Test control methods, systems, apparatus, computer devices, and storage media
By properly scheduling the shutdown and power-off times during the testing of servers and smart network cards, the stability issues caused by inconsistent timing during server and smart network card testing were resolved, ensuring the normal operation of the test program.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- INSPUR SUZHOU INTELLIGENT TECH CO LTD
- Filing Date
- 2022-08-29
- Publication Date
- 2026-06-09
AI Technical Summary
In existing testing technologies for servers and smart network interface cards (NICs), the power-on and power-off timings of the server and the NIC are determined by their respective independently running test programs. This raises the issue that a power outage on one NIC may affect the normal operation of the test program on the other NIC.
When both the first and second test procedures are completed, the control server host performs a shutdown operation, then sends a shutdown signal to the smart network card, and finally instructs the control device to power down the server host and the smart network card. The timing of the shutdown of the server host, the shutdown of the smart network card, and the power-down of the server host are arranged reasonably to ensure the stability of the test process.
By arranging the timing of the testing procedures appropriately, the impact of premature shutdown or power failure of the server host or smart network card on the other party's testing procedures was avoided, thus ensuring the stability and reliability of the testing process.
Smart Images

Figure CN115454744B_ABST