An optimal automatic excavation method for intelligent electric shovel based on stockpile surface prediction model

The intelligent electric shovel automatic excavation method based on the stockpile surface prediction model solves the problems of difficult operation and poor energy consumption of traditional electric shovels, achieves accurate prediction of the stockpile surface morphology and accurate prediction of dynamic excavation volume, and improves efficiency. Mining efficiency and energy consumption optimization.

CN114722586BActive Publication Date: 2024-10-15DALIAN UNIV OF TECH
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202210282044.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-22
Publication Date
2024-10-15
Estimated Expiration
2042-03-22

AI Technical Summary

Technical Problem

Traditional electric shovel excavation operations rely on manual operation, which has problems such as difficult operation, poor efficiency and poor energy consumption. The topography of the pile surface is complex and difficult to predict accurately.

Method used

An intelligent electric shovel automatic excavation method based on the stockpile surface prediction model is adopted. The point cloud data of the stockpile surface is obtained through laser radar scanning, and a PRS prediction model is established. The Lagrangian dynamic equation and high-order polynomial planning are combined to plan the excavation trajectory to achieve dynamic Accurate prediction of excavation volume and optimization of energy consumption.

Benefits of technology

It achieves accurate prediction of the morphological characteristics of the stockpile surface and the dynamic excavation volume under unmanned operation, improves excavation efficiency and energy consumption optimization, and is suitable for mining with complex stockpile surface morphology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114722586B_ABST
    Figure CN114722586B_ABST
Patent Text Reader

Abstract

A method for optimal automatic excavation operation of an intelligent electric shovel based on a stockpile surface prediction model. First, the stockpile surface point cloud data is obtained and processed by scanning the actual material yard with a laser radar; secondly, the stockpile surface with complex and changeable morphological features is accurately modeled; then, the stockpile surface prediction model is used to plan the optimal excavation trajectory; then, the excavation trajectory is executed; finally, the rotation-unloading-reset is performed and it is determined whether to perform the next excavation operation. Since the present invention uses the point cloud obtained by laser radar scanning to accurately model the stockpile surface, it realizes the accurate prediction of the dynamic excavation volume and is suitable for actual excavation conditions. The present invention adopts the PTP method to use high-order polynomials to describe the excavation trajectory, and converts the optimal control problem of the electric shovel into a polynomial coefficient optimization problem. At the same time, factors such as excavation volume and excavation time are considered, and constraints such as mechanism position and motor speed are considered, and the polynomial trajectory coefficients, excavation time, and termination position are optimized, so as to ensure that enough materials are excavated, the excavation time is short, and the energy consumption is optimal.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of intelligent mining electric shovels, and relates to an optimal automatic excavation operation method of an intelligent electric shovel based on a stockpile surface prediction model. Background Art

[0002] Mining electric shovels are key equipment for open-pit mining, and their product performance and production capacity will directly determine the efficiency of mining. Traditional electric shovels currently rely mainly on the operator's experience to perform excavation operations, and there is a large difference in the full bucket rate and excavation efficiency of different operators.

[0003] In addition, the excavation site is dusty and the working environment is harsh, resulting in poor vision for the operator. At the same time, the electric shovel is large, resulting in a long viewing distance for the operator. Coupled with the rich morphological features of the pile surface, manual excavation operations are difficult to operate.

[0004] In addition, the morphological characteristics of the actual stockpile surface are complex and changeable, but most of the current excavation trajectory planning methods imagine the stockpile surface as a plane with a fixed stockpile angle, which does not conform to the actual situation. Summary of the invention

[0005] In order to solve the above problems existing in the prior art, the present invention proposes an optimal automatic excavation operation method for an intelligent electric shovel which is unmanned, can accurately predict the dynamic excavation volume according to different stockpile surface morphology characteristics, can meet a variety of practical application needs and has optimal energy consumption.

[0006] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0007] An optimal automatic excavation method based on a stockpile surface prediction model comprises the following steps:

[0008] A. The electric shovel receives the planned task and moves to a specific excavation position. Then the front working device performs a reset movement and prepares to scan the excavation stockpile surface ahead.

