By constructing an equivalent model of the open-loop power grid with electrical characteristics and a retrospective local expansion method based on source-load nodes, the problem of relying on human experience and computational complexity of the existing open-loop partitioning method of the electromagnetic ring network is solved, and higher quality is achieved. The zoning reduces the short-circuit current and improves the power supply capacity of the grid.

CN115347555BActive Publication Date: 2024-10-18BAODING KECHANG ELECTRICAL CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210945959.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-08
Publication Date
2024-10-18
Estimated Expiration
2042-08-08

AI Technical Summary

Technical Problem

The existing open-loop partitioning method of electromagnetic ring network relies on human experience, has complex calculations and long calculation cycles, cannot effectively handle negative weight edges, affects the accuracy of partitioning, and is difficult to deal with local line overload problems.

Method used

Construct an equivalent model of the open-loop power grid that takes into account the electrical characteristics of the source-load, adopt the retrospective local expansion method based on the source-load node, and achieve the overlapping community division of the electromagnetic ring network through the load extraction factor and improved expansion modularity method, reducing the short-circuit current outside the station and ensure that the short-circuit current within the station is within a reasonable range.

Benefits of technology

It effectively solves the local line overload problem in the open-loop partitioning method, improves the quality of partitioning, reduces the short-circuit current in the station, and improves the power supply capacity and load balance of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115347555B_ABST
    Figure CN115347555B_ABST
Patent Text Reader

Abstract

An electromagnetic ring network open-loop partitioning method considering busbar splitting and disconnection measures includes: step 1, constructing an open-loop partitioned power grid equivalent model considering electrical characteristics; step 2: proposing a retrospective local expansion method based on source-load nodes to obtain the initial partitioning of overlapping communities; step 3, merging the initial overlapping communities to realize the division of the electromagnetic ring network overlapping communities. The modeling process of the invention is practical and simple, effectively solves the problem of local line overload in the open-loop partitioning method, and improves the quality of the open-loop partitioning method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of electric power systems, and in particular relates to an electromagnetic ring network open-loop partitioning method taking into account busbar split operation and disconnection measures. Background Art

[0002] my country currently has problems such as the 500 / 200kV receiving-end power grid structure being too tight and intricate and unclear, the probability of cascading failures in the interconnected power grid increasing, the short-circuit current exceeding the standard, and the weak adaptability of the grid vision access. This has seriously restricted the safe operation level and high-quality development of the power grid in Sanhua area. In this regard, the power guidelines have clearly pointed out that the power grid should be reasonably open-loop partitioned in time to eliminate the impact of the ring network. Therefore, it is urgent to study a practical and effective electromagnetic ring network open-loop partitioning method with strong engineering applicability.

[0003] At present, the generation methods of open-loop partitioning methods mainly include artificial experience open-loop method and open-loop partitioning method generation method based on community discovery algorithm in complex network theory. Artificial experience open-loop method mainly generates open-loop method based on the work experience of staff. Although this method can guarantee the needs of safe operation of the system to a certain extent, it is too dependent on artificial experience, is very subjective, and the calculation is too complicated, and the calculation cycle of method generation is long. The generation algorithm of open-loop partitioning method based on complex network theory can be divided into two categories: splitting algorithm and agglomeration algorithm. The more typical splitting algorithm is GN splitting algorithm, which searches for the line with the largest edge betweenness to disconnect, stops partitioning and generates open-loop partitioning method after meeting certain partitioning conditions. The more typical agglomeration algorithm is Dijkstra algorithm in "Yang Nan, Liu Junhao, Chen Daojun. Research on Generation Method of Open-loop Partitioning Method of Electromagnetic Ring Network Considering Regional Source-Load Balance [J / OL] Journal of the Chinese Society of Electrical Engineering", which takes the combined standby 500kV substation as the central search starting point, searches for 220kV substation nodes through the improved Dijkstra algorithm and adds them to each partition to generate an open-loop partitioning method. The above method has certain reference significance, but it still has some shortcomings, such as over-reliance on human experience, complex calculations, long calculation cycles generated by the method, and inability to handle negative weight edges. These shortcomings often affect the accuracy of the electromagnetic ring network partitioning method.

[0004] Therefore, it is necessary to select a reasonable partitioning algorithm and formulate a practical and effective partitioning method with strong engineering applicability. It is of great significance to study an electromagnetic ring network open-loop partitioning method that considers busbar split operation and disconnection measures. Summary of the invention

[0005] In view of the shortcomings of the prior art, the present invention provides a method for generating an open-loop partitioning method for an electromagnetic ring network taking into account busbar split operation and disconnection measures. An open-loop power grid equivalent model taking into account source-load electrical characteristics is constructed, and on this basis, a retrospective local expansion method based on source-load nodes is proposed to obtain overlapping initial communities, and a main transformer allocation method based on load absorption factors is constructed. The division of overlapping communities of the electromagnetic ring network is achieved by using an initial community merging method with improved expansion modularity. This partitioning method effectively solves the problem of overlapping partitioning, which can not only reduce the short-circuit current outside the station, but also ensure that the short-circuit current inside the station is within a reasonable range, thereby improving the quality of the open-loop partitioning method.

[0006] The purpose of the present invention is to effectively solve the problem of local line overload in the open-loop partitioning method and improve the quality of the open-loop partitioning method, and to provide an electromagnetic ring network open-loop partitioning method generation method that takes into account busbar split operation and line break measures.

