A construction control method based on phased adjustment of auxiliary piers of cable-stayed bridges

By adjusting the top lifting and falling top loading of the auxiliary piers of cable-stayed bridges, the problem of deviation and bending moment control of the main tower in the single cantilever construction stage is solved, and efficient and convenient construction with safe structural stress and controllable linear shape is achieved.

CN114580063BActive Publication Date: 2024-11-12CHINA RAILWAY MAJOR BRIDGE RECONNAISSANCE & DESIGN INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210226080.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-09
Publication Date
2024-11-12
Estimated Expiration
2042-03-09

AI Technical Summary

Technical Problem

During the single cantilever construction stage of cable-stayed bridge, the boundary conditions of the main tower structure are asymmetric due to the vertical constraints of the auxiliary piers, resulting in large deviations in the top of the main tower and the bottom bending moment. The existing construction control methods are cumbersome and not Convenient, difficult to effectively control the structural stress safety and linear shape.

Method used

By adjusting the top lifting and top falling volume of the auxiliary piers, the height of the side span end of the main beam is controlled, and whether the longitudinal deviation of the main tower exceeds the safety threshold, and then adjust the auxiliary in real time during the cable-stayed cable tensioning and the lifting of the main beam segments. The pier height ensures that the longitudinal deviation of the main tower and the bottom bending moment are within the safe range.

Benefits of technology

It realizes efficient and convenient control of the longitudinal deviation position of the main tower and the bottom bending moment in the single cantilever construction stage, ensuring the structure's stress is safe and the linear shape is controllable, which is more convenient and efficient than traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114580063B_ABST
    Figure CN114580063B_ABST
Patent Text Reader

Abstract

The present application discloses a construction control method based on the phased adjustment of auxiliary piers of cable-stayed bridges, which relates to the technical field of cable-stayed bridge construction, including judging whether any of the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted exceeds the safety threshold. If the longitudinal deviation of the main tower after the initial tensioning of the cables exceeds the safety threshold, the height of the side span end of the main beam is raised by adjusting the lifting amount of the auxiliary piers, and then the construction is carried out according to the planned data. If the longitudinal deviation of the main tower after the main beam is hoisted exceeds the safety threshold, the height of the side span end of the main beam is lowered by adjusting the falling amount of the auxiliary piers, and then the construction is carried out according to the planned data. The present application efficiently and conveniently controls the tensioning of the cable and the hoisting of the main beam segments during the cyclic construction by adjusting the lifting amount and the falling amount of the auxiliary piers, so that the top deviation and bottom bending moment of the main tower are within the safe range, ensuring that the structural force is safe and the linear shape is controllable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of construction control of cable-stayed bridges, and in particular to a construction control method based on staged adjustment of auxiliary piers of cable-stayed bridges. Background Art

[0002] Cable-stayed bridges are usually constructed using cantilever erection technology. Before the auxiliary span is closed, the structure is in the symmetrical double cantilever erection stage, with both sides of the main beam suspended in the air. At this stage, the tower is straight and the beam is flat by controlling the horizontal force components of the initial tension of the side and middle span cables to be equal.

[0003] After the auxiliary span is closed, the side span of the main beam is erected on the auxiliary pier, and the middle span of the main beam is still suspended, entering the single cantilever construction stage. At this stage, due to the existence of the vertical constraints of the auxiliary piers, the structural boundary conditions on both sides of the main beam are asymmetric. The subsequent cable tensioning and main beam segment hoisting will cause a large deviation at the top of the main tower and a large bending moment at the bottom of the main tower. Its typical characteristics include that each subsequent cable tensioning construction will cause the main tower to deviate to the side span, and each main beam segment hoisting construction will be conducive to the recovery of the tower deviation, and may even cause the main tower to deviate to the middle span.

[0004] For cable-stayed bridges, especially those with large spans, the cable-stayed tensioning and beam erection after the auxiliary span is connected are often the control conditions for the longitudinal force on the main tower during construction. Measures need to be taken to control the longitudinal deviation of the main tower top and the longitudinal bending moment at the tower bottom to ensure the safety of the main tower structure.

[0005] After the auxiliary span of the cable-stayed bridge is closed, the cyclic construction of cable tensioning and main beam segment hoisting will cause large tower top deviation and tower bottom bending moment. Generally, the counterweight on the beam and the cable tension are adjusted during the cyclic construction process of cable tensioning and main beam segment hoisting to meet the structural force and linear control requirements. That is, the counterweight load weight, counterweight load position, and cable tension need to be repeatedly adjusted in a short period of time. This type of construction control method is time-consuming and labor-intensive, the process is relatively cumbersome, and the actual operability is not strong. Summary of the invention

[0006] The embodiment of the present application provides a construction control method based on the phased adjustment of the auxiliary piers of the cable-stayed bridge. During the single cantilever construction stage, by adjusting the lifting and lowering amounts of the auxiliary piers, the method can efficiently and conveniently control the cable-stayed cable tensioning and main beam segment hoisting cyclic construction, so that the top deviation and bottom bending moment of the main tower are within a safe range, ensuring that the structure is safe and the linear shape is controllable.

