Method and system for preventing voltage drop when output voltage of high-voltage line looper falls off and passes through steel
By adopting a distraction-free switching checking system with power substitution and backup system synchronous design in the high-line movable sleeve dropping system, the problem of voltage dropping when the output voltage of the high-line movable sleeve dropping system is solved, and the pre-finishing area is improved The power supply failure immunity capability realizes disturbance-free power switching for peripheral line failures.
Patent Information
- Application Number
- CN202210148299.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-17
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-02-17
AI Technical Summary
The output voltage of the high-line movable sleeve falls when the output voltage of the high-line movable sleeve falls, which affects the normal drop. The existing technology is difficult to effectively prevent and solve this problem, reducing the power supply failure immunity in the pre-finished rolling area.
Adopt a disturbance-free switching checking system based on power substitution and backup system synchronization design, through power distribution simulation and process timing system, execution decomposition and area supply allocation system, phase number matching and monitoring and diagnosis system, external line fault handling and disturbance-free switching System, realizes disturbance-free power switching in the event of external line failure, and improves the immunity of power failure.
By accurately quantifying power distribution and diagnosis, the faulty power branch is quickly locked, and the disturbance-free power switching of external line faults is achieved, which significantly improves the power failure immunity in the pre-finished rolling area and ensures production continuity.
Smart Images

Figure CN114865609B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel production, and in particular to a method and a system for preventing a voltage drop when a high-voltage wire looper output voltage passes through steel. Background Art
[0002] The high-wire looper did not fall off during the normal steel passing process. By checking the related locking conditions and lines, it was found that the looper's falling conditions and the output-related lines of the relay were normal. For further confirmation, the local operation box was operated and the looper's raising and lowering were completely normal. In addition, the output point instruction was forced to be given in the PLC program, and the looper's falling was also completely normal.
[0003] Furthermore, when steel is passed normally, data of the relevant big data system is detected, and the output command of the looper drop and the action of the relay are normal. It is preliminarily judged that the voltage output to the drop solenoid valve drops during the steel passing process. Then, when steel is passed, the 1# looper is put into operation, and the voltage is measured at the solenoid valve after the drop command is given. It is found that the real-time voltage drops from the normal 24V to 6.3V. The detection data and process experiments prove that the output voltage of the high-wire looper drop-off will have a voltage drop failure when steel is passed, which in turn affects the normal drop of the looper. It is very necessary to prevent the output voltage of the high-wire looper drop-off from dropping when steel is passed, so as to improve the power supply fault immunity of the entire pre-finishing rolling area; therefore, the present invention proposes a method and system for preventing the output voltage of the high-wire looper drop-off from dropping when steel is passed, so as to solve the deficiencies in the prior art. Summary of the invention
[0004] In view of the above problems, the purpose of the present invention is to provide a method and system for preventing the output voltage of a high-wire loop from dropping when the voltage exceeds the steel. By synchronously designing a disturbance-free switching selection system based on power replacement and backup systems, and utilizing the disturbance-free switching selection system to implement disturbance-free power switching operations during external line faults and related faults, the power supply fault resistance capability of the entire pre-finishing rolling area can be greatly improved, and disturbance-free power switching for peripheral line faults including water tanks can be implemented.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A system to prevent voltage drop when the output voltage of a high-voltage line looper falls off and exceeds the steel bar, including power distribution simulation and process timing system, execution decomposition and regional supply distribution system, phase matching and monitoring diagnosis system, and external line fault processing and non-disturbance switching system;
[0007] The power distribution simulation and process timing system is used to design a power distribution simulation experimental platform to accurately quantify the actual distribution of power consumption of the pre-finishing rolling remote cabinet, and then design the execution component action process timing system of the pre-finishing rolling area controlled by the pre-finishing rolling remote system;
[0008] The execution decomposition and regional supply distribution system is used to perform a regional execution component action superposition system through the execution component action process decomposition system, and then design a power supply and distribution system for the pre-finishing rolling remote control system based on the above system;
[0009] The phase matching and monitoring and diagnosis system is used to perform full digital quantity monitoring of the power supply system by adding a phase matching system of the power supply and superimposing a design action signal monitoring unit, and then designing a power supply diagnosis system to perform real-time and visual diagnosis on all trunk and branch power supply systems;
[0010] The external line fault processing and disturbance-free switching system is used to design a power replacement and backup system for a faulty power branch under an external line fault state, and then synchronously design a disturbance-free switching check system, which is used to implement disturbance-free power switching operations during external line faults and related faults.
