Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

122results about How to "Fast construction and installation" patented technology

Multi-split frame type energy-saving air conditioner system and control method thereof

The invention discloses a multi-split frame type energy-saving air conditioner system and a control method thereof. The multi-split frame type energy-saving air conditioner system is characterized in that a natural cooling condenser is respectively connected with a first evaporator, a second evaporator and a third evaporator at outside through a second electromagnetic valve, a fourth electromagnetic valve and a sixth electromagnetic valve; a refrigerant pump is respectively connected with a first condenser, a second condenser and a third condenser at outside through a first electromagnetic valve, a third electromagnetic valve and a fifth electromagnetic valve; the first evaporator is connected with the first condenser, the second evaporator is connected with the second condenser, and the third evaporator is connected with the third evaporator. The multi-split frame type energy-saving air conditioner system has the advantages that the application of single unit cabinets is supported, the application of parallel multi-split cabinets is realized, and the multi-split frame type energy-saving air conditioner system can be used as an alternative plan of modularizing machine room applications; the investment cost is low, the installation and construction speed is high, and the running efficiency is high.
Owner:SHENZHEN XBROTHER TECH

Integrated sewage treatment device

The invention discloses an integrated sewage treatment device, comprising an outer pool (1) which is divided into a pre-precipitation zone (2), an anoxic zone (3), a reaction zone (4) and gas stripping zone (5) from left to right by inserting plates (11); the outer pool (1) is provided with a water inlet pipe (7), a water outlet pipe (8) and a sludge discharge pipe (9); a?facultative?reaction module (14) is arranged in an anoxic zone (3); an aerobic reaction module (15) is arranged in a reaction zone (4); a gas stripping module (16) is arranged in a gas stripping zone (5); the upper parts of the aerobic reaction module (15) and the gas stripping reaction module (16) are provided with air pipes (12), which are connected with a fan (6); the lower part of the gas stripping module (16) is connected with the sludge discharge pipe (9), and the upper part of the gas stripping module (16) is provided with a mixed liquid return pipe (13); the mixed liquid return pipe (13) is connected with one end of a mixed liquor reflux tank (10); and the other end of the mixed liquor reflux tank (10) is connected with the facultative reaction module (14). The invention adopts a modular design with reasonable structure, so as to realize quick construction and installation, convenience for operation and maintenance and strong operability.
Owner:中节能国祯环保科技股份有限公司

Low-intermodulation compatible type connection radio frequency socket and plug and operation method thereof

ActiveCN104577400AOvercome Contact NonlinearityLow intermodulation characteristicsEngagement/disengagement of coupling partsCoupling device engaging/disengagingElectrical conductorEngineering
The invention provides a low-intermodulation compatible type connection radio frequency socket and plug. The socket comprises an outer socket conductor, an inner jack conductor, a socket insulating support, an end face reed and a radial reed. The outer socket conductor is internally provided with an annular groove matched with and coupled to an outer plug conductor. The inner side of the annular groove is the front-segment tongue diameter, and the end face of the annular groove is a mechanical benchmark face. The front-segment tongue diameter and the mechanical benchmark face are designed to be of an integrated structure. The inner plug conductor in the plug is internally provided with an annular groove matched with and coupled to the outer socket conductor and an unlocking sleeve. The inner side of the annular groove is matched with the outer side of a socket-shaped groove in the radial direction, the satisfactory axial matching length is set, and the bottom of the annular groove is the mechanical benchmark face. According to the low-intermodulation compatible type connection radio frequency socket and plug, improvement is conducted on the mechanical benchmark face and electrical benchmark face separating design and contact outer conductor slotting design in the prior art, continuity of full-spectrum characteristic impedance and electric connectivity of a contact port are guaranteed, intermodulation interference and reflection coefficients are further lowered, and wider working bands and excellent return losses are achieved.
Owner:WUTONG HLDG GRP CO LTD +1

Buried type glass fiber reinforced plastic integrated sewage treatment equipment and process