[0007] On the one hand, a construction control method based on phased adjustment of auxiliary piers of a cable-stayed bridge is provided, comprising:

[0008] Acquire first data of the bridge structure and planned data of the construction plan, and process to obtain the longitudinal deviation of the main tower after construction according to the planned data; the bridge structure includes the side span end height of the main beam and the longitudinal deviation of the main tower, and the construction plan includes the initial tensioning of the cable and the lifting of the main beam in sequence;

[0009] Determine whether the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted exceeds the safety threshold:

[0010] If the longitudinal deviation of the main tower after the initial tensioning of the cables exceeds the safety threshold, the height of the side span of the main beam is raised by adjusting the lifting amount of the auxiliary piers, and then construction is carried out according to the planned data;

[0011] If the longitudinal deviation of the main tower after the main beam is hoisted exceeds the safety threshold, the height of the side span of the main beam is lowered by adjusting the amount of the auxiliary piers dropped, and then construction is carried out according to the planned data;

[0012] If the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted do not exceed the safety threshold, construction will be carried out according to the planned data.

[0013] In some embodiments, the bridge structure further includes a main beam mid-span end height and a main beam line shape.

[0014] In some embodiments, the planning data includes initial tension data of the inclined cables when the cables are initially tensioned and weight data of the main beam segments when the main beams are hoisted.

[0015] In some embodiments, the safety threshold includes a side span lateral longitudinal deviation threshold and a mid-span lateral longitudinal deviation threshold, and the side span lateral longitudinal deviation threshold and the mid-span lateral longitudinal deviation threshold are equal.

[0016] In some embodiments, before adjusting the lifting amount of the auxiliary pier, the specific steps of determining the lifting amount of the auxiliary pier include:

[0017] The height of the side span end of the main beam after the jacking before the initial tensioning of the cable is obtained according to the side span lateral longitudinal deviation threshold and the planned data processing;

[0018] Compare the height of the side span end of the main beam after lifting before the initial tensioning of the cable with the height of the side span end of the main beam contained in the first data to obtain the minimum lifting amount;

[0019] The height of the side span end of the main beam after the main beam is lifted before installation is obtained according to the mid-span lateral longitudinal deviation threshold and the planned data processing;

[0020] Compare the height of the side span end of the main beam after the main beam is lifted before installation with the height of the side span end of the main beam contained in the first data to obtain the maximum lifting amount;

[0021] The lifting amount range of the auxiliary pier is determined by the minimum lifting amount and the maximum lifting amount.

[0022] In some embodiments, the specific steps of raising the height of the side span end of the main beam by adjusting the lifting amount of the auxiliary pier include:

[0023] Determine whether the main tower is tilted towards the side span after the main beam is hoisted:

[0024] If so, the longitudinal deviation of the main tower after the initial tensioning of the cable and the longitudinal deviation of the main tower after the main beam is hoisted are compared to obtain a first difference, and half of the first difference is taken as the average longitudinal deviation of the first main tower. The height of the side span end of the main beam after the jacking before the initial tensioning of the cable is obtained according to the average longitudinal deviation of the first main tower and the planned data. The height of the side span end of the main beam after the jacking before the initial tensioning of the cable is compared with the height of the side span end of the main beam in the first data to obtain the optimal jacking amount;

[0025] If not, the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted are averaged to obtain the average longitudinal deviation of the second main tower. The planned data is processed according to the average longitudinal deviation of the second main tower to obtain the height of the side span end of the main beam after lifting before the initial tensioning of the cables. The height of the side span end of the main beam after lifting before the initial tensioning of the cables is compared with the height of the side span end of the main beam in the first data to obtain the optimal lifting amount.

[0026] In some embodiments, before adjusting the lifting amount of the auxiliary pier, the specific steps of determining the lowering amount of the auxiliary pier include:

[0027] The height of the side span end of the main beam after the top is dropped before the main beam is hoisted is obtained according to the mid-span lateral longitudinal deviation threshold and the planned data processing;

[0028] Compare the side span end height of the main beam after the top drop before the main beam is hoisted with the side span end height of the main beam contained in the first data to obtain the minimum top drop amount;

[0029] The height of the side span end of the main beam after the jacking before the initial tensioning of the cable is obtained according to the side span lateral longitudinal deviation threshold and the planned data processing;

[0030] Compare the height of the side span end of the main beam after the top is lifted before the initial tensioning of the cable with the height of the side span end of the main beam contained in the first data to obtain the maximum top drop amount;

[0031] The range of the amount of top drop of the auxiliary pier is determined by the minimum amount of top drop and the maximum amount of top drop.