[0007] A method for generating an electromagnetic ring network open-loop partition method considering busbar split operation and disconnection measures, comprising the following steps:

[0008] Step 1: Construct an open-loop partitioned power grid equivalent model considering electrical characteristics;

[0009] Step 2: Propose a backtracking local expansion method based on source-load nodes to obtain overlapping initial communities;

[0010] Step 3: Merge the initial overlapping communities to realize the division of overlapping communities of the electromagnetic ring network;

[0011] In step 1, when constructing an open-loop partitioned power grid equivalent model considering electrical characteristics, the actual power grid is equivalent to a directed weighted graph D = {V, E, W} with electrical attributes, where V = {v 1 ,v 2 ,...,v n}, E={e 1 ,e 2 ,...,e m} are the node set and edge set in the weighted topological graph, v 1 ,v 2 ,...,v n represents the nodes corresponding to substation 1 to substation n, e 1 ,e 2 ,...,e m represents the edge corresponding to branches 1 to m, n and m represent the number of substations and branches in the graph respectively; W is the weight set of the edges in the topological graph, which represents the structural characteristics and flow characteristics of the power grid. Figure 2 This is the topological diagram of the high and low voltage power grid.

[0012] In order to reflect the connection relationship between nodes, we use the edge set E and the weight set W to establish the adjacency matrix A = (a ij ) i,j=1,...,n , which can be expressed as:

[0013]

[0014] Where: w ij is the edge weight, if there is a directed branch from vi to vj, a ij =w ij , otherwise a ij =0.

[0015] In the network, edge weight is usually used to represent the connection strength between nodes, and the edge weight in the power grid is usually reflected by the branch admittance. However, this can only characterize the structural characteristics of the power grid, but not its operating characteristics. Therefore, considering the admittance and power flow, the edge weight matrix W = (w ij ) i,j=1,...,n The definitions are as follows:

[0016] W=W s *W o (2)

[0017] Where: W s and W O are the structural characteristic weight and the operational characteristic weight, respectively, and are defined by equations (3) and (5).

[0018]

[0019] Take the susceptance as w s The elements in the matrix are:

[0020]

[0021] Where: B i,j Represents node v i and node v j The admittance of the branch between Represents the elements in the edge weight matrix.

[0022]

[0023] The active power between nodes is used as w o The elements of , namely:

[0024]

[0025] Where: p i,j For node v i Flow to node v j The active power. wo The elements in .

[0026] In step 2, the backtracking local expansion method uses the Tan node as the seed and traverses the power supply node until the source node according to the hierarchical structure defined in the adjacency matrix A; at the same time, according to the modular Q-increasing principle, the traversed nodes are saved in the corresponding community to form a partitioned initial community set, including the following sub-steps:

[0027] 2-1) Calculate the node weights and obtain the source node set and seed node set;

[0028] 2-2) According to the hierarchical structure defined in the adjacency matrix A, find the power supply node of the seed as its frontier node set. The frontier node is defined as follows:

[0029]

[0030] Where: C vs is the seed node v s The corresponding community; j is the node of the jth substation, V is the node set in the weighted topology graph, v i is the node of the ith substation, a j,i For elements in a collection.

[0031] 2-3) Calculate the distance between the seed and its frontier node;

[0032] 2-4) Calculate the increment ΔQ of modularity when the frontier node is merged into the seed node community. When ΔQ is greater than 0, the frontier node joins the seed node community.

[0033] 2-5) Repeat steps 2-2) to 2-4) until all nodes have searched for the source node.

[0034] The source node is a node with pure power outflow in the power grid, and the tank node is a node with pure power inflow in the power grid;

[0035] Calculate the node weights based on the power flow relationship of the substation; v i The node weight S(v i ) is defined as follows:

[0036]

[0037] Where: and They are v i The weighted out-degree and weighted in-degree of ;

[0038] The input power of the high-voltage substation is not considered in the two-stage electromagnetic ring network of the present invention, so its input power is set to 0. That is, the weight of the source node calculated by equation 7 is ∞, and the weight of the source node is set to 1 for ease of calculation. Therefore, according to the node weight, the source node set and the pool node set are defined as follows:

[0039]

[0040] Where: v i is the node of the i-th substation

[0041] In the study of power grid zoning, electrical distance is usually used to reflect the degree of connection between different sites. Taking into account the structural characteristics and operating characteristics of the power grid, the electrical distance is defined as follows:

[0042]

[0043] Where: w ij is the edge weight

[0044] In addition, in order to prevent the adverse effects of electromagnetic ring network opening on the reliability of power supply, the power balance point is generally selected as the opening point. To this end, we propose a power contribution factor to measure the power balance of the line between two nodes. The power contribution factor is defined as follows:

[0045]

[0046] Where: μ i,j v j v i The power contribution factor is v l With v i The edge running feature weight between them, K is v i The number of nodes powered, v k With v i The edges between them run feature weights.

[0047] Considering the power balance characteristics between nodes in the power grid, the improved electrical distance is:

[0048]

[0049] Where: μ i ,j is v j v i Power contribution factor, w ij is the edge weight.

