A method, device and electronic device for rounding the single-digit number of market demand

Through the calculation of the type of single-mand number and comprehensive priority of market demand, efficient and orderly mand number compilation is achieved, solving the high cost and time consumption problems of the existing mand number compilation method, ensuring that the product is shipped on time.

CN115131073BActive Publication Date: 2025-07-29创优数字科技(广东)有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210867453.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-21
Publication Date
2025-07-29
Estimated Expiration
2042-07-21

AI Technical Summary

Technical Problem

The existing method of finishing the last-digit number is costly, has a lot of personnel, is time-consuming, is difficult to carry out on a large scale, and is prone to product expiration due to failure to process it in time.

Method used

By obtaining the mantissa type of market demand orders, calculate the mantissa of each market demand order, determine the comprehensive priority based on the mantissa, compose the mantissa according to the priority, and use the mantissa type and resource number for orderly allocation.

Benefits of technology

It achieves no need for a large amount of manpower intervention, reduces labor costs and time, handles the final numbers in a timely manner, avoids product expiration, and ensures on-time delivery.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115131073B_ABST
    Figure CN115131073B_ABST
Patent Text Reader

Abstract

The present invention discloses a method, device and electronic device for rounding the mantissa of market demand sheets, which are used to solve the problems of high cost, large number of input personnel, long time consumption, difficulty in large-scale implementation, and easy expiration of products due to failure to process the mantissa in time in the existing mantissa rounding method. The present invention includes: obtaining market demand sheets of a preset product and determining the mantissa type of the preset product; calculating the mantissas of the market demand sheets corresponding to the mantissa type; determining the comprehensive priority of each market demand sheet according to the mantissa; and performing mantissa rounding on each market demand sheet according to the comprehensive priority.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of product allocation, and particularly to a method, device and electronic device for rounding the mantissa of a market demand list. Background Art

[0002] In actual production, in each link from demand placement, production, procurement and receipt of goods, warehousing management to goods outbound, mantissas may occur. The amount of mantissas is related to enterprise cost control and the capital recovery cycle. Especially for businesses facing overseas markets, mantissas pose challenges to enterprise management. The mantissa problems faced by enterprises mainly focus on three points: First, the mantissa does not meet the full case requirement and cannot be shipped normally; second, there are orders from multiple countries for the same product, resulting in mantissas existing in multiple markets and it is difficult to control the growth of mantissas; third, it is difficult to predict mantissas in advance, resulting in the inability to intervene as early as possible.

[0003] Currently, most enterprises only discover the existence of mantissas during regular inventory checks, and then determine whether they can be filled to a multiple of the full case through requisition or manual judgment. If possible, they are filled to the full case through allocation and then sent to customers.

[0004] However, the method of discovering mantissas through regular inventory checks and then manually calculating and judging whether the mantissas can be filled to a multiple of the full case according to the shipping specification requirements has high costs, requires a large number of personnel, takes a long time, is difficult to carry out on a large scale, and is prone to problems such as product expiration due to the failure to process mantissas in a timely manner. Summary of the Invention

[0005] The present invention provides a method, device and electronic device for rounding the mantissa of a market demand list, which are used to solve the problems of high cost, large number of personnel input, long time consumption, difficulty in large-scale implementation, and easy product expiration due to the failure to process mantissas in a timely manner in the existing mantissa rounding method.

[0006] The present invention provides a method for rounding the mantissa of a market demand list, including:

[0007] Obtaining the market demand list of a preset product and determining the mantissa type of the preset product;

[0008] Calculating the mantissas of the respective market demand lists corresponding to the mantissa type;

[0009] Determining the comprehensive priority of the respective market demand lists according to the mantissas;

[0010] Rounding the mantissas of the respective market demand lists according to the comprehensive priority.

[0011] Optionally, the step of calculating the mantissas of the respective market demand lists corresponding to the mantissa type includes:

[0012] Obtain the quantity of owned resources and the shipping specifications of each of the market demand orders corresponding to the mantissa type;

[0013] Calculate the remainder of the quantity of owned resources divided by the shipping specification to obtain the mantissa of each market demand order.

[0014] Optionally, the step of determining the comprehensive priority of each market demand order according to the mantissa includes:

[0015] Calculate the ratio of the mantissa of each market demand order to the shipping specification to obtain the mantissa percentage of each market demand order;

[0016] Determine the first priority of each market demand order according to the size of the mantissa percentage;

[0017] Sort the shipping specifications of the market demand orders with the same first priority to determine the second priority of the market demand orders with the same first priority;

[0018] Obtain the quantity of the first unowned resources of the business unit to which the market demand orders with the same second priority belong;

[0019] Sort the market demand orders with the same second priority according to the size of the quantity of the first unowned resources to obtain the third priority of the market demand orders with the same second priority;

[0020] Obtain the market priority of the market demand orders with the same third priority;

[0021] Determine the comprehensive priority of each market demand order according to the first priority, the second priority, the third priority, and the market priority.

[0022] Optionally, the step of performing mantissa rounding on each market demand order according to the comprehensive priority includes:

[0023] Determine the unprocessed market demand orders among all the market demand orders;

[0024] Take the unprocessed market demand order with the highest comprehensive priority as the transfer-in party;

[0025] Perform mantissa rounding on the transfer-in party;

[0026] When the rounding fails, adjust the comprehensive priority of the transfer-in party to the lowest priority and return to the step of taking the unprocessed market demand order with the highest comprehensive priority as the transfer-in party;

[0027] When the rounding is successful, retain the rounding result and return to the step of taking the unprocessed market demand order with the highest comprehensive priority as the transfer-in party;

[0028] When there are no unprocessed market demand orders among all the said market demand orders, output all the rounding results.

[0029] Optionally, the step of rounding the mantissa of the transfer-in party includes:

[0030] Obtain the quantity of the second ownerless resources in the same warehouse of the same business unit to which the transfer-in party belongs;

[0031] When the quantity of the second ownerless resources is not less than the mantissa of the transfer-in party, use the quantity of the second ownerless resources to round the mantissa of the transfer-in party to obtain the rounding result.