[0032] In some embodiments, the specific steps of reducing the height of the side span end of the main beam by adjusting the top drop of the auxiliary pier include:

[0033] Determine whether the main tower is tilted toward the side span after the initial tensioning of the cables:

[0034] If so, the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted are averaged to obtain the average longitudinal deviation of the third main tower, and the height of the side span end of the main beam after the top is dropped before the initial tensioning of the cables is obtained according to the planned data processing described in the average longitudinal deviation of the third main tower, and the height of the side span end of the main beam after the top is dropped before the initial tensioning of the cables is compared with the height of the side span end of the main beam in the first data to obtain the optimal top drop amount;

[0035] If not, then compare the longitudinal deviation of the main tower after the initial tensioning of the cables with the longitudinal deviation of the main tower after the main beam is hoisted to obtain a second difference, and take half of the second difference as the average longitudinal deviation of the fourth main tower. According to the average longitudinal deviation of the fourth main tower and the planned data, obtain the side span end height of the main beam after the top is dropped before the initial tensioning of the cables, and compare the side span end height of the main beam after the top is dropped before the initial tensioning of the cables with the side span end height of the main beam in the first data to obtain the optimal top drop amount.

[0036] In some embodiments, the method further comprises:

[0037] The actual structural data of the bridge structure is obtained by measurement, and the actual structural data of the bridge structure is compared with the theoretical structural data of the bridge structure obtained in advance to obtain the first data of the bridge structure.

[0038] In some embodiments, the construction plan includes one initial cable tensioning and one main beam hoisting as one construction combination, and all the initial cable tensioning and all the main beam hoisting of the cable-stayed bridge are completed by cyclically performing the construction combination;

[0039] The method further comprises:

[0040] Before each construction combination is performed, it is determined whether the height of the auxiliary pier is adjusted to determine the time point for adjusting the lifting amount of the auxiliary pier and the time point for adjusting the lowering amount.

[0041] The beneficial effects of the technical solution provided by this application include:

[0042] By controlling the height of each cable and auxiliary pier in the beam erection stage after the auxiliary span is connected, the longitudinal deviation of the main tower and the bending moment at the bottom of the tower are adjusted within a controllable range to ensure the safety of the structure and controllable line shape.

[0043] Compared with traditional main tower internal force control methods such as main beam counterweight and cable tension adjustment, the auxiliary pier lifting and lowering construction is more convenient and efficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0045] Figure 1 It is a schematic diagram of the deformation of the cable-stayed bridge after the initial tensioning of the cables when no auxiliary pier lifting is used in the embodiment of the present invention.

[0046] Figure 2 It is a schematic diagram of the deformation of the cable-stayed bridge after the main beam is hoisted when the auxiliary pier is not used in the embodiment of the present invention.

[0047] Figure 3 It is a schematic diagram of the deformation of the cable-stayed bridge after the cables are initially tensioned when the auxiliary pier is used for lifting in an embodiment of the present invention.

[0048] Figure 4 It is a schematic diagram of the deformation of the cable-stayed bridge after the main beam is hoisted when the auxiliary pier is used for lifting in the embodiment of the present invention.

[0049] Figure 5 It is a flow chart of a construction control method based on phased adjustment of auxiliary piers of a cable-stayed bridge in an embodiment of the present invention.

[0050] Figure 6 This is one of the flow charts of step S3 in the embodiment of the present invention.

[0051] Figure 7 This is the second flow chart of step S3 in the embodiment of the present invention.

[0052] Figure 8 This is one of the flow charts of step S4 in the embodiment of the present invention.

[0053] Fig. 9 This is the second flow chart of step S4 in the embodiment of the present invention.

[0054] Reference numerals:

[0055] 1-longitudinal deformation curve of the main tower under initial tensioning condition of the cable without using auxiliary piers for lifting; 2-longitudinal deformation curve of the main tower under main beam segment hoisting condition without using auxiliary piers for lifting; 3-longitudinal deformation curve of the main tower under initial tensioning condition of the cable with using auxiliary piers for lifting; 4-longitudinal deformation curve of the main tower under main beam segment hoisting condition with using auxiliary piers for lifting; 5-top of auxiliary pier; 6-beam erecting crane. DETAILED DESCRIPTION

[0056] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0057] An embodiment of the present application provides a construction control method based on the phased adjustment of the auxiliary piers of a cable-stayed bridge, which is applied to the cyclic construction of cable-stayed cable tensioning and main beam segment hoisting. Specifically, a construction plan for the cyclic construction is prepared in advance, and the construction plan includes one initial cable tensioning and one main beam hoisting as one construction combination, and the initial tensioning of all cables and the hoisting of all main beams of the cable-stayed bridge are completed through the cyclic construction combination.

