined; according to the current lightning activity probability and the operating status impact degree, the protection alarm information corresponding to each divided area is generated. This solves the technical problem that the existing power system operation alarm scheme cannot achieve efficient protection and early warning in areas prone to lightning because it needs to obtain the operating status of power equipment one by one for data processing. By dividing the power system into regions, the number of power system early warnings that need to be processed is reduced in each divided area, thereby achieving efficient early warning in areas prone to lightning. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0051] Figure 1 A flowchart of a method for alarming an operation of a power system provided in accordance with the first embodiment of the present invention;
[0052] Figure 2 A structural block diagram of an operation alarm device for an electric power system provided in Embodiment 2 of the invention. DETAILED DESCRIPTION
[0053] The embodiment of the present invention provides an operation alarm method and device for an electric power system, which is used to solve the technical problem that the operation alarm scheme of the existing electric power system cannot achieve efficient protection and early warning in areas prone to lightning because it needs to obtain the operation status of electric power equipment one by one for data processing.
[0054] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0055] See also Figure 1 , Figure 1 A flowchart of the steps of an operation alarm method of an electric power system provided in Embodiment 1 of the present invention.
[0056] The present invention provides an operation alarm method for a power system, which is used in a power system. The power system includes power equipment at multiple levels and a lightning monitor. The method includes:
[0057] Step 101, when any lightning monitor collects ion information, the operating status information of each power device is obtained in real time;
[0058] Operation status information refers to the information displayed on each power device or the monitoring device connected thereto, which usually includes normal or abnormal information.
[0059] In an embodiment of the present application, in order to realize subsequent real-time alarm and adjustment of power equipment, the operating status information corresponding to the power equipment at each level in the power system can be obtained in real time through this device as a data basis.
[0060] Step 102, calculating the normalized ratio of the operation status information according to the divided areas where the power equipment is located, and obtaining the system operation status information of the power system in each divided area;
[0061] The normalized ratio refers to calculating the ratio of the normal number to the total number based on the normal number and abnormal number of the operating status information after counting the operating status information of each power device.
[0062] In a specific implementation, the various power devices in the power system are usually placed in different divided areas and there are many of them. In order to save subsequent computing resources, the divided areas where the power devices are located can be used as computing units, and the normalized ratio of the operating status information can be calculated separately to obtain the system operating status information of the power system in each divided area.
[0063] For example, there are multiple divided areas under the thunderstorm weather at the current time point, and there are 10 power equipment in each divided area. Among them, 4 power equipment are operating abnormally due to the thunderstorm weather, and 6 power equipment are operating normally. At this time, the normalized ratio corresponding to the operating status information of the divided area is calculated to be 0.6.
[0064] Step 103, calculating the ratio of each system operation status information to the preset conventional system operation status information, and obtaining the operation status impact degree corresponding to each divided area;
[0065] The conventional system operation status information refers to the system operation status information corresponding to each divided area under conventional weather conditions such as sunny, light rain, cloudy, or the most common weather on the current date in the past decades.
[0066] In the embodiment of the present application, the regions can be divided into dimensions, and the ratios between the corresponding system operation status information and the conventional system operation status information are calculated respectively, so as to obtain the operation status impact degree corresponding to each divided region.
[0067] It should be noted that the numerical range of the operating status impact degree is 0-2. When the value is equal to or greater than 1, it represents a positive impact, indicating that under the influence of thunder and lightning weather, the operation of the power equipment in the divided area is not affected and can even operate more efficiently; when the value is less than 1, it represents a negative impact, and at this time, it is necessary to take alarm protection measures for the power equipment in the divided area; if the value is greater than or equal to 2, it indicates that there is damaged power equipment in the divided area, and the operation and maintenance personnel can be notified to perform further power outages or repairs.
