A load dispatching and distribution method and platform for a complex production system with multiple furnaces and multiple machines

By establishing a digital twin model and a multi-objective optimization algorithm for the multi-furnace and multi-machine system, the load distribution parameters are optimized, the load scheduling problem of the multi-furnace and multi-machine system is solved, and the system's economic benefits and environmental protection goals are balanced and load stability is achieved.

CN114580265BActive Publication Date: 2024-10-18HANGZHOU YINGJI POWER TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202111624074.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-28
Publication Date
2024-10-18
Estimated Expiration
2041-12-28

AI Technical Summary

Technical Problem

The existing multi-furnace and multi-machine system lacks effective coordination and optimization methods in load scheduling, resulting in frequent changes in boiler and turbine loads, making it difficult to meet economic benefits and environmental protection goals at the same time.

Method used

Mechanism modeling and data identification methods are used to establish a digital twin model of the multi-furnace multi-machine system, and the boundary parameters of the heating main pipe are optimized. A multi-objective optimization algorithm is used to establish an economical, environmentally friendly and energy-consumption load dispatching and distribution model to obtain the optimal Load distribution parameters.

Benefits of technology

It realizes the optimized operation of multi-furnace and multi-machine system, reduces frequent load changes, increases the profits of the whole plant, and reduces pollutant emissions and equipment energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114580265B_ABST
    Figure CN114580265B_ABST
Patent Text Reader

Abstract

The present invention discloses a load scheduling and distribution method for a complex production system with multiple furnaces and multiple machines, comprising: establishing a digital twin model of the complex production system with multiple furnaces and multiple machines by adopting mechanism modeling and data identification methods; optimizing the boundary parameters of the source-side heating mother pipe of the system with multiple furnaces and multiple machines based on the heat load demand of the heat users, the heat storage and hysteresis parameters of the heat network; establishing, based on the optimized boundary parameters of the heating mother pipe, maximizing the profit of the whole plant, minimizing the pollutant emission and minimizing the total energy consumption of the equipment in operation as the objective function according to the cost and benefit of different furnace types and the adjustable load range and load change rate of different furnace types, and the energy consumption difference of different equipment of the same furnace type, and setting corresponding constraints of the system with multiple furnaces and multiple machines, and establishing a load scheduling and distribution model with multiple furnaces and multiple machines; optimizing and obtaining the optimal load distribution parameters by adopting a multi-objective optimization algorithm; and sending boiler instructions and steam turbine instructions based on the optimal load distribution parameters after optimization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of intelligent heating, and specifically relates to a load scheduling and distribution method and platform for a complex production system with multiple furnaces and multiple machines. Background Art

[0002] Generally, the steam turbines and boilers of smaller thermal power plants are relatively independent, with only simple signal exchanges. The coordination and control between the turbines and boilers is mostly completed by verbal notification and manual operation. Most thermal power companies also have the characteristics of small turbine and boiler capacity, large number of units, and large fluctuations in thermal load. When generating electricity while providing centralized heating, it is necessary to ensure both heating pressure and power generation load. This situation makes the operation of the entire plant more complicated, and load allocation is more difficult than that of unit units. In order to improve its operating efficiency and increase its economic benefits, it is also very necessary to consider boiler load distribution and steam turbine load distribution.

[0003] The multi-boiler and multi-machine system is highly coupled, and it is necessary to consider the coordination between the machine and the boiler, as well as the coordination between multiple boilers and multiple steam turbines. The entire system is mutually constrained and interdependent. At present, the boiler load distribution and steam turbine load distribution strategies are relatively simple. The total load command is weighted by the load distribution coefficient and sent to each boiler controller. Few researchers have taken into account the multi-boiler and multi-machine scenarios for different fuels and the optimization scheduling including multiple objectives such as economy, environmental protection, and energy consumption.

[0004] Based on the above technical problems, it is necessary to design a new load scheduling and allocation method for complex production systems with multiple furnaces and multiple machines. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide a load scheduling and distribution method and platform for a complex production system with multiple furnaces and multiple machines, establish a digital twin model of the system with multiple furnaces and multiple machines and smoothly optimize the mother pipe parameters, and use the digital twin model as the support and the evaluation system as the optimization guide to establish a multi-objective load scheduling and distribution model including economy, environmental protection and energy consumption, and optimize the distribution model to obtain the optimal load distribution parameters to achieve the optimized operation of the system with multiple furnaces and multiple machines.

[0006] In order to solve the above technical problems, the technical solution of the present invention is:

[0007] A first aspect of the present invention provides a load scheduling and allocation method for a complex production system with multiple furnaces and multiple machines, comprising:

[0008] Step S1, using mechanism modeling and data identification methods to establish a digital twin model of a complex production system with multiple furnaces and multiple machines;

[0009] Step S2, based on the heat load demand of the heat user, the heat storage and hysteresis parameters of the heat network, optimizing the boundary parameters of the source-side heat supply mother pipe of the multi-furnace multi-machine system to reduce the load frequency change of the multi-furnace multi-machine complex production system;

[0010] Step S3, based on the optimized boundary parameters of the heating main pipe, according to the costs and benefits of different furnace types, the adjustable load ranges and load change rates of different furnace types, and the energy consumption differences of different equipment of the same furnace type, an objective function with the goals of maximizing the profit of the whole plant, minimizing pollutant emissions and minimizing the total energy consumption of the put into operation equipment is established, and corresponding multi-furnace and multi-machine system constraints are set to establish a multi-furnace and multi-machine load scheduling and allocation model;

[0011] Step S4, using a multi-objective optimization algorithm to optimize the multi-furnace multi-machine load scheduling and allocation model to obtain the optimal load allocation parameters;

[0012] Step S5: Send boiler instructions and steam turbine instructions based on the optimal load distribution parameters after optimization, adjust the fuel quantity, air volume, water supply and steam inlet parameters, and realize the optimized operation of the complex production system with multiple furnaces and multiple machines.

[0013] Furthermore, in step S1, a digital twin model of a complex production system with multiple furnaces and multiple machines is established by using a mechanism modeling and data identification method, specifically including:

[0014] Constructing the physical model, logical model and simulation model of the multi-furnace and multi-machine complex production system; wherein,

[0015] The establishment of the physical model includes the following steps: establishing physical models of heat users, heat networks, heat supply main pipes, multiple boilers, multiple steam turbines, hot water storage tanks, condensers, water pumps and source-side entities, wherein the boilers include pulverized coal boilers and garbage boilers;

[0016] The establishment of the logic model includes the following steps: establishing a controllable closed-loop logic model based on the logical mechanism relationship between various physical entities in the complex production system with multiple furnaces and multiple machines, and mapping the physical model to the logic model;

[0017] The establishment of the simulation model includes the following steps: building a simulation model of a complex production system with multiple furnaces and multiple machines based on the collected operation data, state data, and physical property data of the complex production system with multiple furnaces and multiple machines, and optimizing the parameters of the simulation model according to the error between the predicted value and the actual value output by the simulation model;

[0018] The physical model, the logical model and the simulation model are integrated into a virtual and real model to construct a system-level digital twin model of the physical entity of the multi-furnace and multi-machine complex production system in a virtual space;

[0019] The real-time operating data of multiple working conditions of the complex production system with multiple furnaces and multiple machines are connected to the system-level digital twin model, and the simulation results of the system-level digital twin model are adaptively identified and corrected using a reverse identification method to obtain the digital twin model of the complex production system with multiple furnaces and multiple machines after identification and correction.

[0020] Furthermore, the energy conservation equation of the pulverized coal boiler is expressed as:

[0021] η b,i G f,i LHV=G b,i (h bout,i -h bin,i )+G r,i (h reout,i -h rein,i );

[0022] Among them, η b,i is the efficiency of the i-th pulverized coal boiler; G f,i is the input fuel flow rate of the i-th pulverized coal boiler; LHV is the lower heating value of the input fuel; G b,i is the steam flow rate flowing through the i-th pulverized coal boiler; h bin,i 、h bout,i is the steam enthalpy entering and leaving the pulverized coal boiler; G r,i is the reheater steam flow rate; h rein,i 、h reout,i is the enthalpy of steam entering and leaving the reheater;

[0023] The process of the steam volume of the steam turbine is expressed as:

[0024]

[0025] Where ρ is the gas density in the steam chamber; p is the pressure in the steam chamber; n is the polynomial index; K1 and K2 are proportional coefficients; s z Is the main steam valve opening;

[0026] The main steam flow rate G flowing into the steam turbine t It is expressed as:

[0027] G t =k v p t s z ;

[0028] Among them, p t is the main steam pressure, s z is the main steam valve opening, k v is the proportionality coefficient;

[0029] The energy conservation equation of the condenser is expressed as:

[0030] η c G h (h hout -h hin )=G c (h cout -h cin );

[0031] Among them, η c is the heat transfer efficiency of the condenser; h hout is the outlet enthalpy of steam, h cout is the outlet enthalpy of cooling water; h hin is the inlet enthalpy of steam, h cin is the inlet enthalpy of cooling water, G h is the steam flow rate, G c is the cooling water flow rate;

[0032] The mathematical relationship between the power consumption, lift and flow rate of the water pump is expressed as:

[0033]

[0034] Among them, P pump is the power consumption of the water pump; pump is the efficiency of the water pump; g is the acceleration due to gravity; G pump H is the flow rate of the working medium flowing through the pump; pump is the head of the water pump;

[0035] The relationship between the heat output of the combustion channel of the pulverized coal boiler and the combustion instruction is expressed as:

[0036]

[0037] Among them, S G is the heat output of the combustion channel, μ B is the combustion instruction, τ is the pure delay time of coal grinding, T b is the combustion channel time constant;