[0032] Optionally, it further includes:

[0033] When the quantity of the second ownerless resources is less than the mantissa of the transfer-in party, calculate the first difference between the quantity of the second ownerless resources and the mantissa of the transfer-in party;

[0034] Obtain the quantity of the third ownerless resources in the non-same warehouse of the same business unit to which the transfer-in party belongs, and the quantity of the third ownerless resources meets the preset specification requirements;

[0035] When the quantity of the third ownerless resources is not less than the first difference, use the quantity of the second ownerless resources and the quantity of the third ownerless resources to round the mantissa of the transfer-in party to obtain the rounding result.

[0036] Optionally, it further includes:

[0037] When the quantity of the third ownerless resources is less than the first difference, calculate the second difference between the quantity of the third ownerless resources and the first difference;

[0038] Obtain the quantity of the fourth ownerless resources of the associated business unit of the transfer-in party, and the quantity of the fourth ownerless resources meets the preset specification requirements;

[0039] When the quantity of the fourth ownerless resources is not less than the second difference, use the quantity of the second ownerless resources, the quantity of the third ownerless resources and the quantity of the fourth ownerless resources to round the mantissa of the transfer-in party to obtain the rounding result.

[0040] Optionally, it further includes:

[0041] When the quantity of the fourth ownerless resources is less than the second difference, calculate the third difference between the quantity of the fourth ownerless resources and the second difference;

[0042] In reverse order of the comprehensive priority, sequentially take the market demand orders with uncompleted mantissa rounding as the transfer-out parties, and determine whether the sum of the mantissas of all the transfer-out parties is not less than the third difference;

[0043] If not, it is determined that the rounding fails. If so, it is determined that the rounding is successful, and the second unowned resource quantity, the third unowned resource quantity, the fourth unowned resource quantity, and the mantissa of the transferor are used to perform mantissa rounding on the transferee.

[0044] The present invention also provides a device for rounding the mantissa of a market demand list, including:

[0045] A mantissa type determination module, configured to obtain a market demand list of a preset product and determine the mantissa type of the preset product;

[0046] A mantissa calculation module, configured to calculate the mantissa of each of the market demand lists corresponding to the mantissa type;

[0047] A comprehensive priority determination module, configured to determine the comprehensive priority of each of the market demand lists according to the mantissa;

[0048] A mantissa rounding module, configured to perform mantissa rounding on each of the market demand lists according to the comprehensive priority.

[0049] The present invention also provides an electronic device, which includes a processor and a memory:

[0050] The memory is used to store program codes and transmit the program codes to the processor;

[0051] The processor is configured to execute the method for rounding the mantissa of a market demand list as described in any one of the above according to the instructions in the program codes.

[0052] As can be seen from the above technical solutions, the present invention has the following advantages: First, the present invention obtains the corresponding mantissa of the market demand list of the preset product to be rounded according to the mantissa type, so as to perform rounding on the market demand list according to the mantissa type, so as to avoid the interference of the product mantissas of different mantissa types on the mantissa rounding of the market demand list. Then, according to the mantissas of each market demand list, the comprehensive priority of each market demand list is determined, so as to perform mantissa rounding on each market demand list according to the comprehensive priority, and the mantissa rounding of each market demand list can be carried out in an orderly manner, and the important market demand lists can be rounded in time, avoiding losses caused by inability to ship due to incomplete mantissas. In addition, the present invention does not require too much human intervention, reduces the labor cost and the time required for mantissa rounding, can process the mantissa in time, and avoids the occurrence of product expiration. Description of the Drawings

[0053] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings required for the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other accompanying drawings can be obtained based on these drawings.

[0054] Figure 1 It is a flowchart of the steps of a market demand single-digit rounding method provided by an embodiment of the present invention;

[0055] Figure 2 It is a flowchart of the steps of a market demand single-digit rounding method provided by another embodiment of the present invention;

[0056] Figure 3 It is a structural block diagram of a market demand single-digit rounding device provided by an embodiment of the present invention. Detailed implementation manners

[0057] The embodiments of the present invention provide a market demand single-digit rounding method, device and electronic device, which are used to solve the problems of high cost, many input personnel, long time consumption, difficulty in large-scale implementation, and easy expiration of products due to failure to process the mantissa in time in the existing mantissa rounding method.

[0058] To make the invention purpose, features and advantages of the present invention more obvious and understandable, the following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the embodiments described below are only some embodiments of the present invention, rather than all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.

[0059] Please refer to Figure 1 , Figure 1 It is a flowchart of the steps of a market demand single-digit rounding method provided by an embodiment of the present invention.

[0060] A market demand single-digit rounding method provided by the present invention may specifically include the following steps:

[0061] Step 101, obtain the market demand list of the preset product and determine the mantissa type of the preset product;

[0062] A market demand form refers to a form generated by a product supplier based on a customer's purchase document, which reflects the customer's purchase quantity. The market demand form records the types, names, required quantities, required times, shipment specifications, inventory quantities, quantities on order, etc. of the products purchased by the customer. Generally speaking, the sum of the inventory quantity and the quantity on order will roughly equal the required quantity of the product (taking into account the reduction of the quantity on order and the inventory quantity due to spot checks, product withdrawals, etc., there will be a certain difference between the sum of the inventory quantity and the quantity on order and the required quantity of the product), and the inventory quantity and the quantity on order will change with the production progress of the product manufacturer.

[0063] In the embodiments of the present invention, the tail number refers to the quantity of inventory or quantity on order on the market demand form that does not meet an integer multiple of the shipment specification.

[0064] The tail number types can include the quantity on order tail number and the inventory tail number. The quantity on order tail number refers to the remainder of the planned quantity of the product to be produced divided by the shipment specification. The inventory tail number refers to the remainder of the quantity of the product that has been returned to the warehouse divided by the shipment specification.

[0065] In actual production, the quantity on order tail number and the inventory tail number are dynamically changing. When some of the products planned to be produced are completed and returned to the warehouse, the quantity on order and the inventory quantity of the product will change. Correspondingly, the inventory tail number and the quantity on order tail number of the product will also change. For example, even if the purchase order given by an enterprise to the upstream product manufacturer meets an integer multiple of the shipment specification, in each link of the product's return to the warehouse, due to factors such as spot checks, the actual products returned to the warehouse are no longer an integer multiple of the shipment specification, so it becomes the inventory tail number. And if an enterprise splits the required quantity of the product in the market demand form into multiple purchase orders and gives them to the product manufacturer, the inventory tail number will be generated in each return process.