The invention belongs to the technical field of sewage treatment and in particular relates to buried type glass fiber reinforced plastic integrated sewage treatment equipment and process. The buried type glass fiber reinforced plastic integrated sewage treatment equipment provided by the invention is wholly buried into the ground and comprises a grid tank, a regulation tank, a hydrolysis-acidification tank, an MBBR (Moving Bed Biofilm Reactor) tank, an inclined tube sedimentation tank, an intermediate water tank and a clean water tank, wherein the grid tank, the regulation tank, the hydrolysis-acidification tank, the MBBR tank, the inclined tube sedimentation tank, the intermediate water tank and the clean water tank are sequentially arranged in series. According to the buried type glass fiber reinforced plastic integrated sewage treatment equipment provided by the invention, the sewage treatment amount reaches 10m<3> / d to 200m<3> / d; sewage is treated for 24h and a designed treatment water amount is 0.5m<3> / h to 10m<3> / h; the treatment capacity per year reaches a grade of ten thousand tons or more; the buried type glass fiber reinforced plastic integrated sewage treatment equipment has the advantages of simplicity in operation, reasonable structure, high treatment efficiency, low investment cost and low operation cost.
Owner:辽宁弘昊环境工程有限公司

Anti-rotation angle tower frame foundation and manufacturing method

The invention provides a steeliness anti-rotation angle tower frame foundation and a manufacturing method. The structure consists of a tower frame installation flange plate, a triangular cylinder foundation pile and an anti-rotation wing element; the tower frame installation flange plate is welded at the top end of the triangular cylinder foundation pile, the anti-rotation wing element is arranged at the vertical side part of the triangular cylinder foundation pile, the top end of the anti-rotation wing element is welded with the bottom of the tower frame installation flange plate, and the top part of the triangular cylinder foundation pile and the connection turning part of the tower frame installation flange plate are welded with stiffened plates. Compared with the prior art, the steeliness anti-rotation angle tower frame foundation overcomes the defects of the rotation of the round tube type rotation angle tower caused by uneven stresses when bracing wire as well as the long construction time and high construction cost when casting the rotation angle tower foundation. The invention has the advantages of simple structure, scientific design, easy construction, strong adaptability and the like, can be installed and used by piling in-situ without the need of evacuating further, is not limited to terrain and has no influence on nearby buildings, thereby having good promotion and application values.
Owner:山东省呈祥电工电气有限公司

Decorative paper surface gypsum board and production method thereof

The invention relates to a decorative paper surface gypsum board and a production method thereof, which mainly solve the technical difficulties of the traditional paper surface gypsum board, such as single surface colour, large labor intensity of workers, low production efficiency, and long construction period. The technical scheme of the invention is that: the decorative paper surface gypsum board comprises a paper surface gypsum board which is used as a base body, wherein the decorative paper surface gypsum board also comprises decorative paper and surface adhering glue; the board surface of the decorative paper surface gypsum board is coated with the surface adhering glue, and the decorative paper is pasted to the board surface of the decorative paper surface gypsum board which is coated with the surface adhering glue and bonded with the board surface together. The production method comprises the following steps of: cleaning the surface of the paper surface gypsum board and putting into the feed end of a surface adhering machine, and meanwhile, installing the decorative paper on a bracket of the surface adhering machine; and spreading the surface adhering glue to a glue spreader, uniformly spreading the surface adhering glue to the board surface by the glue spreader, and meanwhile, pasting the decorative paper to the board surface by continuous rolling, and then solidifying for 24 hours to accomplish the glue adhesion of the decorative paper.
Owner:曹新春

Subarea design method for prefabricating assembled temporary road for enclosed building construction site

The invention discloses a subarea design method for prefabricating an assembled temporary road for enclosed building construction site. According to the invention, a traditional or current bidirectional mixed road design mode is changed, a cross section of a bidirectional mixed road is divided into four parts of independent road subareas, which are an empty lane, a heavy lane, a pedestrian auxiliary lane, and a water collection shoulder area, and the empty lane, the heavy lane, and the pedestrian auxiliary lane cannot be mixed. The empty lane, the heavy lane, and the pedestrian auxiliary laneare respectively connected and arranged along the road, and the water collection shoulder area is arranged at one side of the pedestrian auxiliary lane. A road plane composed of the empty lane, the heavy lane, and the pedestrian auxiliary lane orients the water collection shoulder area and inclined in a unidirectional mode. The designed road has concise and scientific road function, can integrallyoptimize the pavement structure, material amount per unit area and weight per unit area of the prefabricated pavement can be integrally reduced, and the usage cost of the prefabricated pavement during whole life cycle is reduced.
Owner:BEIJING TIANHENG CONSTR