[0050] The modularity Q, a classic indicator of community evaluation, is introduced as an indicator for judging the quality of partitions in the local expansion process. It is defined as follows:

[0051]

[0052] Where: E i,j represents the edge weight between node i and node j; d i represents the edge weights of all edges connected to node i; d j represents the edge weights of all edges connected to node j, and M represents the edge weights of all edges in the network. i ,c j ) represents nodes vi and v j Partition situation, if node v i and node v j In the same partition, it is 1, otherwise it is 0.

[0053] In step 3, the initial communities generated in step 2 are merged, and reasonable opening points of the electromagnetic ring network and the number of main transformers are determined during the merging process to ensure reasonable power flow distribution and reliable power supply of the power grid after partitioning.

[0054] Step 3.1: Load extraction factor;

[0055] Step 3.1.1: Determine the load draw factor based on the proportion of power drawn from the high voltage substation by the initial community

[0056] This factor is determined by calculating the proportion of power absorbed by each initial community from the high-voltage substation to that substation, the load extraction factor η α,β is defined as follows:

[0057]

[0058] Where: η α ,h is the partition α for the high voltage substation v h The extraction factor, L is connected to the high voltage substation v h The number of low-voltage substations, R is the number of low-voltage substations connected to v in partition α h The number of substations, v r With v h The edge running feature weight between them, K is v i The number of nodes powered, v l With v h The edges between them run feature weights.

[0059] Step 3.1.2: Determine the number of main transformers to be allocated based on the load extraction factor

[0060] According to the load extraction factor, from the hub substation v h The number of main transformers assigned to zone α is:

[0061] number α,h =round(tnumber h *η α,h ) (15)

[0062] Where: tnumber h Yes h The number of transformers in α,h For the partition α, the high voltage substation v h The absorption factor of , round() means rounding.

[0063] The above two steps can obtain the method for allocating the number of main transformers.

[0064] Step 3.2: Evaluate the merged communities based on the improved extended modularity EQ';

[0065] Step 3.2.1: Introduce overlapping partition evaluation index EQ

[0066] EQ is the most commonly used overlapping partition evaluation index. It is defined as follows:

[0067]

[0068] Where: T is the number of communities, c t is the Tth community, O i and O j For node v i and v j The number of communities to which it belongs, d i represents the edge weights of all edges connected to node i; d j represents the edge weights of all edges connected to node j, M represents the edge weights of all edges in the network, and a ij is an element in the adjacency matrix A.

[0069] Step 3.2.2: Introduce source-load balancing factor θ

[0070] Further research found that the value of EQ is only related to the edge weight, so it can only evaluate the quality of the network structure, but cannot reflect the degree of regional source negative balance. Therefore, the present invention introduces the source-load balance coefficient θt to correct EQ, which is defined as follows:

[0071]

[0072] Where: X and Y are the number of high-voltage substation nodes and power plant nodes in community t, respectively. and Respectively, community t x 、v y The weighted out-degree of t,x , Pt,y Represents the power supply capacity of high-voltage substation nodes and power plant nodes in community t.

[0073] Step 3.2.3: Introduce source-load balancing factor θt to correct EQ

[0074] Combined with the source-load balancing factor, the improved expansion modularity is defined as:

[0075]

[0076] Step 3.3 Select the maximum value of EQ' to form a partition method

[0077] The initial communities are continuously merged by the main variable quantity allocation method in step 2 and step 3.1. The value of EQ' is calculated each time a merger is made until only one community is left. The number of communities corresponding to the maximum value of EQ' is selected as the partitioning scheme. For example, the maximum value of EQ' is when only i communities are left after the merger. Then these i communities are the final partitioning scheme.

[0078] Compared with the prior art, the present invention has the following technical effects:

[0079] 1) The electromagnetic ring network open-loop partitioning method proposed in the present invention taking into account busbar split operation and disconnection measures can effectively control the short-circuit current in 220kV substations and 500kV substations;

[0080] 2) The backtracking local extension algorithm (BLE) proposed in this paper can effectively discover the overlapping community structure in the power grid;

[0081] 3) The present invention introduces an overlapping partition structure, which can effectively improve the overall load balancing level of the partition, reasonably distribute the segmented bus load of the 500kV substation, and improve the overall power supply capacity of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0082] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0083] Figure 1 is a flow chart of the partitioning method;

[0084] Figure 2 Simplified models for high and low voltage power system topologies;

[0085] Figure 3 It is a schematic diagram of source-tan node;

[0086] Figure 4 The merging process for IEEE 39-node system;

[0087] Figure 5 This is a schematic diagram of the IEEE 39-node system partitioning;

[0088] Figure 6 Merging processes for initial communities;

[0089] Figure 7 is the actual power grid topology diagram;

[0090] Figure 8 Open loop partitioning methods generated for methods 1 and 2;

[0091] Fig. 9 The open-loop partitioning method generated for method 3;

[0092] Fig.10 Main transformer load factor. DETAILED DESCRIPTION

[0093] A method for generating an electromagnetic ring network open-loop partition method considering busbar split operation and disconnection measures, comprising the following steps:

[0094] Step 1: Construct an open-loop partitioned power grid equivalent model considering electrical characteristics:

[0095] The actual power grid is equivalent to a directed weighted graph D = {V, E, W} with electrical attributes, where V = {v 1 ,v 2 ,...,v n}, E={e 1 ,e 2 ,...,e m} are the node set and edge set in the weighted topological graph, v 1 ,v 2 ,...,v n represents the nodes corresponding to substation 1 to substation n, e 1 ,e 2 ,...,e m represents the edge corresponding to branches 1 to m, n and m represent the number of substations and branches in the graph respectively; W is the weight set of the edges in the topological graph, which represents the structural characteristics and flow characteristics of the power grid. Figure 2 The topology diagram of the high and low voltage power grid is shown.