[0066] It should be noted that since the quantity on order tail number is the tail number of the unproduced product and the inventory tail number is the tail number of the product that has been produced and is in stock, when calculating the tail numbers of a preset product in each market demand form, it is necessary to calculate the quantity on order tail number and the inventory tail number of each market demand form respectively. That is, when obtaining the market demand form of the preset product, it is necessary to calculate the corresponding tail numbers according to the tail number types that need to calculate the tail numbers.

[0067] Step 102, calculate the tail numbers of each market demand form corresponding to the tail number type;

[0068] After obtaining the market demand form, the quantity on order tail number and / or the inventory tail number of each market demand form can be calculated according to the shipment specification recorded on the market demand form.

[0069] Assume that the inventory quantity of a market demand order is 110 product units, the order quantity is 80 product units, and the shipment specification is 50 product units. Then the remaining inventory of this market demand order is 10 product units, and the remaining order quantity is 30 product units. 40 product units and 20 product units need to be replenished respectively.

[0070] Step 103: Determine the comprehensive priority of each market demand order according to the remaining quantity.

[0071] Considering that the remaining quantities of different market demand orders are different, there will be differences in the order of rounding up the remaining quantities for different market demand orders. Therefore, in order to avoid confusion during the process of rounding up the remaining quantities, after determining the remaining quantities of each market demand order, the comprehensive priority of each market demand order can be determined according to the remaining quantities of each market demand order.

[0072] It should be noted that since there may be two situations of remaining inventory and remaining order quantity for market demand orders, when setting the comprehensive priority for market demand orders, a comprehensive priority needs to be calculated respectively based on the remaining inventory and the remaining order quantity to perform the rounding up of the remaining inventory and the remaining order quantity respectively.

[0073] It should be noted that in order to avoid causing chaos in the allocation of products by rounding up the remaining quantities of multiple market demand orders for a single product at the same time, in the embodiments of the present invention, each market demand order has only one comprehensive priority under one type of remaining quantity. At the same time, the comprehensive priorities of each market demand order under the same type of remaining quantity are different from each other.

[0074] Step 104: Round up the remaining quantities of each market demand order according to the comprehensive priority.

[0075] After determining the comprehensive priority of each market demand order, the remaining quantities of each market demand order can be rounded up according to the comprehensive priority.

[0076] The present invention first obtains the corresponding remaining quantity of the market demand order of the preset product to be rounded up according to the type of remaining quantity, so as to round up the market demand order according to the type of remaining quantity, so as to avoid the interference of the remaining quantities of products of different types of remaining quantities on the rounding up of the remaining quantities of market demand orders. Then, according to the remaining quantities of each market demand order, the comprehensive priority of each market demand order is determined, so as to round up the remaining quantities of each market demand order according to the comprehensive priority, which can round up the remaining quantities of each market demand order in an orderly manner, and can round up the remaining quantities of important market demand orders in time, avoiding losses caused by inability to ship due to incomplete remaining quantities. In addition, the present invention does not require too much human intervention, reduces the labor cost and the time required for rounding up the remaining quantities, can process the remaining quantities in time, and avoids the occurrence of product expiration.

[0077] Please refer to Figure 2 ,Figure 2 The flowchart of steps of a method for rounding the mantissa of a market demand list provided by another embodiment of the present invention. This embodiment is further refined and supplemented on the basis of any of the above embodiments. Specifically, it may include the following steps:

[0078] Step 201: Obtain the market demand list of a preset product and determine the mantissa type of the preset product;

[0079] Step 201 is the same as step 101. For specific details, reference may be made to the description of step 101, which will not be elaborated here.

[0080] Step 202: Obtain the quantity of owned resources and the shipping specification of each market demand list corresponding to the mantissa type;

[0081] In the embodiment of the present invention, according to different mantissa types, the quantity of owned resources can be divided into the quantity of owned in - list and the quantity of owned inventory.

[0082] The quantity of owned in - list refers to the planned production quantity directly bound to the market demand list.

[0083] The quantity of owned inventory refers to the inventory quantity directly bound to the market demand list.

[0084] The shipping specification refers to the minimum shipping unit required by the market corresponding to the market demand list, such as medium package, full box, etc.

[0085] Step 203: Calculate the remainder of the quantity of owned resources divided by the shipping specification to obtain the mantissa of each market demand list;

[0086] After obtaining the quantity of owned resources according to the mantissa type, the remainder of the quantity of owned resources divided by the shipping specification can be calculated to determine the mantissa of the market demand list.

[0087] The specific process is as follows:

[0088] The mantissa in - list = mod(quantity of owned in - list of the market demand list / shipping specification of the market demand list);

[0089] The mantissa of inventory = mod(quantity of owned inventory of the market demand list / shipping specification of the market demand list).

[0090] If the mantissa is equal to 0, it indicates that there is no corresponding mantissa for the market demand list.

[0091] Step 204: Determine the comprehensive priority of each market demand list according to the mantissa;

[0092] Considering that the mantissas of different market demand orders are different, there will be differences in the order of mantissa rounding for different market demand orders. Therefore, in order to avoid confusion during the mantissa rounding process, after determining the mantissas of each market demand order, the comprehensive priority of each market demand order can be determined according to the mantissas of each market demand order.

[0093] In one example, the steps of determining the comprehensive priority of each market demand order according to the mantissa may include the following sub-steps:

[0094] S41, Calculate the ratio of the mantissa of each market demand order to the shipping specification to obtain the mantissa percentage of each market demand order;

[0095] S42, Determine the first priority of each market demand order according to the size of the mantissa percentage;

[0096] S43, Sort the shipping specifications of market demand orders with the same first priority to determine the second priority of market demand orders with the same first priority;

[0097] S44, Obtain the first unowned resource quantity of the business unit to which the market demand orders with the same second priority belong;

[0098] S45, Sort the market demand orders with the same second priority according to the size of the first unowned resource quantity to obtain the third priority of market demand orders with the same second priority;

[0099] S46, Obtain the market priority of market demand orders with the same third priority;

[0100] S47, Determine the comprehensive priority of each market demand order according to the first priority, second priority, third priority, and market priority.