[0011] Further improvements are as follows: the power distribution simulation experimental platform simulates power design and power supply according to the actual control system of pre-finishing rolling, and then accurately and quantitatively designs the power redistribution system; the pre-finishing rolling remote cabinet is the nearest integrated control system of the pre-finishing rolling area; the actual distribution of power consumption is a sequential and phased power distribution based on the actual production process and dynamic process; the pre-finishing rolling remote system is an integrated production proximal control system for controlling the mechanical, electrical, fluid and process equipment in the pre-finishing rolling area; the actuators include hydraulic solenoid valve systems, pneumatic solenoid valve systems, electric actuator systems and motor actuator components.
[0012] Further improvements are as follows: the power distribution simulation and process timing system consists of a power distribution simulation combined framework system, a power distribution simulation capacity quantification matching system, a power distribution simulation trigger operation start system, a power distribution simulation process monitoring and data acquisition system, a process timing logic control system, and a process timing node monitoring system.
[0013] Further improvements are as follows: the execution component action process decomposition system is based on the action process and action timing decomposition of the logic control link and the logic output instruction, and the power supply and power distribution of each timing stage are obtained through systematic decomposition, and then quantitative system support is provided for the precise quantitative control of the trunk and branch power supply; the regional execution component action superposition system is a power supply superposition system based on the action time period, which is used for precise quantitative design of the power supply time period; the power supply and distribution system is a power distribution and design system including power drive components, trunk power branches and capacity distribution units, branch power systems and capacity distribution units, comprehensive power margin design and supporting systems.
[0014] Further improvement lies in that the execution decomposition and regional supply distribution system consists of an execution decomposition combination unit, an execution decomposition process refining unit, an execution decomposition drive instruction filtering system, an execution decomposition drive process key link monitoring system, a regional supply distribution trunk power supply system, and a regional supply distribution branch power supply system. The execution decomposition and regional supply distribution system realizes precise and quantitative control of the power supply system of the entire pre-finishing remote control system through precise and quantitative decomposition control of the execution decomposition and regional supply distribution system.
[0015] Further improvements are as follows: the power supply phase matching system is a system for power supply phase design and power supply phase matching based on the actual needs of the remote control system, and the power supply phases of the power trunk and branches are optimally matched through design and matching; the full digital quantity monitoring refers to digital signal acquisition and digital signal monitoring of the dynamic state of each power subsystem; the power supply diagnosis system is used to perform comprehensive power supply diagnosis on the power supply system composed of drive component diagnosis, trunk power supply diagnosis, and branch power supply diagnosis, and through full coverage of real-time online diagnosis of the power supply system, intelligent state identification of the power supply system is realized from the perspective of dynamic control; the real-time diagnosis refers to full coverage of the production process or maintenance status; the visual diagnosis refers to improving the visualization of the system through visual state design.
[0016] Further improvements are: the phase matching and monitoring and diagnosis system consists of a phase matching and monitoring and diagnosis signal input system, a phase matching and monitoring and diagnosis signal conversion system, a phase matching and monitoring and diagnosis signal connection system, a phase matching and monitoring and diagnosis output import system, a phase matching and monitoring and diagnosis visualization control system, and a phase matching and monitoring and diagnosis queryable trend system; the phase matching and monitoring and diagnosis system achieves optimal matching of phases and dynamic full coverage of monitoring through combined optimization and logical optimization of phase matching and monitoring and diagnosis.