[0038] The simulation model of the garbage boiler includes a combustion chamber model, a water circulation system model and a superheater system model;

[0039] The combustion chamber model includes a garbage incineration model and a heat exchange model, and the combustion chamber includes a preheating zone, a combustion zone and a burnout zone;

[0040] The general mass balance equation for the preheating zone, combustion zone and burnout zone is expressed as:

[0041]

[0042] Among them, M in is the fuel mass flow rate entering the area; Mout is the fuel mass flow rate out of the area; M a is the quality of primary air entering the area; M g M is the fuel combustion reaction mass in this area; l is the mass of fuel missed in the area;

[0043] The general energy balance equation for the preheating zone, combustion zone and burnout zone is expressed as:

[0044]

[0045] Among them, Q in is the fuel energy entering the zone; Q out is the fuel energy leaving the area; Q is the heat exchange around the area; Q l The heat carried away by the fuel leaking from this area; Q a The heat carried away by the smoke in this area; Q g The heat brought into the area by the primary wind;

[0046] The amount of air required for garbage combustion is expressed as:

[0047] V 0 =0.0889C y +0.265H y +0.0333S y -0.333O y ;

[0048] Among them, C y , H y , S y , O y are the percentages of carbon, sulfur, hydrogen and oxygen in the fuel as received, respectively;

[0049] The water circulation system model includes a steam drum mathematical model, a downcomer mathematical model and an upcomer mathematical model;

[0050] The parameter dynamic evaporation of the drum mathematical model is:

[0051] G evap =C evap (H w -H s );

[0052] Among them, C evap is the evaporation coefficient; H w is the enthalpy of the drum water; H s is the enthalpy of saturated steam;

[0053] The mass balance equation of the downcomer in the mathematical model of the downcomer is expressed as:

[0054] Wd2 =W d1 ;

[0055] Among them, W d1 , W d2 are the working fluid flow rates at the inlet and outlet of the downcomer respectively;

[0056] The outlet pressure of the working fluid of the downcomer system of the downcomer mathematical model is expressed as:

[0057]

[0058] Among them, P d1 is the downcomer inlet pressure, P d2 is the outlet pressure of the downcomer; l d is the height of the downcomer; d W is the flow resistance coefficient of the working medium in the downcomer; d is the flow rate of the working medium in the downcomer; ρ sd is the average density of the working fluid in the downcomer;

[0059] The mass balance equation of the riser in the mathematical model of the riser is expressed as:

[0060] W u2 =W u1 +W u,exp -W u,lk ;

[0061] Among them, W u1 is the inlet flow rate of the working medium in the riser, W u2 W is the outlet flow rate of the working medium in the riser; u,exp is the expansion flow rate of the riser, W u,lk is the leakage flow of the riser;

[0062] The mass balance equation of the superheater system is expressed as:

[0063] W leak =β×W max , W k,out =W k,in -W leak ;

[0064] Among them, W k,in is the inlet flow rate of the working fluid, W k,out is the outlet flow rate of the working fluid, W leak is the leakage mass flow rate of the working fluid, W max is the maximum leakage flow of the working fluid;

[0065] The momentum balance equation of the superheater system is expressed as:

[0066]

[0067] Among them, P g,in is the flue gas inlet pressure, P g,out is the flue gas outlet pressure; P k,in is the working fluid inlet pressure, P k,out is the outlet pressure of the working fluid; k g is the resistance loss function on the flue gas side, k s is the resistance loss function on the working fluid side; is the average mass flow rate of flue gas, is the average mass flow rate of the working fluid; is the average density of smoke, is the average density of the working fluid;

[0068] The establishment of the simulation model of the hot water storage tank comprises the following steps:

[0069] The hot water end of the hot water storage tank is connected to the water supply main pipe of the heat supply outlet, and the cold water end of the hot water storage tank is connected to the water return main pipe of the heat supply inlet;

[0070] When the heating capacity is greater than the heat network load, the excess heating circulating water flows into the hot water storage tank under the condition that the water flow rate of the heating main pipe remains unchanged. The hot water flow rate that needs to be supplemented in the hot water storage tank is expressed as:

[0071]

[0072] When the heating capacity is less than the heat network load, the reduction in heating power will lead to a decrease in the heating circulation water flow rate. The difference with the heat load is supplemented by the hot water storage tank. The hot water flow rate that needs to be released by the hot water storage tank is expressed as:

[0073]

[0074] Among them, N m The heating power of the unit; N h is the heat network load; c p is the average specific heat capacity of circulating water; T out 、T in are the supply and return temperatures of the heat network circulating water respectively; D h It is the circulating water flow of the first heating station;

[0075] During the heat exchange between the hot water storage tank and the heat network, the relationship between the change in the heat extraction steam flow rate and the hot water flow rate of the hot water storage tank is expressed as:

[0076]

[0077] Among them, dD m is the change in heating extraction steam flow rate; D hc is the hot water flow rate in and out of the heat storage tank, the heat storage process is positive, and the heat release process is negative; hm 、h c They are the heating extraction enthalpy and the drainage enthalpy respectively.

[0078] Further, in step S2, based on the heat load demand of the heat user, the heat storage and hysteresis parameters of the heat network, the boundary parameters of the source-side heat supply mother pipe of the multi-furnace multi-machine system are optimized to reduce the load frequency change of the multi-furnace multi-machine system, which specifically includes the following steps:

[0079] Step S21, obtaining the heat load demand of the heat user:

[0080] Step S211, obtaining the historical heat load data, weather data, building type and date type data based on time changes of the complex production system with multiple furnaces and multiple machines as a training sample data set;

[0081] Step S212, preprocessing the weather data, building type and date type data to obtain dimensionless heat load characteristic quantities;

[0082] Step S213, performing grey correlation analysis on the dimensionless heat load characteristic quantity and the historical heat load data, and calculating the characteristic quantity weight according to the correlation degree;

[0083] Step S214: establishing a heat user load prediction model based on a support vector machine according to the preprocessing results and the feature quantity weights;

[0084] Step S215, inputting the current operation data of the complex production system with multiple furnaces and multiple machines into the heat user load prediction model to obtain the heat load demand of the heat user;

[0085] Step S22, obtaining the hysteresis parameter of the steam main pipe:

[0086] When the temperature and pressure of the heating main pipe are stable, there is a certain difference between the steam extraction of the heating main pipe and the total steam consumption of the heat users. By adopting the peak-valley data method for testing, according to the time of daily load increase, when the pressure of the heating main pipe is adjusted to make the steam flow of the heating main pipe peak or valley, the total steam consumption of the heat users is monitored to have a corresponding peak or valley. The lag time between the peak or valley value of the steam flow of the heating main pipe and the total steam consumption of the heat users is the lag time of the pipe network.

[0087] Step S23: Based on the heat load demand and heat storage parameters of the heat users, the main steam main pipe generates a load instruction, and the main steam main pipe pressure is regulated by boiler output regulation or turbine load regulation. The main pipe pressure control system is used to increase or decrease the load of multiple boilers and machines, and the load demand curve is smoothly optimized to reduce frequent load changes. Based on the load demand of the day and the lag time of the pipeline network, the load is increased in advance before the peak period arrives to meet the heat load demand of the heat users.

[0088] Further, in step S3, based on the optimized boundary parameters of the heating mother pipe, according to the costs and benefits of different furnace types, the adjustable load ranges and load change rates of different furnace types, and the energy consumption differences of different equipment of the same furnace type, an objective function is established with maximizing the profit of the whole plant, minimizing pollutant emissions and minimizing the total energy consumption of the put into operation equipment, and corresponding multi-furnace and multi-machine system constraints are set to establish a multi-furnace and multi-machine load scheduling and allocation model, which specifically includes the following steps:

[0089] Step S31, establish the objective function of maximizing the profit of the whole factory:

[0090] maxJ=E1J 售 +E2J 售 +L·J 补 -M.J. 煤 -G1J 1电 -G2J 2电 ;

[0091] Among them, E1 and E2 are the heat generated by the pulverized coal boiler; J 售 is the heat price; L is the amount of garbage consumed; J 补 is the garbage subsidy; M is the raw coal fuel of the pulverized coal boiler; J 煤 is the price of raw coal; G1 and G2 are the electricity used by pulverized coal boiler plants and garbage boiler plants respectively; J 1电 , J 2电 They are the on-grid electricity prices for pulverized coal boilers and garbage boilers;

[0092] Step S32: Establishing the pollutant emission minimization objective function:

[0093]

[0094]

[0095]

[0096]

[0097] Among them, PS j PN j , PY j 、PC j They represent SO2 and NO generated during the production operation of pulverized coal boilers. x , CO, CO2 emissions; PS k PN k , PY k 、PC k They represent SO2 and NO generated during the operation of garbage boilers. x, CO, CO2 emissions; OP j OP k They represent the energy supply of the j-th pulverized coal boiler and the k-th garbage boiler equipment respectively; PA j,CO , represent the SO2 and NO of the j-th pulverized coal boiler equipment respectively. x , CO, CO2 equivalent emission coefficient; PA k,CO , represent the SO2 and NO of the kth garbage boiler equipment respectively. x , CO, CO2 equivalent emission coefficient; Indicates the CO2 equivalent emission coefficient of electricity purchased from the power grid;

[0098] Step S33: Establish the minimum total energy consumption objective function of the put into operation equipment:

[0099] D i , Q i , B i They are respectively the steam consumption, heat consumption and coal consumption of pulverized coal boiler and steam turbine during production and operation; D n , Q n , B n They are respectively the steam consumption, heat consumption and coal consumption of the garbage boiler and steam turbine during production and operation;

[0100] Step S34, setting constraints for a complex production system with multiple furnaces and multiple machines:

