Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

119results about How to "Force safe and reliable" patented technology

Miniaturized heat-resistant and high-dynamic pressure sensor

A miniaturized heat-resistant and high-dynamic pressure sensor comprises a sensor probe which is internally provided with a sensor chip, the sensor chip is fixed through a heat-resistant ceramic adhesive, the sensor probe is connected with a metal tungsten filament which passes through a seal plate, and the seal plate is connected with the sensor probe; the front end face of the sensor probe is provided with a pressure guidance hole which communicates with a pressure channel and a square sensor chip in the sensor probe, the rear end of the sensor chip installation groove is provided with a sensor vacuum chamber, and the side wall of the sensor probe is internally provided with a the metal tungsten filament taken as a lead terminal of the pressure sensor; the sensor chip is square-shaped, four sensitive resistors are arranged at the front surface of the sensor chip in the same direction, the back surface of the sensor chip is a square cavity corresponding to a square sensitive film, andthe pressure is applied to the square sensitive film through the pressure guidance hole. The miniaturized heat-resistant and high-dynamic pressure sensor is small in volume, resistant to heat and fast in response, and can be used for measurement of the total pressure and the static pressure.
Owner:XI AN JIAOTONG UNIV

Temporary anchor cable balance construction method in erecting process of suspension bridge girder

The invention provides a temporary anchor cable balance construction method in the erecting process of a suspension bridge girder, and belongs to the technical field of bridge engineering. The temporary anchor cable balance construction method comprises the steps that a bracket is erected at the position close to the anchorage position firstly, the first section of the girder is mounted on the bracket, and a temporary anchor cable is mounted on the girder to be connected with a side span main cable; then a mid-span beam section is hoisted, the temporary anchor cable mounted on the first section of the girder automatically tightens while the weight of the mid-span beam section is gradually transferred to a mid-span main cable, equivalently, the load is simultaneously applied to the side span and the side span main cable, and significantly-increased main cable force due to the excessively high weight of the beam section of the mid span is balanced; and then a beam section is hoisted at the side span, the side span main cable generates large displacement downwards, thus the tightened temporary anchor cable automatically loosens, the increase amplitude of the side span main cable forceis also decreased accordingly, and unbalanced force of a cable tower due to hoisting construction is decreased. According to the temporary anchor cable balance construction method, the ability of automatically balancing the main span main cable force and the side span main cable force of a suspension bridge is achieved, the bending moment of the cable tower can be decreased, and thus bridge toweris safer during stress.
Owner:DALIAN UNIV OF TECH

Multifunctional portal device of suspension bridge pillar top

The invention provides a multifunctional portal device of a suspension bridge pillar top, and belongs to the field of construction devices of suspension bridges. The multifunctional portal device of the suspension bridge pillar top comprises a field mounted portal body, wherein the field mounted portal body comprises a supporting truss system, a working platform, a catwalk turning cable saddle, a lifting system and a traction system; the working platform is connected to the upper end of the supporting truss system; the lower end of the supporting truss system is anchored to the suspension bridge pillar top through an anchoring system; and the catwalk turning cable saddle, the lifting system and the traction system are respectively connected with the supporting truss system. The multifunctional portal device of the suspension bridge pillar top is provided with the field mounted portal body, a portal is divided into different blocks which are assembled on a tower top, requirements on field hoisting are met, conveying, mounting and machining can be facilitated further, construction installation is simplified, the different blocks of the portal can be combined with the catwalk turning cable saddle at the tower top, the portal is stressed safely, effects of the portal can be fully achieved in various stages of installation construction of an upper structure of the suspension bridge, and multifunction of the portal is fulfilled really.
Owner:THE THIRD ENG CO LTD OF THE HIGHWAY ENG BUREAU OF CCCC

Lateral restraining and reinforcing structure for stabilizing high-fill embankment with soft oil foundation built on bed rock

