Copper strip embedded concrete equipment foundation and construction method
By embedding copper strips at the edges and corners of the concrete equipment foundation, combined with multi-layer plastering and surface treatment, the existing technology problems of easy cracking and poor appearance of the equipment foundation are solved, achieving higher project quality and beauty. Spend.
Patent Information
- Application Number
- CN202210939206.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-05
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2042-08-05
AI Technical Summary
During the construction process, existing concrete equipment foundations are prone to cracking, missing edges and corners, excessive straightness of the upper mouth and poor molding appearance quality.
The basic design of concrete equipment with copper strips is used. Copper strips are embedded at the edges and corners of the body, and multi-layer painting and polishing treatments are performed on the plastering layer and plastering layer, combined with the outer layer protection of pure cement slurry.
It effectively reduces the risk of cracking of concrete equipment foundations, improves surface aesthetics and engineering quality, and ensures uniform arcs, straight lines and beautiful shapes.
Smart Images

Figure CN115059110B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a copper strip-embedded concrete equipment foundation and a construction method. Background Art
[0002] The concrete equipment foundation is a structure that supports and bears all or part of the weight of the equipment. At present, the more common practice is to install the equipment after pouring the concrete and finishing it, without decorating the foundation, which is prone to engineering quality problems such as cracking, missing edges and corners, and is also prone to problems such as excessive straightness of the upper surface and poor molding appearance quality. Summary of the invention
[0003] The purpose of the invention is to provide a copper strip-embedded concrete equipment foundation and a construction method to reduce cracking.
[0004] The technical solution of the present invention is: a copper-bar-embedded concrete equipment foundation comprises a main body, a bottom layer coated on the outer surface of the main body and a plaster layer coated on the outer surface of the bottom layer, the bottom of the main body has a first corner, the top of the main body has a second corner, copper bars are embedded at the first corner and the second corner, the copper bars are attached to the plaster layer, and the outer surface of the plaster layer is provided with a plaster layer flush with the copper bars.
[0005] Preferably, the copper strip is L-shaped with a corner.
[0006] Preferably, the main body is a square column, a third corner is provided between the vertical side walls of the square column, and a copper bar is embedded on the third corner.
[0007] Preferably, a cement layer is provided on the outer surface of the plaster layer and the copper strip, and the cement layer is pure cement slurry.
[0008] Preferably, the plaster layer is a cement mortar layer.
[0009] The present invention also provides a construction method for the copper strip-embedded concrete equipment foundation, comprising:
[0010] 1) Cast concrete to form the main body of the foundation;
[0011] 2) Clean the surface of the body and perform surface roughening to form a bottom layer;
[0012] 3) Construct the plastering layer, and apply cement mortar in layers to form the plastering layer; make the plastering thickness of each point control the ash cake according to the foundation conditions, and implant vertical ribs according to the ash cake, and the top surface of the main body is sloped according to the needs;
[0013] 4) Embed copper strips at each corner;
[0014] 5) Construction of the surface layer: After the surface mortar is compacted with a wooden trowel, a special mold is used to shape and finish the surface;
[0015] 6) After the surface layer is constructed and finished, pour a layer of pure cement slurry, protect the finished product of the clear water surface, cover it with film, woven cloth or building blanket; complete the construction.
[0016] Preferably, the cement mortar ratio of the plaster layer is: cement: sand: water = 1:2.5:0.4.
[0017] Preferably, the plastering layer is divided into two layers of plastering. When each layer of plastering is constructed, the mortar is fully compacted, roughened and smoothed with a wooden trowel.
[0018] Compared with the related art, the present invention has the following beneficial effects:
[0019] 1. The main material of the copper strip-embedded concrete equipment foundation is ordinary cement mortar, which can meet various shapes and sizes required, is energy-saving, environmentally friendly, and low in cost. It is embedded with copper strips and the surface is brushed with pure cement slurry, which has a beautiful appearance.
[0020] 2. The surface of the copper strip embedded concrete equipment foundation is coated with a cement layer (pure cement mortar), and the corners are equipped with corner copper strips, which have a fine and beautiful appearance and also have an auxiliary anti-cracking effect;
[0021] 3. The copper strip-embedded concrete equipment foundation is integrally formed, mildew-proof and crack-resistant, durable, with uniform arcs, straight lines and beautiful shape. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A schematic diagram of the three-dimensional structure of the copper strip-embedded concrete equipment foundation provided by the present invention;
[0023] Figure 2 A schematic cross-sectional view of the copper strip-embedded concrete equipment foundation provided by the present invention.
[0024] In the attached drawings: 1, main body; 11, first corner; 12, second corner; 13, third corner; 2, copper strip; 3, bottom layer; 4, plaster layer; 5, finishing layer. DETAILED DESCRIPTION
[0025] The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict. For the convenience of description, if the words "upper", "lower", "left" and "right" appear in the following, they only indicate that the upper, lower, left and right directions are consistent with the drawings themselves, and do not limit the structure.
[0026] like Figure 1 , Figure 2As shown, a copper bar embedded concrete equipment foundation provided in this embodiment includes a main body 1, a bottom layer 3 coated on the outer surface of the main body 1 and a plaster layer 4 coated on the outer surface of the bottom layer 3, the bottom of the main body 1 has a first corner 11, the top of the main body 1 has a second corner 12, copper bars 2 are embedded at the first corner 11 and the second corner 12, the copper bars 2 are attached to the plaster layer 4, and the outer surface of the plaster layer 4 is provided with a finishing layer 5 flush with the copper bars 2.