[0009] B. The laser radar scans the stockpile surface in front, mines the topographic features of the stockpile surface, and obtains point cloud data of the stockpile surface. Each point in the point cloud is composed of (x, y, z);

[0010] C. After the laser radar scans the stockpile surface to obtain its point cloud data, the point cloud data is denoised, and the denoised point cloud is segmented to remove the point cloud of the non-stockpile surface part to obtain the processed point cloud data of the stockpile surface;

[0011] D. Through the PRS stockpile surface prediction model, the stockpile surface point cloud data processed in step C is used to model the stockpile surface, and the mathematical expression S(x, y) of the stockpile surface is obtained. S(x, y) is the final stockpile surface prediction model, and the stockpile surface prediction value z corresponding to any (x, y) within the projection range of the stockpile surface in the XY plane can be calculated through this model. prs ;

[0012] The PRS stockpile surface prediction model establishment method comprises the following steps:

[0013] D1. The stockpile surface expression S(x,y) obtained using the PRS method can be expressed as follows:

[0014]

[0015] Where: Dx and Dy are the highest orders in the two dimensions of x and y. The values ​​of the two orders need to be determined through experiments, taking into account the modeling accuracy, modeling speed and prediction speed; w mk Represents each term x in the two-variable multivariate equation S(x,y) m y k The corresponding coefficient; z prs Represents the predicted value of the stockpile surface calculated by the stockpile surface prediction model according to a certain (x, y); (x, y) is the first two-dimensional data of all points in the point cloud;

[0016] D2, let Dx and Dy be equal, both are D. According to the pile surface expression (1) in step D1, by the least square method, the difference (z) between the actual z value (point cloud z value) and S (x, y) is used. prs ) is minimized as the goal, and the objective function is established to determine each unknown coefficient w in formula (1) mk The objective function is as follows:

[0017]

[0018] D3. To minimize the objective function E in step D2, let its derivative equal to zero, and we can get the following formula:

[0019]

[0020] Where: U is the coefficient vector, which is composed of each coefficient w of S(x,y) mk H is the point cloud sample output vector, representing the z value of the point cloud data; B is the point cloud sample input matrix, the x and y of each row correspond to the z in H, and n is the number of sample points of the point cloud data.

[0021] D4. According to formula (3), the coefficient vector U can be directly solved analytically by the following formula:

[0022] U=(B T B) -1 B T H (4)

[0023] D5, bringing the coefficient vector U obtained in step D4 back to the stockpile surface expression S(x,y) in step D1 to obtain a stockpile surface prediction model;

[0024] E. Determine the optimal mining trajectory

[0025] The excavation movement of the front working device of the electric shovel is completed by the lifting movement of the lifting rope and the pushing movement of the pushing mechanism. The movement has two degrees of freedom, which can be divided into the translation of the bucket along the axis of the bucket and the rotation of the bucket around the rotation center hinged with the boom. Therefore, the front working device of the electric shovel can be simplified into a two-degree-of-freedom mechanical arm. Although the front working device of the electric shovel performs excavation movement in three-dimensional space, the excavation trajectory surface formed by the excavation movement of the bucket is a curve in the direction parallel to the width of the bucket. Therefore, when planning the excavation trajectory of the electric shovel, the excavation trajectory surface can be discretized into multiple excavation trajectory lines, and then the excavation trajectory curve is parameterized in the two-dimensional space perpendicular to the bucket width, turning a complex three-dimensional surface optimization problem into a trajectory parameter optimization problem. In the two-dimensional planning space, the PTP method is used to determine the starting and ending states, and use high-order polynomials to discretize the excavation trajectories in the x and y directions in the time domain, so that the first 5 coefficients of the polynomial can be solved by the 6th to Kth order polynomial coefficients, excavation time, initial and ending states, and the parameterization process of the excavation trajectory is completed; the dynamic excavation volume is accurately predicted using the stockpile surface prediction model; the excavation resistance is calculated using the excavation resistance empirical formula; the Lagrangian dynamics equation is combined with the shovel motion and structural characteristics to establish an electric shovel dynamics model to calculate the pushing and lifting forces during dynamic excavation; under the premise of satisfying the full bucket rate constraints, the maximum extension of the bucket arm constraints, the rotation constraints, the non-digging constraints, the motor speed constraints, the motor output force constraints, and the motor power constraints, the optimal excavation trajectory that meets multiple requirements under actual working conditions is planned; the specific steps are as follows:

[0026] E1. Discretize the three-dimensional excavation trajectory surface into m excavation trajectory lines at equal intervals in the bucket width direction. Each excavation trajectory line is the same curve in the two-dimensional planning space, but is inconsistent in the three-dimensional space;

[0027] E2. In the two-dimensional planning space, high-order polynomials are used to express the mining trajectory in the x and y directions, and the mathematical expression between the trajectory s and time in the x and y directions is established, as shown in formula (5). At the same time, the initial position, velocity, and acceleration are all zero, the final velocity and acceleration are zero, and the final position is assumed to be (x n ,y n), is the parameter to be optimized, and other parameters to be optimized include the 6th to Kth order polynomial coefficients in formula (5) and mining time t d , and then the first 5 order coefficients (including the 0th order) in equation (5) can be obtained by combining all the parameters to be optimized using the PTP method. The solution method is shown in equation (6);