A lateral restraining and reinforcing structure for stabilizing a high-fill embankment with a soft oil foundation built on a bed rock is used for the lateral restraining and reinforcing of the foundation of the embankment in a region which is limited in the construction of a dug pile. The stability problem of the high-fill embankment and the construction difficulty of the dug pile are overcome, and the problems of insufficient horizontal bearing capability and large deformation of the traditional cast-in-situ bored piles are improved. The structure comprises left reinforced concrete cast-in-situ bored piles and right reinforced concrete cast-in-situ bored piles, which are symmetrically arranged at slope toes at the two sides of the embankment in the longitudinal direction at an interval, left reinforced concrete top beams and right reinforced concrete top beams, which are fixedly connected with the left reinforced concrete cast-in-situ bored piles and the right reinforced concrete cast-in-situ bored piles into a whole are respectively arranged at the tops of the piles, and anchor cables of which the two ends are connected with the top beams in an anchoring way are arranged between the left reinforced concrete top beams and the right reinforced concrete top beams in the extension direction of the embankment at an interval.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

Hinge for installing bridge cable tower and method for installing hinge

The invention discloses a hinge for installing a bridge cable tower and a method for installing the hinge. The hinge comprises a lower hinge seat, a hinge shaft and an upper hinge seat, wherein the upper hinge seat is connected with the lower hinge seat through the hinge shaft and can freely rotate relative to the lower hinge seat. The method comprises the following steps of: fixing the lower hinge seat; connecting the upper hinge seat and the lower hinge seat through a dummy shaft, and welding a cable tower ground first-section box body; and replacing the dummy shaft with the hinge shaft. The cable tower hinge is used for the whole vertical rotation of the cable tower, the lower hinge seat of the hinge is fixed on a lower hinge seat anchor plate, and the lower hinge seat anchor plate is welded and fixed with a steel tower basic section embedded into a concrete tower foundation; and the hinge shaft is manufactured by processing 40Cr steel and hardening and tempering, and lug plates of the upper hinge seat and the lower hinge seat are made of Q345B steel plates and are subjected to non-destructive flaw detection after being manufactured, so that the hinge shaft is safely stressed and reliably used in the whole vertical rotation process of the cable tower, guarantee is provided for the whole vertical rotation of the cable tower, the cable tower is installed in a time-saving and labor-saving mode, and installation accuracy is high.
Owner:JINHUAN CONSTR GRP

Self-tightening rod climbing device

ActiveCN110075492AAchieve self-tighteningForce safe and reliableClimbingPistonEngineering
The invention provides a self-tightening rod climbing device, which comprises a regulating clamp element, a first holding ring, a second holding ring, a pedal, a piston plate, a positioning plate, a clamp foot, anti-slip rubber, a slide groove, a positioning rod, a linkage rod, a stressed plate, a clamping and connecting edge, a hollow groove, an anti-slip threaded plate and a passive plate, wherein the upper and lower sides of the regulating clamp element are movably connected with the first holding ring and the second holding ring through screw bolts; the anti-slip rubber is arranged on thesurface of the first holding ring in an embedded way; the piston plate, the positioning plate and the clamp foot are sequentially arranged inside the second holding ring from the outside to the inside. The back surface of the passive plate is an inclined surface, and the inclination direction is opposite to the inclination direction of the stressed plate, so that the position of the piston plate cannot be changed; the passive plate is extruded by force and extends outwards; further, the anti-slip threaded plate is used for realizing the contact with the rod; meanwhile, the tight clamping of the anti-slip threaded plate on the rod is realized; the self-tightening goal is achieved. By using the arrangement, the self weight of the user is used for clamping, so that the device is safer in theuse process.
Owner:ZHEJIANG HONGXIANG STEEL STRUCTURE CO LTD

Scaffolding construction method used for super shallow buried large underground space

ActiveCN109958445AImprove securityAvoid working conditions that directly face the soil above the tunnel faceUnderground chambersTunnel liningStructure of the EarthUnderground space
The invention discloses a scaffolding construction method used for the super shallow buried large underground space. The scaffolding construction method comprises the steps that an underground excavation construction vertical shaft is conducted in a fence, and a horizontal transverse passage is formed in a vertical shaft; a first guide hole is formed in a selected location in underground space, and, and a transverse shed protection structure perpendicular to the excavation direction is arranged in the first guide hole; the first guide hole forms a girder, and a second guide hole is formed under the protection of the transverse shed protection structure; a third guide hole is excavated, and the third guide hole and the second guide hole are connected together; soil mass between the second guide hole and the third guide hole on the two sides are excavated, and diagonal bracing erection is conducted; soil mass below diagonal bracing is excavated to the bottom, back cover grille erection is conducted, and strip footing is casted; vertical support erection is conducted, and the diagonal bracing is removed by sections; and a permanent structure is arranged. Therefore, the scaffolding construction method can be applied to excavation of a single-layer three-span cross section with the excavation width of about 20 meters and the excavation height of more than 9 meters, and can be used for shallow-buried underground excavation and super shallow buried underground excavation, the excavation volume is small, the excavation step is less, construction conversion is less, the constructionrisk is low, and the comprehensive construction cost is low.
Owner:BEIJING URBAN CONSTR DESIGN & DEV GRP CO