[0058] The construction control method includes first obtaining first data for characterizing the current structural condition of the bridge structure, combining with the planned data containing all the construction plans, predicting the theoretical structural condition of the bridge structure after the construction according to the planned data, if the longitudinal deviation of the main tower exceeds the safety threshold after the construction according to the planned data, it is necessary to pre-adjust the main beam line shape by adjusting the height of the side span end of the main beam before implementing the above construction plan, so as to avoid the longitudinal deviation of the main tower exceeding the safety threshold when implementing the above construction plan. Since the side span end of the main beam is erected on the auxiliary pier after the auxiliary span is closed, the height of the side span end of the main beam can be adjusted by adjusting the lifting amount or the falling amount of the auxiliary pier, and the top deviation and bottom bending moment of the main tower are within the safe range during the efficient and convenient control of the cable-stayed cable tensioning and the main beam segment hoisting cycle construction, ensuring that the cable-stayed bridge structure is safe and the line shape is controllable.

[0059] Specifically, Figure 5 As shown in the figure, the construction control method based on the phased adjustment of the auxiliary piers of the cable-stayed bridge includes:

[0060] Step S1, obtaining the first data of the bridge structure and the planned data of the construction plan, and processing to obtain the longitudinal deviation of the main tower after construction according to the planned data. The bridge structure includes the height of the side span end of the main beam and the longitudinal deviation of the main tower, and the construction plan includes the initial tensioning of the cable and the lifting of the main beam in sequence. The longitudinal deviation of the main tower refers to the displacement of the center line of the main tower relative to the center line of the bridge, and the center line of the bridge is perpendicular to the main beam bridge deck and coincides with the center line of the main tower when there is no deviation. The longitudinal deviation of the main tower is characterized by two indicators, one is the deviation of the top of the main tower, and the other is the bending moment of the bottom of the main tower. The deviation of the top of the main tower corresponds to the bending moment of the bottom of the main tower. If the deviation of the top of the main tower does not exceed the safety range, the bending moment of the bottom of the main tower does not exceed the safety range. If the deviation of the top of the main tower exceeds the safety range, the bending moment of the bottom of the main tower also exceeds the safety range. The bridge structure also includes the height of the middle span end of the main beam and the linear shape of the main beam. The first data of the bridge structure include the relevant data of the side span height of the main beam, the middle span height of the main beam, the main beam alignment, and the longitudinal deviation of the main tower before the initial cable tensioning and the main beam hoisting. The second data of the bridge structure include the relevant data of the side span height of the main beam, the middle span height of the main beam, the main beam alignment, and the longitudinal deviation of the main tower after the initial cable tensioning derived from the construction data, and the relevant data of the side span height of the main beam, the middle span height of the main beam, the main beam alignment, and the longitudinal deviation of the main tower after the main beam hoisting derived from the construction data.

[0061] Step S2: determine whether the longitudinal deviation of the main tower after the initial tensioning of the cables exceeds the safety threshold:

[0062] If yes, go to step S3.

[0063] If not, go to step S4.

[0064] Step S3, after raising the height of the side span end of the main beam by adjusting the lifting amount of the auxiliary pier, the construction is carried out according to the planned data.

[0065] Step S4, judging whether the longitudinal deviation of the main tower after the main beam is hoisted exceeds the safety threshold:

[0066] If yes, go to step S5.

[0067] If not, go to step S6.

[0068] Step S5, after lowering the height of the side span end of the main beam by adjusting the top drop of the auxiliary pier, the construction is carried out according to the planned data.

[0069] Step S6: perform construction according to the planned data.

[0070] In this embodiment, after the auxiliary span is closed and the cables are initially stretched, the main tower will deviate to the side span. After the main beam is hoisted, the main tower will recover and even deviate to the middle span. If the longitudinal deviation of the main tower after the initial stretching of the cables is larger than the longitudinal deviation of the main tower after the main beam is hoisted, the longitudinal deviation of the main tower after the main beam is hoisted will not exceed the safety threshold. If the longitudinal deviation of the main tower after the initial stretching of the cables is smaller than the longitudinal deviation of the main tower after the main beam is hoisted, the longitudinal deviation of the main tower after the initial stretching of the cables will not exceed the safety threshold. This is the basic feature of the initial stretching of the cables and the hoisting of the main beam of the cable-stayed bridge.

[0071] Based on the above basic characteristics, since in a single construction combination, the initial tensioning of the cables is performed first and the main beam is hoisted later. Therefore, first determine whether the longitudinal deviation of the main tower after the initial tensioning of the cables will exceed the safety threshold. If the deviation of the main tower to the side span side exceeds the safety threshold after the initial tensioning of the cables, it means that there will be safety hazards after the initial tensioning of the cables based on the first data. Before the initial tensioning of the cables, it is necessary to increase the height of the side span end of the main beam by adjusting the lifting amount of the auxiliary pier. After the height is increased, after the initial tensioning of the cables, the deviation of the main tower to the side span side will not exceed the safety threshold.