[0028]

[0029]

[0030]

[0031] E3. In the two-dimensional planning space, the i-th mining trajectory line is discretized into n mining trajectory coordinate points (x j ,y j ) is transformed into three-dimensional space to obtain the coordinate value (x ij ,y ij ,z ij ){i=1,2,3,...,m|j=1,2,3,...,n}, and use the stockpile surface prediction model S(x,y) to predict the excavation trajectory coordinate point (x ij ,y ij ,z ij ) corresponds to the coordinate point (x ij ,y ij ,z dij ), then the closed area S enclosed by the i-th excavation trajectory and the curve projected onto the stockpile surface i It can be calculated by the following formula;

[0032]

[0033] Among them, d t To dynamically excavate the thickness, the calculation method is as follows:

[0034]

[0035] E4. Get all S i After that, the dynamic excavation volume is predicted by the following formula;

[0036]

[0037] Where: V is the excavation volume, w is the dip is the bucket width;

[0038] E5. Calculate the excavation resistance based on the excavation resistance empirical formula and dynamic excavation thickness;

[0039] E6. Perform motion analysis and structural analysis on the front-end working device of the electric shovel, select generalized coordinates according to its motion mode and structural characteristics, use Lagrangian dynamics equations combined with the force analysis of the front-end working device to establish a dynamic model of the front-end working device of the electric shovel, use the excavation trajectory expression to solve the displacement, velocity, and acceleration of the generalized coordinates, and then combine the dynamic excavation volume calculation method described in steps E3-E4 and the excavation resistance calculation method described in E5 to calculate the output force of the electric shovel's push motor and lifting motor through the dynamic model;

[0040] E7. Obtain optimization variables according to steps E1-E2, calculate the dynamic excavation volume and the intermediate values ​​required for calculating the energy consumption, force, power and other constraint values ​​according to the method of steps E3-E6, take the minimum unit excavation energy consumption as the goal, take the full bucket rate constraint, the maximum extension constraint of the bucket arm, the rotation constraint, the non-digging constraint, the motor speed constraint, the motor output force constraint, and the motor power constraint as the constraint conditions, and establish the trajectory optimization model shown in the following formula:

[0041]

[0042] in, The polynomial coefficients of the high-order polynomials of the mining trajectory in the x and y directions with respect to time are greater than or equal to 6; [x n ,y n ] is the excavation end position; t d is the digging time; G1 is the full bucket rate constraint; G2 is the maximum extension of the bucket arm constraint; G3 is the rotation constraint; G4 is the no-digging constraint; G5 is the minimum lifting speed constraint; G6 is the maximum lifting speed constraint; G7 is the minimum pushing speed constraint; G8 is the maximum pushing speed constraint; G9 is the maximum allowable lifting force constraint of the motor; G 10 G is the maximum allowable thrust constraint of the motor; 11 To increase the maximum allowable output power constraint of the motor; G 12 is the maximum allowable output power constraint of the push motor; L h is the arm length; z dmax is the end coordinates of m mining trajectories (x in ,y in ){i=1,2,3,...,m} corresponds to the value z on the pile surface din The maximum value in ; is the maximum lifting force on the i-th excavation trajectory, is the maximum value of the maximum lifting forces on the m excavation trajectory lines, Similarly, ED is the vertical distance from the bucket tooth tip to the bucket arm axis;

[0043] E8. Use appropriate optimization algorithms to optimize the trajectory optimization model, find the optimal trajectory parameter values, and determine the optimal mining trajectory;

[0044] F. Convert the obtained optimal excavation trajectory into control parameters of the push motor and the lifting motor, control the front-end working device of the electric shovel to perform excavation movement, and after the excavation is completed, the electric shovel performs rotation-unloading-rotation-reset to complete a single automatic operation process;

[0045] G. After a single automatic operation process is completed, determine whether the next round of excavation operation is required based on the volume of the excavated material. If necessary, go to step A; if not, the excavation task is completed.

[0046] Furthermore, the stockpile surface modeling method described in step D includes, in addition to the PRS polynomial response surface model, an RBF proxy model, a spline curve interpolation model, a triangle patch interpolation model, a nearest neighbor search model or a linear interpolation model.

[0047] Furthermore, the optimization algorithm described in step E8 is a genetic algorithm, a simplex method, a particle swarm algorithm, a gradient descent method, a Newton method, a Gauss-Newton method, a damped Newton method, an artificial potential field method, an ant colony method or an annealing method.