[0101] In the embodiments of the present invention, the comprehensive priority of each market demand order can be determined by the first priority, second priority, third priority, and market priority of each market demand order.

[0102] First, calculate the ratio of the mantissa of each market demand order to the shipping specification to calculate the mantissa percentage of each market demand order (which can be divided into in-order mantissa percentage and inventory mantissa percentage according to different mantissa types). Then, perform the first sorting of each market demand order according to the mantissa percentage to obtain the first priority of each market demand order.

[0103] Then, it is determined whether there are market demand orders with the same first priority. If not, the first priority is the comprehensive priority of each market demand order. If so, for the market demand orders with the same first priority, they are sorted according to the shipping specifications of each market demand order. The smaller the shipping specification of a market demand order, the higher its second priority. For example, if the shipping specifications are divided into medium packages and full cases, and the product capacity of a medium package is smaller than that of a full case, and several medium packages can be combined into a full case, then the second priority of a medium package will be higher than that of a full case.

[0104] Next, it is determined whether there are market demand orders with the same second priority. If not, the market demand orders are sorted according to the first priority and the second priority to obtain the comprehensive priority of each market demand order. If so, the quantity of the first unowned resources of the business unit to which the market demand orders with the same second priority belong is obtained. The market demand orders with the same second priority are sorted according to the size of the quantity of the first unowned resources to obtain the third priority of the market demand orders with the same second priority.

[0105] Among them, the business unit refers to the region corresponding to the market of the market demand order, and each market will be assigned to a region.

[0106] The quantity of unowned resources includes the quantity of unowned orders in progress and the quantity of unowned inventory. The quantity of unowned orders in progress refers to the planned production quantity that is not directly bound to the market demand order. The quantity of unowned inventory refers to the inventory quantity that is not directly bound to the market demand order.

[0107] After calculating the third priority of each market demand order, it can be judged whether there are market demand orders with the same third priority. If not, the market demand orders are sorted according to the first priority, the second priority, and the third priority to obtain the comprehensive priority of each market demand order. If so, the market priority of each market demand order is obtained, and then the market demand orders are sorted according to the first priority, the second priority, the third priority, and the market priority to obtain the comprehensive priority. Among them, the market priority refers to the priority of the market corresponding to the market demand order set in advance, and the priorities of each market are different from each other.

[0108] In a specific implementation, taking the tail number of the order in progress as an example, for the market demand orders with the tail number of the order in progress, the percentage of the tail number of the order in progress can be calculated according to the following formula:

[0109] When the single-tail number percentage = (the in-stock number of the single product in the market demand / the shipping specification of the market demand for a single product) %, for market demands with the same single-tail number percentage, the medium package has the highest market priority, followed by the full case; for multiple medium package market demands with the same single-tail number percentage, those with a larger number of unowned in-stock in the business unit to which each medium package market demand belongs are prioritized (each market demand is pre-assigned to a business unit); if the number of unowned in-stock is the same, then the one with the highest market priority is prioritized. Finally, the comprehensive priority of each market demand is obtained.

[0110] In one example, assume there are 10 market demands, A - J, for a certain product, and their single-tail number percentages are A: 90%, B - H: 80%, I - J: 70%; then the first priority of these market demands is A > B = C = D = E = F = G = H > I = J.

[0111] Among them, the first priorities of B - H are the same, and the first priorities of I - J are the same. Therefore, the second priorities of B - H and I - J need to be calculated separately according to the shipping specifications.

[0112] Assume the shipping specifications of B - J are: B - G: full case, H: medium package, I: medium package, J: full case.

[0113] Then the second priority of B - H is: H > B = C = D = E = F = G, and the second priority of I - J is I > J.

[0114] At this time, combining the first priority and the second priority, the priority ranking can be obtained as: A > H > B = C = D = E = F = G > I > J.

[0115] In the above priority ranking, B - G has the same second priority. Therefore, B - G needs to be further ranked according to the number of unowned in-stock in the business unit to obtain the third priority of B - G.

[0116] Assume the number of unowned in-stock of B - G are: B: 100, C - E: 60, F: 40, G: 30.

[0117] Then the third priority of B - G is: B > C = D = E > F > G.

[0118] At this time, combining the first priority, the second priority, and the third priority, the priority ranking can be obtained as A > H > B > C = D = E > F > G > I > J.

[0119] In the above priority ranking, C - E has the same third priority. At this time, it is necessary to re-rank by combining the market priorities of C - E.

[0120] Assume that the market priority of C - E is E > C > D. Then, considering the first priority, second priority, third priority, and market priority, the comprehensive priorities of each market demand order are as follows:

[0121] A > H > B > E > C > D > F > G > I > J.

[0122] It should be noted that the process of calculating the comprehensive priority of each market demand order based on the inventory tail number is the same as the above process of calculating the comprehensive priority of each market demand order based on the in - order tail number. Specifically, it can refer to the above process of calculating the comprehensive priority of each market demand order based on the in - order tail number, which will not be elaborated here.

[0123] Step 205, perform tail number rounding for each market demand order according to the comprehensive priority.

[0124] After determining the comprehensive priority of each market demand order, tail number rounding can be performed on each market demand order according to the comprehensive priority.

[0125] In one example, the steps of performing tail number rounding for each market demand order according to the comprehensive priority may include the following sub - steps:

[0126] S51, determine the unprocessed market demand orders among all market demand orders;

[0127] S52, take the unprocessed market demand order with the highest comprehensive priority as the receiving party;

[0128] S53, perform tail number rounding on the receiving party;

[0129] The receiving party refers to the market demand order that needs to receive a certain quantity of products to achieve tail number rounding.

[0130] Tail number rounding means completing the tail number so that the in - order quantity or inventory quantity of the market demand order after completion meets an integer multiple of the shipping specification.

[0131] After determining the comprehensive priority of each market demand order, according to the comprehensive priority, all market demand orders can be traversed, and the unprocessed market demand orders are successively taken as the receiving parties for tail number rounding. Among them, the unprocessed market demand order refers to the market demand order that has not been used as a receiving party and has not been used as a shipping party. That is, even if a certain market demand order has not been used as a receiving party for tail number rounding, but it has provided products as a shipping party when other market demand orders are performing tail number rounding, it is not an unprocessed market demand order.