[0096] In order to reflect the connection relationship between nodes in the graph, we use the edge set E and the weight set W to establish the adjacency matrix A = (a ij ) i,j=1,...,n , which can be expressed as:

[0097]

[0098] Where: w ij is the edge weight, if there is a directed branch with v i Point to v j , a ij =wij , otherwise a ij =0.

[0099] In the network, edge weight is usually used to represent the connection strength between nodes, and the edge weight in the power grid is usually reflected by the branch admittance. However, this can only characterize the structural characteristics of the power grid, but not its operating characteristics. Therefore, considering the admittance and power flow, the edge weight matrix W = (w ij ) i,j=1,...,n The definitions are as follows:

[0100] W=W s *W o (2)

[0101] Where: W s and W O are the structural characteristic weight and the operational characteristic weight, respectively, and are defined by equations (3) and (5).

[0102]

[0103] Take the susceptance as w s The elements in the matrix are:

[0104]

[0105] Where: B i,j Represents node v i and node v j The admittance of the branch between Represents the elements in the edge weight matrix.

[0106]

[0107] The active power between nodes is used as w o The elements of , namely:

[0108]

[0109] Where: p i,j For node v i Flow to node v j The active power. w o The elements in .

[0110] Step 2: Propose a backtracking local expansion method based on source-load nodes to obtain the initial partition of overlapping communities;

[0111] Step 2.1: Seed selection;

[0112] The seed is the starting point of the local expansion process and is of great significance for discovering high-quality communities. Considering the characteristics of the flow, the present invention introduces the source node and the pool node as the end point and the starting point of the local expansion process. The definition is as follows, and its schematic diagram is as follows: Figure 3 As shown:

[0113] (a) Source node: The source node is a pure power outflow node in the power grid.

[0114] (b) Tan node: Tan node is a node with pure power inflow in the power grid.

[0115] In order to determine the source node and the sink node, the node weight is calculated according to the power flow relationship of the substation. i The node weight S(v i ) is defined as follows:

[0116]

[0117] Where: and They are v i The weighted out-degree and weighted in-degree of .

[0118] The input power of the high-voltage substation is not considered in the two-stage electromagnetic ring network of the present invention, so its input power is set to 0. That is, the weight of the source node calculated by equation 7 is ∞, and the weight of the source node is set to 1 for ease of calculation. Therefore, according to the node weight, the source node set and the pool node set are defined as follows:

[0119]

[0120] Step 2.2: Local expansion process;

[0121] Step 2.2.1: Electrical distance;

[0122] In the study of power grid zoning, electrical distance is usually used to reflect the degree of connection between different sites. Considering the structural characteristics and operating characteristics of the power grid, the electrical distance is defined as follows:

[0123]

[0124] Where: w ij is the edge weight.

[0125] In addition, in order to prevent the adverse effects of electromagnetic ring network opening on the reliability of power supply, the power balance point is generally selected as the opening point. To this end, we propose a power contribution factor to measure the power balance degree of the line between two nodes, which is defined as follows:

[0126]

[0127] Where: μ i,jv j v i The power contribution factor is v l With v i The edge running feature weight between them, K is v i The number of nodes powered, v k With v i The edges between them run feature weights.

[0128] Considering the power balance characteristics between nodes in the power grid, the improved electrical distance is:

[0129]

[0130] Where: μ i,j v j v i Power contribution factor, w ij is the edge weight.

[0131] Step 2.2.2: Modularity index Q;

[0132] The modularity Q, a classic indicator of community evaluation, is introduced as an indicator for judging the quality of partitions in the local expansion process. It is defined as follows:

[0133]

[0134] Where: E i,j represents the edge weight between node i and node j; d i represents the edge weights of all edges connected to node i; d j represents the edge weights of all edges connected to node j, and M represents the edge weights of all edges in the network. i ,c j ) represents node v i and node v j Partition situation, if node v i and node v j In the same partition, it is 1, otherwise it is 0.

[0135] Step 2.2.3: Backtracking local expansion method;

[0136] Considering the flow characteristics of power grid operation, a backtracking expansion method is proposed. Taking the Tan node as the seed, the power supply node is traversed until the source node according to the hierarchical structure defined in the adjacency matrix A. At the same time, in this process, according to the modular Q increasing principle, the traversed nodes are saved in the corresponding community to form the partition initial community set. The steps are as follows:

[0137] Step 2.2.3.1: Calculate the node weights and obtain the source node set and seed node set.

[0138] Step 2.2.3.2: According to the hierarchy defined in the adjacency matrix A, find the power supply nodes of the seed as its frontier node set. The frontier nodes are defined as follows:

[0139]

[0140] Where: C vs is the seed node v s The corresponding community; j is the node of the jth substation, V is the node set in the weighted topology graph, v i is the node of the ith substation, a j,i Represents the elements in the adjacency matrix A.

[0141] Step 2.2.3.3: Calculate the distance between the seed and its frontier nodes;

[0142] Step 2.2.3.4: Calculate the increment ΔQ of modularity when the frontier node is merged into the seed node community. When ΔQ is greater than 0, the frontier node joins the seed node community.