[0048] Compared with the prior art, the present invention has the following beneficial effects:

[0049] (1) The laser radar scans the pile surface to collect the morphological characteristics of the pile surface and obtains the point cloud of the pile surface. The point cloud is used to establish a pile surface prediction model. The constructed model can better restore the morphological characteristics of the pile surface and realize accurate prediction of the dynamic excavation volume.

[0050] (2) The automatic operation process of the mining electric shovel used in the present invention is more in line with the operation process of traditional manual operation, and the excavation trajectory planning method takes into account various constraints such as position limits, stockpile surface, motor speed and power during the actual excavation operation. While achieving accurate prediction of dynamic excavation volume and optimal unit excavation energy consumption, it also improves the practical applicability of the method. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is the automatic operation flow chart of the present invention;

[0052] Figure 2 It is the actual stockpile point cloud of the present invention and the stockpile surface prediction model diagram established based on the point cloud; in the figure, the point cloud is the processed stockpile surface point cloud data, and the curved surface is the stockpile surface prediction model.

[0053] Figure 3It is the excavation motion diagram of the front working device of the present invention; in the figure, the angle θ between the bucket arm and the vertical direction and the bucket arm extension ρ are the selected generalized coordinates, and the coordinate system is the coordinate system where the excavation trajectory is located.

[0054] Figure 4 It is a discrete diagram of the excavation trajectory surface of the present invention; in the diagram, the curved surface is the excavation trajectory surface, and the multiple curves on the curved surface are discrete excavation trajectories.

[0055] Figure 5 It is a cross-sectional diagram of the excavation volume calculation of the present invention; in the figure, the coordinate axis in brackets refers to the two-dimensional planning space, the y-axis outside the brackets refers to the Z-axis of the three-dimensional space, and the x-axis refers to the projection of the excavation trajectory of the electric shovel on the XY plane.

[0056] Figure 6 It is an excavation trajectory diagram calculated based on the stockpile surface prediction model of the present invention; there are multiple curves in the middle right part of the figure, the black curve is the trajectory line formed at the edge of the bucket, the dark curve is the discrete excavation trajectory line, and the light curve is the stockpile surface cross-sectional curve corresponding to the discrete excavation trajectory on the stockpile surface. DETAILED DESCRIPTION

[0057] The present invention will be further described below in conjunction with the accompanying drawings. Figure 1 As shown, the optimal automatic operation method of the intelligent electric shovel of the present invention comprises the following steps:

[0058] A. The electric shovel receives the planned task and moves to a specific excavation position. Then the front working device performs a reset movement and prepares to scan the excavation stockpile surface ahead.

[0059] B. The laser radar scans the stockpile surface in front, mines the topographic features of the stockpile surface, and obtains point cloud data of the stockpile surface. Each point in the point cloud is composed of (x, y, z);

[0060] C. After the laser radar scans the stockpile surface to obtain its point cloud data, the point cloud data is denoised, and the denoised point cloud is segmented to remove the point cloud of the non-stockpile surface part to obtain the processed point cloud data of the stockpile surface;

[0061] D. Through the PRS stockpile surface prediction model, the stockpile surface point cloud data processed in step C is used to model the stockpile surface, and the mathematical expression S(x, y) of the stockpile surface is obtained. S(x, y) is the final stockpile surface prediction model, through which the predicted value z of the stockpile surface corresponding to any (x, y) within the projection range of the stockpile surface in the XY plane can be calculated. prs , the point cloud data used for modeling and the obtained stockpile surface prediction model are as follows Figure 2 As shown;

[0062] The PRS stockpile surface prediction model establishment method comprises the following steps:

[0063] D1. The mathematical expression S(x,y) of the stockpile surface obtained using the PRS method can be expressed as follows:

[0064]

[0065] Where: Dx and Dy are the highest orders in the two dimensions of x and y. The values ​​of the two orders need to be determined through experiments, taking into account the modeling accuracy, modeling speed and prediction speed; w mk Represents each term x in the two-variable multivariate equation S(x,y) m y k The corresponding coefficient; z prs Represents the predicted value of the stockpile surface calculated by the stockpile surface prediction model according to a certain (x, y); (x, y) is the first two-dimensional data of all points in the point cloud;

[0066] D2, let Dx and Dy be equal, both are D. According to the pile surface expression (1) in step D1, by the least square method, the difference (z) between the actual z value (point cloud z value) and S (x, y) is used. prs ) is minimized as the goal, and the objective function is established to determine each unknown coefficient w in formula (1) mk The objective function is as follows:

[0067]

[0068] D3. To minimize the objective function E in step D2, let its derivative equal to zero, and we can get the following formula:

[0069]

[0070] Where: U is the coefficient vector, which is composed of each coefficient w of S(x,y) mk H is the point cloud sample output vector, representing the z value of the point cloud data; B is the point cloud sample input matrix, the x and y of each row correspond to the z in H, and n is the number of sample points of the point cloud data.