[0132] In one example, the steps of performing tail number rounding on the receiving party may include:

[0133] S5301, obtain the quantity of the second unowned resources in the warehouse of this business unit to which the receiving party belongs;

[0134] S5302. When the quantity of the second ownerless resource is not less than the mantissa of the recipient, use the quantity of the second ownerless resource to round up the mantissa of the recipient to obtain the rounding result.

[0135] The warehouse of this business unit, refers to the same warehouse under the same business unit. That is, the warehouse used by this business unit to which the market demand order belongs to store the resources of this market demand order.

[0136] The quantity of the second ownerless resource can be divided into the quantity of ownerless in the order and the quantity of ownerless inventory according to different mantissa types.

[0137] In the embodiment of the present invention, after determining the recipient, the quantity of the second ownerless resource in the warehouse of this business unit to which the recipient belongs can be obtained to round up the mantissa of the recipient. When the quantity of the second ownerless resource is not less than the mantissa of the recipient, it indicates that the quantity of the second ownerless resource can complete the rounding up of the mantissa of the recipient. At this time, the quantity of the second ownerless resource can be used to round up the mantissa of the recipient to obtain the rounding result. The rounding result indicates that the mantissa rounding of this market demand order has been completed.

[0138] Furthermore, the steps of rounding up the mantissa of the recipient may further include:

[0139] S5303. When the quantity of the second ownerless resource is less than the mantissa of the recipient, calculate the first difference between the quantity of the second ownerless resource and the mantissa of the recipient;

[0140] S5304. Obtain the quantity of the third ownerless resource in the warehouse other than the warehouse of this business unit to which the recipient belongs, and the quantity of the third ownerless resource meets the preset specification requirements;

[0141] S5305. When the quantity of the third ownerless resource is not less than the first difference, use the quantity of the second ownerless resource and the quantity of the third ownerless resource to round up the mantissa of the recipient to obtain the rounding result.

[0142] The warehouse other than the warehouse of this business unit refers to a different warehouse under the same business unit as the warehouse of this business unit.

[0143] The preset specification requirements can be medium packages, full boxes, or other specifications, and can be specifically set according to actual needs.

[0144] In a specific implementation, when the quantity of the second ownerless resource is less than the mantissa of the recipient, it indicates that the quantity of the second ownerless resource cannot complete the mantissa rounding of the market demand order, and the insufficient part needs to be supplemented from other sources. In the embodiment of the present invention, the first difference between the quantity of the second ownerless resource and the mantissa of the recipient can be calculated as the part that needs to be supplemented from other sources.

[0145] In one example, it is possible to choose to complete the first difference part by the quantity of the third ownerless resources in the business unit to which the receiving party belongs but not in the same warehouse. When the quantity of the third ownerless resources is not less than the first difference, it indicates that the quantity of the third ownerless resources can complete the filling of the first difference part. Therefore, at this time, all the second ownerless resources in the same warehouse of this business unit and some / all of the third ownerless resources not in the same warehouse of this business unit can be used to round up the mantissa of the receiving party to obtain the rounding result.

[0146] Further, the steps of rounding up the mantissa of the receiving party may further include:

[0147] S5306, when the quantity of the third ownerless resources is less than the first difference, calculate the second difference between the quantity of the third ownerless resources and the first difference;

[0148] S5307, obtain the quantity of the fourth ownerless resources of the associated business unit of the receiving party, and the quantity of the fourth ownerless resources meets the preset specification requirements;

[0149] S5308, when the quantity of the fourth ownerless resources is not less than the second difference, use the quantity of the second ownerless resources, the quantity of the third ownerless resources, and the quantity of the fourth ownerless resources to round up the mantissa of the receiving party to obtain the rounding result.

[0150] The associated business unit of the receiving party refers to the business unit that does not have the same warehouse as the receiving party but stores the same products.

[0151] In a specific implementation, when the quantity of the third ownerless resources is less than the first difference, it indicates that the quantity of the third ownerless resources cannot complete the filling of the first difference of the market demand order, and other sources are needed to complete the insufficient part. In the embodiment of the present invention, the second difference between the quantity of the third ownerless resources and the first difference can be calculated as the part that needs to be completed by other sources.

[0152] In one example, it is possible to choose to complete the second difference part by the quantity of the fourth ownerless resources of the associated business unit of the receiving party. When the quantity of the fourth ownerless resources is not less than the second difference, it indicates that the quantity of the fourth ownerless resources can complete the filling of the second difference part. Therefore, at this time, all the second ownerless resources in the same warehouse of this business unit, all the third ownerless resources not in the same warehouse of this business unit, and some / all of the fourth ownerless resources of the associated business unit of the receiving party can be used to round up the mantissa of the receiving party to obtain the rounding result.

[0153] Further, the steps of rounding up the mantissa of the receiving party may further include:

[0154] S5309, when the quantity of the fourth ownerless resources is less than the second difference, calculate the third difference between the quantity of the fourth ownerless resources and the second difference;

[0155] S5310. Sequentially take the market demand orders with uncompleted mantissas rounded up in reverse order of the comprehensive priority as the transfer-out parties, and determine whether the mantissa of the transfer-out party is not less than the third difference;

[0156] S5311. If not, determine that the rounding up fails; if so, determine that the rounding up is successful, and use the second unowned resource quantity, the third unowned resource quantity, the fourth unowned resource quantity, and the mantissa of the transfer-out party to perform mantissa rounding up for the transfer-in party.

[0157] In a specific implementation, when the fourth unowned resource quantity is less than the second difference, it indicates that the third unowned resource quantity cannot complete the complement of the second difference of the market demand order, and the insufficient part needs to be completed through other sources. In the embodiments of the present invention, the third difference between the fourth unowned resource quantity and the second difference can be calculated as the part that needs to be completed by other sources.