[0072] If it is determined that the longitudinal deviation of the main tower after the initial tensioning of the cables will not exceed the safety threshold, then continue to determine whether the longitudinal deviation of the main tower after the main beam is hoisted will exceed the safety threshold. If, after the main beam is hoisted, the deviation of the main tower toward the mid-span side will exceed the safety threshold, it means that there will be safety hazards after the initial tensioning of the cables and the hoisting of the main beam based on the first data, and it is necessary to adjust the height of the auxiliary pier at most once before the initial tensioning of the cables (in order to save construction steps, a single construction combination only adjusts the height of the auxiliary pier at most once before the initial tensioning of the cables. Therefore, after the height of the auxiliary pier is adjusted before the initial tensioning of the cables, the height of the auxiliary pier when the main beam is hoisted is still equal to the height of the auxiliary pier when the cables are initially tensioned). By adjusting the amount of the auxiliary pier falling to the top, the height of the side span end of the main beam is lowered. After the height is lowered, after the initial tensioning of the cables and the hoisting of the main beam, the deviation of the main tower toward the mid-span side will not exceed the safety threshold.

[0073] Take the example that the main tower deviates to the side span after the initial tensioning of the cable and the main tower deviates to the main span after the main beam is hoisted. Figure 1 As shown in the figure, it is a schematic diagram of the deformation of the main tower and the main beam after the initial tensioning of the cable without the assistance of the auxiliary pier. The longitudinal deformation curve 1 of the main tower in the initial tensioning condition of the inclined cable without the auxiliary pier is greater than the safety threshold of the main tower longitudinal deviation d1 (mainly the longitudinal deviation of the tower top) relative to the center line of the bridge. The longitudinal deviation d1 of the main tower corresponds to the bending moment M1 at the bottom of the tower. Figure 2 As shown in the figure, the longitudinal deformation curve 2 of the main tower under the main beam segment lifting condition without auxiliary pier lifting is less than the safety threshold of the main tower longitudinal deviation d2 (mainly refers to the longitudinal deviation of the tower top) relative to the bridge centerline, and the main tower longitudinal deviation d2 corresponds to the tower bottom bending moment M2. After the lifting amount △i is calculated by the above control construction method, as shown in Figure 3As shown in the figure, the longitudinal deformation curve 3 of the main tower in the initial tensioning condition of the inclined cable with auxiliary piers, the longitudinal deviation d1' of the main tower relative to the center line of the bridge is less than the safety threshold, and the longitudinal deviation d1' of the main tower corresponds to the bending moment M1' at the bottom of the tower. Figure 4 As shown, the main tower longitudinal deformation curve 4 of the main tower longitudinal deviation d2' relative to the bridge centerline under the main beam segment lifting condition using the auxiliary pier is less than the safety threshold, and the main tower longitudinal deviation d2' corresponds to the tower bottom bending moment M2'.

[0074] In this embodiment, by raising the height of the side span end of the main tower before the initial tensioning of the cables, it is possible to ensure that the longitudinal deviation of the main tower does not exceed the safety threshold during construction, thereby ensuring the safety of the bridge structure.

[0075] In a preferred embodiment, the planned data includes initial tension data of the inclined cables when the cables are initially tensioned and weight data of the main beam segments when the main beams are hoisted.

[0076] In this embodiment, the bridge structure data after the initial cable tensioning can be calculated based on the existing bridge structure data and the initial cable tensioning data when the cables are initially tensioned, and it can be determined whether the longitudinal deviation of the main tower exceeds the safety range after the initial cable tensioning. Similarly, based on the existing bridge structure data, the initial cable tensioning data when the cables are initially tensioned, and the main beam segment weight data when the main beam is hoisted, it can be determined whether the longitudinal deviation of the main tower exceeds the safety range after the initial cable tensioning and the main beam hoisting are performed in sequence.

[0077] Furthermore, the bridge structure data before the initial cable extension can be retrieved based on the bridge structure data after the initial cable extension and the initial cable tension data when the cable extension is initially extended. The bridge structure data before the initial cable extension can also be retrieved based on the bridge structure data after the main beam is hoisted.

[0078] In a preferred embodiment, the safety threshold comprises a side span lateral longitudinal deviation threshold and a mid-span lateral longitudinal deviation threshold, and the side span lateral longitudinal deviation threshold and the mid-span lateral longitudinal deviation threshold are equal.

[0079] In this embodiment, the side span side longitudinal deviation threshold refers to the maximum offset of the main tower to the side span side, and the mid-span side longitudinal deviation threshold refers to the maximum offset of the main tower to the mid-span side.

