A hole pipe structure and construction method for preventing wear and breakage of the weld of a freezing pipe joint
By arranging the orifice inner casing, outer casing and sealing mechanism between the frozen pipe and the orifice pipe, combined with the support rod and seal, the problem of wear and fracture of the frozen pipe joint weld joint is solved, and the stability and stability of the frozen pipe are achieved. Improvement of construction reliability.
Patent Information
- Application Number
- CN202210907420.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-29
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-07-29
AI Technical Summary
During the freezing construction process, frozen pipe joints are prone to wear and tear due to temperature changes and the entry of gravel into the gaps, affecting construction stability.
An orifice tube structure including an inner casing of the orifice, an outer casing of the orifice and a sealing mechanism is designed. The sealing mechanism and support rod prevent gravel from entering the gap, and seals and springs are used to seal the annular gap to avoid wear of the welding joint. .
It effectively avoids the wear and tear of the frozen pipe joint weld caused by gravel, and improves the stability and construction reliability of the frozen pipe.
Smart Images

Figure CN115288703B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of orifice pipes, in particular to an orifice pipe structure and a construction method for preventing the wear and breakage of the weld of a freezing pipe joint. Background Art
[0002] The freezing method is a common method used to reinforce the ground in the construction of municipal connection channels and end reinforcement projects. During the application of the freezing method, as the freezing construction time increases, the frozen pipes are prone to breakage, which has always been an important issue affecting the application of the freezing method. During the freezing construction process, the frozen pipes are usually connected by welding, and the frozen pipes and the orifice pipes are also fixedly connected by welding; and the frozen pipe joints are generally considered to be the weaker parts of the frozen pipes. Most of the common frozen pipe fractures during construction are also caused by damage to the frozen pipe joints. There are mainly two reasons for this: on the one hand, during the freezing process, the mechanical properties of the frozen pipe joints cannot adapt to the shrinkage and deformation of the frozen wall after temperature changes, resulting in the fracture of the frozen pipe joints; for this reason, the only way is to improve the mechanical properties of the frozen drill rod material and reduce the risk of fracture of the frozen pipe joints. On the other hand, when the freezing pipe drill rod is drilling, the drilling circulating fluid flows out through the gap between the freezing pipe drill rod and the orifice pipe. In the sandy stratum, gravel easily enters the gap between the freezing pipe drill rod and the orifice pipe along with the drill rod circulating fluid, resulting in the subsequent freezing construction process. Gravel reaches the welding part of the freezing pipe and the orifice pipe, causing wear of the freezing pipe joint weld, and even causing the freezing pipe drill rod to break at the freezing pipe joint. Therefore, how to prevent gravel from wearing the freezing pipe joint weld is an important way to solve the problem of freezing pipe breakage. Summary of the invention
[0003] To this end, the technical problem to be solved by the present invention is to provide a hole pipe structure and construction method for preventing the wear and breakage of the freezing pipe joint weld, so as to solve the problem of wear and breakage of the freezing pipe joint weld caused by sand and gravel entering the gap between the freezing pipe drill rod and the hole pipe along with the drill rod circulating fluid when the freezing pipe drill rod is drilling.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0005] A hole pipe structure for preventing the wear and breakage of the weld of a freezing pipe joint, comprising an hole inner sleeve, an hole outer sleeve and a sealing mechanism; the hole inner sleeve has a first axial cavity, a freezing pipe drill rod passes through the first axial cavity, a first annular gap is formed between the hole inner sleeve and the freezing pipe drill rod, the sealing mechanism is located in the first annular gap, and the hole inner sleeve and the freezing pipe drill rod are sealed and matched through the sealing mechanism; the hole outer sleeve is sleeved on the hole inner sleeve, a second annular gap is formed between the hole inner sleeve and the hole outer sleeve, a second ball valve is installed on the hole outer sleeve, and the second ball valve is fluidically connected to the second annular gap.
[0006] The orifice pipe structure for preventing wear and breakage of the weld of the freezing pipe joint is as follows: at the end away from the soil-facing side: the orifice inner sleeve and the orifice outer sleeve are both fixedly connected to an end face of the same flange; at the end adjacent to the soil-facing side: the orifice inner sleeve and the orifice outer sleeve are fixedly connected via a support rod located in the second annular gap.
