Power communication network routing method based on path and node heat

Through the power communication network routing method based on path and node heat, it solves the problem in the existing technology that path selection relies on external controllers and does not consider node performance, achieves efficient and accurate message transmission, reduces traffic congestion, and improves network performance. performance.

CN114785728BActive Publication Date: 2024-10-15STATE GRID HEILONGJIANG ELECTRIC POWER CO LTD SHUANGYASHAN POWER SUPPLY CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210440672.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-25
Publication Date
2024-10-15
Estimated Expiration
2042-04-25

AI Technical Summary

Technical Problem

The existing power communication network relies heavily on external controllers when selecting the minimum path, and does not consider the impact of node performance optimization and message forwarding traffic on path transmission speed, resulting in traffic congestion.

Method used

A power communication network routing method based on path and node popularity is used to screen candidate nodes through thresholds, construct multiple primary paths based on node density, and select the optimal path based on node comprehensive performance to avoid path selection relying on external controllers.

Benefits of technology

It improves the efficiency and accuracy of message transmission, reduces communication traffic congestion, improves power communication network performance, and ensures that the selection of the optimal path does not rely on external controllers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114785728B_ABST
    Figure CN114785728B_ABST
Patent Text Reader

Abstract

The invention relates to a routing method for an electric power communication network based on paths and node heat, and belongs to the field of electric power communication networks. The invention solves the problem that when the existing electric power communication is performed by selecting the minimum path, there is a high degree of dependence on the external controller when selecting the path, and the optimization of the performance of each node itself in the selected path and the influence of the flow of forwarding messages of each node on the transmission speed of the selected path are not considered. The present invention determines the candidate nodes from two aspects: the minimum path heat and the heat of each node in the path, constructs multiple preliminary paths according to the density of the candidate nodes, and then screens the multiple preliminary paths based on the comprehensive performance of the nodes themselves, and finally selects the optimal path to realize message transmission. In addition, the influence of the performance of each node itself and the density of the nodes on the selection of the optimal path is considered in the whole process of message transmission, so as to ensure the efficient and accurate transmission of messages. The present invention is mainly used for message transmission in an electric power communication network.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of electric power communication networks. Background Art

[0002] As the supporting network of smart grid, the reliability of power communication network has become a prerequisite for the intelligent, economical and safe operation of smart grid. The types of power communication services are becoming more and more diversified, and the business volume is showing an explosive growth trend. It is mainly used for the efficient and accurate transmission of power business data. As a strong guarantee for the stable operation of the power system and the development of communication services, it is difficult to ensure the reliable and safe transmission of power communication services by static routing algorithms alone. In order to optimize the flexibility of network resource control and ensure the efficient and accurate transmission of power business data, there is a way in the prior art to improve the transmission efficiency by selecting the minimum path with the help of an external controller. However, the determination of the minimum path is highly dependent on the external controller, and the optimization of the performance of each node in the selected minimum path is not considered, nor is the influence of the traffic of forwarding messages of each node on the transmission speed of the selected path considered, resulting in traffic congestion. Therefore, the above problems need to be solved urgently. Summary of the invention

[0003] The purpose of the present invention is to solve the problem that when the existing power communication is performed by selecting the minimum path, there is a high degree of dependence on the external controller when selecting the path, and the optimization of the performance of each node in the selected path and the flow of forwarding messages of each node on the selected path The transmission speed has an impact. The present invention provides a power communication network routing method based on path and node heat.

[0004] A power communication network routing method based on paths and node heat, wherein the power communication network includes a plurality of nodes, and the method includes the following steps:

[0005] S1. Traverse and find all paths from the starting node to the destination node for each message;

[0006] S2, determine whether the heat of the minimum path among all paths is greater than threshold 1, if the result is yes, execute step S3, if the result is no, execute step S4;

[0007] S3, taking nodes in the minimum path whose heat is less than threshold 2 as candidate nodes, and executing step S5;

[0008] S4, taking all nodes in the minimum path as candidate nodes, and executing step S5;

[0009] S5, taking nodes whose heat of each node in the secondary small path in all paths is less than the threshold value 2 as candidate nodes, and executing step S6;

[0010] S6, merging the candidate nodes in the minimum path and the candidate nodes in the next smallest path into a candidate node set, constructing multiple preliminary paths from the start node to the destination node according to the density of the nodes in the candidate node set, and executing step S7;

[0011] S7, screening multiple preliminary paths based on the comprehensive performance of the node itself, obtaining the optimal path, and executing step S8;

[0012] S8. The message carried by the starting node is transmitted to the destination node according to the optimal path to complete the message transmission.