[0143] Step 2.2.3.5: Repeat steps 2.2.3.2-2.2.3.4 until all nodes have searched for the source node.

[0144] Step 3: Merge the initial overlapping communities to realize the division of overlapping communities of the electromagnetic ring network;

[0145] The initial communities generated in step 2 above are merged, and reasonable opening points of the electromagnetic ring network and the allocation method of the main transformer are determined during the merging process to ensure reasonable power flow distribution and reliable power supply of the power grid after partitioning.

[0146] Step 3.1: Load extraction factor;

[0147] Step 3.1.1: Determine the load draw factor based on the proportion of power drawn from the high voltage substation by the initial community

[0148] This factor is determined by calculating the proportion of power absorbed by each initial community from the high-voltage substation to that substation, the load extraction factor η α,β is defined as follows:

[0149]

[0150] Where: η α,h For the partition α, the high voltage substation v h The extraction factor, L is connected to the high voltage substation v h The number of low-voltage substations, R is the number of low-voltage substations connected to v in partition α hThe number of substations, v r With v h The edge running feature weight between them, K is v i The number of nodes powered, v l With v h The edges between them run feature weights.

[0151] Step 3.1.2: Determine the number of main transformers to be allocated based on the load extraction factor

[0152] According to the load extraction factor, from the hub substation v h The number of main transformers assigned to zone α is:

[0153] number α,h =round(tnumber h *η α,h ) (15)

[0154] Where: tnumber h Yes h The number of transformers in α ,h is the partition α for the high voltage substation v h The extraction factor of , round() means rounding. The above two steps can get the main variable allocation quantity method.

[0155] Step 3.2: Evaluate the merged communities based on the improved extended modularity EQ';

[0156] Step 3.2.1: Introduce overlapping partition evaluation index EQ

[0157] EQ is the most commonly used overlapping partition evaluation index. It is defined as follows:

[0158]

[0159] Where: T is the number of communities, c t is the Tth community, O i and O j For node v i and v j The number of communities to which it belongs, d i represents the edge weights of all edges connected to node i; d j represents the edge weights of all edges connected to node j, M represents the edge weights of all edges in the network, and a ij is an element in the adjacency matrix A.

[0160] Step 3.2.2: Introduce source-load balancing factor θ

[0161] Further research found that the value of EQ is only related to the edge weight, so it can only evaluate the quality of the network structure, but cannot reflect the degree of regional source negative balance. Therefore, the present invention introduces the source-load balancing coefficient θt to correct EQ, which is defined as follows:

[0162]

[0163] Where: X and Y are the number of high-voltage substation nodes and power plant nodes in community t, respectively. and Community tv x 、v y The weighted out-degree of t,x , P t,y Represents the power supply capacity of high-voltage substation nodes and power plant nodes in community t.

[0164] Step 3.2.3: Introduce source-load balancing factor θt to correct EQ

[0165] Combined with the source-load balancing factor, the improved expansion modularity is defined as:

[0166]

[0167] Step 3.3 Select the maximum value of EQ' to form a partition method

[0168] According to the main variable quantity allocation method in step 2 and step 3.1, the initial communities are continuously merged, and the value of EQ' is calculated each time a merger is made until only one community is left. The number of communities corresponding to the maximum value of EQ' is selected as the partitioning scheme. For example, the maximum value of EQ' is when only i communities are left after the merger. At this time, these i communities are the final partitioning scheme.

[0169] Example:

[0170] Simulation verification based on standard examples

[0171] Example Description

[0172] In order to verify the accuracy and effectiveness of the proposed method, the present invention uses the modified New England 10-machine 39-node system as an example for simulation analysis. Since the present method is to solve two voltage level power grids, the present invention adjusts the 39-node system, where 6, 16, and 26 are modified to 500kV substations, and the remaining stations are 220kV substations, and each 500kV substation is equipped with 3 main transformers. The substations are interconnected through 500kV transmission lines to form a 500 / 220kV transmission network. The method of the present invention is used to solve the calculation under this example to obtain the open-loop partitioning method, and the short-circuit current and main transformer load of the system after the implementation of the method are analyzed, thereby verifying the effectiveness and accuracy of the present method in solving the electromagnetic ring network partitioning problem.

[0173] Simulation Results

[0174] At this point, 7 initial communities are formed. The merging process of the initial communities is as follows: Figure 4 As shown. Figure 4 It can be seen that when the system is divided into three communities, the maximum value of EQ is 0.5217. The results are shown in Table 1.

[0175] Table 1 Partitioning method

[0176]

[0177] Results Analysis

[0178] As can be seen from Table 1, the IEEE 39-node system is divided into three overlapping partitions, with overlapping nodes 6, 16, and 26, respectively. At the same time, bus segmentation operation measures are taken at these overlapping nodes. As can be seen from Table 2, the generated partitioning method can control the short-circuit current of all nodes within a reasonable range. Among them, the short-circuit current in substations 6, 16, and 26 has dropped most significantly. The reason is that by introducing an overlapping community structure, these three 500kV substations operate in pairs, providing conditions for taking bus segmentation operation measures. Furthermore, as shown in Table 3, the load rate of the 500kV segmented main transformer is within a reasonable range. On the basis of considering the source load balancing factor, a reasonable bus segmentation method is proposed to avoid unbalanced load distribution.