Bridge steel girder shearing pressing bearing type anchoring plate structure

The invention belongs to the technical field of bridge structures, and particularly relates to a bridge steel girder shearing pressing bearing type anchoring plate structure. The bridge steel girder shearing pressing bearing type anchoring plate structure comprises an anchoring plate. A notch with the upper end narrower than the lower end is formed in the upper portion of the anchoring plate. An anchoring pipe is embedded in the upper portion of the notch. An upper baffle is welded to the top of the anchoring pipe and an anchoring cushion plate is welded to the bottom of the anchoring pipe. An upper sleeve is arranged on the upper face of the upper baffle. The upper sleeve and the anchoring pipe are coaxial. The anchoring plate comprises two upper anchoring plate bodies and a lower anchoring plate body. A pressure bearing plate is welded to the outer surface of the lower portion of the anchoring pipe. The pressure bearing plate and the anchoring cushion plate are spaced by a certain distance and arranged in parallel. According to the bridge steel girder shearing pressing bearing type anchoring plate structure, the pressure bearing plate is arranged, so that a force transfer way of the structure is added, the structure is stressed safely, force is transferred reliably, anti-fatigue performance is excellent, the problems of stress concentration, local deformation and fatigue cracking of an anchoring structure can be well solved, and the stress safety and the service life of the structure are guaranteed.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Supporting system of pre-stressed concrete laminated slab of shear wall structure

A supporting system of a pre-stressed concrete laminated slab of a shear wall structure belongs to the field of building construction and comprises a quadruple shear wall body, a first wood brace, a second wood brace and a laminated slab, wherein Z-shaped fixation parts are arranged uniformly on the upper annular circumference on the inner wall of the quadruple shear wall body, the lower part of the Z-shaped fixation part is fixed on the shear wall body, an U-shaped groove is formed between the upper part of the Z-shaped fixation part and the wall part, and the first wood brace is respectively clamped in the U-shaped groove of the row of Z-shaped fixation parts on the upper part of each shear wall body. The supporting system of the pre-stressed concrete laminated slab of the shear wall structure provided by the invention is beneficial in that (1) construction operations of this invention are simple and convenient and can guarantee a construction period; (2) installation quality of the laminated slab can be controlled easily, and evenness can be guaranteed; and (3) the laminated slab provided by the invention is definite in load carrying, safe and reliable, and eliminates safety hidden dangers of template frame collapse with a traditional manner.
Owner:JIANGSU HUAJIANG CONSTR GROUP

Sandwich heat-preserving decorative board with mixed hollow porous fiber reinforced heat-preserving mortar and manufacturing method

The invention relates to a sandwich heat-preserving decorative board with mixed hollow porous fiber reinforced heat-preserving mortar and a manufacturing method.A heat-preserving core veneer of the heat-preserving decorative board is a formed veneer and provided with big and round through holes; a hanging part capable of being positioned is arranged at the inner side of a back plate and tightly attached to the back face of the heat-preserving core veneer, and the same big and round through holes are formed in the positions corresponding to the big and round holes in the heat-preserving core veneer; the ends of the hanging part capable of being positioned are provided with small and round holes, square holes and right-angled hooks used for connecting, installing and lapping the heat-preserving decorative board in a positioning mode; fiber grid cloth is arranged at the inner side of a panel and is spaced from the heat-preserving core veneer by 2 mm; the mixed hollow porous fiber reinforced heat-preserving mortar is poured into the periphery of the heat-preserving core veneer through sealed formworks, the panel, the back plate and sealed edges are formed after the mortar is hardened, and bridge-cutoff shear connectors are formed in the big and round holes; the decorative board has the advantages that a good integrated space stress structure is formed through overall pouring of the panel, the back plate, the bridge-cutoff shear connectors and the sealed edges, positioning and splicing are accurate, and the fireproof performance is improved.
Owner:NORTH CHINA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Tent capable of being disinfected and sterilized