[0071] D4. According to formula (3), the coefficient vector U can be directly solved analytically by the following formula:

[0072] U=(B T B) -1 B T H (4)

[0073] D5, bringing the coefficient vector U obtained in step D4 back to the stockpile surface expression S(x,y) in step D1 to obtain a stockpile surface prediction model;

[0074] E. Determine the optimal mining trajectory

[0075] The excavation movement of the front working device of the electric shovel is completed by the lifting movement of the lifting rope and the pushing movement of the pushing mechanism. Figure 3 As shown in the figure, the motion has two degrees of freedom, which can be divided into the translation of the bucket arm along the axis of the bucket arm and the rotation of the bucket arm along the rotation center articulated with the boom. Therefore, the front working device of the electric shovel can be simplified into a two-degree-of-freedom mechanical arm. Although the front working device of the electric shovel performs excavation motion in three-dimensional space, the excavation trajectory surface formed by the excavation motion of the bucket is a curve in the direction parallel to the width of the bucket. Therefore, when planning the excavation trajectory of the electric shovel, the excavation trajectory surface can be discretized into multiple excavation trajectory lines, such as Figure 4 As shown. Then, the excavation trajectory curve is parameterized in the two-dimensional space perpendicular to the bucket width direction, and a complex three-dimensional surface optimization problem is transformed into a trajectory parameter optimization problem. In the two-dimensional planning space, the PTP method is used to determine the starting and ending states, and use high-order polynomials to discretize the excavation trajectories in the x and y directions in the time domain respectively, so that the first 5 order coefficients of the polynomial can be solved by the 6th to Kth order polynomial coefficients, excavation time, initial and ending states, and the parameterization process of the excavation trajectory is completed. The coordinate system of the excavation trajectory is shown in Figure 3 As shown in the figure; the stockpile surface prediction model is used to accurately predict the dynamic excavation volume, such as Figure 5 As shown in the figure; the excavation resistance is calculated using the excavation resistance empirical formula; the electric shovel dynamics model is established by combining the Lagrangian dynamics equation with the motion and structural characteristics of the electric shovel to calculate the pushing and lifting forces during dynamic excavation; the optimal excavation trajectory that meets multiple requirements under actual working conditions is planned under the premise of satisfying the full bucket rate constraints, the maximum extension of the bucket arm constraints, the rotation constraints, the non-digging constraints, the motor speed constraints, the motor output force constraints, and the motor power constraints; the specific steps are as follows:

[0076] E1. Discretize the three-dimensional excavation trajectory surface into m excavation trajectory lines at equal intervals in the bucket width direction. Each excavation trajectory line is the same curve in the two-dimensional planning space, but is inconsistent in the three-dimensional space. The excavation trajectory discretization method is as follows: Figure 4 As shown, first, the excavation trajectory surface is discretized into m excavation trajectory surfaces in the bucket width direction, and an excavation trajectory line is taken in the middle of each excavation trajectory surface. The excavation performance values ​​such as the pushing and lifting force, power, and energy consumption calculated on the line are used as the excavation performance values ​​such as the force, power, and energy consumption of the excavation motion of the electric shovel within the excavation trajectory surface;

[0077] E2. In the two-dimensional planning space, high-order polynomials are used to express the mining trajectory in the x and y directions, and the mathematical expression between the trajectory s and time in the x and y directions is established, as shown in formula (5). At the same time, the initial position, velocity, and acceleration are all zero, the final velocity and acceleration are zero, and the final position is assumed to be (x n ,yn ), is the parameter to be optimized, and other parameters to be optimized include the 6th to Kth order polynomial coefficients in formula (5) and mining time t d , and then the first 5 order coefficients (including the 0th order) in equation (5) can be obtained by combining all the parameters to be optimized using the PTP method. The solution method is shown in equation (6);

[0078]

[0079]

[0080]

[0081] E3. In the two-dimensional planning space, the i-th mining trajectory line is discretized into n mining trajectory coordinate points (x j ,y j ) is transformed into three-dimensional space to obtain the coordinate value (x ij ,y ij ,z ij ){i=1,2,3,...,m|j=1,2,3,...,n}, and use the stockpile surface prediction model S(x,y) to predict the excavation trajectory coordinate point (x ij ,y ij ,z ij ) corresponds to the coordinate point (x ij ,y ij ,z dij ),like Figure 5 As shown, the closed area S enclosed by the i-th excavation trajectory and the curve projected onto the stockpile surface is i It can be calculated by the following formula;