[0101] The constraints of the multi-furnace and multi-machine complex production system include heating capacity constraints, variable load rate constraints, single boiler capacity constraints, single steam turbine capacity constraints, pulverized coal boiler mother pipe pressure constraints and garbage boiler mother pipe pressure constraints;

[0102] The expression of the heating capacity constraint is:

[0103] Q min ≤Q≤Q max ;

[0104] Among them, Q min , Q max are the minimum and maximum heating supply respectively;

[0105] The expression of the variable load rate constraint is:

[0106] ΔB≤ΔB MAX , ΔB MAX =∑ΔB 煤 +∑ΔB 垃 ;

[0107] Where, ΔBMAX is the maximum variable load rate of the boiler, ΔB 煤 , ΔB 垃 are the variable load rates of pulverized coal boiler and garbage boiler respectively;

[0108] The expression of the single boiler capacity constraint is:

[0109] B 煤min ≤B 煤i ≤B 煤max , B 垃min ≤B 垃i ≤B 垃max ;

[0110] Among them, B 煤min , B 垃min are the minimum capacities of pulverized coal boiler and garbage boiler respectively; B 煤max , B 垃max They are the maximum capacities of pulverized coal boiler and garbage boiler respectively;

[0111] The expression of the capacity constraint of a single steam turbine is:

[0112] X min ≤X i ≤X max ;

[0113] Among them, X min , X max are the minimum and maximum capacities of the steam turbine, respectively;

[0114] The expression of the main pipe pressure constraint of the pulverized coal boiler is:

[0115] P 煤 ≤B 煤max -B 煤min ;

[0116] The expression of the main pipe pressure constraint of the garbage boiler is:

[0117] P 垃 ≤B 垃max -B 垃min .

[0118] Furthermore, in step S4, a multi-objective optimization algorithm is used to optimize the multi-furnace multi-machine load scheduling and allocation model to obtain the optimal load allocation parameters, including:

[0119] Step S41: using the entropy weight method to calculate the entropy and entropy weight corresponding to each objective function, the entropy weight model represents the objective weight of each evaluation objective function; defining the subjective weight of each objective function, combining the objective weight and the subjective weight to obtain a comprehensive weight, and updating the weight of each objective function by the comprehensive weight;

[0120] Step S42: Use a multi-objective optimization algorithm to perform the next optimization. If the convergence condition is met, the optimization is terminated and the optimal load distribution parameters are output; if the convergence condition is not met, the weight calculation and parameter optimization are performed again;

[0121] And, after the step S4, it also includes: judging whether the steam volume in the heating main pipe is reasonable according to the optimal load distribution parameters, if reasonable, executing step S5; otherwise, returning to step S2, and re-optimizing the boundary parameters of the heating main pipe.

[0122] Furthermore, in step S42, a multi-objective optimization algorithm is used to perform the next optimization. If the convergence condition is met, the optimization is terminated and the optimal load distribution parameters are output; if the convergence condition is not met, the weight calculation and parameter optimization are performed again, which specifically includes the following steps:

[0123] Step S421, setting the hybrid rice optimization algorithm execution related parameters;

[0124] Step S422: Generate a random initial population, and assign each objective function value and crowding degree;

[0125] Step S423, dividing the lines into maintainer lines, restorer lines and sterile lines according to the Pareto solution set relationship;

[0126] Step S424, hybridizing the maintainer line with the sterile line to update the sterile line, and self-pollinating the restorer line to update the restorer line itself;

[0127] Step S425, taking the restorer lines and sterile lines in the updated population as sub-populations, and merging the sub-populations with the original population into a new population using an elite strategy;

[0128] Step S426, assigning each objective function value and crowding degree to the generated new population;

[0129] Step S427, determine whether the convergence condition is met. If the convergence condition is met, terminate the optimization and output the optimal solution, that is, the optimal load distribution parameter; otherwise, recalculate the weight and calculate the individual fitness value to search for the best solution again.

[0130] Furthermore, the elite strategy is to retain elite individuals based on the Pareto ranking of the combined large population of the original population and the sub-population and the crowding degree of each individual. Once the remaining reserved space is insufficient to accommodate the feasible solutions of the Pareto layer to be retained, they are retained by sorting by crowding degree until the preset population size is reached.

[0131] Furthermore, the multi-objective hybrid rice optimization algorithm also includes sorting the population using a hierarchical non-dominated sorting method. The feasible solutions at the same level do not dominate each other, while the feasible solutions at this level can dominate the Pareto set of the next level. The hierarchical implementation step is to use the comparison method to sort the solution set to be sorted one level at a time.

[0132] The second aspect of the present invention provides a load dispatching and distribution platform for a complex production system with multiple furnaces and multiple machines, which comprises:

[0133] The digital twin model building module uses mechanism modeling and data identification methods to build a digital twin model of a complex production system with multiple furnaces and machines;

[0134] The mother pipe parameter optimization module optimizes the boundary parameters of the source-side heating mother pipe of the multi-furnace multi-machine system based on the heat load demand of the heat user, the heat storage and hysteresis parameters of the heat network, so as to reduce the load frequency change of the multi-furnace multi-machine system;

[0135] The load dispatching and allocation model establishment module is based on the optimized boundary parameters of the heating main pipe, the cost and benefits of different furnace types, the adjustable load range and load change rate of different furnace types, and the energy consumption difference of different equipment of the same furnace type. The objective function is to maximize the profit of the whole plant, minimize the pollutant emissions and minimize the total energy consumption of the put into operation equipment, and set the corresponding multi-furnace and multi-machine system constraints to establish a multi-furnace and multi-machine load dispatching and allocation model;

[0136] A parameter optimization module, which uses a multi-objective optimization algorithm to optimize the multi-furnace and multi-machine load scheduling and allocation model to obtain the optimal load allocation parameters;

[0137] The instruction issuing module sends boiler instructions and steam turbine instructions based on the optimal load distribution parameters after optimization, adjusts the fuel quantity, air volume, water supply and steam inlet parameters, and realizes the optimized operation of the multi-boiler and multi-machine system.

[0138] The beneficial effects of the present invention are:

[0139] (1) The present invention establishes a digital twin model of a multi-furnace multi-machine system and smoothly optimizes the mother pipe parameters. With the digital twin model as the support and the evaluation system as the optimization guide, a multi-objective load dispatching and allocation model including economy, environmental protection and energy consumption is established, and the allocation model is optimized to obtain the optimal load allocation parameters, thereby realizing the optimized operation of the multi-furnace multi-machine system;

[0140] (2) Based on the research on the heat load demand of heat users, the heat storage and hysteresis of the heat network, the present invention optimizes the heat supply mother pipe parameters of the multi-furnace and multi-machine production system, reduces the frequent load changes of boilers and steam turbines, and finally provides the operator with accurate instructions on fuel, wind, and water (steam), and conducts tracking feedback;

[0141] (3) The present invention can maximize the production profit within the plant, minimize pollutant emissions, and minimize the energy consumption of the operating equipment by matching and scheduling the load between the two fuel types and optimizing the load distribution between different equipment of the same type;

[0142] (4) The present invention is based on a comprehensive evaluation method of economy, environmental protection and energy consumption of multiple furnaces and multiple machines, and comprehensively considers multi-dimensional constraint quantification conditions, provides operation boundaries and operation constraints for the coordinated operation of multiple furnaces and multiple machines, and uses a mechanism model and optimization algorithm to search for a load scheduling and allocation scheme under the boundary parameter requirements of the current heating mother pipe, and gives the optimal value of the operating load of multiple furnaces and multiple machines;

[0143] (5) The present invention adopts an improved hybrid rice optimization algorithm, which slightly expands the diversity of the population in the iterative process while ensuring the feasibility of convergence within the effective time of the algorithm, thereby improving its comprehensive optimization performance in global search and local search.

[0144] Other features and advantages will be described in the following description, and partly become apparent from the description, or understood by practicing the invention. The purpose and other advantages of the invention are realized and obtained by the structures particularly pointed out in the description and the drawings.

[0145] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0146] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0147] Figure 1 It is a flow chart of a load dispatching and distributing method for a complex production system with multiple furnaces and multiple machines according to the present invention;

[0148] Figure 2 This is a schematic diagram of a complex production system with multiple furnaces and multiple machines according to the present invention;

[0149] Figure 3 This is a schematic diagram of the load dispatching and allocation structure of the present invention;

[0150] Figure 4 This is a schematic diagram of a load scheduling and distribution platform for a complex production system with multiple furnaces and multiple machines according to the present invention. DETAILED DESCRIPTION

[0151] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0152] Example 1

[0153] Figure 1 It is a flow chart of a load scheduling and distribution method for a complex production system with multiple furnaces and multiple machines involved in the present invention.

[0154] Figure 2 It is a schematic diagram of a complex production system with multiple furnaces and multiple machines involved in the present invention.

[0155] like Figure 1 , 2 As shown, this embodiment 1 provides a load scheduling and allocation method for a complex production system with multiple furnaces and multiple machines, which includes:

[0156] Step S1, using mechanism modeling and data identification methods to establish a digital twin model of a complex production system with multiple furnaces and multiple machines;

[0157] Step S2, based on the heat load demand of the heat user and the hysteresis parameter of the steam main pipe, the boundary parameters of the source side heat supply main pipe of the multi-furnace multi-machine system are optimized to reduce the load frequency change of the complex production system with multiple furnaces and multiple machines;

[0158] Step S3, based on the optimized boundary parameters of the heating main pipe, according to the costs and benefits of different furnace types, the adjustable load ranges and load change rates of different furnace types, and the energy consumption differences of different equipment of the same furnace type, an objective function with the goals of maximizing the profit of the whole plant, minimizing pollutant emissions and minimizing the total energy consumption of the put into operation equipment is established, and corresponding multi-furnace and multi-machine system constraints are set to establish a multi-furnace and multi-machine load scheduling and allocation model;

[0159] Step S4, using a multi-objective optimization algorithm to optimize the multi-furnace multi-machine load scheduling model to obtain the optimal load distribution parameters;

[0160] Step S5: Send boiler instructions and steam turbine instructions based on the optimal load distribution parameters after optimization, adjust the fuel quantity, air volume, water supply and steam inlet parameters, and realize the optimized operation of the complex production system with multiple furnaces and multiple machines.