[0013] Principle analysis: In order to avoid communication traffic congestion caused by excessive heat of the minimum path corresponding to each message and the heat of each node in the path, the heat of the minimum path is first screened by threshold one, and all nodes in the minimum path are selected as candidate nodes when the heat of the minimum path is lower than threshold one; then the heat of each node in the path when the heat of the minimum path is higher than threshold one is screened by threshold two, and a part of candidate nodes is selected; then a part of candidate nodes is selected from the secondary small path, and multiple preliminary paths are constructed according to the density of candidate nodes, and then multiple preliminary paths are screened based on the comprehensive performance of the nodes themselves, and finally the optimal path is selected to realize message transmission.

[0014] Advantages of the present invention: The power communication network routing method based on path and node heat described in the present invention has a simple process, and in the process of determining the optimal path, the purpose is not to select the minimum path, but to select the optimal path. The transmission purpose of the optimal path is to efficiently and accurately transmit messages, avoid the selected path from causing congestion to the communication flow of the power communication network, and improve the performance of the power communication network. Specifically, the candidate nodes are determined from the two aspects of the minimum path heat and the heat of each node in the path, and multiple preliminary paths are constructed according to the density of the candidate nodes. Then, based on the comprehensive performance of the nodes themselves, the multiple preliminary paths are screened, and finally the optimal path is selected to realize message transmission. In addition, the influence of the performance of each node itself and the density of the nodes on the selection of the optimal path is considered in the entire message transmission process, and the path selection does not rely on an external controller. It determines whether it can be used as a node in the optimal path through the performance of the node itself and the density of the nodes, and ensures that each node in the optimal path is optimal. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a flow chart of the power communication network routing method based on path and node heat described in the present invention.

[0016] Figure 2 It is a schematic diagram of the principle after the area formed by all nodes in the candidate node set is divided; among them, L 1 To L 9 They are the first to ninth segmentation units respectively. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0019] See also Figure 1 Description of the present embodiment, the power communication network routing method based on path and node heat described in this embodiment, the power communication network includes multiple nodes, and the method includes the following steps:

[0020] S1, traverse and find all paths from the starting node to the destination node;

[0021] S2, determine whether the heat of the minimum path among all paths is greater than threshold 1, if the result is yes, execute step S3, if the result is no, execute step S4;

[0022] S3, taking nodes in the minimum path whose heat is less than threshold 2 as candidate nodes, and executing step S5;

[0023] S4, taking all nodes in the minimum path as candidate nodes, and executing step S5;

[0024] S5, taking nodes whose heat of each node in the secondary small path in all paths is less than the threshold value 2 as candidate nodes, and executing step S6;

[0025] S6, merging the candidate nodes in the minimum path and the candidate nodes in the next smallest path into a candidate node set, constructing multiple preliminary paths from the start node to the destination node according to the density of the nodes in the candidate node set, and executing step S7;

[0026] S7, screening multiple preliminary paths based on the comprehensive performance of the node itself, obtaining the optimal path, and executing step S8;

[0027] S8. The message carried by the starting node is transmitted to the destination node according to the optimal path to complete the message transmission.

[0028] In this implementation, the minimum path refers to the path with the shortest transmission distance; the second-smallest path is the path with a transmission distance less than the transmission distance of the minimum path. When applied, when the starting node carries multiple messages, in order to avoid the communication traffic congestion caused by the excessive heat of the minimum path corresponding to each message and the heat of each node in the path, the heat of the minimum path is first screened by threshold one, and all nodes in the minimum path are selected as candidate nodes when the heat of the minimum path is lower than threshold one; then the heat of each node in the path when the heat of the minimum path is higher than threshold one is screened by threshold two, and a batch of candidate nodes are selected; then the candidate nodes in a batch of small paths are selected, and multiple preliminary paths are constructed using all candidate nodes, and then the multiple preliminary paths are screened, and finally the optimal path is selected to achieve message transmission. In the process of determining the optimal path, the purpose is not to select the minimum path with the shortest transmission distance, but to select the optimal path, overcome path congestion, and select the optimal path based on the sparsity of the nodes and the comprehensive performance of the nodes themselves, so as to finally achieve efficient and accurate transmission of messages.

[0029] Furthermore, in this embodiment, the heat of each path is determined as follows:

[0030] First, determine the information flow bandwidth occupancy rate of all nodes in the power communication network at the current moment;

[0031] Secondly, the weight of the average information flow bandwidth occupancy rate of each node in each path is calculated, and the weight of the average information flow bandwidth occupancy rate of each node is used as the heat of the path where the current node is located.

[0032] This method of determining the heat of each path can obtain the heat of the minimum path and lay a good foundation for the selection of subsequent nodes.

[0033] Furthermore, the weight of the information flow bandwidth occupancy rate of each node in each path is calculated as follows:

[0034] The sum of the information flow bandwidth occupancy rates of all nodes in the current path is calculated to obtain the total information flow bandwidth occupancy rate of the current path; then the weight of the average information flow bandwidth occupancy rate of each node in the current path is obtained by dividing the total information flow bandwidth occupancy rate of the current path by the number of nodes in the current path.

