Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

28872 results about "Mesh grid" patented technology

News scene three-dimensional reconstruction and visualization method based on multi-source remote sensing data

The invention provides a news scene three-dimensional reconstruction and visualization method based on multi-source remote sensing data, and relates to the technical field of three-dimensional reconstruction, and the method comprises the steps: extracting multi-modal data feature points through employing a spatial position weighted iterative nearest point algorithm and a tensor projection algorithm; after bidirectional attention deep neural network processing and local geometric consistency constraint screening, registration multi-source remote sensing data is generated, data enhancement is carried out through a variational auto-encoder network and a generative adversarial network, the enhanced data is used for depth information generation and texture feature migration, an initial three-dimensional grid model is generated based on a Poisson reconstruction algorithm, and the initial three-dimensional grid model is constructed; and carrying out topological optimization by combining multi-view projection consistency constraint and a grid optimization algorithm to obtain an optimized three-dimensional scene model, setting a space division function, carrying out space division, constructing a grade model and a depth region, generating a scene semantic segmentation map, and updating a visual scene.
Owner:XINHUA FUSION MEDIA TECH DEV (BEIJING) CO LTD

Scene space three-dimensional model dynamic modeling method based on multi-modal data

The embodiment of the invention provides a scene space three-dimensional model dynamic modeling method based on multi-modal data, and the method comprises the steps: fusing the feature information of a video sequence, point cloud data and IMU data, and building a space-time corresponding relation through employing a particle filtering algorithm. Scene semantic understanding is realized based on a Transform multi-modal scene analysis network, scene scores are calculated in combination with spatial density, depth occlusion and shape change features, and an optimal modeling algorithm is selected through a strategy network of deep reinforcement learning training. Meanwhile, scene dynamic features are analyzed by using a deep neural network and a graph neural network, adaptive grid subdivision and geometric constraint reconstruction of a dynamic region are realized, and a reconstruction threshold is dynamically adjusted according to a scene semantic type. According to the method, the three-dimensional reconstruction quality and efficiency of a large-scale complex scene are effectively improved.
Owner:UNIVERSAL UBIQUITOUS TECH CO LTD

Numerical control machine tool intelligent maintenance decision-making method and system based on digital twinning

The invention provides an intelligent maintenance decision-making method and system for a numerical control machine tool based on digital twinning, and relates to the technical field of equipment maintenance, and the method comprises the steps: obtaining the structural data and simulation precision requirements of the numerical control machine tool, determining the optimal grid size and distribution parameters of a finite element model, obtaining operation conditions, and adding the operation conditions to a multi-physics coupling modeling module, generating a machine tool digital twinborn model, fusing the machine tool digital twinborn model with the physical field, generating a machine tool operation degradation model, and optimizing to obtain a self-evolution digital twinborn model; obtaining machine tool operation parameters, performing preprocessing to obtain multi-modal perception data, extracting multi-view potential features, determining potential correlation features, and obtaining a machine tool health state evaluation result; the method comprises the following steps: generating a multi-level fault prediction result, determining a candidate maintenance scheme, adding the candidate maintenance scheme and the multi-level fault prediction result into a knowledge graph construction module, generating a semantic association network, and solving to obtain an optimal maintenance decision in combination with a multi-objective optimization algorithm.
Owner:CHANGZHOU PERFECT DIMENSION TECH CO LTD

Underground construction decision-making method based on three-dimensional geological modeling and risk hot area identification

The invention discloses an underground construction decision-making method based on three-dimensional geological modeling and risk hot area identification, and relates to the field of fusion of artificial intelligence and geological engineering. The method comprises the following steps: firstly, acquiring drilling data, geological radar images and seismic reflecting layer information, constructing a three-dimensional geological voxel model with spatial topology constraints, and accurately describing a geological unit structure by adopting an irregular grid mode; and then, extracting a time sequence characteristic index under construction disturbance, forming a continuous time sequence characteristic vector, inputting the continuous time sequence characteristic vector into a convolutional recurrent neural network model with a space attention aggregation mechanism and a deep memory unit, and predicting a risk heat value of each space position. And on the basis, through heat gradient clustering and neighborhood consistency analysis, a dynamic high-risk hot area is identified, and a risk hot area map is constructed. And finally, in combination with the construction stage, the equipment plan and the sensor feedback information, constructing a multi-target auxiliary decision function, and generating a construction decision result including operation path reconstruction, rhythm adjustment and power limit and control suggestions.
Owner:南京中交浦滨建设有限公司 +1