Trackless trolley for transferring reinforcing mesh sheets of rock-fill dam panels and construction method

The invention provides a trackless trolley for transferring reinforcing mesh sheets of rock-fill dam panels and a construction method. A plurality of walking tire devices are arranged at the bottom ofa trolley frame, and the walking tire devices are connected with the trolley frame through a lifting mechanism. A plurality of liftable hooks are further arranged at the bottom of the trolley frame.The construction method comprises the following steps that when the walking tire devices of the trackless trolley transfers the reinforcing mesh sheets on post-poured blocks, through the cooperation of the lifting mechanism and the liftable hooks, the height of the trolley can be adjusted to adapt to a construction site, the liftable hooks hangs the reinforcing mesh sheets, the reinforcing mesh sheets are transported to setting positions by using the trolley, when the arrangement of the reinforcing mesh sheets of a current row is finished, the trackless trolley is moved to another row, and theabove steps are continued; and the transferring of the reinforcing mesh sheets can be realized by above steps. The liftable walking tire devices are arranged, the trackless trolley can be adapted tothe quick hanging and mounting, transferring and quick in-place installation construction of the reinforcing mesh sheets when the panel thickness is varied during the construction of first-poured blocks and the post-poured blocks of the panels.
Owner:CHINA GEZHOUBA (GRP) FIRST ENG CO LTD +1

Continuous annealing unit drying oven aluminized pipeline installation method

The invention particularly relates to a continuous annealing unit drying oven aluminized pipeline installation method. The method is characterized by comprising the steps of 1, optimal arrangement ofpipelines and supports; 2, segmented prefabrication of the pipelines; 3, welding and installation of the pipelines. According to the method, through the BIM technology, the arrangement of the pipelines and the supports is optimized, the optimal trend of the pipelines is determined, and the positions of the supports are precisely determined. By using the parameterization characteristics of a pipeline model, the pipelines are subjected to segmented prefabrication and then subjected to aluminizing treatment. During welding of the pipelines, the variety of welding rods is optimized, a positioningtool is made for pipeline assembly, and by using the one-side welding both-side formation technology, pipeline welding is conducted. During pipeline installation, a series of protective measures are adopted, it is ensured that the aluminized layers of the pipelines are not damaged. By using the installation method, the installation difficult of an aluminized pipeline is reduced, and the construction progress is expedited. The method as the advanced technology in the field of pipeline installation effectively solves the key technological problems during construction of the aluminized pipeline.
Owner:SHANGHAI ERSHIYE CONSTR CO LTD +1

Water supply pipeline pressure test process

The invention discloses a water supply pipeline pressure test process. The process comprises the steps of pressure test preparation, pipeline pressure test water injection, pipeline pressurization, standing observation and pressure test device dismounting. The pipeline assembly has the beneficial effects that the pressure gauges are installed on the main water pipe, the branch water pipes and the branch water pipes correspondingly so that the pressure values of all the pipelines of the whole pipeline assembly can be monitored, the accuracy of the monitored pressure values can be ensured, connecting pieces used for being connected with the pressure gauges do not need to be additionally installed on the pipelines, and rapid construction and installation are facilitated; the exhaust valve is installed at the water outlet end of the branch water pipe with the highest horizontal height, the stop valve is installed at the position of a pipe opening connected with the exhaust valve, air in the pipeline assembly can be exhausted in the water injection process, meanwhile, when water flows out of the exhaust valve, it is indicated that the pipeline assembly is filled with water, and then the branch water pipe can be plugged through the stop valve. And water injection cleaning is carried out on the pipeline assembly after pressure testing, and it is ensured that residual objects in the pipeline are cleaned up so that the pipeline can be delivered to a user for use.
Owner:中铁建设集团机电安装有限公司 +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products