[0158] In an example, the market demand orders with uncompleted mantissas rounded up can be taken in reverse order of the comprehensive priority, and the mantissa of the transfer-out party is used to complete the complement of the third difference part. When the sum of the mantissas of all market demand orders with uncompleted mantissas rounded up is less than the third difference, it indicates that even by adding the mantissas of all market demand orders with uncompleted mantissas rounded up, the mantissa rounding up of the current transfer-in party cannot be completed. At this time, it is determined that the current transfer-in party cannot complete the mantissa rounding up, and the rounding up fails, and no mantissa rounding up is performed on it.

[0159] If the sum of the mantissas of all market demand orders with uncompleted mantissas rounded up is not less than the third difference, it indicates that by adding the mantissas of some / all market demand orders with uncompleted mantissas rounded up, the mantissa rounding up of the current transfer-in party can be completed. At this time, the mantissa of the market demand order with uncompleted mantissa rounded up can be used to complete the complement of the third difference in reverse order of the comprehensive priority to finally achieve the mantissa rounding up of the transfer-in party.

[0160] S54. When the rounding up fails, adjust the comprehensive priority of the transfer-in party to the lowest priority, and return to the step of taking the market demand order with the highest comprehensive priority among the unprocessed market demand orders as the transfer-in party;

[0161] In the embodiments of the present invention, when the mantissa rounding up of the transfer-in party fails, no mantissa rounding up is performed on the transfer-in party, its mantissa is retained, its comprehensive priority is adjusted to the lowest priority, and it is marked as a processed market demand order. Then return to step S52 to perform the rounding up of the next market demand order.

[0162] S55. When the rounding up is successful, retain the rounding up result, and return to the step of taking the market demand order with the highest comprehensive priority among the unprocessed market demand orders as the transfer-in party;

[0163] In an embodiment of the present invention, when the rounding is successful, the rounding result can be retained, and then step S52 is returned to perform the rounding of the next market demand order.

[0164] S56. When there are no unprocessed market demand orders among all market demand orders, output all rounding results.

[0165] When there are no unprocessed market demand orders among all market demand orders, that is, each market demand order has appeared at least as an incoming party or an outgoing party, stop performing the mantissa rounding and output all market demand orders that have completed the mantissa rounding.

[0166] For example, assume there are 5 market demand orders A - E, and market demand order A has the highest comprehensive priority. First, it is used as the incoming party to perform the mantissa rounding. After calculation, it is found that the mantissa rounding of market demand order A cannot be completed. Then, the comprehensive priority of market demand order A is adjusted to the lowest and given to other market demand orders as the outgoing party for mantissa rounding. Then, the mantissa rounding of market demand order B is performed. The rounding is cycled according to the comprehensive priority until it stops when encountering the first market demand order that has already been the outgoing party (at this time, market demand order A is also the outgoing party).

[0167] Another example, assume there are 3 market demand orders F - H. The market demand order F with the highest comprehensive priority has been filled as the incoming party, and the market demand order H with the lowest comprehensive priority has been used as the outgoing party to help market demand order F perform the mantissa rounding. Then, the mantissa rounding of the market demand order G with the second - highest comprehensive priority is performed. After calculation, it is found that the mantissa of market demand order G cannot be filled to meet the shipping specification. Then, the comprehensive priority of market demand order G is adjusted to the lowest. Then, it is found that the market demand order H with the third - highest comprehensive priority has participated in the mantissa rounding of market demand order F as the outgoing party, so the mantissa rounding operation stops, and the market demand order F that has completed the mantissa rounding is output.

[0168] The present invention first obtains the corresponding mantissas of the market demand orders of the preset products to be rounded by mantissa type, so that the market demand orders can be rounded according to the mantissa type, avoiding the interference of product mantissas of different mantissa types on the mantissa rounding of market demand orders. Then, according to the mantissas of each market demand order, the comprehensive priorities of each market demand order are determined, and the mantissa rounding of each market demand order is performed according to the comprehensive priorities, which can perform the mantissa rounding of each market demand order in an orderly manner, and can perform the mantissa rounding of important market demand orders in a timely manner, avoiding losses caused by inability to ship due to incomplete mantissas. In addition, the present invention does not require too much human intervention, reduces the labor cost and the time required for mantissa rounding, can process the mantissa in a timely manner, and avoids the occurrence of product expiration.

[0169] Please refer to Figure 3 , Figure 3The structural block diagram of a market demand single-digit rounding device provided by an embodiment of the present invention.

[0170] An embodiment of the present invention provides a market demand single-digit rounding device, including:

[0171] A mantissa type determination module 301, configured to obtain a market demand list of a preset product and determine the mantissa type of the preset product;

[0172] A mantissa calculation module 302, configured to calculate the mantissa of each market demand list corresponding to the mantissa type;

[0173] A comprehensive priority determination module 303, configured to determine the comprehensive priority of each market demand list according to the mantissa;

[0174] A mantissa rounding module 304, configured to round the mantissa of each market demand list according to the comprehensive priority.

[0175] In the embodiment of the present invention, the mantissa calculation module 302 includes:

[0176] A main resource quantity and shipping specification acquisition sub-module, configured to obtain the main resource quantity and shipping specification of each market demand list corresponding to the mantissa type;

[0177] A mantissa calculation sub-module, configured to calculate the remainder of the main resource quantity and the shipping specification to obtain the mantissa of each market demand list.

[0178] In the embodiment of the present invention, the comprehensive priority determination module 303 includes:

[0179] A mantissa percentage calculation sub-module, configured to calculate the ratio of the mantissa of each market demand list to the shipping specification to obtain the mantissa percentage of each market demand list;

[0180] A first priority calculation sub-module, configured to determine the first priority of each market demand list according to the magnitude of the mantissa percentage;

[0181] A second priority calculation sub-module, configured to sort the shipping specifications of market demand lists with the same first priority to determine the second priority of market demand lists with the same first priority;

[0182] A first non-main resource quantity acquisition sub-module, configured to obtain the first non-main resource quantity of the business unit to which the market demand lists with the same second priority belong;

[0183] A third priority calculation sub-module, configured to sort the market demand lists with the same second priority according to the magnitude of the first non-main resource quantity to obtain the third priority of market demand lists with the same second priority;

[0184] A market priority acquisition sub-module for acquiring the market priority of market demand orders with the same third priority;

[0185] A comprehensive priority calculation sub-module for determining the comprehensive priority of each market demand order according to the first priority, the second priority, the third priority, and the market priority.