[0080] In a preferred embodiment, if Figure 6 As shown, in the step S3, before adjusting the lifting amount of the auxiliary pier, the specific steps of determining the lifting amount of the auxiliary pier include:

[0081] Step S31a, obtaining the side span end height of the main beam after jacking before initial tensioning of the cables according to the side span lateral longitudinal deviation threshold and the planned data processing.

[0082] Step S32a, comparing the height of the side span end of the main beam after lifting before the initial tensioning of the cable with the height of the side span end of the main beam contained in the first data to obtain the minimum lifting amount.

[0083] Step S33a, obtaining the side span end height of the main beam after jacking before the main beam is hoisted according to the mid-span lateral longitudinal deviation threshold and the planned data processing.

[0084] Step S34a, compare the side span end height of the main beam after lifting before the main beam is hoisted with the side span end height of the main beam contained in the first data to obtain the maximum lifting amount.

[0085] Step S35a, determining the lifting amount range of the auxiliary pier according to the minimum lifting amount and the maximum lifting amount.

[0086] In this embodiment, after the initial tension of the cable, the main tower deviates toward the side span, and after the main beam is hoisted, the main tower deviates toward the middle span. Therefore, the minimum lifting amount must meet the requirement that the main tower curve coincides with the side span longitudinal deviation threshold after the initial tension of the cable, and the maximum lifting amount must meet the requirement that the main tower curve coincides with the main span longitudinal deviation threshold after the main beam is hoisted. That is, after the initial tension of the cable, the main tower curve at least cannot deviate to the side span beyond the side span longitudinal deviation threshold, and after the main beam is hoisted, the main tower curve at least cannot deviate to the middle span beyond the middle span longitudinal deviation threshold.

[0087] After determining the lifting amount range, you can arbitrarily determine a lifting amount within the lifting amount range as needed. After adjusting the height of the auxiliary pier and the side span end height of the main beam according to the lifting amount, you can carry out the initial tensioning of the cables and the lifting of the main beam.

[0088] In a preferred embodiment, if Figure 7 As shown, in the step S3, before adjusting the lifting amount of the auxiliary pier, the specific steps of determining the lifting amount of the auxiliary pier include:

[0089] Step S31b, judging whether the main tower is deviated toward the side span after the main beam is hoisted:

[0090] If yes, go to step S32b.

[0091] If not, go to step S33b.

[0092] Step S32b, compare the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted to obtain a first difference, take half of the first difference as the average longitudinal deviation of the first main tower, obtain the height of the side span end of the main beam after jacking before the initial tensioning of the cables according to the average longitudinal deviation of the first main tower and the planned data, compare the height of the side span end of the main beam after jacking before the initial tensioning of the cables with the height of the side span end of the main beam in the first data, and obtain the optimal jacking amount.

[0093] Step S33b, average the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted to obtain the average longitudinal deviation of the second main tower, and obtain the side span end height of the main beam after jacking before the initial tensioning of the cables according to the planned data processing based on the average longitudinal deviation of the second main tower, and compare the side span end height of the main beam after jacking before the initial tensioning of the cables with the side span end height of the main beam in the first data to obtain the optimal jacking amount.

[0094] In this embodiment, if the main tower is still located on the side span after the main beam is hoisted, it means that the main tower is offset to the side span by a large amount after the initial tension of the cable. Even if the main tower is restored to the center line of the bridge during the subsequent main beam hoisting, it is still located on the side span of the bridge. In order to minimize the longitudinal deviation of the main tower after the initial tension of the cable and the longitudinal deviation of the main tower after the main beam is hoisted, that is, to minimize the displacement of the main tower to both sides, a lifting amount can be applied before the initial tension of the cable to offset the main tower to the middle span after the main beam is hoisted. In this way, the main tower will not be offset too much to the side span after the initial tension of the cable, so that the main tower after the initial tension of the cable and the main tower after the main beam are hoisted are as close to the center line of the bridge as possible. The calculation process of the lifting amount is described in step S32b.

[0095] If the main tower is deflected to the middle span side after the main beam is hoisted, in order to minimize the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted, the calculation process of the lifting amount is as described in step S33b.

[0096] In a preferred embodiment, if Figure 8 As shown, in the step S4, before adjusting the lifting amount of the auxiliary pier, the specific steps of determining the lowering amount of the auxiliary pier include:

[0097] Step S41a, obtaining the side span end height of the main beam after the top is dropped before the main beam is hoisted according to the mid-span lateral longitudinal deviation threshold and the planned data processing.

[0098] Step S42a, compare the side span end height of the main beam after the main beam is lifted and lifted with the side span end height of the main beam contained in the first data to obtain the minimum lift amount.

[0099] Step S43a, obtaining the side span end height of the main beam after jacking before initial tensioning of the cables according to the side span lateral longitudinal deviation threshold and the planned data processing.

[0100] Step S44a, compare the side span end height of the main beam after the jacking before the initial tensioning of the cable with the side span end height of the main beam contained in the first data to obtain the maximum jacking amount.