[0007] The above-mentioned orifice pipe structure that prevents wear and breakage of the welding joint of the freezing pipe joint, the other end face of the flange is fixedly connected to the first ball valve by screws; the first ball valve has a second axial cavity, and one end of the freezing pipe drill rod passes through the second axial cavity and the first axial cavity in turn and extends into the bottom of the drill hole.
[0008] The above-mentioned orifice pipe structure for preventing wear and breakage of the weld of the freezing pipe joint, the sealing mechanism includes a sealing member, a limiting ring, a first rubber ring, a second rubber ring, a cylindrical slider and a spring; in the first annular gap, from the end adjacent to the soil-facing side to the end away from the soil-facing side are the limiting ring, the first rubber ring, the sealing member, the second rubber ring, the cylindrical slider and the spring in sequence; the limiting ring is fixedly mounted on the inner wall of the orifice inner casing, the first rubber ring, the second rubber ring, the cylindrical slider and the spring are all mounted on the freezing pipe drill rod; the sealing member fills the first annular gap between the first rubber ring and the second rubber ring; one end of the spring abuts against the cylindrical slider, and the other end abuts against the first ball valve.
[0009] The orifice pipe structure for preventing the weld of the freezing pipe joint from being worn and broken, the sealing element is a skeleton oil seal or a packing.
[0010] The orifice pipe structure for preventing the wear and breakage of the weld of the freezing pipe joint is characterized in that hemp silk is wrapped around the outer sleeve of the orifice.
[0011] A construction method for preventing wear and fracture of a freezing pipe joint weld, wherein a hole pipe structure for preventing wear and fracture of a freezing pipe joint weld is used for drilling construction, and the hole pipe structure for preventing wear and fracture of a freezing pipe joint weld comprises a hole inner casing, a hole outer casing and a sealing mechanism; the hole inner casing has a first axial cavity, a freezing pipe drill rod passes through the first axial cavity, a first annular gap is formed between the hole inner casing and the freezing pipe drill rod, the sealing mechanism is located in the first annular gap, and the hole inner casing and the freezing pipe drill rod are sealed and matched through the sealing mechanism; the hole outer casing is sleeved on the hole inner casing, a second annular gap is formed between the hole inner casing and the hole outer casing, a second ball valve is installed on the hole outer casing, and the second ball valve is in fluid communication with the second annular gap;
[0012] At the end away from the soil facing side: the orifice inner sleeve and the orifice outer sleeve are both fixedly connected to an end surface of the same flange; at the end adjacent to the soil facing side: the orifice inner sleeve and the orifice outer sleeve are fixedly connected via a support rod located in the second annular gap;
[0013] The other end surface of the flange is fixedly connected to the first ball valve by screws; the first ball valve has a second axial cavity, and one end of the freezing pipe drill rod sequentially passes through the second axial cavity and the first axial cavity and extends into the bottom of the borehole;
[0014] The construction method to prevent the wear and breakage of the weld of the frozen pipe joint specifically includes the following steps:
[0015] Step A: according to the orifice pipe structure for preventing wear and breakage of the weld of the freezing pipe joint, assemble the orifice inner sleeve, the orifice outer sleeve and the flange, and lower them into the drilled hole;
[0016] Step B: installing the sealing mechanism in the first annular gap formed by the freezing pipe drill rod and the inner casing of the orifice;
[0017] Step C: fixing the first ball valve to the flange through the screws;
[0018] Step D: construct a freezing pipe drill rod and open the second ball valve so that during the drilling process, the drilling circulating fluid is discharged from the second ball valve.
[0019] The above-mentioned construction method for preventing wear and breakage of the weld of the freezing pipe joint, the sealing mechanism includes a sealing member, a limiting ring, a first rubber ring, a second rubber ring, a cylindrical slider and a spring; in the first annular gap, from the end adjacent to the soil-facing side to the end away from the soil-facing side are the limiting ring, the first rubber ring, the sealing member, the second rubber ring, the cylindrical slider and the spring in sequence; the limiting ring is fixedly mounted on the inner wall of the inner sleeve of the orifice, and the first rubber ring, the second rubber ring, the cylindrical slider and the spring are all mounted on the freezing pipe drill rod; the sealing member fills the first annular gap between the first rubber ring and the second rubber ring; one end of the spring abuts against the cylindrical slider, and the other end abuts against the first ball valve.
[0020] In the above construction method for preventing wear and fracture of the weld of a freezing pipe joint, the sealing member is a skeleton oil seal or a packing.