Large-scene three-dimensional reconstruction method based on three-dimensional Gaussian sputtering

The invention discloses a large-scene three-dimensional reconstruction method based on three-dimensional Gaussian sputtering, and relates to computer graphics. The method comprises the following steps: collecting a multi-view image set of a large scene; obtaining a scene sparse point cloud according to the multi-view image set; performing monocular depth estimation on the multi-view image by using a pre-trained depth prediction network to obtain monocular depth estimation priori; the method comprises the following steps of: performing global training on a scene by utilizing scene sparse point cloud and monocular depth estimation prior to obtain an initial three-dimensional Gaussian model, and performing space grid division on the initial three-dimensional Gaussian model to obtain a plurality of scene blocks with axis alignment bounding boxes; setting image view angle data of each scene block; performing deep supervised training on the Gaussian ellipsoids in the plurality of scene blocks by using a parallel GPU (Graphics Processing Unit); combining the trained scene blocks to obtain a final three-dimensional Gaussian model; in view of low geometric structure reconstruction precision caused by only depending on color information of a multi-view image in large-scene three-dimensional rendering, the method improves the reconstruction precision of large-scene rendering.
Owner:JSTI GRP CO LTD +2

Three-dimensional geological modeling parameter optimization method and system based on deep learning

The invention provides a three-dimensional geological modeling parameter optimization method and system based on deep learning, and relates to the field of geological prospecting and modeling.The method comprises the steps that drilling data and remote sensing data of a geological prospecting area are obtained, and multi-source geological data of three-dimensional geological modeling are formed; generating geological profile map data of the geological features according to the drilling data, generating landform profile map data corresponding to the topographic features according to the remote sensing data, and extracting boundary information of the geological exploration area; carrying out gridding processing on a three-dimensional space, dividing a geologic body of the geological exploration area into a plurality of small grid units, and defining geological modeling parameters; the preliminary three-dimensional geological grid model is constructed according to the geological profile map data, the landform contour map data and the boundary information, the size and the resolution of the grid are dynamically adjusted according to the geological change area, the three-dimensional geological model is obtained through optimization and adjustment, the modeling precision is improved, manual intervention is reduced, and computing resources are saved.
Owner:崂山国家实验室

Three-dimensional model adaptive generation method based on video and point cloud data

The embodiment of the invention provides a three-dimensional model adaptive generation method based on video and point cloud data, scene data is collected through a multi-view camera array and a depth scanning array, and key features are extracted and screened by using a hierarchical feature extraction network and an attention mechanism. And organizing local data blocks by adopting a hierarchical index tree based on a union-check set, and realizing self-adaptive parameter optimization by combining integrity and accuracy scores. Meanwhile, efficient reconstruction and material mapping of a local three-dimensional grid are realized through a parallel operation channel and a dynamic calculation resource scheduling mechanism. According to the method, the precision and efficiency problems of a traditional three-dimensional reconstruction scheme in processing a large-scale scene are effectively solved, and the model generation quality is improved.
Owner:UNIVERSAL UBIQUITOUS TECH CO LTD