[0161] In this embodiment, in step S1, a digital twin model of a complex production system with multiple furnaces and multiple machines is established by using a mechanism modeling and data identification method, specifically including:

[0162] Construct physical models, logical models and simulation models of complex production systems with multiple furnaces and machines;

[0163] Physical model: Establish physical models of heat users, heat networks, heat supply mains, multiple boilers, multiple steam turbines, hot water storage tanks, condensers, water pumps and source-side entities. Boilers include pulverized coal boilers and garbage boilers.

[0164] Logical model: Establish a controllable closed-loop logical model based on the logical mechanism relationship between the physical entities of the complex production system with multiple furnaces and multiple machines, and map the physical model to the logical model;

[0165] Simulation model: Build a simulation model of a complex production system with multiple furnaces and multiple machines based on the collected operation data, status data, and physical property data of the complex production system with multiple furnaces and multiple machines, and optimize the parameters of the simulation model based on the error between the predicted value and the actual value output by the simulation model;

[0166] Integrate the physical model, logical model and simulation model into a virtual and real model to build a system-level digital twin model of the physical entity of a complex production system with multiple furnaces and machines in virtual space;

[0167] The real-time operating data of multiple operating conditions of a complex production system with multiple furnaces and multiple machines are connected to the system-level digital twin model, and the reverse identification method is used to perform adaptive identification and correction on the simulation results of the system-level digital twin model to obtain the digital twin model of the complex production system with multiple furnaces and multiple machines after identification and correction.

[0168] It should be noted that the present invention is not limited to pulverized coal boilers and garbage boilers, but may also be other fuel boilers.

[0169] In this embodiment, when the pulverized coal boiler simulation model is established, the main components include combustion equipment and heating surfaces. The heating surface interacts with steam and water to transfer the heat energy generated by the boiler to the steam and water cycle. The energy conservation equation of the pulverized coal boiler is expressed as:

[0170] η b,i G f,i LHV=G b,i (h bout,i -h bin,i )+G r,i (h reout,i -h rein,i );

[0171] Among them, η b,i is the efficiency of the i-th boiler; G f,i is the input fuel flow rate of the i-th boiler; LHV is the lower heating value of the input fuel; G b,i is the steam flow rate flowing through the i-th boiler; h bin,i 、h bout,iis the steam enthalpy entering and leaving the boiler; G r,i is the reheater steam flow rate; h rein,i 、h reout,i is the enthalpy of steam entering and leaving the reheater;

[0172] When the steam turbine simulation model is established, the power of the steam turbine is affected by the valve opening. The actual dynamic process is: as the valve opening increases, the steam flow rate entering the steam chamber increases, the pressure of the steam chamber increases, and the steam flow rate entering the steam turbine also increases, so that the power output of the steam turbine is increased, and the speed of the steam turbine also increases with the increase of power; the process of the steam volume of the steam turbine is expressed as:

[0173]

[0174] Where ρ is the gas density in the steam chamber; p is the pressure in the steam chamber; n is the polynomial index; K1 and K2 are proportional coefficients; s z Is the main steam valve opening;

[0175] Main steam flow rate G flowing into the turbine t Main steam pressure p t and main steam valve opening s z , proportionality coefficient k v The product of is expressed as: G t =k v p t s z ;

[0176] When the condenser simulation model is established, the condenser includes three heat exchange processes: condensation heat release, heat conduction, and convection heat release. Its energy conservation equation is expressed as: η c G h (h hout -h hin )=G c (h cout -h cin ), where η c is the heat transfer efficiency of the condenser; h hout 、h cout are the outlet enthalpies of steam and cooling water respectively; h hin 、h cin are the inlet enthalpy of steam and cooling water respectively; G h , G c are the flow rates of steam and cooling water respectively;

[0177] When the water pump simulation model is established, the mathematical relationship between the water pump power consumption and head and flow rate is expressed as:

[0178]

[0179] Among them, P pump is the power consumption of the pump; pump is the efficiency of the pump; g is the acceleration due to gravity; G pump is the flow rate of the working fluid flowing through the pump; H pump is the pump head;

[0180] When the dynamic model of the pulverized coal boiler combustion process is established, the boiler control system controls the pulverizing system to grind coal, burn, and output corresponding heat through the combustion command. Among them, the coal grinding process is that after receiving the combustion command, the pulverizing system grinds the coal into pulverized coal and inputs it into the combustion channel before it can be used for combustion and heat generation; the relationship between the heat output of the combustion channel and the combustion command is expressed as:

[0181]

[0182] Among them, S G is the heat output of the combustion channel; μ B is the combustion instruction; τ is the pure delay time of coal grinding; T b is the combustion channel time constant;

[0183] When the garbage boiler simulation model is established, it includes the combustion chamber model, water circulation system model and superheater system model; the combustion chamber model includes the garbage incineration model and heat exchange model. The garbage moves along the grate and goes through the three zones of preheating zone, combustion zone and burnout zone in the combustion chamber.

[0184] The mass balance equation common to the three zones is expressed as:

[0185] Among them, M in is the fuel mass flow rate entering the area; M out is the fuel mass flow rate out of the area; M a is the quality of primary air entering the area; M g M is the fuel combustion reaction mass in this area; l is the mass of fuel missed in the area;

[0186] The energy balance equation common to the three zones is expressed as:

[0187] Among them, Q in is the fuel energy entering the zone; Q out is the fuel energy leaving the area; Q is the heat exchange around the area; Q l The heat carried away by the fuel leaking from this area; Q a The heat carried away by the smoke in this area; Q g The heat brought into the area by the primary wind;

[0188] The amount of air required for garbage combustion is expressed as: V 0=0.0889C y +0.265H y +0.0333S y -0.333O y ; Among them, C y , H y , S y , O y are the percentages of carbon, sulfur, hydrogen and oxygen in the fuel as received, respectively;

[0189] The water circulation system model includes the mathematical model of the steam drum, the mathematical model of the downcomer and the mathematical model of the riser;

[0190] When the mathematical model of the steam drum is established, the parameter dynamic evaporation capacity G is introduced through the exchange of matter and energy between steam and liquid. evap =C evap (H w -H s ), where C evap is the evaporation coefficient; H w is the enthalpy of the drum water; H s is the enthalpy of saturated steam;

[0191] The mass balance equation of the downcomer is expressed as:

[0192] W d2 =W d1 ;

[0193] Among them, W d1 , W d2 are the working fluid flow rates at the inlet and outlet of the downcomer respectively;

[0194] The outlet pressure of the working fluid in the downcomer system is expressed as:

[0195]

[0196] Among them, P d1 , P d2 are the inlet and outlet pressures of the downcomer, respectively; l d is the height of the downcomer; d W is the flow resistance coefficient of the working medium in the downcomer; d is the flow rate of the working medium in the downcomer; ρ sd is the average density of the working fluid in the downcomer;

[0197] The mass balance equation of the riser is expressed as:

[0198] W u2 =W u1 +W u,exp -W u,lk ;

[0199] Among them, Wu1 , W u2 are the inlet and outlet flow rates of the working fluid in the riser, respectively; W u,exp , W u,lk They are the expansion flow and leakage flow of the riser respectively;

[0200] The mass balance equation of the superheater system is expressed as:

[0201] W leak =β×W max , W k,out =W k,in -W leak ;

[0202] Among them, W k,in , W k,out , W leak , W max They are the inlet, outlet, leakage mass flow rate and maximum leakage flow rate of the working fluid respectively;

[0203] The momentum balance equation of the superheater system is expressed as:

[0204]

[0205] Among them, P g,in , P g,out are the flue gas inlet and outlet pressures respectively; P k,in , P k,out are the inlet and outlet pressures of the working fluid respectively; k g , k s are the resistance loss functions on the flue gas side and the working fluid side respectively; are the average mass flow rates of flue gas and working fluid respectively; are the average densities of flue gas and working fluid respectively;

[0206] The simulation model of the hot water storage tank is established, including:

[0207] The hot water end of the hot water storage tank is connected to the water supply main pipe at the heat supply outlet, and the cold water end is connected to the water return main pipe at the heat supply inlet; when the hot water storage tank is storing heat, the circulating water supply of the heat network flows from the heat network into the hot water storage tank through the corresponding valve, and the corresponding cold water in the hot water storage tank flows into the circulating water return main pipe through the valve, and the hot water storage tank water pump plays the role of discharging cold water; when the hot water storage tank is releasing heat, the hot water in the hot water storage tank flows into the water supply main pipe of the heat network through the corresponding valve, and the hot water storage tank water pump plays the role of discharging hot water, and the corresponding cold water flows back to the hot water storage tank from the water return main pipe of the heat network through the corresponding valve;

[0208] When the heating capacity is greater than the heat network load, the water flow of the heating main pipe remains unchanged, and the excess heating circulating water flows into the hot water storage tank. The hot water flow that needs to be supplemented in the hot water storage tank is expressed as:

[0209]

[0210] When the heating capacity is less than the heat network load, the reduction in heating power will lead to a decrease in the heating circulation water flow rate. The difference with the heat load is supplemented by the hot water storage tank. The hot water flow rate that needs to be released by the hot water storage tank is expressed as:

[0211]

[0212] Among them, N m The heating power of the unit; N h is the heat network load; c p is the average specific heat capacity of circulating water; T out 、T in are the supply and return temperatures of the heat network circulating water respectively; D h It is the circulating water flow of the first heating station;

[0213] During the heat exchange between the hot water storage tank and the heat network, the relationship between the change in the heating extraction steam flow rate and the hot water flow rate of the hot water storage tank is expressed as:

[0214]

[0215] Among them, dD m is the change in heating extraction steam flow rate; D hc is the hot water flow rate in and out of the heat storage tank, the heat storage process is positive, and the heat release process is negative; h m 、h c They are the heating extraction enthalpy and the drainage enthalpy respectively.