[0021] The above construction method for preventing the wear and breakage of the weld of the freezing pipe joint is that hemp silk is wrapped around the outer sleeve of the hole.
[0022] The technical solution of the present invention achieves the following beneficial technical effects:
[0023] The orifice pipe of the present invention comprises an orifice inner casing and an orifice outer casing, and a sealing mechanism is installed between the orifice inner casing and the freezing pipe drill rod. Compared with the single-layer orifice pipe in the prior art, this structure can effectively prevent gravel in the formation from entering the gap between the orifice pipe and the freezing pipe drill rod along with the drilling circulating fluid, thereby preventing the wear and breakage of the freezing pipe joint weld caused by gravel.
[0024] The setting of the support rod can, on the one hand, connect the inner sleeve of the orifice and the outer sleeve of the orifice to prevent the second annular gap from being deformed, and on the other hand, block larger gravel from entering the second annular gap to avoid clogging of the second annular gap; the seal (skeleton oil seal or packing) in the sealing mechanism has a sealing effect on the first annular gap; the limit ring can limit the seal, the first rubber ring, the second rubber ring, the cylindrical slider and the spring in the first annular gap to prevent the seal from moving as the frozen drill rod is drilled; the setting of the cylindrical slider and the spring can ensure that the seal is densely filled in the annular space to achieve effective sealing of the first annular gap. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 A schematic diagram of an orifice pipe structure for preventing wear and breakage of a freezing pipe joint weld in an embodiment of the present invention;
[0026] Figure 2 The present invention Figure 1 Enlarged view of point A in the middle.
[0027] The reference numerals in the figure are as follows: 1-freezing pipe drill rod; 2-support rod; 3-limiting ring; 4-inner casing of the orifice; 5-outer casing of the orifice; 6-cylindrical slider; 7-spring; 8-screw; 9-first rubber ring; 10-first ball valve; 11-second ball valve; 12-soil side; 13-second rubber ring; 14-seal; 15-flange. DETAILED DESCRIPTION
[0028] Example 1
[0029] The orifice pipe structure of this embodiment to prevent the freezing pipe joint weld from wearing and breaking is as follows Figure 1 As shown, it includes an orifice inner casing 4, an orifice outer casing 5 and a sealing mechanism; the orifice inner casing 4 has a first axial cavity, the freezing pipe drill rod 1 passes through the first axial cavity, a first annular gap is formed between the orifice inner casing 4 and the freezing pipe drill rod 1, the sealing mechanism is located in the first annular gap, and the orifice inner casing 4 and the freezing pipe drill rod 1 are sealed and matched through the sealing mechanism; the orifice outer casing 5 is sleeved on the orifice inner casing 4, a second annular gap is formed between the orifice inner casing 4 and the orifice outer casing 5, a second ball valve 11 is installed on the orifice outer casing 5, and the second ball valve 11 is fluidically connected with the second annular gap.
[0030] At the end away from the soil-facing side 12: the orifice inner sleeve 4 and the orifice outer sleeve 5 are both fixedly connected to an end face of the same flange 15; at the end adjacent to the soil-facing side 12: the orifice inner sleeve 4 and the orifice outer sleeve 5 are fixedly connected via a support rod 2 located in the second annular gap; the orifice outer sleeve 5 is wrapped with hemp thread.
[0031] The other end face of the flange 15 is fixedly connected to the first ball valve 10 by means of screws 8; the first ball valve 10 has a second axial cavity, and one end of the freezing pipe drill rod 1 sequentially passes through the second axial cavity and the first axial cavity and extends into the bottom of the borehole.
[0032] like Figure 2As shown, the sealing mechanism includes a sealing member 14, a limiting ring 3, a first rubber ring 9, a second rubber ring 13, a cylindrical slider 6 and a spring 7; in the first annular gap, from the end adjacent to the soil-facing side 12 to the end away from the soil-facing side 12, there are the limiting ring 3, the first rubber ring 9, the sealing member 14, the second rubber ring 13, the cylindrical slider 6 and the spring 7 in sequence; the limiting ring 3 is fixedly mounted on the inner wall of the inner sleeve 4 of the orifice, and the first rubber ring 9, the second rubber ring 13, the cylindrical slider 6 and the spring 7 are all sleeved on the freezing pipe drill rod 1; the sealing member 14 is filled in the first annular gap between the first rubber ring 9 and the second rubber ring 13; one end of the spring 7 abuts against the cylindrical slider 6, and the other end abuts against the first ball valve 10; the sealing member 14 is a skeleton oil seal.