Method and system for detecting defects of polyethylene plastic hollow plate

The invention discloses a polyethylene plastic hollow plate defect detection method and system, and relates to the technical field of nondestructive testing, the system is composed of a plurality of functional modules, and the system comprises: a multi-mode sensing module for collecting multi-source data including a hollow plate surface image, three-dimensional morphology data and an ultrasonic reflection signal; the historical database construction module is used for performing space-time alignment and feature level fusion on the multi-source data to generate a composite defect feature matrix; collecting ultrasonic signal waveforms of known defects, extracting characteristic parameters, and establishing a historical waveform library; calculating a characteristic parameter classification range of each type of defects based on a historical waveform library; judging whether the detection waveform parameter falls into a classification range corresponding to the processing noise or not, and if so, rejecting the signal; otherwise, keeping; and the defect area identification module is used for dividing the surface of the hollow plate into uniform grids based on the surface image of the hollow plate, and counting the density of the residual ultrasonic detection sources in each grid.
Owner:ZHEJIANG INSTITUTE OF QUALITY SCIENCES

Urban functional area gridding identification and classification method based on multi-source spatio-temporal data

The invention provides an urban functional area gridding identification and classification method based on multi-source spatio-temporal data, and relates to the technical field of area identification, and the method comprises the steps: carrying out the dynamic grid division of an urban area through employing a self-adaptive grid division algorithm, obtaining the multi-source spatio-temporal data of a gridding area, carrying out the space-time alignment, and generating a multi-dimensional time sequence feature set; extracting multi-dimensional feature vectors of the grid units through a multi-modal feature fusion algorithm, acquiring long-range time sequence features by using a bidirectional gating recursion unit, calculating spatial correlation features based on a multi-head attention mechanism, and inputting the two types of features into a feature fusion network with jump connection to generate enhanced spatial-temporal features; and an optimization strategy is adopted, a functional area clustering center point is determined through density peak value clustering in sequence to obtain an initial division result, the initial result is optimized by combining spectral clustering of spatial adjacency constraints, and the boundary of the functional area is optimized by using a simulated annealing algorithm, so that accurate identification and classification of the urban functional area are realized.
Owner:XINHUA FUSION MEDIA TECH DEV (BEIJING) CO LTD

Urban underground passage fire risk dynamic monitoring and early warning method and system

The invention relates to an urban underground passage fire risk dynamic monitoring and early warning method and system, and solves the problems that single index evaluation is difficult to reflect real risks and a fixed threshold cannot adapt to complex working conditions, and the method comprises the steps: building a four-level threshold library according to risk values, and dynamically adjusting a threshold boundary in combination with a scene; when the risk value is lower than a preset threshold value, the monitoring state is continued; when the risk value exceeds a threshold value in the current scene, triggering a corresponding early warning and pushing the early warning to a command center, coupling historical fire data and dynamic attribute matrix data, and calculating the fire probability of each grid; the smoke diffusion path and the structural fire endurance are simulated by calculating fluid mechanics, the fire consequence severity is quantified, the fire probability of each grid and the fire consequence severity are fused by adopting a fuzzy comprehensive evaluation method to generate a risk matrix, and a high-level risk area is marked. The method has the following technical effects that dynamic monitoring and early warning of the urban underground passage fire risk are realized, and the evaluation accuracy and the early warning reliability are improved.
Owner:CHINA JILIANG UNIV

High-voltage switch cabinet intelligent operation and maintenance system and method based on digital twinning

The invention discloses an intelligent operation and maintenance system and method for a high-voltage switch cabinet based on digital twinning, relates to the technical field of intelligent power grids, and solves the problems of nonlinear effect modeling distortion, cross-spatio-temporal scale coupling deviation accumulation, time sequence real-time contradiction and insufficient extreme working condition adaptation in the prior art. Hysteresis parameters of the ferromagnetic material are dynamically calibrated through a quantum annealing optimization algorithm, and electromagnetic-thermal field strong coupling synchronous calculation is realized by combining multi-scale mesh generation and an implicit thermal field iterative algorithm; constructing an incremental transfer learning framework to fuse aging features and real-time data, and correcting boundary conditions of the model by adopting four-dimensional variational assimilation; establishing a hybrid verification platform to dynamically feed back extreme working condition parameters, and generating a credible operation and maintenance instruction in combination with a block chain; according to the method, the contact temperature rise prediction precision, the residual life evaluation reliability and the circuit breaker transient response real-time performance are remarkably improved, and active immune type intelligent operation and maintenance of the high-voltage switch cabinet under the extreme working condition are achieved.
Owner:HENAN REAL ELECTRIC