[0017] Further improvements are as follows: the external line fault state refers to the damaged grounding fault of the peripheral line of the pre-finishing area in a complex water environment, high temperature environment, and red steel environment; the power supply replacement and backup system is a system designed for backup replacement of external line failures; the disturbance-free switching selection system is a visual and convenient hooking operation interface designed on the basis of the fault power supply branch power supply replacement and backup system, and the visual and convenient hooking operation interface is used to realize uninterrupted online processing and disturbance-free switching operations in production under external lines or other abnormal conditions.
[0018] Further improvements are: the external line fault processing and disturbance-free switching system consists of an external line fault diagnosis and query system, an external line fault visualization reminder system, an external line fault disturbance-free processing system, an external line fault processing and signal optimization system, a disturbance-free switching data import system, and a disturbance-free switching logic connection system; the external line fault processing and disturbance-free switching system achieves the best guarantee for production continuity through optimized control of faults and intelligent design of disturbance-free switching.
[0019] The method for preventing the voltage from dropping when the output voltage of a high-voltage line looper falls through the steel comprises the following steps:
[0020] Step 1: Design a power distribution simulation experimental platform through power distribution simulation and process timing system to accurately quantify the actual power consumption distribution of the pre-finishing rolling remote cabinet;
[0021] Step 2: Design the execution component action process timing system of the pre-finishing rolling area controlled by the pre-finishing rolling remote system through the execution decomposition and regional supply allocation system;
[0022] Step 3: Perform a regional execution of the component action superposition system by executing the component action process decomposition system, obtain the power supply and power distribution of each timing stage through systematic decomposition, and then provide quantitative system support for accurate and quantitative trunk and branch power control;
[0023] Step 4: Design the power supply and distribution system of the pre-finishing rolling remote control system based on the power distribution simulation experiment platform, the execution component action process timing system and the regional execution component action superposition system;
[0024] Step 5: Use the phase matching and monitoring diagnosis system to add a phase matching system to the power supply and superimpose the designed action signal monitoring unit to perform full digital monitoring operations on the power supply system;
[0025] Step 6: Design a power supply diagnosis system through phase matching and monitoring diagnosis system to perform real-time and visual diagnosis on all trunk and branch power supply systems;
[0026] Step 7: Design an external line fault handling and disturbance-free switching system to replace the faulty power branch power supply and provide a backup system in the event of an external line fault;
[0027] Step 8: Simultaneously design a disturbance-free switching check system, and use the disturbance-free switching check system to achieve disturbance-free power switching in the event of external line faults and related faults.
[0028] The beneficial effects of the present invention are as follows: the system and method of the present invention conducts precise quantitative experiments on the power supply system through the power supply phase matching system, and then designs a precise and quantitative power supply trunk and branch system, which can provide quantitative data support for the design of a modular power supply system based on field drive. By designing a power supply diagnosis system, the power supply system can be clearly and clearly diagnosed with precise quantitative positioning and fixed points. When a fault occurs on site, the power branch can be quickly locked. By synchronously designing a disturbance-free switching check system based on power replacement and backup systems, the disturbance-free switching check system is used to implement disturbance-free power switching operations during external line faults and related faults, which can greatly improve the power supply fault immunity of the entire pre-finishing area, and can implement disturbance-free power switching for peripheral line faults including water tanks. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the process of the present invention;
[0030] Figure 2 It is a schematic diagram of the system framework of the present invention. DETAILED DESCRIPTION
[0031] In order to deepen the understanding of the present invention, the present invention will be further described in detail below in conjunction with examples. The examples are only used to explain the present invention and do not constitute a limitation on the protection scope of the present invention.