[0035] In this preferred method, the ratio of the total information flow bandwidth occupancy rate of the current path to the number of nodes in the current path is used as the weight of the average information flow bandwidth occupancy rate of each node in the current path, and the weight of the average information flow bandwidth occupancy rate of each node in each path is obtained, which comprehensively reflects the heat of the path where the current node is located.

[0036] Furthermore, the heat of each node is determined by taking the information flow bandwidth occupancy rate of each node as the heat of the node. The information flow bandwidth occupancy rate of the node is used as the heat of the node to comprehensively reflect the working status of the node at the current moment and the communication flow of the message transmission, as well as the comprehensive consideration of the future message transmission.

[0037] For further details, see Figure 2 , S6, merge the candidate nodes in the minimum path and the candidate nodes in the second smallest path into a candidate node set, and construct multiple preliminary paths from the starting node to the destination node according to the density of the nodes in the candidate node set. The implementation method is:

[0038] The area formed by all nodes in the candidate node set is divided into multiple segmentation units of the same size. The node with the best performance in each segmentation unit is used as the selected node. The selected nodes of two or more segmentation units are freely combined to form multiple paths, which are all used as the preliminary paths from the starting node to the destination node.

[0039] by Figure 2 As an example, Figure 2 The solid line and the dotted line in the figure are two different paths, wherein the solid line path is composed of 4 nodes, namely, node 11, node 23, node 51 and node 91; the dotted line path is composed of 5 nodes, namely, node 11, node 23, node 33, node 63 and node 91; the node 11 is the first segmentation unit L 1 The selected node, node 23 is the second segmentation unit L 2 The selected node, node 51 is the fifth segmentation unit L 5 The selected node, node 91 is the ninth segmentation unit L 9 The selected node, node 33 is the third segmentation unit L 3 The selected node, node 63 is the sixth segmentation unit L 6 The selected node of

[0040] Figure 2 In this method, the area formed by all nodes in the candidate node set is divided into multiple segmentation units. The node with the best performance in each segmentation unit is selected as the selected node. Then, the selected nodes of any two or more segmentation units are freely combined to form a variety of different preliminary paths. This avoids the waste of node resources due to the dense occupation of too many nodes in the message transmission process, reduces the risk of message loss caused by excessive submission times between nodes, and ensures the accuracy of message transmission.

[0041] Furthermore, S7, based on the comprehensive performance of the node itself, multiple preliminary paths are screened to obtain the optimal path in the following manner:

[0042] S71. Calculate the average comprehensive performance weight of each node in each preliminary selected path among the preliminary selected paths with the same number of nodes.

[0043] S72. Select the preliminary path where the node with the largest comprehensive performance weight is located as the optimal path.

[0044] In this preferred method, the preliminary paths are screened based on the comprehensive performance of the nodes themselves to ensure that the performance of the nodes in the optimal path is the strongest, further improve the speed of message transmission, and improve the overall performance of the power communication network.

[0045] Furthermore, the calculation method of the weight of each node's comprehensive performance is as follows:

[0046]

[0047] Among them, M i is the weight of the comprehensive performance of the i-th node, i is an integer; P 0 (i) is the residual energy of node i; q 0 (i) is the total energy of node i; P 1 (i) is the remaining cache of node i; q 1 (i) is the total cache of node i; P 2 (i) is the remaining bandwidth of node i; q 2 (i) is the total bandwidth of node i; k 1 to k 6 are the first to sixth adjustment coefficients respectively, and k 1 +k 2 +k 3 +k 4 +k 5+ k 6 =1.

[0048] In this preferred embodiment, the influence of the residual energy, residual cache and residual bandwidth of node i on the weight of the comprehensive performance is comprehensively considered, and the consideration is comprehensive and can truly reflect the overall comprehensive performance of the node itself.

[0049] Furthermore, S8, the message carried by the starting node is transmitted to the destination node according to the optimal path to complete the message transmission in the following manner:

[0050] The starting node first divides the message into N message segments in sequence, and the tail of one message segment and the beginning of the other message segment of two adjacent message segments are set with the same pairing mark. After the marking is completed, the starting node sends the message segments with the full bandwidth of the remaining bandwidth according to the current remaining bandwidth; in the process of transmitting the message, all nodes on the optimal path forward the received message segments with the full bandwidth of the remaining bandwidth according to the current remaining bandwidth; when the destination node receives all the message segments, it reassembles the message according to the same pairing mark between the two adjacent message segments to complete the message transmission.