Method of Constructing Digital Twin Physical Field of Computer Numerical Control Machine Tool with Double Order Reduction

A method of constructing a digital twin physical field of a computer numerical control machine tool with double order reduction is provided. A physical field finite element simulation sample data set in a working state sampling space has an order preliminarily reduced to sparse grid node data via an improved K Nearest Neighbor (KNN) algorithm, so that the number of point sets is kept within the real-time rendering capability range of graphic rendering software. A digital twin physical field proxy model is trained using a radial basis function (RBF) to realize reconstruction of the physical field. The proxy model is iteratively optimized using a genetic algorithm to solve the problem of deviation between a proxy physical field model and a real physical model. Finally, the proxy model is deployed to a digital twin system, and the physical field distribution is solved in real time.
Owner:ZHEJIANG UNIV

Surface flaw analysis method combined with metal material fatigue life prediction

The invention provides a surface flaw analysis method combined with metal material fatigue life prediction, which comprises the following steps: carrying out grid optimization and refinement processing on an initial three-dimensional model, and carrying out refinement reconstruction on a local area to obtain a three-dimensional geometric model of the surface of a metal material, the three-dimensional geometric model comprising micro-scale surface flaw information; carrying out region division on the three-dimensional geometric model, identifying and extracting a surface defect region, carrying out edge detection on the surface defect region, and determining an accurate geometric contour and spatial position information of a defect; using finite element analysis software to import the three-dimensional geometric model and the flaw mathematical description model of the metal material, setting material attributes, boundary conditions and load conditions, and establishing a finite element analysis model containing microscopic flaws; and carrying out stress-strain analysis on the finite element analysis model of the microscopic flaws, calculating stress distribution and stress concentration coefficients around the flaws, and evaluating the influence of the flaws on fatigue crack initiation and expansion by adopting a fracture mechanics theory.
Owner:IFLYTEK SOUTH CHINA ARTIFICIAL INTELLIGENCE RES INST GUANGZHOU CO LTD

Systems, methods, and devices for powering a mesh network using a portable power case

Systems, methods, and articles for a portable power case are disclosed. The portable power case is comprised of at least one battery and at least one PCB. The portable power case is operable to supply power to a transceiver. The portable power case is operable to be charged using a DC power source (e.g., solar panel, wind turbine, water turbine). A plurality of portable power cases, DC power sources, and transceivers are operable to form a mesh network.
Owner:LAT ENTERPRISES INC

Enterprise employee behavior analysis and safety risk early warning monitoring method and system

The invention provides an enterprise employee behavior analysis and safety risk early warning monitoring method and system, and relates to the technical field of enterprise risk management, and the method comprises the steps: collecting employee terminal operation behavior data, building an activity thermal distribution diagram based on office area grid behavior association intensity, and training a behavior evaluation model. And inputting the behavior scoring matrix into a deep neural network to extract target behavior characteristics, calculating an abnormal behavior risk weight coefficient in combination with a department security policy, performing classification and analyzing a risk diffusion probability, and generating a risk situation index to determine an early warning level. Starting a response strategy according to the early warning level, blocking high-risk early warning in real time, tracking associated accounts, establishing a risk association map, identifying potential risk propagation nodes and performing active protection, finally generating an early warning report and feeding back effective protection rules to a behavior baseline model, and realizing continuous optimization of a risk early warning mechanism. And the accuracy and effectiveness of safety risk early warning in the enterprise are improved.
Owner:STATE GRID HEILONGJIANG ELECTRIC POWER COMPANY

Twin power station collision visual simulation method and system based on physical simulation