[0032] according to Figure 1-2 As shown, this embodiment proposes a system to prevent the voltage drop when the output voltage of the high-voltage line looper falls through the steel, including a power distribution simulation and process timing system, an execution decomposition and regional supply distribution system, a phase matching and monitoring diagnosis system, and an external line fault processing and non-disturbance switching system;
[0033] The power distribution simulation and process timing system is used to design a power distribution simulation experimental platform to accurately quantify the actual distribution of power consumption of the pre-finishing rolling remote cabinet, and then design the execution component action process timing system of the pre-finishing rolling area controlled by the pre-finishing rolling remote system;
[0034] The execution decomposition and regional supply distribution system is used to perform a regional execution component action superposition system through the execution component action process decomposition system, and then design a power supply and distribution system for the pre-finishing rolling remote control system based on the above system;
[0035] The phase matching and monitoring and diagnosis system is used to perform full digital quantity monitoring of the power supply system by adding a phase matching system of the power supply and superimposing a design action signal monitoring unit, and then designing a power supply diagnosis system to perform real-time and visual diagnosis on all trunk and branch power supply systems;
[0036] The external line fault processing and disturbance-free switching system is used to design a power replacement and backup system for a faulty power branch under an external line fault state, and then synchronously design a disturbance-free switching check system, which is used to implement disturbance-free power switching operations during external line faults and related faults.
[0037] The power distribution simulation experiment platform simulates power design and power supply according to the actual control system of pre-finishing rolling, and then accurately and quantitatively designs the power redistribution system; the pre-finishing rolling remote cabinet is the nearest integrated control system of the pre-finishing rolling area; the actual distribution of power consumption is a sequential and phased power distribution based on the actual production process and dynamic process; the pre-finishing rolling remote system is an integrated production proximal control system for controlling the mechanical, electrical, fluid and process equipment in the pre-finishing rolling area; the actuators include hydraulic solenoid valve systems, pneumatic solenoid valve systems, electric actuator systems and motor actuator components.
[0038] The power distribution simulation and process timing system consists of a power distribution simulation combined framework system, a power distribution simulation capacity quantification matching system, a power distribution simulation trigger operation start system, a power distribution simulation process monitoring and data acquisition system, a process timing logic control system, and a process timing node monitoring system.
[0039] The execution component action process decomposition system is based on the action process and action timing decomposition of the logic control link and the logic output instruction, and obtains the power supply and power distribution of each timing stage through systematic decomposition, and then provides quantitative system support for the precise quantitative control of the trunk and branch power supply; the regional execution component action superposition system is a power supply superposition system based on the action time period, which is used for the precise quantitative design of the power supply time period; the power supply and distribution system is a power distribution and design system including power drive components, trunk power branches and capacity distribution units, branch power systems and capacity distribution units, comprehensive power margin design and supporting systems.
[0040] The execution decomposition and regional supply distribution system consists of an execution decomposition combination unit, an execution decomposition process refining unit, an execution decomposition drive instruction filtering system, an execution decomposition drive process key link monitoring system, a regional supply distribution trunk power system, and a regional supply distribution branch power system. The execution decomposition and regional supply distribution system achieves precise and quantitative control of the power supply system of the entire pre-finishing remote control system through precise and quantitative decomposition control of the execution decomposition and regional supply distribution system.
[0041] The power supply phase matching system is a system for power supply phase design and power supply phase matching based on the actual needs of the remote control system. The power supply phases of the power trunk and branches are optimally matched through design and matching. The full digital quantity monitoring refers to the digital signal acquisition and digital signal monitoring of the dynamic state of each power subsystem. The power supply diagnosis system is used to perform comprehensive power supply diagnosis on the power supply system composed of drive component diagnosis, trunk power supply diagnosis, and branch power supply diagnosis. Through full coverage of real-time online diagnosis of the power supply system, intelligent state identification of the power supply system is realized from the perspective of dynamic control. The real-time diagnosis refers to full coverage of the production process or maintenance status. The visual diagnosis refers to improving the visualization of the system through visual state design.