[0051] In this preferred method, during the process of transmitting a message, a message is divided into N message segments and during the transmission along the optimal path, each node in the optimal path forwards the message segments with full bandwidth. Depending on the remaining bandwidth of each node, the number of message segments transmitted by each node each time is different. After all the message segments are sent to the destination node, the messages are reassembled according to the same pairing marks between two adjacent message segments to obtain a complete message and complete the message transmission. This transmission method is more efficient and avoids delays.

[0052] Although the present invention is described herein with reference to specific embodiments, it should be understood that these embodiments are merely examples of the principles and applications of the present invention. It should therefore be understood that many modifications may be made to the exemplary embodiments and that other arrangements may be devised without departing from the spirit and scope of the present invention as defined by the appended claims. It should be understood that the various dependent claims and features described herein may be combined in a manner different from that described in the original claims. It should also be understood that features described in conjunction with individual embodiments may be used in other described embodiments.

Claims

1. A power communication network routing method based on paths and node heat, wherein the power communication network comprises a plurality of nodes, It is characterized in that The method comprises the following steps: S1. Traverse and find all paths from the starting node to the destination node for each message; S2, determine whether the heat of the minimum path among all paths is greater than threshold 1, if the result is yes, execute step S3, if the result is no, execute step S4; the minimum path refers to the path with the shortest transmission distance; S3, taking nodes in the minimum path whose heat is less than threshold 2 as candidate nodes, and executing step S5; S4, taking all nodes in the minimum path as candidate nodes, and executing step S5; S5, taking nodes whose heat of each node in the secondary small path in all paths is less than the threshold value 2 as candidate nodes, and executing step S6; S6, merging the candidate nodes in the minimum path and the candidate nodes in the second smallest path into a candidate node set, dividing the area formed by all the nodes in the candidate node set to form multiple segmentation units of the same size, and the node with the best performance in each segmentation unit is used as the selected node. The selected nodes of two or more segmentation units are freely combined to form multiple paths, and the multiple paths are all used as the preliminary paths from the starting node to the destination node, and executing step S7; S7, screening multiple preliminary paths based on the comprehensive performance of the node itself, obtaining the optimal path, and executing step S8; S8, the message carried by the starting node is transmitted to the destination node according to the optimal path to complete the message transmission; The heat of each path is determined as follows: First, determine the information flow bandwidth occupancy rate of all nodes in the power communication network at the current moment; Secondly, calculate the weight of the average information flow bandwidth occupancy rate of each node in each path, and use the weight of the average information flow bandwidth occupancy rate of each node as the heat of the path where the current node is located; The weight of the information flow bandwidth occupancy rate of each node in each path is calculated as follows: The sum of the information flow bandwidth occupancy rates of all nodes in the current path is calculated to obtain the total information flow bandwidth occupancy rate of the current path; then the weight of the average information flow bandwidth occupancy rate of each node in the current path is obtained by dividing the total information flow bandwidth occupancy rate of the current path by the number of nodes in the current path; The heat of each node is determined as follows: The information flow bandwidth occupancy rate of each node is taken as the heat of the node.

2. The power communication network routing method based on path and node heat according to claim 1, It is characterized in that S7. The implementation method of screening multiple preliminary paths based on the comprehensive performance of the node itself and obtaining the optimal path is as follows: S71. Calculate the average comprehensive performance weight of each node in each preliminary selected path among the preliminary selected paths with the same number of nodes. S72. Select the preliminary path where the node with the largest comprehensive performance weight is located as the optimal path.

3. The power communication network routing method based on path and node heat according to claim 2, It is characterized in that The weight of each node's comprehensive performance is calculated as follows: Among them, M i is the weight of the comprehensive performance of the i-th node, i is an integer; P 0 (i) is the residual energy of node i; q 0 (i) is the total energy of node i; P 1 (i) is the remaining cache of node i; q 1 (i) is the total cache of node i; P 2 (i) is the remaining bandwidth of node i; q 2 (i) is the total bandwidth of node i; k 1 to k 6 are the first to sixth adjustment coefficients respectively, and k 1 +k 2 +k 3 +k 4 +k 5+ k 6 =1.

4. The power communication network routing method based on path and node heat according to claim 1, It is characterized in that S8. The message carried by the starting node is transmitted to the destination node according to the optimal path to complete the message transmission in the following manner: The starting node first divides the message into N message segments in sequence, and the tail of one message segment and the beginning of the other message segment of two adjacent message segments are set with the same pairing mark. After the marking is completed, the starting node sends the message segments with the full bandwidth of the remaining bandwidth according to the current remaining bandwidth; in the process of transmitting the message, all nodes on the optimal path forward the received message segments with the full bandwidth of the remaining bandwidth according to the current remaining bandwidth; When the destination node receives all the message fragments, it reassembles the message according to the same pairing marks between two adjacent message fragments to complete the message delivery.