[0082]

[0083] Among them, d t To dynamically excavate the thickness, the calculation method is as follows:

[0084]

[0085] E4. Get all S i After that, the dynamic excavation volume is predicted by the following formula;

[0086]

[0087] Where: V is the excavation volume, w is the dip is the bucket width;

[0088] E5. Calculate the excavation resistance based on the excavation resistance empirical formula and dynamic excavation thickness;

[0089] E6. Perform motion analysis and structural analysis on the front working device of the electric shovel. Since the motion of the front working device can be divided into the translation of the bucket arm along the bucket arm axis and the rotation of the bucket arm along the rotation center hinged with the boom, the angle θ between the bucket arm and the vertical direction and the bucket arm extension ρ can be selected as generalized coordinates according to its motion mode and structural characteristics, such as Figure 3 As shown, the dynamic model of the front working device of the electric shovel is established by combining the Lagrangian dynamic equation with the force analysis of the front working device, and the displacement, velocity and acceleration of the generalized coordinates are solved by using the excavation trajectory expression. Combined with the dynamic excavation volume calculation method described in steps E3-E4 and the excavation resistance calculation method described in E5, the output force of the push motor and the lifting motor of the electric shovel can be calculated through the dynamic model;

[0090] E7. Obtain optimization variables according to steps E1-E2, calculate the dynamic excavation volume and the intermediate values ​​required for calculating the energy consumption, force, power and other constraint values ​​according to the method of steps E3-E6, take the minimum unit excavation energy consumption as the goal, take the full bucket rate constraint, the maximum extension constraint of the bucket arm, the rotation constraint, the non-digging constraint, the motor speed constraint, the motor output force constraint, and the motor power constraint as the constraint conditions, and establish the trajectory optimization model shown in the following formula:

[0091]

[0092] in, The polynomial coefficients of the high-order polynomials of the mining trajectory in the x and y directions with respect to time are greater than or equal to 6; [x n ,y n ] is the excavation end position; t d is the digging time; G1 is the full bucket rate constraint; G2 is the maximum extension of the bucket arm constraint; G3 is the rotation constraint; G4 is the no-digging constraint; G5 is the minimum lifting speed constraint; G6 is the maximum lifting speed constraint; G7 is the minimum pushing speed constraint; G8 is the maximum pushing speed constraint; G9 is the maximum allowable lifting force constraint of the motor; G 10 G is the maximum allowable thrust constraint of the motor; 11 To increase the maximum allowable output power constraint of the motor; G 12 is the maximum allowable output power constraint of the push motor; L h is the arm length; z dmax is the end coordinates of m mining trajectories (x in ,y in ){i=1,2,3,...,m} corresponds to the value z on the pile surface din The maximum value in ; is the maximum lifting force on the i-th excavation trajectory, is the maximum value of the maximum lifting forces on the m excavation trajectory lines, Similarly, ED is the vertical distance from the bucket tooth tip to the bucket arm axis;

[0093] E8. Use appropriate optimization algorithms to optimize the trajectory optimization model, find the optimal trajectory parameter value, determine the optimal excavation trajectory, and optimize the optimal excavation trajectory obtained by optimizing the stockpile surface prediction model. Figure 6 As shown;

[0094] F. Convert the obtained optimal excavation trajectory into control parameters of the push motor and the lifting motor, control the front-end working device of the electric shovel to perform excavation movement, and after the excavation is completed, the electric shovel performs rotation-unloading-rotation-reset to complete a single automatic operation process;

[0095] G. After a single automatic operation process is completed, determine whether the next round of excavation operation is required based on the volume of the excavated material. If necessary, go to step A; if not, the excavation task is completed.

[0096] Furthermore, the stockpile surface modeling method described in step D includes, in addition to the PRS polynomial response surface model, an RBF proxy model, a spline curve interpolation model, a triangle patch interpolation model, a nearest neighbor search model or a linear interpolation model.

[0097] Furthermore, the optimization algorithm described in step E8 is a genetic algorithm, a simplex method, a particle swarm algorithm, a gradient descent method, a Newton method, a Gauss-Newton method, a damped Newton method, an artificial potential field method, an ant colony method or an annealing method.