[0186] In an embodiment of the present invention, the mantissa rounding module 304 includes:

[0187] An unprocessed market demand order determination sub-module for determining unprocessed market demand orders among all market demand orders;

[0188] An incoming party determination sub-module for taking the unprocessed market demand order with the highest comprehensive priority as the incoming party;

[0189] A mantissa rounding sub-module for rounding the mantissa of the incoming party;

[0190] A first return sub-module for, when the rounding fails, adjusting the comprehensive priority of the incoming party to the lowest priority and returning the step of taking the unprocessed market demand order with the highest comprehensive priority as the incoming party;

[0191] A second return sub-module for, when the rounding is successful, retaining the rounding result and returning the step of taking the unprocessed market demand order with the highest comprehensive priority as the incoming party;

[0192] A rounding result output sub-module for outputting all rounding results when there are no unprocessed market demand orders among all market demand orders.

[0193] In an embodiment of the present invention, the mantissa rounding sub-module includes:

[0194] A second ownerless resource quantity acquisition unit for acquiring the quantity of the second ownerless resources in the current warehouse of the current business unit to which the incoming party belongs;

[0195] A first mantissa rounding unit for, when the quantity of the second ownerless resources is not less than the mantissa of the incoming party, rounding the mantissa of the incoming party with the quantity of the second ownerless resources to obtain a rounding result.

[0196] In an embodiment of the present invention, the mantissa rounding sub-module further includes:

[0197] A first difference calculation unit for, when the quantity of the second ownerless resources is less than the mantissa of the incoming party, calculating a first difference between the quantity of the second ownerless resources and the mantissa of the incoming party;

[0198] A third ownerless resource quantity acquisition unit for acquiring the quantity of the third ownerless resources in a non-current warehouse of the current business unit to which the incoming party belongs, and the quantity of the third ownerless resources meets the preset specification requirements;

[0199] A second mantissa rounding unit, configured to perform mantissa rounding on the receiving party by using the second unowned resource quantity and the third unowned resource quantity to obtain a rounding result when the third unowned resource quantity is not less than the first difference.

[0200] In an embodiment of the present invention, the mantissa rounding sub-module further includes:

[0201] A second difference calculation unit, configured to calculate a second difference between the third unowned resource quantity and the first difference when the third unowned resource quantity is less than the first difference;

[0202] A fourth unowned resource quantity acquisition unit, configured to acquire a fourth unowned resource quantity of an associated business unit of the receiving party, and the fourth unowned resource quantity meets a preset specification requirement;

[0203] A third rounding result unit, configured to perform mantissa rounding on the receiving party by using the second unowned resource quantity, the third unowned resource quantity, and the fourth unowned resource quantity to obtain a rounding result when the fourth unowned resource quantity is not less than the second difference.

[0204] In an embodiment of the present invention, the mantissa rounding sub-module further includes:

[0205] A third difference calculation unit, configured to calculate a third difference between the fourth unowned resource quantity and the second difference when the fourth unowned resource quantity is less than the second difference;

[0206] A judgment unit, configured to sequentially use the market demand orders with uncompleted mantissa rounding as the sending party in reverse order of the comprehensive priority, and judge whether the mantissa sum of all sending parties is not less than the third difference;

[0207] A fourth mantissa rounding unit, configured to, if not, determine that the rounding fails, and if so, determine that the rounding is successful, and perform mantissa rounding on the receiving party by using the second unowned resource quantity, the third unowned resource quantity, the fourth unowned resource quantity, and the mantissa of the sending party.

[0208] An embodiment of the present invention further provides an electronic device, which includes a processor and a memory:

[0209] The memory is used to store program codes and transmit the program codes to the processor;

[0210] The processor is configured to execute the market demand order mantissa rounding method according to the instructions in the program codes.

[0211] Those skilled in the art can clearly understand that for the convenience and conciseness of description, the specific working processes of the above-described systems, devices, and units can refer to the corresponding processes in the foregoing method embodiments, and will not be described herein again.

[0212] Each embodiment in this specification is described in a progressive manner. Each embodiment focuses on the differences from other embodiments. For the same or similar parts among the embodiments, reference can be made to each other.

[0213] Those skilled in the art should understand that the embodiments of the present invention can be provided as methods, devices, or computer program products. Therefore, the embodiments of the present invention can take the form of completely hardware embodiments, completely software embodiments, or embodiments combining software and hardware aspects. Moreover, the embodiments of the present invention can take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0214] The embodiments of the present invention are described with reference to the flowcharts and / or block diagrams of methods, terminal devices (systems), and computer program products according to the embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to the processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing terminal devices to generate a machine, such that the instructions executed by the processor of the computer or other programmable data processing terminal devices generate a device for implementing the functions specified in Figure 1 one process or multiple processes and / or blocks Figure 1 one block or multiple blocks.

[0215] These computer program instructions can also be stored in a computer-readable memory that can direct a computer or other programmable data processing terminal device to work in a specific manner, such that the instructions stored in the computer-readable memory generate a manufactured article including an instruction device, and the instruction device implements the functions specified in Figure 1 one process or multiple processes and / or blocks Figure 1 one block or multiple blocks.

[0216] These computer program instructions can also be loaded onto a computer or other programmable data processing terminal device, such that a series of operation steps are executed on the computer or other programmable terminal device to generate a computer-implemented process. Thus, the instructions executed on the computer or other programmable terminal device provide steps for implementing the functions specified in Figure 1 one process or multiple processes and / or blocks Figure 1 one block or multiple blocks.

[0217] Although the preferred embodiments of the embodiments of the present invention have been described, those skilled in the art can make additional changes and modifications once they know the basic creative concept. Therefore, the appended claims are intended to be construed as including the preferred embodiments and all changes and modifications that fall within the scope of the embodiments of the present invention.

[0218] Finally, it should also be noted that in this text, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the term "comprising", "including" or any other variant thereof is intended to cover non-exclusive inclusion, so that a process, method, article or terminal device comprising a series of elements not only includes those elements, but also includes other elements not expressly listed, or also includes elements inherent to such process, method, article or terminal device. Without further limitation, an element defined by the statement "comprising an..." does not exclude the presence of additional identical elements in the process, method, article or terminal device comprising the element.