PendingCN111608466ATimely disinfection and sterilization treatmentFully disinfectedTents/canopiesLavatory sanitoryEngineeringMechanical engineering
The invention discloses a tent capable of being disinfected and sterilized. The tent comprises a frame body and an outer skin; the outer skin is arranged on the frame body; the frame body comprises two bottom air columns; three longitudinal air columns are installed on the bottom air columns; and oblique air columns are installed on the longitudinal air columns. According to the tent capable of being disinfected and sterilized provided by the invention, when a person enters the frame body through an entrance on the outer skin, a first cylinder pushes a connecting plate downwards, and the connecting plate drives a lifting plate to descend; the lifting plate drives a telescopic rod to extend, a shower descends, and the shower drives a telescopic tube to extend; a piston rod of a second cylinder cooperates with a positioning rod to drive the shower to rotate and adjust the angle of the shower; a water pump draws disinfectant fluid from a water tank through a first connecting pipe, and thewater pump delivers the disinfectant fluid to two shunt pipes through a second connecting pipe and a tee; the shunt pipes spray the disinfectant fluid through the shower through the telescopic tube to disinfect the person, so that the problem that a traditional emergency medical tent in the prior art cannot perform sufficient disinfection treatment on entering personnel of different heights is solved.
Owner:马鞍山市华奇维亚科技发展有限公司

Vertical load loading device and method applicable to out-of-plane unstable frame structure

The invention discloses a vertical load loading device and a vertical load loading method applicable to an out-of-plane unstable frame structure. The vertical load loading device comprises a force sensor, a hydraulic jack, a high-strength bolt, a vertical load simulating truss, a strengthening beam, a strengthening beam, a reinforcing angle, a braced steel frame, an oil source, an oil pipe, a controller and a computer; the lower surface of a test piece beam and the upper surface of the hydraulic jack are fixedly consolidated; the lower end of the hydraulic jack is tightly connected with the vertical load simulating truss, the braced steel frame is tightened with the ground by virtue of foot bolts, and the hydraulic jack contains the force sensor and can read magnitude of a real-time vertical force. By virtue of the vertical load loading device and method, a vertical load is applied to a frame structure unstable in out-of-plane, a vertical load value can be accurately obtained, the load is maintained to be constant, and the advantages of definite force transfer, convenience in dismounting, simple operation, safety and reliability are achieved. The device and loading method make up the gap of China in the research field and have stronger practical application value.
Owner:XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY

Glass connection claw of extra large hidden type glass curtain wall and mounting structure of glass connection claw

The invention discloses a glass connection claw of an extra large hidden type glass curtain wall and a mounting structure of the glass connection claw, the glass connection claw is characterized by comprising a plurality of connection claws, horizontal steel tubes, longitudinal ropes and rear support steel frames, each connection claw comprises an upper clamp, a lower clamp, a connection part and a pull rod, the connection part connects the upper clamp and the lower clamp, the pull rod is embedded into a splicing seam of adjacent glass, a bearing connection part is embedded into a cross splicing seam of every two adjacent pieces of glass and in the middle of the pull rod, the bearing connection part is cross-shaped and comprises a bearing support piece and a sleeve, the bearing support piece is arranged horizontally, the sleeve is arranged longitudinally, and the pull rod is fixed in the sleeve; the connection claws are opposite to the long edges of the glass. According to the glass connection claw of the extra large hidden type glass curtain wall and the mounting structure of the glass connection claw, self weight between upper glass and lower glass can be transmitted by the matching of the pull rods and the bearing connection parts, the tress is more reasonable, the mounting of the extra large hidden type glass curtain wall is realized, and excellent transparency and safety are provided.
Owner:苏州苏明装饰股份有限公司

Super-large planar area partially prestressed concrete open caisson foundation and construction method thereof