[0068] Step 104, determining the current lightning activity probability corresponding to each divided area based on the ion information and the historical lightning activity probability;
[0069] Optionally, step 104 may include the following sub-steps:
[0070] Obtain the ion intensity corresponding to the ion information;
[0071] According to the ion intensity, a preset ion intensity-probability relationship table is retrieved to obtain the probability of detecting lightning activities corresponding to each divided area centered on the lightning monitor;
[0072] The probabilities and values of each detected lightning activity probability and the historical lightning activity probability are calculated respectively to obtain the current lightning activity probability corresponding to each divided area.
[0073] While calculating the impact degree of the operating status corresponding to each divided area, the lightning monitor can obtain the ion intensity corresponding to the ion information and the historical lightning activity probability at the current moment in the past few years. According to the ion intensity, the preset ion intensity-probability relationship table is retrieved to determine the probability of lightning activity detection corresponding to the ion intensity, and the corresponding lightning activity detection probability is determined by dividing the area one by one with the lightning monitor as the center.
[0074] Furthermore, the probabilities and values of each detected lightning activity probability and the historical lightning activity probability are calculated respectively to obtain the current lightning activity probability corresponding to each divided area.
[0075] It should be noted that the probability of historical lightning activity can obtain the number of historical lightning activities and the number of statistical years in each divided area. By calculating the ratio of the number of historical lightning activities to the number of years, the probability of historical lightning activity can be obtained.
[0076] Step 105: Generate protection alarm information corresponding to each divided area according to the current lightning activity probability and the impact degree of the operating status.
[0077] Optionally, step 105 may include the following sub-steps:
[0078] According to the probability range corresponding to each current lightning activity probability, determine the alarm level corresponding to each divided area;
[0079] Selecting a partition area whose running status impact is less than a preset negative impact threshold as a target partition area;
[0080] According to the matching relationship between each alarm level and the target divided area, corresponding protection alarm information is generated respectively.
[0081] In this embodiment, after obtaining the current lightning activity probability and the degree of impact of the operating state, since not all power equipment in the divided areas need to be protected and alarmed, in order to further save the resource consumption of subsequent protection alarm information, the alarm level corresponding to each divided area can be determined according to the probability range corresponding to each current lightning activity probability. Then, based on the specific values of the degree of impact of the operating state of each divided area, the divided area whose degree of impact of the operating state is less than the preset negative impact threshold is selected as the target divided area, and finally the target divided area is matched with the alarm level to determine the alarm level corresponding to each target divided area, thereby generating different protection alarm information.
[0082] In the specific implementation, in order to facilitate users to view the protection alarm information corresponding to each target division area, it can be marked and displayed in the form of a regional activity diagram, using colors that gradually darken as the alarm level increases, such as yellow, orange, red, black, etc.
[0083] It is worth mentioning that the three-dimensional location information and attributes of power equipment at all levels can also be superimposed on the regional activity map, including but not limited to transmission lines, power plants and substations.
[0084] Furthermore, the method further comprises the following steps S11-S13:
[0085] S11. If the operating status impact degree is less than the negative impact threshold, increase the transmission voltage corresponding to the power equipment in the divided area according to the preset voltage amplitude until the operating status impact degree is greater than or equal to the negative impact threshold;
[0086] S12. If the impact degree of the operating status is greater than or equal to the negative impact threshold and less than the damage threshold, the transmission voltage of the power equipment in the divided area is maintained at the current moment;
[0087] S13. If the impact degree of the operating status is equal to or greater than the damage threshold, the power equipment is determined to be damaged, and the current connection with the power equipment in the divided area is disconnected.
[0088] In a specific implementation, after obtaining the operating status impact degree at the current moment, in order to realize the subsequent operation regulation of the power equipment, the operating status impact degree and the negative impact threshold can be further compared.