[0179] Table 2 Short circuit current

[0180]

[0181] Table 3 Main transformer load factor

[0182]

[0183] Simulation verification based on actual examples

[0184] In order to verify the effectiveness of the method of the present invention, the following three methods are used to simulate the actual examples and compare the results:

[0185] Method 1: the traditional open-loop partitioning method based on the non-overlapping community algorithm in the prior art 1, in which only disconnection measures are taken;

[0186] Method 2: Based on method 1, take busbar split operation measures directly for 500kV substations with excessively high short-circuit current;

[0187] Method 3: The method of the present invention, based on the BLE algorithm, considers the disconnection measures and busbar split operation measures in parallel during the generation process of the open-loop partitioning method.

[0188] Example Description

[0189] Take the power grid of a province in central China as an example. The power grid consists of 15 500kV hub substations, 99 220kV substations, 5 thermal power plants and 2 hydropower stations. In this power grid, the 500 / 220kV electromagnetic ring network structure is tight. The short-circuit current of 10 500kV substations and 48 220kV substations exceeds the standard, and the short-circuit current of 8 substations seriously exceeds 70kA. The equivalent topology diagram of the network before partitioning is shown in the figure below: Figure 7 shown.

[0190] Simulation Results

[0191] The results of dividing the power grid using methods 1, 2, and 3 are shown in Table 4. The schematic diagram of the division is shown in Figure 8 , 9 Method 3 generates 28 initial communities, and the merging process is as follows: Figure 6 When EQ' is 0.7132, the optimal partition result is 10 communities.

[0192] Table 4 Open loop partitioning method

[0193]

[0194] As shown in the table, compared with Method 2 and Method 3, Method 1 only adopts disconnection measures and does not adopt busbar split operation measures. Figure 8 , Fig. 9 It can be seen that the partitions generated by methods 1 and 2 are independent of each other, while there are overlapping nodes between the partitions generated by method 3. The reason is that both methods 1 and 2 are based on non-overlapping community discovery algorithms, and the generated power grid partitions are independent of each other, and there are no overlapping substations; while the BLE algorithm used in method 3 is an overlapping community discovery algorithm, and there are partitions in the generated power grid partition method with 500kV substations as overlapping nodes.

[0195] Comparative Analysis

[0196] 1) Necessity analysis of busbar split operation measures during open-loop partitioning

[0197] In order to verify the necessity of introducing busbar split operation measures, the busbar short-circuit current of 220kV substation and the short-circuit current of 500kV substation in Method 1 and Method 2 are firstly compared and analyzed.

[0198] Table 5 Short-circuit current in 500kV substation obtained by method 1 and method 2

[0199]

[0200] As can be seen from Table 5, in the open-loop partitioning method generated by Method 1, there are 7 500kV substations whose busbar short-circuit current exceeds the limit of 50kA; while in Method 2, except for XC and ZZX, the short-circuit currents in other substations are within a reasonable range. This shows that compared with Method 1, Method 2 has a better effect in short-circuit current suppression. The main reason is that the busbar short-circuit current in the 500kV substation mainly comes from the main transformer in the station, and Method 1 only adopts the disconnection measure to formulate the open-loop partitioning method, which has limited effect on the busbar short-circuit current suppression in the 500kV substation. Therefore, only the short-circuit current of the substation with a small number of transformers in the three substations HL, DT, and WC drops below the limit. In contrast, Method 2 not only adopts the disconnection measure but also considers the busbar split operation measure. Since the busbar split operation measure can reduce the number of main transformers injecting short-circuit current into the same section of busbar, the short-circuit current in most 500kV substations in the open-loop partition method generated by method 2 is effectively controlled; for 220kV substations, since the line disconnection measure can increase the electrical distance between substations and reduce the short-circuit current provided by substations from other partitions, method 1 can control the short-circuit current of most 220kV substations within a limited range. However, since there are multiple 500kV substations with the same number of main transformers in the partitions where substations 2, 3, and 8 are located, the short-circuit current of these substations still exceeds the limit. In contrast, method 2 uses busbar split operation measures to control the short-circuit current of all 220kV substations within a limited range.

[0201] Therefore, although the busbar short-circuit current of the 220kV substation can be controlled within a limited range by only disconnecting the line, the short-circuit current suppression effect on the 500kV substation is limited. By further taking the busbar split operation measure, the short-circuit current in both the 220kV substation and the 500kV substation can be controlled within a limited range.

[0202] 2) Necessity analysis of introducing overlapping partition structure

[0203] Firstly, the short-circuit current in the 500 kV substation and the busbar short-circuit current in the 220 kV substation generated by Method 2 and Method 3 are compared and analyzed. The short-circuit current results are shown in Table 6.

[0204] Table 6 Short-circuit current in 500kV substation obtained by method 2 and method 3

[0205]

[0206] As can be seen from Table 6, method 3 can control the 220kV bus short-circuit current of all 500kV substations within 50kA, while the short-circuit current of ZZX in method 2 still exceeds the limit. Because in method 2, partitions 5 and 7 are independent of each other, and the substations js and mzs connected to ZZX are included in community 7. In this case, since ZZX is the only power source for substations js and mzs, the bus split operation measures adopted by ZZX will not meet the N-1 principle. Therefore, in method 2, ZZX does not have the conditions to adopt bus split operation measures; on the contrary, in method 3, ZZX is an overlapping node, and the substations js and mzs connected to it are powered by ZZX and HL at the same time, creating conditions for ZZX to adopt bus split operation measures. Therefore, method 3 can control the short-circuit current in ZZX within a reasonable range. Therefore, the introduction of overlapping partition structure can improve the suppression effect of short-circuit current in 500kV substations.