[0042] The phase matching and monitoring and diagnosis system consists of a phase matching and monitoring and diagnosis signal input system, a phase matching and monitoring and diagnosis signal conversion system, a phase matching and monitoring and diagnosis signal connection system, a phase matching and monitoring and diagnosis output import system, a phase matching and monitoring and diagnosis visualization control system, and a phase matching and monitoring and diagnosis queryable trend system; the phase matching and monitoring and diagnosis system achieves optimal matching of phases and dynamic full coverage of monitoring through combined optimization and logical optimization of phase matching and monitoring and diagnosis.
[0043] The external line fault state refers to the damaged grounding fault of the peripheral line of the pre-finishing rolling area in a complex water environment, high temperature environment, and red steel environment; the power supply replacement and backup system is a system designed for backup replacement of external line failures; the disturbance-free switching selection system is a visual and convenient hooking operation interface designed on the basis of the fault power supply branch power supply replacement and backup system. Through the visual and convenient hooking operation interface, uninterrupted online processing and disturbance-free switching operations of production in external lines or other abnormal conditions can be realized.
[0044] The external line fault processing and disturbance-free switching system consists of an external line fault diagnosis and query system, an external line fault visualization reminder system, an external line fault disturbance-free processing system, an external line fault processing and signal optimization system, a disturbance-free switching data import system, and a disturbance-free switching logic connection system; the external line fault processing and disturbance-free switching system achieves the best guarantee for production continuity through optimized control of faults and intelligent design of disturbance-free switching.
[0045] The method for preventing the voltage from dropping when the output voltage of a high-voltage line looper falls through the steel comprises the following steps:
[0046] Step 1: Design a power distribution simulation experimental platform through power distribution simulation and process timing system to accurately quantify the actual power consumption distribution of the pre-finishing rolling remote cabinet;
[0047] Step 2: Design the execution component action process timing system of the pre-finishing rolling area controlled by the pre-finishing rolling remote system through the execution decomposition and regional supply allocation system;
[0048] Step 3: Perform a regional execution of the component action superposition system by executing the component action process decomposition system, obtain the power supply and power distribution of each timing stage through systematic decomposition, and then provide quantitative system support for accurate and quantitative trunk and branch power control;
[0049] Step 4: Design the power supply and distribution system of the pre-finishing rolling remote control system based on the power distribution simulation experiment platform, the execution component action process timing system and the regional execution component action superposition system;
[0050] Step 5: Use the phase matching and monitoring diagnosis system to add a phase matching system to the power supply and superimpose the designed action signal monitoring unit to perform full digital monitoring operations on the power supply system;
[0051] Step 6: Design a power supply diagnosis system through phase matching and monitoring diagnosis system to perform real-time and visual diagnosis on all trunk and branch power supply systems;
[0052] Step 7: Design an external line fault handling and disturbance-free switching system to replace the faulty power branch power supply and provide a backup system in the event of an external line fault;
[0053] Step 8: Simultaneously design a disturbance-free switching check system, and use the disturbance-free switching check system to achieve disturbance-free power switching in the event of external line faults and related faults.
[0054] The system and method of the present invention conducts precise quantitative experiments on the power supply system through the power supply phase matching system, and then designs a precise and quantitative power supply trunk and branch system, which can provide quantitative data support for the design of a modular power supply system based on field drive. By designing a power supply diagnosis system, the power supply system can be clearly and clearly diagnosed with precise quantitative positioning and fixed points. When a fault occurs on site, the power branch can be quickly locked. By synchronously designing a disturbance-free switching check system based on power replacement and backup systems, the disturbance-free switching check system is used to implement disturbance-free power switching operations during external line faults and related faults, which can greatly improve the power supply fault immunity of the entire pre-finishing area and can implement disturbance-free power switching for peripheral line faults including water tanks.