[0089] If the operating status impact degree is less than the negative impact threshold, the transmission voltage of the power equipment is increased according to the preset voltage amplitude, and the operating status impact degree is updated in real time until the operating status impact degree is greater than or equal to the negative impact threshold; if the operating status impact degree is greater than or equal to the negative impact threshold and less than the damage threshold, it indicates that the operating status of the power equipment is good at this time and the transmission voltage of the power equipment can be maintained at the current moment; if the operating status impact degree is equal to or greater than the damage threshold, it indicates that the power equipment may have been damaged by the weather. In order to avoid further negative impacts, the power equipment is determined to be damaged at this time, and the current connection with the power equipment is disconnected, thereby ensuring the safe use of the remaining power equipment.
[0090] It is worth mentioning that after determining that the power equipment is damaged, the information about the damage of the power equipment can also be sent to the operation and maintenance personnel at the same time, so as to facilitate the operation and maintenance personnel to carry out repairs.
[0091] In another example of the present invention, the method further includes the following steps S21-S22:
[0092] S21. When a lightning strike occurs, obtain updated operating status information of each power device at the current moment;
[0093] S22, using the updated operating status information as new operating status information, jumping to the step of calculating the normalized ratio of the operating status information according to the divided areas where the power equipment is located, and obtaining the system operating status information of the power system in each divided area.
[0094] In an embodiment of the present application, when the lightning monitor detects ion information, if a lightning strike occurs, the operating status of the power equipment may change. The updated operating status information of each power equipment at the current moment can be obtained and used as the new operating status information, and the process jumps to step 102, thereby achieving real-time adjustment of the power system and real-time acquisition of the operating status of the power equipment.
[0095] It is worth mentioning that each divided area can be monitored in real time. If the line tripping information uploaded by the user is received or the operating status is detected to be abnormal, the divided area where the power equipment is located can be locked and the abnormality of a certain power equipment can be monitored again, thereby realizing the rapid positioning of the lightning damage location.
[0096] Optionally, historical lightning data statistics and current data can be summarized and processed, and the information can be uploaded in real time, such as statistics on lightning activities at key locations such as transmission lines, substations, and power plants; generate ground lightning density, lightning days, lightning hours, total number of lightning strikes, average intensity, and form daily, monthly, and annual reports; output statistical results for analysis and evaluation of the operating status of the power system.
[0097] In the embodiment of the present application, when any lightning monitor collects ion information, the operating status information of each power equipment is obtained in real time; the normalized ratio of the operating status information is calculated according to the divided area where the power equipment is located, and the system operating status information of the power system in each divided area is obtained; the ratio of each system operating status information and the preset conventional system operating status information is calculated to obtain the operating status impact degree corresponding to each divided area; based on the ion information and the historical lightning activity probability, the current lightning activity probability corresponding to each divided area is determined; according to the current lightning activity probability and the operating status impact degree, the protection alarm information corresponding to each divided area is generated respectively. Thereby solving the technical problem that the existing power system operation alarm scheme cannot realize efficient protection and early warning in lightning-prone areas because it needs to obtain the operating status of power equipment one by one for data processing. By dividing the power system into regions, the number of power system early warnings that need to be processed is reduced in the form of each divided area, thereby realizing efficient early warning in lightning-prone areas.
[0098] See also Figure 2 , Figure 2 This is a structural block diagram of an operation alarm device for an electric power system provided in Embodiment 2 of the present invention.
[0099] The present invention also provides an operation alarm device for an electric power system, which is used in an electric power system. The electric power system includes electric power equipment at multiple different levels and a lightning monitor. The device includes:
[0100] The operation status information acquisition module 201 is used to acquire the operation status information of each power device in real time when any lightning monitor collects ion information;
[0101] The system operation status determination module 202 is used to calculate the normalized ratio of the operation status information according to the divided areas where the power equipment is located, and obtain the system operation status information of the power system in each divided area;
[0102] The operation status impact degree calculation module 203 is used to calculate the ratio of each system operation status information and the preset conventional system operation status information to obtain the operation status impact degree corresponding to each divided area;
[0103] A lightning activity probability calculation module 204 is used to determine the current lightning activity probability corresponding to each divided area based on the ion information and the historical lightning activity probability;
[0104] The protection alarm information generating module 205 is used to generate protection alarm information corresponding to each divided area according to the current lightning activity probability and the impact degree of the operating state.