[0027] In one embodiment, the body 1 is cylindrical, the bottom of the body 1 has a first corner 11, the top of the body 1 has a second corner 12, and the first corner 11 and the second corner 12 are both embedded with copper bars 2.
[0028] In another embodiment, the body 1 is a square column. In addition to the first corners 11 and the second corners 12 described above, a third corner 13 is provided between the vertical side walls of the square column, and the copper bar 2 is embedded in the third corner 13 .
[0029] The copper strip 2 is L-shaped with a corner, which is adapted to the corresponding corner. The copper strip 2 is attached to the plaster layer 4, and the outer surface of the plaster layer 4 is provided with a plaster layer 5 flush with the copper strip 2. The outer surface of the plaster layer 5 and the copper strip 2 is provided with a cement layer.
[0030] The present invention also provides a construction method for the above-mentioned copper strip embedded concrete equipment foundation, including the following steps: concrete foundation construction → cleaning the base layer (keeping it clean) → slurry throwing with glue and cement slurry → two layers of cement mortar (cement: sand: water = 1:2.5:0.4) → copper strip corner protection installation → surface polishing 2 to 3 times (after initial setting and before final setting) → brushing 1 mm pure cement slurry on the surface.
[0031] The specific steps include:
[0032] 1) pouring concrete to form a body 1 of the foundation;
[0033] 2) After the construction of the main body 1 is completed, the surface of the equipment foundation is cleaned and roughened to ensure that there is no water accumulation, slag accumulation or debris on the surface, and finally the bottom layer 3 is formed;
[0034] 3) Construction of plaster layer 4, glue cement slurry slurry: layered construction cement mortar painting construction, cement mortar ratio: cement: sand: water = 1:2.5:0.4, make ash cakes before painting (ash cakes are cement blocks used to control the building elevation and the flatness and verticality of the wall when plasterers paint or pouring the floor), make plastering thickness at each point according to the foundation conditions to control the ash cakes, and make vertical ribs according to the ash cakes. When decorating the building, the wall plastering area is large. Before plastering, use mortar to make small ash cakes (also called dotting) on the wall at a certain interval, and then continue to use mortar to make one or several ash bars (generally the interval is not more than 1.5m) along the vertical and horizontal directions of the small ash cakes to control the plastering thickness and flatness. The top surface of the main body 1 of the equipment foundation is sloped as required (slopeing refers to building a certain gentle slope in the designed drainage direction to guide the rainwater on the roof in an organized manner to the rainwater drainage system of the building and the city. This method of forming the roof slope is called building slope, material slope or pad slope), with a smooth slope and no water accumulation; if the equipment foundation has an arc, ensure that the plastering thickness of each plane within the arc range is consistent. Cement mortar is constructed in two layers to prevent cracking caused by excessive thickness in one construction. When constructing each layer of plastering, use a wooden trowel to fully compact, rub and flatten the mortar;
[0035] 4) The copper strip 2 is embedded in each corner of the body 1. The end cut of the copper strip 2 should be flat, the copper strip 2 should be installed firmly and straight, the splicing should be tight, and the arc part should be bent before embedding;
[0036] 5) Construction of the surface layer 5, the surface mortar is applied and compacted with a wooden trowel, and then a special mold is used to shape and trim the surface and finish the surface. After the surface mortar is cured, the surface should be flat and without indentations, the corners should be square and straight, and the arcs should be consistent. After the painting is completed, watering or covering should be carried out in time for maintenance;
[0037] 6) After the surface layer is constructed and finished, pour 1mm pure cement slurry and protect the finished product of the clear water surface. Cover it with film, woven cloth or building blanket to prevent permanent defects caused by pollution, scratches and damage.
[0038] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A construction method for a copper strip-embedded concrete equipment foundation, characterized in that: include: 1) A body (1) is cast with concrete to form a foundation, wherein the body (1) is a square column; the bottom of the body (1) has a first corner (11), and the top of the body (1) has a second corner (12); 2) cleaning the surface of the body (1) and roughening the surface to form a bottom layer (3); 3) constructing a plaster layer (4), applying cement mortar in layers to form a plaster layer (4); the cement mortar ratio of the plaster layer (4) is: cement: sand: water = 1:2.5:0.4; making a plastering thickness at each point to control the plaster cake according to the foundation conditions, and implanting vertical ribs according to the plaster cake; Before plastering, small plaster cakes are made on the wall at a certain interval with mortar, and then one or more plaster ribs are made along the small plaster cakes in the vertical and horizontal directions with mortar to control the plastering thickness and flatness; the top surface of the main body (1) is sloped according to requirements; the plastering layer (4) is divided into two layers of plastering, and when each layer of plastering is constructed, the mortar is fully compacted, rubbed and smoothed with a wooden trowel; 4) A copper bar (2) is embedded at the first corner (11) and the second corner (12); the copper bar (2) is L-shaped with a corner; 5) Construction of finishing layer (5): After the surface mortar is compacted with a wooden trowel, a special mold is used to shape and finish the surface; 6) After the surface layer is constructed and finished, pour a layer of pure cement slurry, protect the finished product of the clear water surface, cover it with film, woven cloth or building blanket; complete the construction.
Citation Information
Patent Citations
Reinforced concrete stair step cement mortar surface layer plastering construction structure
CN203347126U
Equipment foundations corner protection device
CN205742254U
Drainage type tower crane foundation structure
CN210216493U
Copper bar edge-embedded concrete equipment foundation
CN217840083U