[0055] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A system to prevent the voltage drop when the output voltage of a high-voltage line looper falls off and exceeds the steel, characterized by: It includes power distribution simulation and process timing system, execution decomposition and regional supply distribution system, phase matching and monitoring diagnosis system, and external line fault handling and non-disturbance switching system; The power distribution simulation and process timing system is used to design a power distribution simulation experimental platform to accurately quantify the actual distribution of power consumption of the pre-finishing rolling remote cabinet, and then design the execution component action process timing system of the pre-finishing rolling area controlled by the pre-finishing rolling remote system; The execution decomposition and regional supply distribution system is used to perform a regional execution component action superposition system through the execution component action process decomposition system, and then design a power supply and distribution system for the pre-finishing rolling remote control system based on the above system; The phase matching and monitoring and diagnosis system is used to perform full digital quantity monitoring of the power supply system by adding a phase matching system of the power supply and superimposing a design action signal monitoring unit, and then designing a power supply diagnosis system to perform real-time and visual diagnosis on all trunk and branch power supply systems; The external line fault processing and disturbance-free switching system is used to design a power replacement and backup system for a faulty power branch under an external line fault state, and then synchronously design a disturbance-free switching check system, which is used to implement disturbance-free power switching operations during external line faults and related faults.
2. The system for preventing the voltage drop of the high-voltage line looper when the output voltage exceeds the steel according to claim 1 is characterized in that: The power distribution simulation experiment platform simulates power design and power supply according to the actual control system of pre-finishing rolling, and then accurately and quantitatively designs the power redistribution system; the pre-finishing rolling remote cabinet is the nearest integrated control system of the pre-finishing rolling area; the actual distribution of power consumption is a sequential and phased power distribution based on the actual production process and dynamic process; the pre-finishing rolling remote system is an integrated production proximal control system for controlling the mechanical, electrical, fluid and process equipment in the pre-finishing rolling area; the actuators include hydraulic solenoid valve systems, pneumatic solenoid valve systems, electric actuator systems and motor actuator components.
3. The system for preventing the voltage drop of the high-voltage line looper when the output voltage exceeds the steel according to claim 1 is characterized in that: The power distribution simulation and process timing system consists of a power distribution simulation combined framework system, a power distribution simulation capacity quantification matching system, a power distribution simulation trigger operation start system, a power distribution simulation process monitoring and data acquisition system, a process timing logic control system, and a process timing node monitoring system.
4. The system for preventing the voltage drop of the high-voltage line looper when the output voltage exceeds the steel according to claim 1 is characterized in that: The execution component action process decomposition system is based on the action process and action timing decomposition of the logic control link and the logic output instruction, and obtains the power supply and power distribution of each timing stage through systematic decomposition, and then provides quantitative system support for the precise quantitative control of the trunk and branch power supply; the regional execution component action superposition system is a power supply superposition system based on the action time period, which is used for the precise quantitative design of the power supply time period; the power supply and distribution system is a power distribution and design system including power drive components, trunk power branches and capacity distribution units, branch power systems and capacity distribution units, comprehensive power margin design and supporting systems.
5. The system for preventing the voltage drop of the high-voltage line looper when the output voltage exceeds the steel according to claim 1 is characterized in that: The execution decomposition and regional supply distribution system consists of an execution decomposition combination unit, an execution decomposition process refining unit, an execution decomposition drive instruction filtering system, an execution decomposition drive process key link monitoring system, a regional supply distribution trunk power system, and a regional supply distribution branch power system. The execution decomposition and regional supply distribution system achieves precise and quantitative control of the power supply system of the entire pre-finishing remote control system through precise and quantitative decomposition control of the execution decomposition and regional supply distribution system.
6. The system for preventing the voltage drop of the high-voltage line looper when the output voltage exceeds the steel according to claim 1 is characterized in that: The power supply phase matching system is a system for power supply phase design and power supply phase matching based on the actual needs of the remote control system. The power supply phases of the power trunk and branches are optimally matched through design and matching. The full digital quantity monitoring refers to the digital signal acquisition and digital signal monitoring of the dynamic state of each power subsystem. The power supply diagnosis system is used to perform comprehensive power supply diagnosis on the power supply system composed of drive component diagnosis, trunk power supply diagnosis, and branch power supply diagnosis. Through full coverage of real-time online diagnosis of the power supply system, intelligent state identification of the power supply system is realized from the perspective of dynamic control. The real-time diagnosis refers to full coverage of the production process or maintenance status. The visual diagnosis refers to improving the visualization of the system through visual state design.