[0098] The above-described embodiments merely express the implementation methods of the present invention, but they cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that for those skilled in the art, several modifications and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. An optimal automatic excavation method for an intelligent electric shovel based on a stockpile surface prediction model, characterized in that: The following steps are involved: A. After the electric shovel receives the planned task and moves to the specific excavation position, the front working device performs reset movement and prepares to scan the excavation stockpile surface ahead; B. The laser radar scans the stockpile surface in front, mines the topographic features of the stockpile surface, and obtains point cloud data of the stockpile surface. Each point in the point cloud is composed of (x, y, z); C. After the laser radar scans the stockpile surface to obtain its point cloud data, the point cloud data is denoised, and then the denoised point cloud is segmented to remove the point cloud of the non-stockpile surface part to obtain the processed point cloud data of the stockpile surface; D. Through the PRS stockpile surface prediction model, the stockpile surface point cloud data processed in step C is used to model the stockpile surface, and the mathematical expression S(x, y) of the stockpile surface is obtained. S(x, y) is the final stockpile surface prediction model, and the stockpile surface prediction value z corresponding to any (x, y) within the projection range of the stockpile surface in the XY plane can be calculated through this model. prs ; The PRS stockpile surface prediction model establishment method comprises the following steps: D1. The expression S(x,y) of the stockpile surface obtained using the PRS method is expressed as follows: Where: Dx and Dy are the highest order numbers in the x and y dimensions; w mk Represents each term x in the two-variable multivariate equation S(x,y) m y k The corresponding coefficient; z prs Represents the predicted value of the stockpile surface calculated by the stockpile surface prediction model according to a certain (x, y); (x, y) is the first two-dimensional data of all points in the point cloud; D2, let Dx and Dy be equal, both D; according to the pile surface expression (1) in step D1, establish the objective function by the least square method, with the minimum difference between the actual z value and S (x, y) as the goal, so as to determine each unknown coefficient w in equation (1) mk ; The objective function is as follows: D3. To minimize the objective function E in step D2, let its derivative equal to zero, and we can get the following formula: Where: U is the coefficient vector, which is composed of each coefficient w of S(x,y) mk Composition; H is the point cloud sample output vector, representing the z value of the point cloud data; B is the point cloud sample input matrix, the x and y of each row correspond to the z in H, and n is the number of sample points of the point cloud data; D4. According to formula (3), the coefficient vector U is directly solved analytically by the following formula: U=(B T B) -1 B T H (4) D5, bringing the coefficient vector U obtained in step D4 back to the stockpile surface expression S(x,y) in step D1 to obtain a stockpile surface prediction model; E. Determine the optimal mining trajectory The excavation motion of the front working device of the electric shovel is completed by the lifting motion of the lifting rope and the pushing motion of the pushing mechanism, and the front working device of the electric shovel can be simplified into a two-degree-of-freedom mechanical arm. When planning the excavation trajectory of the electric shovel, the excavation trajectory surface is first discretized into multiple excavation trajectory lines, and then the excavation trajectory curve is parameterized in a two-dimensional space perpendicular to the bucket width, and a complex three-dimensional surface optimization problem is transformed into a trajectory parameter optimization problem; in the two-dimensional planning space, the PTP method is used to determine the starting and ending states, and the excavation trajectories in the x and y directions are discretized in the time domain using high-order polynomials, so that the first 5 coefficients of the polynomial are The 6th to Kth order polynomial coefficients, excavation time, initial and final states are solved simultaneously to complete the parameterization process of the excavation trajectory; the dynamic excavation volume is accurately predicted using the stockpile surface prediction model; the excavation resistance is calculated using the excavation resistance empirical formula; the Lagrangian dynamics equation is combined with the shovel motion and structural characteristics to establish the shovel dynamics model to calculate the pushing and lifting forces during dynamic excavation; on the premise of satisfying the full bucket rate constraints, the maximum extension of the bucket arm constraints, the rotation constraints, the non-digging constraints, the motor speed constraints, the motor output force constraints, and the motor power constraints, the optimal excavation trajectory that meets multiple requirements under actual working conditions is planned; the specific steps are as follows: E1. Discretize the three-dimensional excavation trajectory surface into m excavation trajectory lines at equal intervals in the bucket width direction. Each excavation trajectory line is the same curve in the two-dimensional planning space, but is inconsistent in the three-dimensional space; E2. In the two-dimensional planning space, high-order polynomials are used to express the mining trajectory in the x and y directions, and the expression between the trajectory s and time in