[0216] In this embodiment, in step S2, based on the heat load demand of the heat user and the hysteresis parameter of the steam main pipe, the boundary parameters of the source side heat supply main pipe of the multi-furnace multi-machine system are optimized to reduce the load frequency change of the multi-furnace multi-machine system, including:

[0217] Step S21, obtaining the heat load demand of the heat user:

[0218] Step S211, obtaining the historical heat load data, weather data, building type and date type data based on time changes of the complex production system with multiple furnaces and multiple machines as a training sample data set;

[0219] Step S212, preprocessing the weather data, building type and date type data to obtain dimensionless heat load characteristic quantities;

[0220] Step S213, performing grey correlation analysis on the dimensionless heat load characteristic quantity and the historical heat load data, and calculating the characteristic quantity weight according to the correlation degree;

[0221] Step S214: establishing a heat user load prediction model based on a support vector machine according to the preprocessing results and the feature quantity weights;

[0222] Step S215, inputting the current operation data of the multi-furnace multi-machine system into the heat user load prediction model to obtain the heat load demand of the heat user;

[0223] Step S22, obtaining the hysteresis parameter of the steam main pipe:

[0224] When the temperature and pressure of the heating main pipe are stable, there is a certain difference between the steam extraction of the heating main pipe and the total steam consumption of the heat users. By using the peak-valley data method for testing, according to the daily load increase time, when the pressure of the heating main pipe is adjusted to make the steam flow of the heating main pipe peak or valley, the total steam consumption of the heat users is monitored to have a corresponding peak or valley. The lag time between the peak or valley value of the steam flow of the heating main pipe and the total steam consumption of the heat users is the lag time of the pipe network.

[0225] Step S23: Based on the heat load demand and heat storage parameters of the heat users, the main steam main pipe generates a load instruction, and the main steam main pipe pressure is regulated by boiler output regulation or turbine load regulation. The main pipe pressure control system is used to increase or decrease the load of multiple boilers and machines, and the load demand curve is smoothly optimized to reduce frequent load changes. Based on the load demand of the day and the lag time of the pipeline network, the load is increased in advance before the peak period arrives to meet the heat load demand of the heat users.

[0226] Figure 3 It is a schematic diagram of the load scheduling and distribution structure involved in the present invention.

[0227] like Figure 3 As shown, in this embodiment, in step S3, based on the optimized boundary parameters of the heating mother pipe, according to the costs and benefits of different furnace types, the adjustable load ranges and load change rates of different furnace types, and the energy consumption differences of different equipment of the same furnace type, an objective function is established with maximizing the profit of the whole plant, minimizing pollutant emissions and minimizing the total energy consumption of the put into operation equipment, and corresponding multi-furnace and multi-machine system constraints are set to establish a multi-furnace and multi-machine load scheduling and allocation model, which specifically includes:

[0228] Step S31, establish the objective function of maximizing the profit of the whole factory:

[0229] maxJ=E1J 售 +E2J 售 +L·J 补 -M.J. 煤 -G1J 1电 -G2J 2电 ;

[0230] Among them, E1 and E2 are the heat generated by the pulverized coal boiler; J售 is the heat price; L is the amount of garbage consumed; J 补 is the garbage subsidy; M is the raw coal fuel of the pulverized coal boiler; J 煤 is the price of raw coal; G1 and G2 are the electricity used by pulverized coal boiler plants and garbage boiler plants respectively; J 1电 , J 2电 They are the on-grid electricity prices for pulverized coal boilers and garbage boilers;

[0231] Step S32: Establishing the pollutant emission minimization objective function:

[0232]

[0233]

[0234]

[0235]

[0236] Among them, PS j PN j , PY j 、PC j They represent SO2 and NO generated during the production operation of pulverized coal boilers. x , CO, CO2 emissions; PS k PN k , PY k 、PC k They represent SO2 and NO generated during the operation of garbage boilers. x , CO, CO2 emissions; OP j OP k They represent the energy supply of the j-th pulverized coal boiler and the k-th garbage boiler equipment respectively; PA j,CO , They represent the SO2 and NO of the j-th pulverized coal boiler equipment. x , CO, CO2 equivalent emission coefficient; PA k,CO , represent the SO2 and NO of the kth garbage boiler equipment respectively. x , CO, CO2 equivalent emission coefficient; Indicates the CO2 equivalent emission coefficient of electricity purchased from the power grid;

[0237] Step S33: Establish the minimum total energy consumption objective function of the put into operation equipment:

[0238]

[0239] Among them, Di , Q i , B i They are respectively the steam consumption, heat consumption and coal consumption of pulverized coal boiler and steam turbine during production and operation; D n , Q n , B n They are respectively the steam consumption, heat consumption and coal consumption of the garbage boiler and steam turbine during production and operation;

[0240] Step S34, setting constraints for a complex production system with multiple furnaces and multiple machines:

[0241] The constraints of the complex production system with multiple boilers and multiple machines include heating capacity constraints, variable load rate constraints, single boiler capacity constraints, single steam turbine capacity constraints, pulverized coal boiler mother pipe pressure constraints, and garbage boiler mother pipe pressure constraints;

[0242] Heating capacity constraints:

[0243] Q min ≤Q≤Q max ;

[0244] Among them, Q min , Q max are the minimum and maximum heating supply respectively;

[0245] Variable load rate constraints:

[0246] ΔB≤ΔB MAX , ΔB MAX =∑ΔB 煤 +∑ΔB 垃 ;

[0247] Where, ΔB MAX is the maximum variable load rate of the boiler, ΔB 煤 , ΔB 垃 are the variable load rates of pulverized coal boiler and garbage boiler respectively;

[0248] Single boiler capacity constraints:

[0249] B 煤min ≤B 煤i ≤B 煤max , B 垃min ≤B 垃i ≤B 垃max ;

[0250] Among them, B 煤min , B 垃min are the minimum capacities of pulverized coal boiler and garbage boiler respectively; B 煤max , B 垃max They are the maximum capacities of pulverized coal boiler and garbage boiler respectively;

[0251] Capacity constraints of a single steam turbine:

[0252] X min ≤X i ≤X max ;

[0253] Among them, X min , X max are the minimum and maximum capacities of the steam turbine, respectively;

[0254] Pulverized coal boiler main pipe pressure constraint: P 煤 ≤B 煤max -B 煤min ;

[0255] Garbage boiler main pipe pressure constraint: P 垃 ≤B 垃max -B 垃min .

[0256] In this embodiment, in step S4, a multi-objective optimization algorithm is used to optimize the multi-furnace multi-machine load scheduling and allocation model to obtain the optimal load allocation parameters, including:

[0257] Step S41: using the entropy weight method to calculate the entropy and entropy weight corresponding to each objective function, the entropy weight model represents the objective weight of each evaluation objective function; defining the subjective weight of each objective function, combining the objective weight and the subjective weight to obtain the comprehensive weight, and updating the weight of each objective function through the comprehensive weight;

[0258] Step S42: Use a multi-objective optimization algorithm to perform the next optimization. If the convergence condition is met, the optimization is terminated and the optimal load distribution parameters are output; if the convergence condition is not met, the weight calculation and parameter optimization are performed again;

[0259] And, after the step S4, it also includes: judging whether the steam volume in the heating main pipe is reasonable according to the optimal load distribution parameters, if reasonable, executing step S5; otherwise, returning to step S2, and re-optimizing the boundary parameters of the heating main pipe.

[0260] In actual applications, the proportion of the index value of the i-th object under the j-th index is calculated: Calculate the entropy value of the jth indicator: Calculate the weight coefficient: Get the objective weight of each target W = [w1,w2,w3....,w i ,..,w n ]. Define the subjective weight of the evaluation index as V = [v1,v2,v3....,v i ,..,v n The comprehensive weight is A=[a1,a2,a3....,a i ,..,an ], a i is the comprehensive weight of the i-th evaluation index, The comprehensive weight is used to update the weight of each objective in each initial solution.

[0261] In this embodiment, in step S42, a multi-objective optimization algorithm is used to perform the next optimization. If the convergence condition is met, the optimization is terminated and the optimal load distribution parameters are output; if the convergence condition is not met, the weight calculation and parameter optimization are re-performed, specifically including:

[0262] Step S421, setting the hybrid rice optimization algorithm execution related parameters;

[0263] Step S422: Generate a random initial population, and assign each objective function value and crowding degree;

[0264] Step S423, dividing the lines into maintainer lines, restorer lines and sterile lines according to the Pareto solution set relationship;

[0265] Step S424, hybridizing the maintainer line with the sterile line to update the sterile line, and self-pollinating the restorer line to update the restorer line itself;

[0266] Step S425, taking the restorer lines and sterile lines in the updated population as sub-populations, and merging the sub-populations with the original population into a new population using an elite strategy;

[0267] Step S426, assigning each objective function value and crowding degree to the generated new population;

[0268] Step S427, determine whether the convergence condition is met. If the convergence condition is met, terminate the optimization and output the optimal solution, that is, the optimal load distribution parameter; otherwise, recalculate the weight and calculate the individual fitness value to search for the best solution again.