[0101] Step S45a, determining the range of the drop amount of the auxiliary pier according to the minimum drop amount and the maximum drop amount.

[0102] In a preferred embodiment, if Fig. 9As shown, in step S4, the specific steps of reducing the height of the side span end of the main beam by adjusting the top drop of the auxiliary pier include:

[0103] Step S41b, determining whether the main tower is deflected toward the side span after the cables are initially stretched:

[0104] If yes, go to step S42b.

[0105] If not, go to step S43b.

[0106] Step S42b, average the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted to obtain the average longitudinal deviation of the third main tower, and obtain the side span end height of the main beam after the top is dropped before the initial tensioning of the cables according to the planned data processing according to the average longitudinal deviation of the third main tower, and compare the side span end height of the main beam after the top is dropped before the initial tensioning of the cables with the side span end height of the main beam in the first data to obtain the optimal top drop amount.

[0107] Step S43b, compare the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted to obtain a second difference, take half of the second difference as the average longitudinal deviation of the fourth main tower, obtain the side span end height of the main beam after the top is dropped before the initial tensioning of the cables according to the average longitudinal deviation of the fourth main tower and the planned data, compare the side span end height of the main beam after the top is dropped before the initial tensioning of the cables with the side span end height of the main beam in the first data, and obtain the optimal top drop amount.

[0108] In a preferred embodiment, the method further comprises:

[0109] The actual structural data of the bridge structure is obtained by measurement, and the actual structural data of the bridge structure is compared with the theoretical structural data of the bridge structure obtained in advance to obtain the first data of the bridge structure.

[0110] In this embodiment, before obtaining the first data, the bridge structure data needs to be corrected to ensure the accuracy of subsequent calculations. In a preferred embodiment, the construction plan includes one initial cable tensioning and one main beam hoisting as one construction combination, and the initial cable tensioning of all cables and the hoisting of all main beams of the cable-stayed bridge are completed by cyclically performing the construction combination.

[0111] The method further comprises:

[0112] Before each construction combination is performed, it is determined whether the height of the auxiliary pier is adjusted to determine the time point for adjusting the lifting amount of the auxiliary pier and the time point for adjusting the lowering amount.

[0113] In this embodiment, since the cable initial tensioning and main beam hoisting are performed multiple times during the entire cable-stayed bridge cycle, the longitudinal deviation of the main tower after the initial cable tensioning and the main beam hoisting is predicted before each initial cable tensioning. If the threshold is exceeded, the lifting and lowering amounts of the auxiliary piers need to be adjusted. The adjustment time is selected according to the actual situation before the initial cable tensioning.

[0114] For combined-beam cable-stayed bridges, the compressive stress reserve of the bridge deck can be increased and the risk of cracking can be reduced by adjusting the timing of concrete bridge deck bonding.

[0115] The present application is not limited to the above-mentioned implementation modes. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications are also considered to be within the scope of protection of the present application.