[0105] Optionally, the lightning activity probability calculation module 204 is specifically configured to:
[0106] Obtain the ion intensity corresponding to the ion information;
[0107] According to the ion intensity, a preset ion intensity-probability relationship table is retrieved to obtain the probability of detecting lightning activities corresponding to each divided area centered on the lightning monitor;
[0108] The probabilities and values of each detected lightning activity probability and the historical lightning activity probability are calculated respectively to obtain the current lightning activity probability corresponding to each divided area.
[0109] Optionally, the protection alarm information generating module 205 is specifically used to:
[0110] According to the probability range corresponding to each current lightning activity probability, determine the alarm level corresponding to each divided area;
[0111] Selecting a partition area whose running status impact is less than a preset negative impact threshold as a target partition area;
[0112] According to the matching relationship between each alarm level and the target divided area, corresponding protection alarm information is generated respectively.
[0113] Optionally, the device further comprises:
[0114] A voltage adjustment module is used to increase the transmission voltage corresponding to the power equipment in the divided area according to a preset voltage amplitude if the operating state impact degree is less than the negative impact threshold, until the operating state impact degree is greater than or equal to the negative impact threshold;
[0115] A voltage maintenance module, used to maintain the transmission voltage of the power equipment in the divided area at the current moment if the impact degree of the operating state is greater than or equal to the negative impact threshold and less than the damage threshold;
[0116] The connection and disconnection module is used to determine that the power equipment is damaged and disconnect the current connection between the power equipment in the divided area if the impact degree of the operating status is equal to or greater than the damage threshold.
[0117] Optionally, the device further comprises:
[0118] An update information acquisition module is used to obtain the updated operating status information of each power device at the current moment when a lightning strike occurs;
[0119] The loop module is used to use the updated operating status information as the new operating status information, jump to execute the steps of calculating the normalized ratio of the operating status information according to the divided areas where the power equipment is located, and obtain the system operating status information of the power system in each divided area.
[0120] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the above-described devices and modules can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0121] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0122] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical modules, that is, they may be located in one place or distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0123] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An operation alarm method for a power system, characterized in that: Used in an electric power system, the electric power system includes multiple electric power devices at different levels and a lightning monitor, the method includes: When any of the lightning monitors collects ion information, the operating status information of each of the power equipment is obtained in real time; Calculating the normalized ratio of the operation status information respectively according to the divided areas where the electric power equipment is located, to obtain the system operation status information of the electric power system in each of the divided areas; Calculating the ratio of each of the system operation status information to the preset conventional system operation status information to obtain the operation status impact degree corresponding to each of the divided areas; Based on the ion information and the historical lightning activity probability, determining the current lightning activity probability corresponding to each of the divided areas; According to the current lightning activity probability and the impact degree of the operating state, protection alarm information corresponding to each of the divided areas is generated respectively.
2. The method according to claim 1, characterized in that The step of determining the current lightning activity probability corresponding to each of the divided areas based on the ion information and the historical lightning activity probability comprises: Obtaining the ion intensity corresponding to the ion information; According to the ion intensity, a preset ion intensity-probability relationship table is retrieved to obtain the probability of detecting lightning activity corresponding to each of the divided areas centered on the lightning monitor; The probabilities and values of each of the detected lightning activity probabilities and the historical lightning activity probabilities are calculated respectively to obtain the current lightning activity probabilities corresponding to each of the divided areas.
3. The method according to claim 1, characterized in that The step of generating protection warning information corresponding to each of the divided areas according to the current lightning activity probability and the impact degree of the operating state includes: According to the probability range corresponding to each of the current lightning activity probabilities, respectively determine the alarm level corresponding to each of the divided areas; Selecting a division area whose running state impact degree is less than a preset negative impact threshold as a target division area; According to the matching relationship between each of the alarm levels and the target divided areas, corresponding protection alarm information is generated respectively.