[0269] In this embodiment, the elite strategy is to first retain elite individuals based on the Pareto ranking of the merged large population of the original population and the sub-population and the crowding degree of each individual. Once the remaining reserved space is insufficient to accommodate the feasible solutions of the Pareto layer to be retained, they are retained by crowding ranking until the preset population size is reached.

[0270] In this embodiment, the multi-objective hybrid rice optimization algorithm also includes sorting the population using a hierarchical non-dominated sorting method. The feasible solutions at the same level do not dominate each other, while the feasible solutions at this level can dominate the Pareto set of the next level. The hierarchical implementation step is to use the comparison method to sort the solution set to be sorted level by level.

[0271] It should be noted that the multi-objective optimization algorithm of the present invention is not limited to the multi-objective hybrid rice optimization algorithm, and may also be other optimization algorithms, for example, an improved PSO algorithm is used for optimization, including:

[0272] Initialize particle velocity and position;

[0273] Calculate particle fitness;

[0274] Find individual and group extremes;

[0275] Update speed and position;

[0276] Update individual extreme values ​​and group extreme values;

[0277] Determine whether the termination condition is met. If so, output the optimal solution; otherwise, re-update the speed and position;

[0278] Among them, the speed update and position update are expressed as:

[0279]

[0280] Among them, V id is the velocity of the particle; X i is the position of the particle; k is the current iteration number; w is the inertia weight; d is the current dimension; i is the number of particles; c1 and c2 are acceleration factors; r1 and r2 are random numbers in the interval [0,1]; P i , P j They are individual extreme value and group extreme value respectively;

[0281] The method of adjusting the inertia weight by generating random numbers can obtain better values ​​and jump out of local extreme values ​​in the later stage of the algorithm, which is also conducive to accelerating the convergence speed of the algorithm and maintaining the search performance of the algorithm. The specific inertia weight setting is: w=0.5+rand / 2, and the rand function will generate random numbers that are evenly dispersed in [0,1] according to probability. The acceleration factors c1 and c2 respectively adjust the maximum step lengths moving toward the individual extreme value and the group extreme value, and are important parameters that determine the trajectory of each particle and the exchange of information. A relatively nonlinear adjustment pairing experiment was conducted on the acceleration factors c1 and c2. The algorithm optimization performance is better when the sum of the acceleration factors c1 and c2 is less than 3.

[0282] The fitness function needs to determine the corresponding weight of the optimization target according to the priority of the optimized target. The weight distribution of the target of maximum plant profit, minimum pollution emission and minimum total energy consumption of equipment affects the optimized fuel, air volume, water volume and steam inlet parameters and the optimization results. The corresponding weights are w1, w2 and w3 respectively. The optimization of various targets can be achieved by modifying the size of each target weight.

[0283] It should be noted that after the solution set is obtained through the multi-objective optimization algorithm, the TOPSIS distance method can also be used to establish a decision analysis model to achieve the ranking of the optimal solution, including: constructing a comprehensive evaluation matrix, normalizing the decision matrix; solving the weighted normalized matrix; determining the interval positive ideal solution and negative ideal solution; calculating the distance of each solution to the positive and negative ideal solutions; calculating the degree of closeness of each solution to the ideal solution and visualizing it; determining the order of advantages and disadvantages of the solutions according to the degree of closeness to the positive ideal solution; and outputting the optimal operating parameters.

[0284] In actual applications, load dispatch and allocation are carried out based on the digital twin model. After the boiler and turbine instructions are issued, the real-time operation data of the multi-boiler and multi-machine system is obtained through the digital twin model to monitor the performance of the boiler and turbine. The operating performance of the turbine is related to the steam inlet parameters (flow, temperature, pressure), cold end parameters (flow, temperature, pressure), whether the high-pressure heater is put into operation, etc. (including extraction steam, it is also related to the extraction steam flow, temperature, and pressure). It is necessary to establish a complex calculation model to obtain the real-time performance of the turbine. For the boiler, according to the load demand, the coal supply (coal feeder speed) and air supply (fan frequency conversion) should match each other. Untimely adjustment or mismatch between air and coal will lead to increased energy consumption. When the load is stable, the air volume is high, and the boiler efficiency decreases with the increase of oxygen content. After the air volume is adjusted, the oxygen content at the furnace outlet decreases, and the boiler efficiency recovers. When reducing the load, reduce the coal first and then reduce the air, the oxygen content at the furnace outlet increases, and the boiler efficiency decreases rapidly.

[0285] Figure 4 It is a schematic diagram of a load dispatching and distribution platform of a complex production system with multiple furnaces and multiple machines involved in the present invention.

[0286] like Figure 4 As shown, the second aspect of the present invention further proposes a load scheduling and distribution platform for a complex production system with multiple furnaces and multiple machines, the load scheduling and distribution platform comprising:

[0287] Digital twin model building module: Use mechanism modeling and data identification methods to build a digital twin model of a complex production system with multiple furnaces and machines;

[0288] Main pipe parameter optimization module: Based on the heat load demand of heat users and the lag parameters of the steam main pipe, the boundary parameters of the source-side heating main pipe of the multi-boiler and multi-machine system are optimized to reduce the load frequency changes of the multi-boiler and multi-machine system;

[0289] Load dispatching and allocation model establishment module: Based on the optimized boundary parameters of the heating main pipe, according to the costs and benefits of different furnace types, the adjustable load range and load change rate of different furnace types, and the energy consumption differences of different equipment of the same furnace type, the objective function is established with the maximization of the whole plant profit, the minimization of pollutant emissions and the minimum total energy consumption of the put into operation equipment, and the corresponding multi-furnace and multi-machine system constraints are set to establish a multi-furnace and multi-machine load dispatching and allocation model;

[0290] Parameter optimization module: Use multi-objective optimization algorithm to optimize the multi-furnace and multi-machine load scheduling model to obtain the optimal load distribution parameters;

[0291] Instruction issuing module: Send boiler instructions and steam turbine instructions based on the optimal load distribution parameters after optimization, adjust the fuel quantity, air volume, water supply and steam inlet parameters, and realize the optimized operation of multi-boiler and multi-machine system.

[0292] The present invention establishes a digital twin model of a multi-furnace and multi-machine system and smoothly optimizes the mother pipe parameters. With the digital twin model as the support and the evaluation system as the optimization guide, a multi-objective load dispatching and allocation model including economy, environmental protection and energy consumption is established, and the allocation model is optimized to obtain the optimal load allocation parameters, thereby realizing the optimized operation of the multi-furnace and multi-machine system. Based on the research on the heat load demand of heat users, the heat storage and hysteresis of the heat network, the heat supply mother pipe parameters of the multi-furnace and multi-machine production system are optimized to reduce the frequent changes in the load of boilers and steam turbines. Ultimately, precise instructions on fuel, wind, and water (steam) are provided to operating personnel, and tracking feedback is provided. By means of load matching scheduling between two types of fuel and optimal load distribution between different equipment of the same type, the maximum production profit within the plant, the minimum pollutant emission and the minimum energy consumption of the equipment in operation can be achieved. Based on the comprehensive evaluation method of economy, environmental protection and energy consumption of multiple furnaces and multiple machines, and comprehensive consideration of multi-dimensional constraint quantification conditions, the operation boundaries and operation constraints are provided for the coordinated operation of multiple furnaces and multiple machines. The mechanism model and optimization algorithm are used to search for the load scheduling and distribution scheme under the current boundary parameter requirements of the heating mother pipe, and the optimal value of the operating load of multiple furnaces and multiple machines is given. The improved hybrid rice optimization algorithm is used to slightly expand the diversity of the population in the iterative process while ensuring the feasibility of convergence within the effective time of the algorithm, so that its comprehensive optimization performance in global search and local search is improved.

[0293] In several embodiments provided in the present application, it should be understood that the disclosed system and method can also be implemented in other ways. The system embodiments described above are merely schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the systems, methods and computer program products according to multiple embodiments of the present invention. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of the code, and a part of the module, program segment or code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart, can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.

[0294] In addition, the functional modules in the various embodiments of the present invention may be integrated together to form an independent part, or each module may exist independently, or two or more modules may be integrated to form an independent part.

[0295] If the function is implemented in the form of a software function module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.

[0296] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A load dispatching and distribution method for a complex production system with multiple furnaces and multiple machines, characterized in that: It includes: Step S1, using mechanism modeling and data identification methods to establish a digital twin model of a complex production system with multiple furnaces and multiple machines; Step S2, based on the heat load demand of the heat user, the heat storage and hysteresis parameters of the heat network, optimizing the boundary parameters of the source-side heat supply mother pipe of the multi-furnace multi-machine system to reduce the load frequency change of the multi-furnace multi-machine complex production system; Step S3, based on the optimized boundary parameters of the heating main pipe, according to the costs and benefits of different furnace types, the adjustable load ranges and load change rates of different furnace types, and the energy consumption differences of different equipment of the same furnace type, an objective function with the goals of maximizing the profit of the whole plant, minimizing pollutant emissions and minimizing the total energy consumption of the put into operation equipment is established, and corresponding multi-furnace and multi-machine system constraints are set to establish a multi-furnace and multi-machine load scheduling and allocation model; Step S4, using a multi-objective optimization algorithm to optimize the multi-furnace multi-machine load scheduling and allocation model to obtain the optimal load allocation parameters; Step S5: Send boiler instructions and steam turbine instructions based on the optimal load distribution parameters after optimization, adjust the fuel quantity, air volume, water supply and steam inlet parameters, and realize the optimized operation of the complex production system with multiple furnaces and multiple machines.