[0207] In order to further analyze the necessity of introducing overlapping community structure, the load factor of main transformer in the partitioning method generated by method 1, method 2 and method 3 is compared and analyzed. The load factor of main transformer and its variance results are shown as follows: Fig.10 And as shown in Table 7.

[0208] Table 7 Main transformer load factor variance

[0209]

[0210] from Fig.10It can be seen that in Method 1 and Method 2, the main transformers NX.a and NX.b are in a light load state, the main transformers YT.a and YT.b are in a heavy load state, and the load rate of each main transformer in Method 3 is normal. It can be seen from Table 7 that compared with the initial power grid, the load rate variance of Method 1 and Method 2 is significantly increased, and the load rate variance of Method 3 is slightly increased. The main reasons are as follows: 1) Since Method 1 and Method 2 are based on non-overlapping community discovery algorithms, the partitions generated by these methods are independent of each other. For example, the 500kV substation AJC and WC jointly supply power to Partition 2, while NX independently supplies power to Partition 4. Under this partitioning method, since Partition 4 has a lighter load, NX still has a larger power supply margin with a lighter load, but it still cannot supply power to Partition 2. Therefore, at the NX substation, the load rate of the main transformers NX.a and NX.b is 16.6%, which is in a light load state; while Method 3 divides the power grid into overlapping communities, that is, the main transformers of overlapping nodes can realize joint power supply to multiple partitions. That is, AJC is used as an overlapping node to form partitions 9 and 10 with NX and WC respectively. Compared with partition 4 of method 1 and method 2, partition 9 of method 3 includes the 220kV substation cw connected to the 500kV substation AJC. The results show that compared with methods 1 and 2, the load factors of AJC and WC transformers decreased from 58.6% and 47.6% to 41.1% and 44.0%, respectively, while the load factor of NX transformer increased from 16.6% to 30.9%. In addition, the power supply capacity of partition 10 in method 3 is better than that of partition 2 in methods 1 and 2. 2) For YT substation, methods 1 and 2 combine YT and DT substations, disconnect YT and GT, and increase the load supplied by the transformer of YT substation. At the same time, the busbar split operation measures of method 2 further aggravated the load imbalance of the YT transformer, and the load rate of the transformer YT.a increased by 89.2%; while method 3 used YT as an overlapping node, and combined with DT and GT to supply power to partitions 5 and 7 respectively, which means that GT can share the load pressure of YT. Therefore, even with the busbar split operation measures, the transformer load rate in the YT substation can still be controlled below 70%.

[0211] It can be seen that the introduction of overlapping partition structure can improve the overall load balancing rate of the partition, and improve the load balancing of the main transformer in the 500kV substation that adopts busbar split operation measures, thereby increasing the overall power supply capacity of the power grid.

Claims

1. An electromagnetic ring network open-loop partitioning method considering busbar division and disconnection measures, It is characterized in that It includes the following steps: Step 1: Construct an open-loop partitioned power grid equivalent model considering electrical characteristics; Step 2: Propose a backtracking local expansion method based on source-load nodes to obtain overlapping initial communities; Step 3: Merge the initial overlapping communities to realize the division of overlapping communities of the electromagnetic ring network; In step 1, when constructing an open-loop partitioned power grid equivalent model considering electrical characteristics, the actual power grid is equivalent to a directed weighted graph D = {V, E, W} with electrical attributes, where V = {v 1 ,v 2 ,...,v n }, E={e 1 ,e 2 ,...,e m } are the node set and edge set in the weighted topological graph, v 1 ,v 2 ,...,v n represents the nodes corresponding to substation 1 to substation n, e 1 ,e 2 ,...,e m represents the edge corresponding to branches 1 to m, n and m represent the number of substations and branches in the graph respectively; W is the weight set of the edges in the topological graph, which represents the structural characteristics and flow characteristics of the power grid; In step 2, the backtracking local expansion method uses the Tan node as the seed and traverses the power supply nodes until the source node according to the hierarchical structure defined in the adjacency matrix A; at the same time, according to the modular Q-increasing principle, the traversed nodes are saved in the corresponding communities to form an overlapping initial community set; The backtracking local expansion method includes the following sub-steps: 2-1) Calculate the node weights and obtain the source node set and seed node set; 2-2) According to the hierarchical structure defined in the adjacency matrix A, find the power supply node of the seed as its frontier node set. The frontier node is defined as follows: Where: C vs is the seed node v s The corresponding community; j is the node of the jth substation, V is the node set in the weighted topology graph, v i is the node of the i-th substation, 2-3) Calculate the distance between the seed and its frontier node; 2-4) Calculate the increment ΔQ of modularity when the frontier node is merged into the seed node community. When ΔQ is greater than 0, the frontier node joins the seed node community. 2-5) Repeat steps 2-2) to 2-4) until all nodes have searched for the source node; The source node is a power pure outflow node in the power grid, and the Tan node is a power pure inflow node in the power grid; considering the power flow characteristics, the source node and the Tan node are introduced as the end point and the starting point of the local expansion process; In order to determine the source node and the pool node, the node weight is calculated according to the power flow relationship of the substation, v i The node weight S(v i ) is defined as follows: Where: and They are v i The weighted out-degree and weighted in-degree of ; The input power of the high-voltage substation is not considered in the two-stage electromagnetic ring network, so its input power is set to 0, that is, the weight of the source node calculated by equation 7 is ∞. For the convenience of calculation, the weight of the source node is set to 1. Therefore, according to the node weight, the source node set and the pool node set are defined as follows: Where: v i is the node of the i-th substation.