The invention provides a twin power station collision visual simulation method and system based on physical simulation, and relates to the technical field of data processing, and the method comprises the steps: obtaining a three-dimensional geometric model of a twin power station, carrying out space division, extracting geometric parameters, obtaining material data, constructing a material correlation model and a mechanical model, and carrying out fusion to obtain a physical simulation model; acquiring initial collision condition parameters as boundary conditions, performing local grid encryption, constructing a nonlinear kinetic equation of a collision process, performing time domain solution, determining equivalent stress distribution and equivalent plastic strain distribution, and generating a collision result; judging whether plastic deformation or fracture failure occurs, generating full collision process physical field data, generating a collision animation frame sequence, generating a stress distribution cloud picture and a plastic strain cloud picture, constructing a fracture special effect, and comprehensively generating a collision visual scene.
Owner:HANGZHOU ELECTRIC EQUIP MFG

Multi-working-condition-oriented equipment fault diagnosis method based on unbalanced learning

The invention discloses a multi-working-condition-oriented equipment fault diagnosis method based on unbalanced learning, and the method comprises the following steps: collecting the operation data of equipment under different working conditions through a plurality of sensors, carrying out the preprocessing, feature extraction and feature selection of the collected original operation data, and obtaining a feature set; processing the feature set by adopting an unbalanced learning technology and a cost-sensitive learning algorithm to obtain a balanced data set; constructing a multi-working-condition fault diagnosis model based on learning, and optimizing model parameters by adopting a method of combining cross validation and grid search according to a balanced data set in a model training process; deploying a multi-working-condition fault diagnosis model obtained through training, carrying out the online diagnosis of equipment faults, and continuously updating and optimizing the model through a continuous learning mechanism. According to the method, the unbalanced learning technology is applied to multi-working-condition fault diagnosis, the accuracy and robustness of diagnosis can be remarkably improved, and real-time monitoring and predictive maintenance of the equipment health state are achieved.
Owner:CHINA SHIP DEV & DESIGN CENT

Cable system full life cycle health management method based on digital twinning

The invention relates to the technical field of intelligent operation and maintenance of power equipment, in particular to a cable system full life cycle health management method based on digital twinning, which comprises the following steps: step 1, constructing a cable digital twinning body fusing electric-thermal-mechanical-chemical multi-physical fields; 2, dynamically fusing multi-source monitoring data, and collecting a cable skin continuous temperature sequence, a partial discharge pulse waveform and soil environment parameters; 3, solving a coupling equation of conductivity-thermal conductivity-stress tensor-ion diffusivity through iteration to realize multi-physical field linkage simulation; 4, generating a self-adaptive maintenance decision, inputting the insulation aging factor into an LSTM predictor to output a residual life prediction value, and generating a maintenance work order when the residual life is lower than a threshold value; and 5, carrying out closed-loop correction on the model, and updating the insulation aging factor calculation model and the physical attributes of the three-dimensional grid according to actual maintenance data. The method improves the safety, reliability and operation and maintenance efficiency of the cable system, and has important industrial application prospects.
Owner:DONGGUAN ZHONGZHEN ENERGY TECH CO LTD

Thermal processing management and control method, system and equipment based on digital twinning and storage medium

The invention relates to the technical field of hot working control, and discloses a hot working management and control method, system and device based on digital twinning and a storage medium. The method comprises the steps of obtaining technological parameters and quality data of smelting, casting, forging and pressing and heat treatment procedures through a multi-sensor fusion internet-of-things data acquisition system, constructing a hot working full-process data set and a multi-dimensional technological data platform, achieving parameter mapping and grid conversion through a self-adaptive interface algorithm, establishing a collaborative simulation platform, and obtaining a multi-dimensional technological data platform. And constructing a digital twinborn model and deploying the digital twinborn model to an edge computing gateway to generate a visual management and control system. And calculating a process parameter combination and a resource priority allocation scheme. According to the invention, on the basis of obtaining a large amount of process data in real time, cross-process collaborative optimization and intelligent decision can be realized, especially under the conditions of multi-physics field coupling and complex time-varying characteristics, how to effectively monitor and adjust process parameters in real time and ensure the optimization of product quality and production efficiency.
Owner:HENAN UNIV OF SCI & TECH

Method and device for mapping three-dimensional (3D) point cloud model based on deep learning