2. The load scheduling and distribution method for a complex production system with multiple furnaces and multiple machines according to claim 1 is characterized in that: In step S1, a digital twin model of a complex production system with multiple furnaces and multiple machines is established by using a mechanism modeling and data identification method, specifically including: Constructing the physical model, logical model and simulation model of the multi-furnace and multi-machine complex production system; wherein, The establishment of the physical model includes the following steps: establishing physical models of heat users, heat networks, heat supply main pipes, multiple boilers, multiple steam turbines, hot water storage tanks, condensers, water pumps and source-side entities, wherein the boilers include pulverized coal boilers and garbage boilers; The establishment of the logic model includes the following steps: establishing a controllable closed-loop logic model based on the logical mechanism relationship between various physical entities in the complex production system with multiple furnaces and multiple machines, and mapping the physical model to the logic model; The establishment of the simulation model includes the following steps: building a simulation model of a complex production system with multiple furnaces and multiple machines based on the collected operation data, state data, and physical property data of the complex production system with multiple furnaces and multiple machines, and optimizing the parameters of the simulation model according to the error between the predicted value and the actual value output by the simulation model; The physical model, the logical model and the simulation model are integrated into a virtual and real model to construct a system-level digital twin model of the physical entity of the multi-furnace and multi-machine complex production system in a virtual space; The real-time operating data of multiple working conditions of the complex production system with multiple furnaces and multiple machines are connected to the system-level digital twin model, and the simulation results of the system-level digital twin model are adaptively identified and corrected using a reverse identification method to obtain the digital twin model of the complex production system with multiple furnaces and multiple machines after identification and correction.

3. The load dispatching and allocating method for a complex production system with multiple furnaces and multiple machines according to claim 2 is characterized in that: The energy conservation equation of the pulverized coal boiler is expressed as: η b,i G f,i LHV=G b,i (h bout,i -h bin,i )+G r,i (h reout,i -h rein,i ); Among them, η b,i is the efficiency of the i-th pulverized coal boiler; G f,i is the input fuel flow rate of the i-th pulverized coal boiler; LHV is the lower heating value of the input fuel; G b,i is the steam flow rate flowing through the i-th pulverized coal boiler; h bin,i 、h bout,i is the steam enthalpy entering and leaving the pulverized coal boiler; G r,i is the reheater steam flow rate; h rein,i 、h reout,i is the enthalpy of steam entering and leaving the reheater; The process of the steam volume of the steam turbine is expressed as: Where ρ is the gas density in the steam chamber; p is the pressure in the steam chamber; n is the polynomial index; K1 and K2 are proportional coefficients; s z Is the main steam valve opening; The main steam flow rate G flowing into the steam turbine t It is expressed as: G t =k v p t s z ; Among them, p t is the main steam pressure, s z is the main steam valve opening, k v is the proportionality coefficient; The energy conservation equation of the condenser is expressed as: η c G h (h hout -h hin )=G c (h cout -h cin ); Among them, η c is the heat transfer efficiency of the condenser; h hout is the outlet enthalpy of steam, h cout is the outlet enthalpy of cooling water; h hin is the inlet enthalpy of steam, h cin is the inlet enthalpy of cooling water, G h is the steam flow rate, G c is the cooling water flow rate; The mathematical relationship between the power consumption, lift and flow rate of the water pump is expressed as: Among them, P pump is the power consumption of the water pump; pump is the efficiency of the water pump; g is the acceleration due to gravity; G pump H is the flow rate of the working medium flowing through the pump; pump is the head of the water pump; The relationship between the heat output of the combustion channel of the pulverized coal boiler and the combustion instruction is expressed as: Among them, S G is the heat output of the combustion channel, μ B is the combustion instruction, τ is the pure delay time of coal grinding, T b is the combustion channel time constant; The simulation model of the garbage boiler includes a combustion chamber model, a water circulation system model and a superheater system model; The combustion chamber model includes a garbage incineration model and a heat exchange model, and the combustion chamber includes a preheating zone, a combustion zone and a burnout zone; The general mass balance equation for the preheating zone, combustion zone and burnout zone is expressed as: Among them, M in is the fuel mass flow rate entering the area; M out is the fuel mass flow rate out of the area; M a is the quality of primary air entering the area; M g M is the fuel combustion reaction mass in this area; l is the mass of fuel missed in the area; The general energy balance equation for the preheating zone, combustion zone and burnout zone is expressed as: Among them, Q in is the fuel energy entering the zone; Q out is the fuel energy leaving the area; Q is the heat exchange around the area; Q l The heat carried away by the fuel leaking from this area; Q a The heat carried away by the smoke in this area; Q g The heat brought into the area by the primary wind; The amount of air required for garbage combustion is expressed as: <h2 style=";text-align:left;direction:ltr">V<h2 style=";text-align:left;direction:ltr"> 0 <h2 style=";text-align:left;direction:ltr"> <0.0889C<h2 style=";text-align:left;direction:ltr"> y <h2 style=";text-align:left;direction:ltr"> +0.265H<h2 style=";text-align:left;direction:ltr"> y <h2 style=";text-align:left;direction:ltr"> +0.0333S<h2 style=";text-align:left;direction:ltr"> y <h2 style=";text-align:left;direction:ltr"> -0.333O<h2 style=";text-align:left;direction:ltr"> y <h2 style=";text-align:left;direction:ltr"> ; Among them, C y , H y , S y , O y are the percentages of carbon, sulfur, hydrogen and oxygen in the fuel as received, respectively; The water circulation system model includes a steam drum mathematical model, a downcomer mathematical model and an upcomer mathematical model; The parameter dynamic evaporation of the drum mathematical model is: G evap =C evap (H w -H s ); Among them, C evap is the evaporation coefficient; H w is the enthalpy of the drum water; H s is the enthalpy of saturated steam; The mass balance equation of the downcomer in the mathematical model of the downcomer is expressed as: IN d2 =In d1 ; Among them, W d1 , W d2 are the working fluid flow rates at the inlet and outlet of the downcomer respectively; The outlet pressure of the working fluid of the downcomer system of the downcomer mathematical model is expressed as: Among them, P d1 is the downcomer inlet pressure, P d2 is the outlet pressure of the downcomer; l d is the height of the downcomer; d W is the flow resistance coefficient of the working medium in the downcomer; d is the flow rate of the working medium in the downcomer; ρ sd is the average density of the working fluid in the downcomer; The mass balance equation of the riser in the mathematical model of the riser is expressed as: IN u2 =In u1 +W u,exp -IN u,lk ; Among them, W u1 is the inlet flow rate of the working medium in the riser, W u2 W is the outlet flow rate of the working medium in the riser; u,exp is the expansion flow rate of the riser, W u,lk is the leakage flow of the riser; The mass balance equation of the superheater system is expressed as: IN leak =β×W max ,IN k,out =In k,in -IN leak ; Among them, W k,in is the inlet flow rate of the working fluid, W k,out is the outlet flow rate of the working fluid, W leak is the leakage mass flow rate of the working fluid, W max is the maximum leakage flow of the working fluid; The momentum balance equation of the superheater system is expressed as: Among them, P g,in is the flue gas inlet pressure, P g,out is the flue gas outlet pressure; P k,in is the working fluid inlet pressure, P k,out is the outlet pressure of the working fluid; k g is the resistance loss function on the flue gas side, k s is the resistance loss function on the working fluid side; is the average mass flow rate of flue gas, is the average mass flow rate of the working fluid; is the average density of smoke, is the average density of the working fluid; The establishment of the simulation model of the hot water storage tank comprises the following steps: The hot water end of the hot water storage tank is connected to the water supply main pipe of the heat supply outlet, and the cold water end of the hot water storage tank is connected to the water return main pipe of the heat supply inlet; When the heating capacity is greater than the heat network load, the excess heating circulating water flows into the hot water storage tank under the condition that the water flow rate of the heating main pipe remains unchanged. The hot water flow rate that needs to be supplemented in the hot water storage tank is expressed as: When the heating capacity is less than the heat network load, the reduction in heating power will lead to a decrease in the heating circulation water flow rate. The difference with the heat load is supplemented by the hot water storage tank. The hot water flow rate that needs to be released by the hot water storage tank is expressed as: Among them, N m The heating power of the unit; N h is the heat network load; c p is the average specific heat capacity of circulating water; T out , T in are the supply and return temperatures of the heat network circulating water respectively; D h It is the circulating water flow of the first heating station; During the heat exchange between the hot water storage tank and the heat network, the relationship between the change in the heat extraction steam flow rate and the hot water flow rate of the hot water storage tank is expressed as: Among them, dD m is the change in heating extraction steam flow rate; D hc h is the hot water flow rate in and out of the heat storage tank, which is positive during the heat storage process and negative during the heat release process; m 、h c They are the heating extraction enthalpy and the drainage enthalpy respectively.

4. The load scheduling and distribution method for a complex production system with multiple furnaces and multiple machines according to claim 1 is characterized in that: In the step S2, based on the heat load demand of the heat user, the heat storage and hysteresis parameters of the heat network, the boundary parameters of the source-side heat supply mother pipe of the multi-furnace multi-machine system are optimized to reduce the load frequency change of the multi-furnace multi-machine system, which specifically includes the following steps: Step S21, obtaining the heat load demand of the heat user: Step S211, obtaining the historical heat load data, weather data, building type and date type data based on time changes of the complex production system with multiple furnaces and multiple machines as a training sample data set; Step S212, preprocessing the weather data, building type and date type data to obtain dimensionless heat load characteristic quantities; Step S213, performing grey correlation analysis on the dimensionless heat load characteristic quantity and the historical heat load data, and calculating the characteristic quantity weight according to the correlation degree; Step S214: establishing a heat user load prediction model based on a support vector machine according to the preprocessing results and the feature quantity weights; Step S215, inputting the current operation data of the complex production system with multiple furnaces and multiple machines into the heat user load prediction model to obtain the heat load demand of the heat user; Step S22, obtaining the hysteresis parameter of the steam main pipe: When the temperature and pressure of the heating main pipe are stable, there is a certain difference between the steam extraction of the heating main pipe and the total steam consumption of the heat users. By adopting the peak-valley data method for testing, according to the time of daily load increase, when the pressure of the heating main pipe is adjusted to make the steam flow of the heating main pipe peak or valley, the total steam consumption of the heat users is monitored to have a corresponding peak or valley. The lag time between the peak or valley value of the steam flow of the heating main pipe and the total steam consumption of the heat users is the lag time of the pipe network. Step S23: Based on the heat load demand and lag parameters of the heat users, the main steam main pipe generates a load instruction, and the main steam main pipe pressure is regulated by boiler output regulation or turbine load regulation. The main pipe pressure control system is used to increase or decrease the load of multiple boilers and machines, and the load demand curve is smoothly optimized to reduce frequent load changes. Based on the load demand of the day and the lag time of the pipeline network, the load is increased in advance before the peak period arrives to meet the heat load demand of the heat users.