[0219] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that they can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements on some of the technical features; and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for rounding the single-digit mantissa of market demand, characterized in that, Including: Obtain the market demand list of a preset product and determine the mantissa type of the preset product; wherein, the mantissa type includes single mantissa and inventory mantissa; Calculate the mantissas of the respective market demand lists corresponding to the mantissa type; Determine the comprehensive priority of each market demand list according to the mantissa; Perform mantissa rounding on each market demand list according to the comprehensive priority; Wherein, the step of determining the comprehensive priority of each market demand list according to the mantissa includes: Calculate the ratio of the mantissa of each market demand list to the shipping specification to obtain the mantissa percentage of each market demand list; Determine the first priority of each market demand list according to the magnitude of the mantissa percentage; Sort the shipping specifications of the market demand lists with the same first priority to determine the second priority of the market demand lists with the same first priority; Obtain the first unowned resource quantity of the business unit to which the market demand lists with the same second priority belong; Sort the market demand lists with the same second priority according to the magnitude of the first unowned resource quantity to obtain the third priority of the market demand lists with the same second priority; Obtain the market priority of the market demand lists with the same third priority; Determine the comprehensive priority of each market demand list according to the first priority, the second priority, the third priority, and the market priority.

2. The method according to claim 1, wherein The step of calculating the mantissas of the respective market demand lists corresponding to the mantissa type includes: Obtain the owned resource quantity and shipping specification of each market demand list corresponding to the mantissa type; Calculate the remainder of the owned resource quantity divided by the shipping specification to obtain the mantissa of each market demand list.

3. The method according to any one of claims 1-2, characterized in that, The step of performing mantissa rounding on each market demand list according to the comprehensive priority includes: Determine the unprocessed market demand lists among all the market demand lists; Take the unprocessed market demand list with the highest comprehensive priority as the transfer-in party; Perform mantissa rounding on the transfer-in party; When the rounding fails, adjust the comprehensive priority of the transfer-in party to the lowest priority and return to the step of taking the unprocessed market demand list with the highest comprehensive priority as the transfer-in party; When the rounding is successful, retain the rounding result and return to the step of taking the unprocessed market demand list with the highest comprehensive priority as the transfer-in party; When there are no unprocessed market demand lists among all the market demand lists, output all the rounding results.

4. The method according to claim 3, characterized in that The step of performing mantissa rounding on the transfer-in party includes: Obtain the second unowned resource quantity of the main warehouse of the business unit to which the transfer-in party belongs; When the second unowned resource quantity is not less than the mantissa of the transfer-in party, use the second unowned resource quantity to perform mantissa rounding on the transfer-in party to obtain the rounding result.

5. The method according to claim 4, characterized in that, Also including: When the second unowned resource quantity is less than the mantissa of the transfer-in party, calculate the first difference between the second unowned resource quantity and the mantissa of the transfer-in party; Obtain the third unowned resource quantity of the non-main warehouse of the business unit to which the transfer-in party belongs, and the third unowned resource quantity meets the preset specification requirements; When the third number of unowned resources is not less than the first difference, the second number of unowned resources and the third number of unowned resources are used to round up the mantissa of the incoming party to obtain a rounded result.

6. The method according to claim 5, wherein Also includes: When the third number of unowned resources is less than the first difference, calculating a second difference between the third number of unowned resources and the first difference; Obtaining the number of the fourth unowned resources of the associated business unit of the transferee, where the number of the fourth unowned resources meets preset specification requirements; When the fourth number of unowned resources is not less than the second difference, the second number of unowned resources, the third number of unowned resources, and the fourth number of unowned resources are used to round up the mantissa of the incoming party to obtain a rounded result.

7. The method according to claim 6, wherein Also includes: When the fourth number of unowned resources is less than the second difference, calculating a third difference between the fourth number of unowned resources and the second difference; The market demand orders with unfinished rounded-off digits are selected as transfer-out parties in descending order of comprehensive priority, and it is determined whether the sum of the digits of all the transfer-out parties is not less than the third difference; If not, determine that the rounding fails; if so, determine that the rounding succeeds, and use the second unowned resource quantity, the third unowned resource quantity, the fourth unowned resource quantity and the mantissa of the transfer-out party to round the mantissa of the transfer-in party.

8. A market demand single-digit rounding device, characterized in that include: a tail number type determination module, configured to obtain a market demand list of a preset product and determine the tail number type of the preset product; a tail number calculation module, configured to calculate the tail number of each market demand order corresponding to the tail number type; wherein the tail number type includes the order tail number and the inventory tail number; A comprehensive priority determination module, configured to determine the comprehensive priority of each of the market demand orders according to the tail number; a decimal rounding module, configured to round the decimals of each market demand order according to the comprehensive priority; Among them, the comprehensive priority determination module includes: The tail digit percentage calculation submodule is used to calculate the ratio of the tail digit of each market demand order to the shipping specifications to obtain the tail digit percentage of each market demand order; A first priority calculation submodule, for determining the first priority of each market demand order according to the size of the tail percentage; A second priority calculation submodule is used to sort the shipping specifications of the market demand orders with the same first priority and determine the second priority of the market demand orders with the same first priority; The first unowned resource quantity acquisition submodule is used to obtain the first unowned resource quantity of the business unit to which the market demand order with the same second priority belongs; A third priority calculation submodule, configured to sort the market demand orders with the same second priority according to the quantity of the first unowned resources, to obtain a third priority of the market demand orders with the same second priority; A market priority acquisition submodule is used to obtain the market priority of market demand orders with the same third priority; The comprehensive priority calculation submodule is used to determine the comprehensive priority of each market demand order based on the first priority, the second priority, the third priority and the market priority.

9. An electronic device, characterized in that, The device includes a processor and a memory: The memory is used to store program code and transmit the program code to the processor; The processor is configured to execute the market demand single-digit rounding method according to any one of claims 1-7 based on the instructions in the program code.

Citation Information

Patent Citations

  • Information processing method, data processing system, medium and calculation device

    CN107392543A

  • Package recommendation method, device and system

    CN110135960A