[0033] Example 2
[0034] The construction is carried out using the orifice pipe structure for preventing the wear and fracture of the weld of the freezing pipe joint of Example 1, which specifically includes the following steps:
[0035] Step A: according to the orifice pipe structure for preventing wear and fracture of the weld of the freezing pipe joint in Example 1, the orifice inner sleeve 4, the orifice outer sleeve 5 and the flange 15 are assembled and lowered into the drilled hole; the drilling depth is to drill through the outermost steel bar of the pipe segment or the ground-connected wall, and the reserved protective layer is not drilled through temporarily to prevent the formation water and soil from entering the borehole and causing water and sand gushing;
[0036] Step B: installing the sealing mechanism in the first annular gap formed by the freezing pipe drill rod 1 and the inner casing 4 of the orifice;
[0037] Step C: fixing the first ball valve 10 to the flange 15 via the screws 8;
[0038] Step D: construct a freezing pipe drill rod and open the second ball valve 11 so that the drilling circulating fluid can leak out from the second ball valve 11 during the drilling process; due to the sealing effect of the sealing mechanism, gravel can be prevented from entering the first annular gap formed between the casing 4 in the hole and the freezing pipe drill rod 1 along with the drilling circulating fluid, thereby reducing the risk of wear and breakage of the freezing pipe joint weld caused by gravel.
[0039] In this embodiment, the setting of the support rod can, on the one hand, connect the inner sleeve of the orifice and the outer sleeve of the orifice to prevent the second annular gap from being deformed, and on the other hand, block larger-sized gravel from entering the second annular gap to avoid clogging of the second annular gap; the seal in the sealing mechanism, that is, the skeleton oil seal, has a sealing effect on the first annular gap; the limit ring can limit the seal, the first rubber ring, the second rubber ring, the cylindrical slider and the spring in the first annular gap to prevent the seal from moving as the frozen drill rod is drilled; the setting of the cylindrical slider and the spring can ensure that the seal is densely filled in the annular space to achieve effective sealing of the first annular gap.
[0040] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the claims of this patent application.
Claims
1. An orifice pipe structure for preventing wear and breakage of the weld of a freezing pipe joint, characterized in that: The invention comprises an orifice inner casing (4), an orifice outer casing (5) and a sealing mechanism; the orifice inner casing (4) has a first axial cavity, a freezing pipe drill rod (1) passes through the first axial cavity, a first annular gap is formed between the orifice inner casing (4) and the freezing pipe drill rod (1), the sealing mechanism is located in the first annular gap, and the orifice inner casing (4) and the freezing pipe drill rod (1) are sealed and matched through the sealing mechanism; the orifice outer casing (5) is sleeved on the orifice inner casing (4), a second annular gap is formed between the orifice inner casing (4) and the orifice outer casing (5), a second ball valve (11) is installed on the orifice outer casing (5), and the second ball valve (11) is in fluid communication with the second annular gap; At the end away from the soil-facing side (12), the orifice inner sleeve (4) and the orifice outer sleeve (5) are both fixedly connected to an end face of the same flange (15); at the end adjacent to the soil-facing side (12), the orifice inner sleeve (4) and the orifice outer sleeve (5) are fixedly connected via a support rod (2) located in the second annular gap; the other end face of the flange (15) is fixedly connected to the first ball valve (10) via a screw (8); the first ball valve (10) has a second axial cavity, and one end of the freezing pipe drill rod (1) passes through the second axial cavity and the first axial cavity in sequence and extends into the bottom of the borehole.
2. The orifice pipe structure for preventing wear and breakage of the weld of a freezing pipe joint according to claim 1, characterized in that: The sealing mechanism comprises a sealing member (14), a limiting ring (3), a first rubber ring (9), a second rubber ring (13), a cylindrical slider (6) and a spring (7); in the first annular gap, from the end adjacent to the soil facing side (12) to the end away from the soil facing side (12), the limiting ring (3), the first rubber ring (9), the sealing member (14), the second rubber ring (13), the cylindrical slider (6) and the spring (7) are arranged in sequence; the limiting ring (3) is fixedly mounted on the inner wall of the inner sleeve (4) of the orifice, and the first rubber ring (9), the second rubber ring (13), the cylindrical slider (6) and the spring (7) are all sleeved on the freezing pipe drill rod (1); the sealing member (14) is filled in the first annular gap between the first rubber ring (9) and the second rubber ring (13); one end of the spring (7) abuts against the cylindrical slider (6), and the other end abuts against the first ball valve (10).
