Power transmission and transformation project data centralized processing method

By generating a reference time and marking it with a time stamp in power transmission and transformation projects, the problem of inaccurate timing matching of equipment data in power transmission and transformation projects is solved, and efficient data waveform analysis and accurate electrical parameter judgment are achieved.

CN115690471BActive Publication Date: 2026-06-26STATE GRID HUBEI ELECTRIC POWER RES INST

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
STATE GRID HUBEI ELECTRIC POWER RES INST
Filing Date
2022-09-30
Publication Date
2026-06-26

Smart Images

  • Figure CN115690471B_ABST
    Figure CN115690471B_ABST
Patent Text Reader

Abstract

The application provides a power transmission and transformation engineering data centralized processing method, comprising the following steps: generating a reference time in a calculation center, sending the reference time to a data detection node, and correcting the reference time according to data transmission time; after receiving the reference time, adjusting the clock of the current detection node according to the reference technology, and generating a time label based on the adjusted clock; after obtaining detection data, adding the time label to the detection data, and sending the detection data with the added time label to the calculation center; the calculation center sets comparison group data according to the time label and a pre-set calculation item, generates a data waveform according to the comparison group data, compares the data waveform with a reference waveform, and obtains a comparison result. Through pre-time calibration, the application can accurately control the time point of data acquisition, obtain data at the same time for calculation and analysis, and obtain accurate results.
Need to check novelty before this filing date? Find Prior Art