5. The load scheduling and distribution method for a complex production system with multiple furnaces and multiple machines according to claim 1 is characterized in that: In the step S3, based on the optimized boundary parameters of the heating main pipe, according to the costs and benefits of different furnace types, the adjustable load ranges and load change rates of different furnace types, and the energy consumption differences of different equipment of the same furnace type, an objective function is established with maximizing the profit of the whole plant, minimizing pollutant emissions and minimizing the total energy consumption of the put into operation equipment, and corresponding multi-furnace and multi-machine system constraints are set to establish a multi-furnace and multi-machine load scheduling and allocation model, which specifically includes the following steps: Step S31, establish the objective function of maximizing the profit of the whole factory: maxJ=E1J 售 +E2J 售 +L·J 补 -M·J 煤 -G1J 1电 -G2J 2电 ; Among them, E1 and E2 are the heat generated by the pulverized coal boiler; J 售 is the heat price; L is the amount of garbage consumed; J 补 is the garbage subsidy; M is the raw coal fuel of the pulverized coal boiler; J 煤 is the price of raw coal; G1 and G2 are the electricity used by pulverized coal boiler plants and garbage boiler plants respectively; J 1电 , J 2电 They are the on-grid electricity prices for pulverized coal boilers and garbage boilers; Step S32: Establishing the pollutant emission minimization objective function: PS j =OP j (PA j,CO ); PS k =OP k (PA k,CO ); Among them, PS j PN j , PY j 、PC j They represent SO2 and NO generated during the production operation of pulverized coal boilers. x , CO, CO2 emissions; PS k PN k , PY k 、PC k They represent SO2 and NO generated during the operation of garbage boilers. x , CO, CO2 emissions; OP j OP k They represent the energy supply of the j-th pulverized coal boiler and the k-th garbage boiler equipment respectively; represent the SO2 and NO of the j-th pulverized coal boiler equipment respectively. x , CO, CO2 equivalent emission coefficient; represent the SO2 and NO of the kth garbage boiler equipment respectively. x , CO, CO2 equivalent emission coefficient; Indicates the CO2 equivalent emission coefficient of electricity purchased from the power grid; Step S33: Establishing the minimum total energy consumption objective function of the put into operation equipment: D i , Q i , B i They are respectively the steam consumption, heat consumption and coal consumption of pulverized coal boiler and steam turbine during production and operation; D n , Q n , B n They are respectively the steam consumption, heat consumption and coal consumption of the garbage boiler and steam turbine during production and operation; Step S34, setting constraints for a complex production system with multiple furnaces and multiple machines: The constraints of the multi-furnace and multi-machine complex production system include heating capacity constraints, variable load rate constraints, single boiler capacity constraints, single steam turbine capacity constraints, pulverized coal boiler mother pipe pressure constraints and garbage boiler mother pipe pressure constraints; The expression of the heating capacity constraint is: Q min ≤Q≤Q max ; Among them, Q min , Q max are the minimum and maximum heating supply respectively; The expression of the variable load rate constraint is: ΔB≤ΔB MAX ,ΔB MAX =∑ΔB 煤 +∑ΔB 垃 ; Where, ΔB MAX is the maximum variable load rate of the boiler, ΔB 煤 , ΔB 垃 are the variable load rates of pulverized coal boiler and garbage boiler respectively; The expression of the single boiler capacity constraint is: B 煤min ≤B 煤i ≤B 煤max ,B 垃min ≤B 垃i ≤B 垃max ; Among them, B 煤min , B 垃min are the minimum capacities of pulverized coal boiler and garbage boiler respectively; B 煤max , B 垃max They are the maximum capacities of pulverized coal boiler and garbage boiler respectively; The expression of the capacity constraint of a single steam turbine is: X min ≤X i ≤X max ; Among them, X min , X max are the minimum and maximum capacities of the steam turbine, respectively; The expression of the main pipe pressure constraint of the pulverized coal boiler is: P 煤 ≤B 煤max -B 煤min ; The expression of the main pipe pressure constraint of the garbage boiler is: P 垃 ≤B 垃max -B 垃min 。 6. The load dispatching and allocating method for a multi-furnace and multi-machine complex production system according to claim 1 is characterized in that: In step S4, a multi-objective optimization algorithm is used to optimize the multi-furnace multi-machine load scheduling and allocation model to obtain the optimal load allocation parameters, including: Step S41: using the entropy weight method to calculate the entropy and entropy weight corresponding to each objective function, the entropy weight model represents the objective weight of each evaluation objective function; defining the subjective weight of each objective function, combining the objective weight and the subjective weight to obtain a comprehensive weight, and updating the weight of each objective function by the comprehensive weight; Step S42: Use a multi-objective optimization algorithm to perform the next optimization. If the convergence condition is met, the optimization is terminated and the optimal load distribution parameters are output; if the convergence condition is not met, the weight calculation and parameter optimization are performed again; And, after the step S4, it also includes: judging whether the steam volume in the heating main pipe is reasonable according to the optimal load distribution parameters, if reasonable, executing step S5; otherwise, returning to step S2, and re-optimizing the boundary parameters of the heating main pipe.

7. The load dispatching and allocating method for a complex production system with multiple furnaces and multiple machines according to claim 6 is characterized in that: In step S42, a multi-objective optimization algorithm is used to perform the next optimization. If the convergence condition is met, the optimization is terminated and the optimal load distribution parameters are output; if the convergence condition is not met, the weight calculation and parameter optimization are performed again, which specifically includes the following steps: Step S421, setting the hybrid rice optimization algorithm execution related parameters; Step S422: Generate a random initial population, and assign each objective function value and crowding degree; Step S423, dividing the lines into maintainer lines, restorer lines and sterile lines according to the Pareto solution set relationship; Step S424, hybridizing the maintainer line with the sterile line to update the sterile line, and self-pollinating the restorer line to update the restorer line itself; Step S425, taking the restorer lines and sterile lines in the updated population as sub-populations, and merging the sub-populations with the original population into a new population using an elite strategy; Step S426, assigning each objective function value and crowding degree to the generated new population; Step S427, determine whether the convergence condition is met. If the convergence condition is met, terminate the optimization and output the optimal solution, that is, the optimal load distribution parameter; otherwise, recalculate the weight and calculate the individual fitness value to search for the best solution again.

8. The load dispatching and allocating method for a complex production system with multiple furnaces and multiple machines according to claim 7 is characterized in that: The elite strategy is to retain elite individuals based on the Pareto ranking of the combined large population of the original population and the sub-population and the crowding degree of each individual. Once the remaining reserved space is insufficient to accommodate the feasible solutions of the Pareto layer to be retained, they are retained according to the crowding ranking until the preset population size is reached.

9. The load dispatching and allocating method for a complex production system with multiple furnaces and multiple machines according to claim 7, characterized in that: The multi-objective hybrid rice optimization algorithm also includes sorting the population using a hierarchical non-dominated sorting method. The feasible solutions at the same level do not dominate each other, while the feasible solutions at this level can dominate the Pareto set of the next level. The hierarchical implementation step is to use the comparison method to sort the solution set to be sorted one level at a time.

10. A load dispatching and distribution platform for a complex production system with multiple furnaces and multiple machines, characterized in that: It includes: The digital twin model building module uses mechanism modeling and data identification methods to build a digital twin model of a complex production system with multiple furnaces and machines; The mother pipe parameter optimization module optimizes the boundary parameters of the source-side heating mother pipe of the multi-furnace multi-machine system based on the heat load demand of the heat user, the heat storage and hysteresis parameters of the heat network, so as to reduce the load frequency change of the multi-furnace multi-machine system; The load dispatching and allocation model establishment module is based on the optimized boundary parameters of the heating main pipe, the cost and benefits of different furnace types, the adjustable load range and load change rate of different furnace types, and the energy consumption difference of different equipment of the same furnace type. The objective function is to maximize the profit of the whole plant, minimize the pollutant emissions and minimize the total energy consumption of the put into operation equipment, and set the corresponding multi-furnace and multi-machine system constraints to establish a multi-furnace and multi-machine load dispatching and allocation model; A parameter optimization module, which uses a multi-objective optimization algorithm to optimize the multi-furnace and multi-machine load scheduling and allocation model to obtain the optimal load allocation parameters; The instruction issuing module sends boiler instructions and steam turbine instructions based on the optimal load distribution parameters after optimization, adjusts the fuel quantity, air volume, water supply and steam inlet parameters, and realizes the optimized operation of the multi-boiler and multi-machine system.

Citation Information

Patent Citations

  • Operation optimization method of comprehensive energy system based on multi-agent game

    CN111881616A

  • Multi-unit thermal power plant heat supply mode and parameter online optimization method

    CN113822496A

  • Method for analyzing energy efficiency of generator set

    WO2017050207A1