Power transmission and transformation project data centralized processing method
By generating a reference time and marking it with a time stamp in power transmission and transformation projects, the problem of inaccurate timing matching of equipment data in power transmission and transformation projects is solved, and efficient data waveform analysis and accurate electrical parameter judgment are achieved.
CN115690471BActive Publication Date: 2026-06-26STATE GRID HUBEI ELECTRIC POWER RES INST
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- STATE GRID HUBEI ELECTRIC POWER RES INST
- Filing Date
- 2022-09-30
- Publication Date
- 2026-06-26
Smart Images

Figure CN115690471B_ABST
Abstract
The application provides a power transmission and transformation engineering data centralized processing method, comprising the following steps: generating a reference time in a calculation center, sending the reference time to a data detection node, and correcting the reference time according to data transmission time; after receiving the reference time, adjusting the clock of the current detection node according to the reference technology, and generating a time label based on the adjusted clock; after obtaining detection data, adding the time label to the detection data, and sending the detection data with the added time label to the calculation center; the calculation center sets comparison group data according to the time label and a pre-set calculation item, generates a data waveform according to the comparison group data, compares the data waveform with a reference waveform, and obtains a comparison result. Through pre-time calibration, the application can accurately control the time point of data acquisition, obtain data at the same time for calculation and analysis, and obtain accurate results.