A method for mapping a three-dimensional (3D) point cloud model based on deep learning includes: extracting features of image data by using a convolutional neural network; extracting features of point cloud data by using a PointNet point cloud processing network, and constructing a 3D model of the point cloud data by using a triangular mesh; aligning the 3D model and an image spatially and temporally; performing projection mapping on the aligned 3D model and image, and superimposing location information in the point cloud data onto texture information of the image to obtain a first fused image; fusing the features of the point cloud data and the features of the image data to obtain a second fused image with a fused feature; and superimposing the first fused image onto the second fused image, and obtaining a superimposition weight by using the convolutional neural network, to generate a mapped 3D model.
Owner:CHINA UNIV OF GEOSCIENCES (WUHAN) +1

Riverbed evolution prediction method based on multi-source data fusion

The invention provides a riverbed evolution prediction method based on multi-source data fusion, and belongs to the technical field of hydrological resource monitoring. The method comprises the following steps: acquiring and fusing multi-source data by using different devices, performing data preprocessing to form unified three-dimensional grid data, and then generating a multi-scale feature map based on a designed feature extraction network; based on the designed multi-channel convolutional neural network, learning and extracting features on multiple channels at the same time, and performing hierarchical expression and fusion on different information sources; and finally, based on the designed time sequence regression network, extracting a complex dependency relationship in the time sequence through a double-layer LSTM structure, learning residual error information through an adaptive residual error correction module to improve prediction precision, and obtaining a final prediction result. The method shows relatively high applicability and robustness in a complex river channel environment, and can cope with various river bed form changes caused by natural factors and human activities through multi-source data fusion and an innovative feature extraction and regression method.
Owner:YELLOW RIVER INST OF HYDRAULIC RES YELLOW RIVER CONSERVANCY COMMISSION

Submarine cable risk dynamic assessment method and system based on multi-modal deep learning

The invention discloses a submarine cable risk dynamic assessment method and system based on multi-modal deep learning, and belongs to the field of marine infrastructure operation and maintenance. Aiming at the problems of incomplete data coverage, unreal generated scene, low evaluation reliability and the like in the prior art, the method comprises the following steps of: 1) constructing a multi-source heterogeneous data set containing six types of data including geology, ocean, ships, biology and the like, and realizing data alignment by adopting space-time grid coding; 2) designing a physical constraint generative adversarial network, and generating risk scene data conforming to a fluid mechanics law through a Navier-Stokes equation constraint; 3) creating a hierarchical space-time fusion network (HST-Transform), and combining CNN spatial feature extraction, a time sequence attention mechanism and a dynamic memory module to realize multi-modal fusion; according to the method, the detection rate of rare risk events is increased by 62%, the evaluation accuracy rate reaches 91.7%, the false alarm rate is reduced by 34% compared with a traditional method, and submarine cable breakage accidents can be effectively prevented.
Owner:GUANGDONG POWER GRID CO LTD

Low-altitude integrated management system based on grid digital twinborn model and intelligent algorithm

The invention discloses a low-altitude integrated management system based on a grid digital twin model and an intelligent algorithm, and relates to the technical field of low-altitude aircrafts. The method comprises the following steps: multi-source sensing data fusion and grid coding are carried out, and an airspace environment space-time database is constructed; constructing an airspace environment space-time database to carry out three-dimensional subdivision on the airspace; generating a multi-scale grid twinborn body, and associating a corresponding attribute for each level of grid according to a management requirement; generating an airspace risk thermodynamic diagram in the future 5-30 minutes; establishing a grid state change triggering rule; and generating a multi-target optimal path set by taking the grid navigation cost as a weight. According to the invention, by combining the real-time operation data of the low-altitude aircraft, the meteorological environment and other data with the artificial intelligence algorithm and the navigation rule base, the airspace traffic flow is analyzed, the flight plan is optimized, the flight route is intelligently distributed, the automatic route setting of any two points is realized, and the response speed of the low-altitude flight service system and the processing capability of various flight data are improved.
Owner:SHANDONG RUIHANG GEOGRAPHIC INFORMATION ENG CO LTD