The invention discloses a super-large planar area partially prestressed concrete open caisson foundation and a construction method thereof. The super-large planar area partially prestressed concrete open caisson foundation comprises a lower initial partially prestressed concrete open caisson section and a jointing partially prestressed concrete or common reinforced concrete open caisson section above the initial partially prestressed concrete open caisson section, wherein the initial partially prestressed concrete open caisson section (1) is in a partially prestressed concrete structure, a partially prestressed 'crossed' beam is formed on longitudinal and transverse internal partition walls with prestressed steel wire bundles, and the partially prestressed 'crossed' beam and an identicallyprestressed caisson wall can form a partially prestressed concrete 'beam lattice' capable of effectively resisting complex stress conditions; the initial partially prestressed concrete open caisson section is sunk down to a designated position, and then every subsequent standard section is sequentially jointed and sunk down to the designated position until final sinking is completed. The super-large planar area partially prestressed concrete open caisson foundation and the construction method thereof can improve the structural safety and the anti-cracking performance of an open caisson sunk through pot-like excavating and sinking, thereby being particularly applicable to large rectangular, round, elliptical and end-circular open caisson foundations of 4000-10000 m2.
Owner:SOUTHWEST JIAOTONG UNIV +1

Assembled beam column structure and construction method thereof

The invention relates to an assembled beam column structure and a construction method thereof and relate to the technical field of building structure design and construction, against the problem thatexisting prefabricated components of an prefabricated building and cast-in-place part connection nodes are disposed at the intersecting nodes of beam columns, so that the structural stress performanceis poor, resulting in unreasonable force. The assembled beam column structure includes a prefabricated section, a cast-in-place section and a plurality of structure columns, wherein the prefabricatedsection is at least one prefabricated primary beam and at least one support which are prefabricated to be a whole, or at least one prefabricated primary beam and at least one prefabricated secondarybeam which are prefabricated to be a whole; the cast-in-place section is connected between two adjacent prefabricated primary beams and/or prefabricated secondary beams, the cast-in-place section is formed by on-site concrete pouring, and the connecting node of the prefabricated section and the cast-in-place section has a distance of L/4 to L/3 from the center of the adjacent support or prefabricated primary beam; the structure columns are connected to the bottom of the support; and L is the calculated span of the beam.
Owner:NO 2 CONSTR GRP CO LTD OF SHANGHAI CONSTR GRP

Construction method of deep foundation pit bracing system

ActiveCN102220764BLow costGive full play to the tensile and compressive propertiesExcavationsBulkheads/pilesCement pasteCompressive strength
The invention relates to a deep foundation pit bracing system and a construction method thereof. The deep foundation pit bracing system comprises a curtain which is arranged at the periphery of a deep foundation pit, and steel pipe concrete pouring piles are constructed in the curtain according to designed interval and specification before prehardening of the curtain. The construction method of the deep foundation pit bracing system comprises the following steps: drilling three unit grooves connected together at one time, wherein a drilling machine stops rotating when drilling to scheduled depth; and injecting cement paste into the bottoms of the unit grooves from bottom to top, wherein the drilling machine rotates reversely to upwards lift a drilling tool to form the curtain, the drilling tool is lifted out of the ground, the next groove section is constructed in sequence, and the groove sections are in occluded cutting and overlapped with one another, so that an integrated continuous seepage-proofing curtain can be formed by the continuous construction. The invention has the advantages that the manufacturing cost is very low, the construction period is short, wide promotion is suitable; the tensile and compressive strength can be greatly improved due to the adoption of the concrete, the use of a large amount of anchor bars can be reduced, and the safety during the construction is improved; and the working period is not occupied for the pile construction, the time can be shortened greatly, and the construction period can be brought forward.
Owner:邢占东 +2

Foot bridge of self-anchorage balance stress chord rope structure

The invention discloses a foot bridge of a self-anchorage balance stress chord rope structure. The foot bridge of the self-anchorage balance stress chord rope structure comprises a bridge deck slab, eccentric structures, a horizontal tensioning chord rope, counter weight loads and longitudinal stay bars, wherein the bridge deck slab is arranged on the horizontal tensioning chord rope, the horizontal tensioning chord rope is connected with the eccentric structures on the two sides, the counter weight loads are arranged on the eccentric structures, the longitudinal stay bars are arranged between the eccentric structures and the horizontal tensioning chord rope, and rod pieces are arranged between the horizontal tensioning chord rope and the longitudinal stay bars. According to the foot bridge, the characteristics of using local materials in a mountainous area are brought into full play, by means of the existing geological and topographic conditions in the mountainous area, the external material transportation and construction installation difficulty is lowered, and the foot bridge not only is applicable to the mountainous area, but also can be used for an urban overpass, is safe in stress, convenient to construct, economical and practical, and has higher application and popularization value.
Owner:ZHEJIANG SCI RES INST OF TRANSPORT
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products