the x and y directions is established, as shown in formula (5). At the same time, the initial position, velocity, and acceleration are all zero, the final velocity and acceleration are zero, and the final position is assumed to be (x n ,y n ), is the parameter to be optimized, and other parameters to be optimized include the 6th to Kth order polynomial coefficients in formula (5) and mining time t d , and then the PTP method is used to combine all the parameters to be optimized to obtain the first 5 order coefficients in formula (5), including the 0th order, and the solution method is shown in formula (6); E3. In the two-dimensional planning space, the i-th mining trajectory line is discretized into n mining trajectory coordinate points (x j ,y j ) is transformed into three-dimensional space to obtain the coordinate value (x ij ,y ij ,z ij ), i = 1, 2, 3, ..., m, j = 1, 2, 3, ..., n, use the pile surface prediction model S (x, y) to predict the excavation trajectory coordinate point (x ij ,y ij ,z ij ) corresponds to the coordinate point (x ij ,y ij ,z dij ), then the closed area S enclosed by the i-th excavation trajectory and the curve projected onto the stockpile surface i It can be calculated by the following formula; Among them, d t To dig thickness dynamically; E4. Get all S i After that, the dynamic excavation volume is predicted by the following formula; Where: V is the excavation volume, w is the dip is the bucket width; E5. Calculate the excavation resistance based on the excavation resistance empirical formula and dynamic excavation thickness; E6. Perform motion analysis and structural analysis on the front-end working device of the electric shovel, select generalized coordinates according to its motion mode and structural characteristics, use Lagrangian dynamic equations combined with the force analysis of the front-end working device to establish a dynamic model of the front-end working device of the electric shovel, use the excavation trajectory expression to solve the displacement, velocity, and acceleration of the generalized coordinates, and then combine the dynamic excavation volume calculation method described in steps E3-E4 and the excavation resistance calculation method described in E5 to calculate the output force of the electric shovel's push motor and lifting motor through the dynamic model; E7. According to steps E1-E2, the optimization variables are obtained. With the minimum unit excavation energy consumption as the goal, full bucket rate constraint, maximum arm extension constraint, slewing constraint, no digging constraint, motor speed constraint, motor output force constraint, and motor power constraint as constraints, a trajectory optimization model is established as shown in the following formula: in, The polynomial coefficients of the high-order polynomials of the mining trajectory in the x and y directions with respect to time are greater than or equal to 6; [x n ,y n ] is the excavation end position; t d is the digging time; G1 is the full bucket rate constraint; G2 is the maximum extension of the bucket arm constraint; G3 is the rotation constraint; G4 is the no-digging constraint; G5 is the minimum lifting speed constraint; G6 is the maximum lifting speed constraint; G7 is the minimum pushing speed constraint; G8 is the maximum pushing speed constraint; G9 is the maximum allowable lifting force constraint of the motor; G 10 G is the maximum allowable thrust constraint of the motor; 11 To increase the maximum allowable output power constraint of the motor; G 12 is the maximum allowable output power constraint of the push motor; L h is the arm length; z dmax is the end coordinates of m mining trajectories (x in ,y in ), i = 1, 2, 3, ..., m, corresponding to the value z on the pile surface din The maximum value in ; is the maximum lifting force on the i-th excavation trajectory, is the maximum value of the maximum lifting forces on the m excavation trajectory lines, Similarly, ED is the vertical distance from the bucket tooth tip to the bucket arm axis. E8. Use appropriate optimization algorithms to optimize the trajectory optimization model, find the optimal trajectory parameter values, and determine the optimal mining trajectory; F. Convert the obtained optimal excavation trajectory into control parameters of the push motor and the lifting motor, control the front-end working device of the electric shovel to perform excavation movement, and after the excavation is completed, the electric shovel performs rotation-unloading-rotation-reset to complete a single automatic operation process; G. After a single automatic operation process is completed, determine whether the next round of excavation operation is required based on the volume of the excavated material. If necessary, go to step A; if not, the excavation task is completed.

2. The optimal automatic excavation method of an intelligent electric shovel based on a stockpile surface prediction model according to claim 1 is characterized in that: The stockpile surface modeling method described in step D includes, in addition to the PRS polynomial response surface model, an RBF proxy model, a spline curve interpolation model, a triangle patch interpolation model, a nearest neighbor search model or a linear interpolation model.

3. The optimal automatic excavation method of an intelligent electric shovel based on a stockpile surface prediction model according to claim 1 is characterized in that: The optimization algorithm described in step E8 is a genetic algorithm, a simplex method, a particle swarm algorithm, a gradient descent method, a Newton method, a Gauss-Newton method, a damped Newton method, an artificial potential field method, an ant colony method or an annealing method.

Citation Information

Cited By

  • Autonomous continuous excavation planning method for mining electric shovel

    CN121612283A