Dynamic method and system for thermal fatigue evaluation of integrated circuit package

The invention provides a dynamic method and system for thermal fatigue evaluation of integrated circuit packaging, and relates to the technical field of integrated circuits, and the method comprises the steps: employing a genetic algorithm to determine the arrangement position of a temperature sensor, and collecting a temperature data sequence of a temperature sensor array and the corresponding time information; establishing a thermal-mechanical coupling analysis model comprising a geometric model, a material constitutive relationship and a load boundary, and performing mesh generation on the thermal-mechanical coupling analysis model to obtain a finite element model; based on the finite element model, periodically solving by adopting a nonlinear iterative algorithm to obtain a welding spot stress-strain field data sequence and time information corresponding to the welding spot stress-strain field data sequence, establishing a corrected Coffin-Manson model considering a temperature-stress-time coupling effect, calculating a fatigue damage increment of the welding spot, and accumulating the fatigue damage increment in real time; and performing thermal fatigue state evaluation on the integrated circuit packaging structure according to the change rate of the accumulated fatigue damage value.
Owner:BEIJING YANHUANG GUOXIN TECH CO LTD

Low-altitude airspace management method and system based on data analysis

The invention discloses a low-altitude airspace management method and system based on data analysis, and relates to the technical field of air traffic management and low-altitude airspace planning, and the method comprises the steps: 1, multi-scale dynamic grid division: adjusting the grid granularity in real time according to the aircraft density and environment complexity, generating a multi-scale grid by adopting an optimized quadtree data structure, and carrying out the multi-scale dynamic grid division; boundary smoothing processing is carried out on boundary areas of the grids with different scales; 2, intelligent airspace layering: dynamically adjusting the thickness of a height layer according to a risk score, and setting a buffer layer to enhance the flight safety; and 3, intelligent semantic annotation: giving dynamic semantic information such as risk levels and traffic priorities to the grid units, embedding airspace control regulations and flight rules, and realizing multi-source data fusion and real-time updating of semantic information. According to the method, the problems of static division limitation, boundary problem, insufficient real-time performance and the like in the prior art are solved, and the airspace resource utilization rate and the flight safety are improved.
Owner:SHANDONG JIANZHU UNIV

Underground cable pipeline abnormity monitoring method and system

ActiveCN119272213Aimprove accuracyImprove collection accuracyNeural learning methodsData setMarine engineering
The invention discloses an underground cable pipeline abnormity monitoring method and system, and the method comprises the following steps: S1, building a three-dimensional grid based on the regional soil distribution condition, and obtaining a collection point data set based on the three-dimensional grid and underground cable pipeline data; s2, acquiring acquisition distribution corresponding to each to-be-arranged sensor type based on the to-be-arranged sensor type and the acquisition point data set; s3, acquiring underground cable pipeline time sequence data acquired by each sensor based on acquisition distribution, and performing clustering analysis on the underground cable pipeline time sequence data to acquire abnormal data points; and S4, obtaining an abnormal position according to the abnormal data points and the collection distribution, and outputting abnormal information of the underground cable pipeline according to the abnormal position. The method has the beneficial effects that the physical position of the cable pipeline is considered, meanwhile, the soil environment characteristics are considered, the accuracy of sensor arrangement in the pipeline is improved, the abnormal data point analysis efficiency is improved, and the underground cable pipeline abnormity can be conveniently and timely checked.
Owner:国网浙江省电力有限公司浦江县供电公司 +1

Environment modeling method and system for realizing intelligent security and protection