2. The method according to claim 1, It is characterized in that In step 1, in order to reflect the connection relationship between nodes, the edge set E and the weight set W are used to establish the adjacency matrix A = (a ij ) i,j=1,...,n , which can be expressed as: Where: w ij is the edge weight, if there is a directed branch with v i Point to v j , a ij =w ij , otherwise a ij =0;v i ,v j represents the nodes corresponding to substation i and substation j; Considering the admittance and power flow comprehensively, the edge weight matrix W = (w ij ) i,j=1,...,n The definition is as follows: W=W s *IN o (2) Where: W s and W O are the structural characteristic weight and the operational characteristic weight, respectively, defined by equations (3) and (5); Take the susceptance as w s The elements in the matrix are: Where: B i,j Represents node v i and node v j The admittance of the branch between represents the elements in the edge weight matrix; The active power between nodes is used as w o The elements of Where: p i,j For node v i Flow to node v j The active power, w o The elements in .

3. The method according to claim 1, It is characterized in that The electrical distances are defined as follows: Where: w ij is the edge weight; In addition, in order to prevent the adverse effects of electromagnetic ring network opening on the reliability of power supply, the power balance point is selected as the opening point; the power contribution factor is used to measure the power balance degree of the line between the two nodes, and the power contribution factor is defined as follows: Where: μ i,j v j v i The power contribution factor is v l With v i The edge running feature weight between them, K is v i The number of nodes powered, v k With v i The edge running feature weights between them; Considering the power balance characteristics between nodes in the power grid, the improved electrical distance is: Where: μ i,j v j v i Power contribution factor, w ij is the edge weight.

4. The method according to claim 3, It is characterized in that The modularity Q, a classic indicator of community evaluation, is introduced as an indicator for judging the quality of partitions in the local expansion process. It is defined as follows: Where: E i,j represents the edge weight between node i and node j; d i represents the edge weights of all edges connected to node i; d j represents the edge weights of all edges connected to node j, n represents the number of substations, and M represents the edge weights of all edges in the network; δ(c i ,c j ) represents node v i and node v j Partition situation, if node v i and node v j In the same partition, it is 1, otherwise it is 0.

5. The method according to claim 1, It is characterized in that In step 3, the electromagnetic ring network overlapping communities are divided through the following sub-steps: Step 3.1: Construct a method for allocating the number of main transformers based on load extraction factors; Step 3.1.1: Determine the load extraction factor based on the proportion of power absorbed by the initial community from the high-voltage substation to that substation; This factor is determined by calculating the proportion of power absorbed by each initial community from the high-voltage substation to that substation, the load extraction factor η α,β is defined as follows: Where: η α,h For the partition α, the high voltage substation v h The extraction factor, L is connected to the high voltage substation v h The number of low-voltage substations, R is the number of low-voltage substations connected to v in partition α h The number of substations, v r With v h The edge running feature weight between them, K is v i The number of nodes powered, v l With v h The edge running feature weights between them; Step 3.1.2: Determine the number of main transformers to be allocated based on the load absorption factor; According to the load extraction factor, from the hub substation v h The number of main transformers assigned to zone α is: number α,h =round(tnumber h *η α,h ) (15) Where: tnumber h Yes h The number of transformers in α,h For the partition α, the high voltage substation v h The extraction factor, round() means rounding; The above two steps can obtain the main transformer allocation quantity; Step 3.2: Evaluate the merged communities based on the improved extended modularity EQ'; Step 3.2.1: Introduce the overlapping partition evaluation index EQ; The definition of EQ is as follows: Where: T is the number of communities, c t is the Tth community, O i and O j For node v i and v j The number of communities to which it belongs, d i represents the edge weights of all edges connected to node i; d j represents the edge weights of all edges connected to node j, M represents the edge weights of all edges in the network, and a ij is the element in the adjacency matrix A; Step 3.2.2: Introduce source-load balancing factor θ; The source-load balancing coefficient θt is introduced to correct EQ, which is defined as follows: Where: X and Y are the number of high-voltage substation nodes and power plant nodes in community t, respectively. and Respectively, community t x 、v y The weighted out-degree of t,x , P t,y It represents the power supply capacity of high-voltage substation nodes and power plant nodes in community t; Step 3.2.3: Introduce source-load balancing coefficient θt to correct EQ; Combined with the source-load balancing factor, the improved expansion modularity is defined as: Step 3.3: Select the maximum value of EQ' to form a partition method; The initial communities are continuously merged according to the main transformer quantity allocation method in step 2 and step 3.

1. The value of EQ' is calculated each time a merger is made until only one community is left. The number of communities corresponding to the maximum value of EQ' is selected as the partitioning scheme. For example, the maximum value of EQ' is when only i communities are left after the merger, then these i communities are the partitioning scheme.

Citation Information

Patent Citations

  • Methods for determining losses in a distribution network

    DE102013210674A1