4. The method according to claim 3, characterized in that The method further comprises: If the operating status impact degree is less than the negative impact threshold, the transmission voltage corresponding to the power equipment in the divided area is increased according to a preset voltage amplitude until the operating status impact degree is greater than or equal to the negative impact threshold; If the impact degree of the operating state is greater than or equal to the negative impact threshold and less than the damage threshold, maintaining the transmission voltage of the power equipment in the divided area at the current moment; If the impact degree of the operating status is equal to or greater than the damage threshold, the power device is determined to be damaged, and the current connection with the power devices in the divided area is disconnected.
5. The method according to any one of claims 1 to 4, characterized in that: The method further comprises: When a lightning strike occurs, obtaining updated operating status information of each of the power devices at the current moment; The updated operating status information is used as new operating status information, and the step of calculating the normalized ratio of the operating status information according to the divided areas where the power equipment is located is jumped to obtain the system operating status information of the power system in each of the divided areas.
6. An operation alarm device for a power system, characterized in that: Used in an electric power system, the electric power system includes multiple electric power equipment at different levels and a lightning monitor, the device includes: An operation status information acquisition module, used to acquire the operation status information of each of the power equipment in real time when any of the lightning monitors collects ion information; A system operation status determination module, used to calculate the normalized ratio of the operation status information according to the divided areas where the power equipment is located, and obtain the system operation status information of the power system in each of the divided areas; An operation status impact degree calculation module, used to calculate the ratio of each of the system operation status information and the preset conventional system operation status information, and obtain the operation status impact degree corresponding to each of the divided areas; A lightning activity probability calculation module, used to determine the current lightning activity probability corresponding to each of the divided areas based on the ion information and the historical lightning activity probability; The protection alarm information generation module is used to generate protection alarm information corresponding to each of the divided areas according to the current lightning activity probability and the impact degree of the operating state.
7. The device according to claim 6, characterized in that The lightning activity probability calculation module is specifically used for: Obtaining the ion intensity corresponding to the ion information; According to the ion intensity, a preset ion intensity-probability relationship table is retrieved to obtain the probability of detecting lightning activity corresponding to each of the divided areas centered on the lightning monitor; The probabilities and values of each of the detected lightning activity probabilities and the historical lightning activity probabilities are calculated respectively to obtain the current lightning activity probabilities corresponding to each of the divided areas.
8. The device according to claim 6, characterized in that The protection alarm information generation module is specifically used to: According to the probability range corresponding to each of the current lightning activity probabilities, respectively determine the alarm level corresponding to each of the divided areas; Selecting a division area whose running state impact degree is less than a preset negative impact threshold as a target division area; According to the matching relationship between each of the alarm levels and the target divided areas, corresponding protection alarm information is generated respectively.
9. The device according to claim 8, characterized in that The device also includes: A voltage adjustment module, configured to increase the transmission voltage corresponding to the power equipment in the divided area according to a preset voltage amplitude if the operating state impact degree is less than the negative impact threshold, until the operating state impact degree is greater than or equal to the negative impact threshold; A voltage maintenance module, configured to maintain the transmission voltage of the power equipment in the divided area at the current moment if the impact degree of the operating state is greater than or equal to the negative impact threshold and less than the damage threshold; The connection and disconnection module is used to determine that the power equipment is damaged and disconnect the current connection between the power equipment in the divided area if the impact degree of the operating status is equal to or greater than the damage threshold.
10. The device according to any one of claims 6 to 9, characterized in that: The device also includes: An updated information acquisition module, used to acquire updated operating status information of each of the electric power devices at the current moment when a lightning strike occurs; A loop module is used to use the updated operating status information as new operating status information, jump to execute the step of calculating the normalized ratio of the operating status information according to the divided areas where the power equipment is located, and obtain the system operating status information of the power system in each of the divided areas.
Citation Information
Patent Citations
On-line transmission line lightning shielding failure trip early-warning method
CN103207340A
Weather analysis method and device based on radar echo figure
CN110045441A