The invention discloses an environment modeling method and system for realizing intelligent security and protection, and relates to the technical field of intelligent security and protection, and the method comprises the steps: collecting a visual image and depth data of a monitoring region, and generating a monitoring scene feature matrix; performing hierarchical feature extraction on the monitoring scene feature matrix by using a deep convolutional neural network, and constructing a scene semantic feature map; projecting the scene semantic feature map to a three-dimensional monitoring space according to the depth data, and constructing a three-dimensional scene grid model; extracting spatial topological characteristics of each grid node in the three-dimensional scene grid model, and calculating association weights among the grid nodes; and constructing a scene dynamic knowledge graph based on the spatial topological features and the associated weights, and carrying out modeling analysis on abnormal events. According to the method, through cooperative collection of the multi-view vision sensor and the depth sensor, in combination with information entropy weighted standardization and principal component analysis, accurate generation of the monitoring scene feature matrix is realized, and the problems of information redundancy and feature coupling in traditional vision data processing are effectively solved.
Owner:深圳市五兴科技有限公司

Optical lens high-precision three-dimensional reconstruction method and system

The invention provides an optical lens high-precision three-dimensional reconstruction method and system, and the method comprises the steps: building a mapping relation between lens characteristics and three-dimensional reconstruction parameters according to the imaging principles, optical path structures and aberration characteristics of different optical lenses, and obtaining the parameter configuration of different lens types; obtaining optical lens parameters of a to-be-reconstructed scene, and preliminarily determining parameters including point cloud density, gridding resolution and texture mapping precision corresponding to the lens in combination with parameter configuration of different lens types; filtering, denoising and down-sampling are carried out on the high-density point cloud, triangularized grid reconstruction is carried out on the point cloud according to a set gridding resolution, and a gridding three-dimensional model of the scene is generated; original image information is mapped to the gridding three-dimensional model, the texture sampling rate and the fusion mode are controlled according to preset mapping precision, and a three-dimensional reconstruction model with vivid textures is obtained.
Owner:CHONGQING AEROSPACE POLYTECHNIC COLLEGE

Ground stress field three-dimensional dynamic inversion method based on multi-scale adaptive algorithm

The invention relates to the technical field of crustal stress field data processing, in particular to a crustal stress field three-dimensional dynamic inversion method based on a multi-scale adaptive algorithm. The method comprises the following steps: acquiring a geological data set of a target area; constructing a crustal stress field three-dimensional initial model based on the geological data set, and performing geologic body space division and mesh generation to obtain crustal stress field three-dimensional mesh model data; performing multi-scale region division on the crustal stress field three-dimensional grid model data, and establishing a multi-scale weighting function to obtain multi-scale partition mapping information; and constructing a cross-scale boundary adaptive transmission mechanism, and establishing a stress tensor continuity constraint model at a multi-scale partition boundary to obtain cross-scale stress boundary coupling data. Through a multi-scale adaptive algorithm and dynamic closed-loop optimization, high-precision, dynamic and continuous inversion of a crustal stress field in a complex geologic structure is realized.
Owner:INST OF GEOMECHANICS

Large complex ellipsoidal part machining deformation control method based on dynamic cutting planning

Disclosed in the present invention is a large complex ellipsoidal part machining deformation control method based on dynamic cutting planning. The method comprises: performing initial clamping on a blank part, constructing a machining coordinate system, completing reference non-contact measurement and reference surface fitting of inner and outer shape surfaces of the blank part, and completing the division of a generatrix tangent plane; on the basis of product feature decomposition, completing in the same coordinate system the comparison between each theoretical section and an actually measured section, completing cutting evaluation based on the generatrix tangent plane in a machining area, and guiding overall machining route planning and local machining route planning; on the basis of route planning and a cuttable margin, using an adjustable support device to complete part clamping based on dynamic adjustment, so as to realize stable cutting under a variable cutting thickness, and thereby solving the problem of overall deformation control of a large complex ellipsoidal part; and completing high-rib feature twist amount identification in combination with adjustable support, and completing tool path trajectory offset compensation on the basis of a relationship between a circumferential offset and an allowance, and thereby realizing precise compensation machining of a mesh after a local twist. The present invention solves the key difficulties of high-rib local twist deformation compensation and overall deformation control on the basis of ensuring the precision of the residual wall thickness during numerical control machining of a large complex thin-walled ellipsoidal part, thereby further improving the overall manufacturing reliability of a large complex ellipsoidal part.
Owner:SICHUAN AEROSPACE LONG MARCH EQUIP MFG CO LTD