Claims

1. A construction control method based on phased adjustment of auxiliary piers of cable-stayed bridges, characterized in that: include: First data of the bridge structure and planned data of the construction plan are obtained, and the longitudinal deviation of the main tower after construction according to the planned data is processed; the bridge structure includes the side span end height of the main beam and the longitudinal deviation of the main tower, and the construction plan includes the initial tensioning of the cable and the lifting of the main beam in sequence; Determine whether any of the longitudinal deviation of the main tower after the initial tensioning of the cable and the longitudinal deviation of the main tower after the main beam is hoisted exceeds a safety threshold: the safety threshold includes a side span longitudinal deviation threshold and a middle span side longitudinal deviation threshold, and the side span side longitudinal deviation threshold and the middle span side longitudinal deviation threshold are equal; If the longitudinal deviation of the main tower after the initial tensioning of the cables exceeds the safety threshold, the height of the side span end of the main beam is raised by adjusting the lifting amount of the auxiliary piers, and then construction is carried out according to the planned data; If the longitudinal deviation of the main tower after the main beam is hoisted exceeds the safety threshold, the height of the side span of the main beam is lowered by adjusting the amount of the auxiliary piers dropped, and then construction is carried out according to the planned data; If the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted do not exceed the safety threshold, the construction will be carried out according to the planned data; Before adjusting the lifting amount of the auxiliary pier, the specific steps of determining the lifting amount of the auxiliary pier include: The height of the side span end of the main beam after the jacking before the initial tensioning of the cable is obtained according to the side span lateral longitudinal deviation threshold and the planned data processing; Compare the height of the side span end of the main beam after lifting before the initial tensioning of the cable with the height of the side span end of the main beam contained in the first data to obtain the minimum lifting amount; The height of the side span end of the main beam after the main beam is lifted before installation is obtained according to the mid-span lateral longitudinal deviation threshold and the planned data processing; Compare the height of the side span end of the main beam after the main beam is lifted before installation with the height of the side span end of the main beam contained in the first data to obtain the maximum lifting amount; The lifting amount range of the auxiliary pier is determined by the minimum lifting amount and the maximum lifting amount; The specific steps of raising the height of the side span end of the main beam by adjusting the lifting amount of the auxiliary pier include: Determine whether the main tower is tilted towards the side span after the main beam is hoisted: If so, the longitudinal deviation of the main tower after the initial tensioning of the cable and the longitudinal deviation of the main tower after the main beam is hoisted are compared to obtain a first difference, and half of the first difference is taken as the average longitudinal deviation of the first main tower. The height of the side span end of the main beam after the jacking before the initial tensioning of the cable is obtained according to the average longitudinal deviation of the first main tower and the planned data. The height of the side span end of the main beam after the jacking before the initial tensioning of the cable is compared with the height of the side span end of the main beam in the first data to obtain the optimal jacking amount; If not, the longitudinal deviation of the main tower after the initial tensioning of the cable and the longitudinal deviation of the main tower after the main beam is hoisted are averaged to obtain the average longitudinal deviation of the second main tower, and the height of the side span end of the main beam after the jacking before the initial tensioning of the cable is obtained according to the planned data processing described in the average longitudinal deviation of the second main tower, and the height of the side span end of the main beam after the jacking before the initial tensioning of the cable is compared with the height of the side span end of the main beam in the first data to obtain the optimal jacking amount; Before adjusting the lifting amount of the auxiliary pier, the specific steps of determining the lowering amount of the auxiliary pier include: The height of the side span end of the main beam after the top is dropped before the main beam is hoisted is obtained according to the mid-span lateral longitudinal deviation threshold and the planned data processing; Compare the side span end height of the main beam after the top drop before the main beam is hoisted with the side span end height of the main beam contained in the first data to obtain the minimum top drop amount; The height of the side span end of the main beam after the jacking before the initial tensioning of the cable is obtained according to the side span lateral longitudinal deviation threshold and the planned data processing; Compare the height of the side span end of the main beam after the top is lifted before the initial tensioning of the cable with the height of the side span end of the main beam contained in the first data to obtain the maximum top drop amount; The range of the top drop amount of the auxiliary pier is determined by the minimum top drop amount and the maximum top drop amount; The specific steps of reducing the height of the side span end of the main beam by adjusting the amount of top fall of the auxiliary pier include: Determine whether the main tower is tilted toward the side span after the initial tensioning of the cables: If so, the longitudinal deviation of the main tower after the initial tensioning of the cables and the longitudinal deviation of the main tower after the main beam is hoisted are averaged to obtain the average longitudinal deviation of the third main tower, and the height of the side span end of the main beam after the top is dropped before the initial tensioning of the cables is obtained according to the planned data processing described in the average longitudinal deviation of the third main tower, and the height of the side span end of the main beam after the top is dropped before the initial tensioning of the cables is compared with the height of the side span end of the main beam in the first data to obtain the optimal top drop amount; If not, then compare the longitudinal deviation of the main tower after the initial tensioning of the cables with the longitudinal deviation of the main tower after the main beam is hoisted to obtain a second difference, and take half of the second difference as the average longitudinal deviation of the fourth main tower. According to the average longitudinal deviation of the fourth main tower and the planned data, obtain the side span end height of the main beam after the top is dropped before the initial tensioning of the cables, and compare the side span end height of the main beam after the top is dropped before the initial tensioning of the cables with the side span end height of the main beam in the first data to obtain the optimal top drop amount.

2. The construction control method based on phased adjustment of auxiliary piers of cable-stayed bridge according to claim 1 is characterized in that: The bridge structure also includes a main beam mid-span end height and a main beam line shape.

3. The construction control method based on phased adjustment of auxiliary piers of cable-stayed bridge according to claim 1 is characterized in that: The planned data include initial tension data of the inclined cables when the cables are initially tensioned and weight data of the main beam segments when the main beams are hoisted.

4. The construction control method based on phased adjustment of auxiliary piers of cable-stayed bridge according to claim 1 is characterized in that: The method further comprises: The actual structural data of the bridge structure is obtained by measurement, and the actual structural data of the bridge structure is compared with the theoretical structural data of the bridge structure obtained in advance to obtain the first data of the bridge structure.

5. The construction control method based on phased adjustment of auxiliary piers of cable-stayed bridge according to claim 1, characterized in that: The construction plan includes one construction combination of initial tensioning of cables and one main beam hoisting, and completing the initial tensioning of all cables and hoisting of all main beams of the cable-stayed bridge by cyclically performing the construction combination; The method further comprises: Before each construction combination is performed, it is determined whether the height of the auxiliary pier is adjusted to determine the time point for adjusting the lifting amount of the auxiliary pier and the time point for adjusting the lowering amount.