3. The orifice pipe structure for preventing wear and breakage of the weld of a freezing pipe joint according to claim 2, characterized in that: The sealing element (14) is a skeleton oil seal or a packing.
4. The orifice pipe structure for preventing wear and breakage of the weld of a freezing pipe joint according to claim 1, characterized in that: The outer sleeve (5) of the orifice is wrapped with hemp silk.
5. A construction method for preventing wear and breakage of the weld of a frozen pipe joint, characterized in that: A borehole pipe structure for preventing the wear and fracture of the weld of a freezing pipe joint is used for drilling construction. The borehole pipe structure for preventing the wear and fracture of the weld of a freezing pipe joint comprises an inner borehole casing (4), an outer borehole casing (5) and a sealing mechanism; the inner borehole casing (4) has a first axial cavity, a freezing pipe drill rod (1) passes through the first axial cavity, a first annular gap is formed between the inner borehole casing (4) and the freezing pipe drill rod (1), the sealing mechanism is located in the first annular gap, and the inner borehole casing (4) and the freezing pipe drill rod (1) are sealed by the sealing mechanism; the outer borehole casing (5) is sleeved on the inner borehole casing (4), a second annular gap is formed between the inner borehole casing (4) and the outer borehole casing (5), a second ball valve (11) is installed on the outer borehole casing (5), and the second ball valve (11) is in fluid communication with the second annular gap; At the end away from the soil facing side (12), the orifice inner sleeve (4) and the orifice outer sleeve (5) are both fixedly connected to an end surface of the same flange (15); at the end adjacent to the soil facing side (12), the orifice inner sleeve (4) and the orifice outer sleeve (5) are fixedly connected via a support rod (2) located in the second annular gap; The other end surface of the flange (15) is fixedly connected to the first ball valve (10) by means of screws (8); the first ball valve (10) has a second axial cavity, and one end of the freezing pipe drill rod (1) passes through the second axial cavity and the first axial cavity in sequence and extends into the bottom of the borehole; The construction method to prevent the wear and breakage of the weld of the frozen pipe joint specifically includes the following steps: Step A: according to the orifice pipe structure for preventing the wear and breakage of the weld of the freezing pipe joint, the orifice inner sleeve (4), the orifice outer sleeve (5) and the flange (15) are assembled and lowered into the drilled hole; Step B: installing the sealing mechanism in the first annular gap formed by the freezing pipe drill rod (1) and the inner casing (4) of the orifice; Step C: fixing the first ball valve (10) to the flange (15) via the screws (8); Step D: construct a freezing pipe drill rod and open the second ball valve (11) so that during the drilling process, the drilling circulating fluid can be discharged from the second ball valve (11).
6. The construction method for preventing wear and breakage of the weld of a freezing pipe joint according to claim 5, characterized in that: The sealing mechanism comprises a sealing member (14), a limiting ring (3), a first rubber ring (9), a second rubber ring (13), a cylindrical slider (6) and a spring (7); in the first annular gap, from the end adjacent to the soil facing side (12) to the end away from the soil facing side (12), the limiting ring (3), the first rubber ring (9), the sealing member (14), the second rubber ring (13), the cylindrical slider (6) and the spring (7) are arranged in sequence; the limiting ring (3) is fixedly mounted on the inner wall of the inner sleeve (4) of the orifice, and the first rubber ring (9), the second rubber ring (13), the cylindrical slider (6) and the spring (7) are all sleeved on the freezing pipe drill rod (1); the sealing member (14) is filled in the first annular gap between the first rubber ring (9) and the second rubber ring (13); one end of the spring (7) abuts against the cylindrical slider (6), and the other end abuts against the first ball valve (10).
7. The construction method for preventing wear and breakage of the weld of a freezing pipe joint according to claim 6, characterized in that: The sealing element (14) is a skeleton oil seal or a packing.
8. The construction method for preventing wear and breakage of the weld of a freezing pipe joint according to claim 5, characterized in that: Hemp thread is wound around the orifice outer sleeve (5).