7. The system for preventing the voltage drop of the high-voltage line looper when the output voltage exceeds the steel according to claim 1 is characterized in that: The phase matching and monitoring and diagnosis system consists of a phase matching and monitoring and diagnosis signal input system, a phase matching and monitoring and diagnosis signal conversion system, a phase matching and monitoring and diagnosis signal connection system, a phase matching and monitoring and diagnosis output import system, a phase matching and monitoring and diagnosis visualization control system, and a phase matching and monitoring and diagnosis queryable trend system; the phase matching and monitoring and diagnosis system achieves optimal matching of phases and dynamic full coverage of monitoring through combined optimization and logical optimization of phase matching and monitoring and diagnosis.
8. The system for preventing the voltage drop of the high-voltage line looper when the output voltage exceeds the steel according to claim 1 is characterized in that: The external line fault state refers to the damaged grounding fault of the peripheral line in the pre-finishing rolling area in a complex water environment, high temperature environment, and red steel environment; the power supply replacement and backup system is a system designed for backup replacement of external line faults; The disturbance-free switching tick system is a visual and convenient tick operation interface designed on the basis of the fault power branch power replacement and backup system. Through the visual and convenient tick operation interface, uninterrupted online processing and disturbance-free switching operations can be realized in production under external lines or other abnormal conditions.
9. The system for preventing the voltage drop when the output voltage of a high-voltage line looper falls off according to claim 1 is characterized in that: The external line fault processing and disturbance-free switching system consists of an external line fault diagnosis and query system, an external line fault visualization reminder system, an external line fault disturbance-free processing system, an external line fault processing and signal optimization system, a disturbance-free switching data import system, and a disturbance-free switching logic connection system; the external line fault processing and disturbance-free switching system achieves the best guarantee for production continuity through optimized control of faults and intelligent design of disturbance-free switching.
10. A method for preventing the voltage from dropping when the output voltage of a high-voltage line looper falls through the steel, characterized in that: The following steps are involved: Step 1: Design a power distribution simulation experimental platform through power distribution simulation and process timing system to accurately quantify the actual power consumption distribution of the pre-finishing rolling remote cabinet; Step 2: Design the execution component action process timing system of the pre-finishing rolling area controlled by the pre-finishing rolling remote system through the execution decomposition and regional supply allocation system; Step 3: Perform a regional execution of the component action superposition system by executing the component action process decomposition system, obtain the power supply and power distribution of each timing stage through systematic decomposition, and then provide quantitative system support for accurate and quantitative trunk and branch power control; Step 4: Design the power supply and distribution system of the pre-finishing rolling remote control system based on the power distribution simulation experiment platform, the execution component action process timing system and the regional execution component action superposition system; Step 5: Use the phase matching and monitoring diagnosis system to add a phase matching system to the power supply and superimpose the designed action signal monitoring unit to perform full digital monitoring operations on the power supply system; Step 6: Design a power supply diagnosis system through phase matching and monitoring diagnosis system to perform real-time and visual diagnosis on all trunk and branch power supply systems; Step 7: Design an external line fault handling and disturbance-free switching system to replace the faulty power branch power supply and provide a backup system in the event of an external line fault; Step 8: Simultaneously design a disturbance-free switching check system, and use the disturbance-free switching check system to achieve disturbance-free power switching in the event of external line faults and related faults.
Citation Information
Patent Citations
Control method and system for comprehensive regulation and control of tail steel of double high speed line
CN113649419A
Waste cutting interlocking intelligent correction control system and method
CN113759764A
